CN219760467U - Distribution operation and maintenance operation rod and distribution operation and maintenance external member - Google Patents

Distribution operation and maintenance operation rod and distribution operation and maintenance external member Download PDF

Info

Publication number
CN219760467U
CN219760467U CN202320329291.3U CN202320329291U CN219760467U CN 219760467 U CN219760467 U CN 219760467U CN 202320329291 U CN202320329291 U CN 202320329291U CN 219760467 U CN219760467 U CN 219760467U
Authority
CN
China
Prior art keywords
socket
maintenance
power distribution
hole
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320329291.3U
Other languages
Chinese (zh)
Inventor
谭友奇
王艳青
谭升旗
谭栩林
尹娅婷
彭玉槐
聂婉芹
唐袆侃成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Yongzhou Power Supply Co of State Grid Hunan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Yongzhou Power Supply Co of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Yongzhou Power Supply Co of State Grid Hunan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202320329291.3U priority Critical patent/CN219760467U/en
Application granted granted Critical
Publication of CN219760467U publication Critical patent/CN219760467U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a power distribution operation and maintenance operating rod which comprises a telescopic rod body, a connector, a first fixing piece, a second fixing piece and a third fixing piece, wherein a socket hole is formed in the top end of the telescopic rod body, an inserting rod is arranged at the bottom end of the connector, the inserting rod is inserted into the socket hole and is fixed in the socket hole through the first fixing piece, a socket groove for inserting a first operating tool and a first mounting part for mounting the second fixing piece are formed in the top end of the connector, the second fixing piece is used for fixing the first operating tool in the socket groove, a sleeving surface is formed in the outer wall surface of the top end of the connector, a second mounting part is arranged on the sleeving surface, an outwards-protruding pressing part is arranged at the top end of the inserting rod, and a graduated scale is arranged on the outer wall of the telescopic rod body. A power distribution operation and maintenance kit is also disclosed, comprising a first type of operation tool, a second type of operation tool, a third type of operation tool and a power distribution operation and maintenance operation lever. The power distribution operation and maintenance operating rod and the power distribution operation and maintenance suite are small in labor intensity, high in working efficiency and convenient to use.

Description

Distribution operation and maintenance operation rod and distribution operation and maintenance external member
Technical Field
The utility model relates to the technical field of electric power safety tools, in particular to a power distribution operation and maintenance operating rod and a power distribution operation and maintenance suite.
Background
At present, in the power industry, various insulating operation tools such as an insulating brake pulling rod, an insulating height measuring rod, an insulating branches saw, an insulating deicing hammer and the like are needed in daily operation and maintenance work of a power distribution network, the various insulating operation tools need to be provided with respective operation rods, and the various insulating operation tools can not be used in common as operation extending to a high place, and one or more tools are often needed for one time of outdoor operation and maintenance.
Disclosure of Invention
The utility model aims to solve the technical problem of overcoming the defects of the prior art and providing the power distribution operation and maintenance operating rod and the power distribution operation and maintenance suite which are low in labor intensity, high in working efficiency and convenient to use.
In order to solve the technical problems, the utility model adopts the following technical scheme:
the utility model provides a distribution fortune dimension action bars, includes telescopic link body, connector, first mounting, second mounting and third mounting, the top of telescopic link body is equipped with socket, the bottom of connector is equipped with the inserted bar, the inserted bar is inserted and is located in the socket, and fix in the socket through first mounting, the top of connector is equipped with the socket that supplies first kind of operating tool male and is used for installing the first installation department of second mounting, the second mounting is used for fixing first kind of operating tool in the socket, the top outer wall surface of connector is established to the socket that supplies the second kind of operating tool to cup joint, be equipped with the second installation department that is used for installing the third mounting on the socket, the third mounting is used for fixing the second kind of operating tool on the socket, the top of inserted bar is equipped with the outside protrusion and is used for compressing tightly the compressing tightly portion of third kind of operating tool, be equipped with on the outer wall of telescopic link body along telescopic link body axial extension's scale.
As a further improvement of the above technical scheme:
the socket is positioned on the top end face of the connector.
The first installation part is a through hole penetrating through the socket and penetrating through to two sides of the connector.
The second fixing piece is a bolt.
The socket joint face is an annular face, the second installation portion is a threaded hole, and the third fixing piece is a screw.
The socket holes are round holes or square holes, and the inserting rods are matched with the socket holes.
The socket is characterized in that at least two through holes are formed in the socket rod at intervals along the axial direction of the socket rod, mounting holes penetrating through the inside and the outside are formed in the hole wall of the socket hole, and the first fixing piece penetrates through the mounting holes and the through holes.
The inserted link overcoat is equipped with the elastic cushion, the elastic cushion presss from both sides tightly between the top face of compressing tightly portion and telescopic link.
A power distribution operation and maintenance kit comprises a first operation tool, a second operation tool, a third operation tool and the power distribution operation and maintenance operation rod.
As a further improvement of the above technical scheme:
the first operation tool comprises a saw blade and a plug-in block fixed at one end of the saw blade, the plug-in block is matched with the socket, the second operation tool comprises a deicing hammer, a conical tip part arranged at one end of the deicing hammer and a sleeve hole arranged at the other end of the deicing hammer, the sleeve hole is matched with a sleeve joint surface, the third operation tool comprises a mounting block and a brake pulling hook fixed on the mounting block, the mounting block is provided with a sleeve joint hole, and the sleeve joint hole is matched with the plug-in rod.
Compared with the prior art, the utility model has the advantages that:
the power distribution operation and maintenance operation rod can be combined with the first operation tool, the second operation tool or the third operation tool for corresponding operation, only one power distribution operation and maintenance operation rod and the required operation tool are needed to be carried when the power distribution operation and maintenance operation rod goes out for maintenance, a plurality of operation rods are not needed to be carried, labor intensity is low, working efficiency is high, and the power distribution operation and maintenance operation rod is convenient to use.
The power distribution operation and maintenance kit comprises all technical characteristics of the power distribution operation and maintenance operation rod, and has all advantages of the power distribution operation and maintenance operation rod.
Drawings
Fig. 1 is a schematic diagram of the main sectional structure of the power distribution operation and maintenance operation lever of the present utility model.
Fig. 2 is a combination of a telescopic rod body and a first operating tool of the distribution and operation kit according to the present utility model.
Fig. 3 is a combination of a telescopic rod body and a second operating tool of the distribution and operation kit of the present utility model.
Fig. 4 is a combination of a telescoping pole body and a third tool for operation and maintenance of the distribution and distribution system of the present utility model.
The reference numerals in the drawings denote:
1. a telescopic rod body; 11. a socket hole; 111. a mounting hole; 12. a graduated scale; 2. a connector; 21. a rod; 211. a pressing part; 212. a through hole; 22. a socket; 23. a first mounting portion; 24. a sleeving surface; 25. a second mounting portion; 3. a first fixing member; 4. a second fixing member; 5. a third fixing member; 6. a first operating tool; 61. sawing; 62. a plug block; 7. a second type of operating means; 71. deicing hammer; 72. a cone tip; 73. trepanning; 8. a third operating means; 81. a mounting block; 811. a socket hole; 82. a brake pulling hook; 9. an elastic pad.
Detailed Description
The utility model will be described in further detail with reference to the drawings and the specific examples.
As used in this disclosure and in the claims, the terms "a," "an," "the," and/or "the" are not specific to a singular, but may include a plurality, unless the context clearly dictates otherwise. The terms "first," "second," and the like, as used in this disclosure, do not denote any order, quantity, or importance, but rather are used to distinguish one element from another. Likewise, the word "comprising" or "comprises", and the like, means that elements or items preceding the word are included in the element or item listed after the word and equivalents thereof, but does not exclude other elements or items. The terms "connected" or "connected," and the like, are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect.
Embodiment one:
fig. 1 shows an embodiment of the power distribution operation and maintenance operation rod according to the present utility model, the power distribution operation and maintenance operation rod comprises a telescopic rod body 1, a connector 2, a first fixing piece 3, a second fixing piece 4 and a third fixing piece 5, a socket 11 is arranged at the top end of the telescopic rod body 1, an inserting rod 21 is arranged at the bottom end of the connector 2, the inserting rod 21 is inserted into the socket 11 and is fixed in the socket 11 through the first fixing piece 3, a socket 22 for inserting the first operation tool 6 and a first installation part 23 for installing the second fixing piece 4 are arranged at the top end of the connector 2, the second fixing piece 4 is used for fixing the first operation tool 6 in the socket 22, a sleeved joint surface 24 for sleeving the second operation tool 7 is arranged at the top end of the connector 2, a second installation part 25 for installing the third fixing piece 5 is arranged at the sleeved joint surface 24, a protrusion protruding from the top end of the inserting rod 21 for pressing the third operation tool 6 is arranged at the top end of the inserting rod 21, and a scale 12 extending outwards along the axial direction of the telescopic rod body 1 is arranged at the top end of the telescopic rod body 2.
When the first type of operation tool 6 is needed, the first type of operation tool 6 is inserted into the socket 22 at the top end of the connector 2, and the operation is performed by fixing the second fixing member 4 on the first mounting portion 23 in the socket 22. When the second type operation tool 7 is needed, the second type operation tool 7 is sleeved on the sleeving surface 24 at the top end of the connector 2, and the third fixing piece 5 arranged on the second installation part 25 is fixed on the sleeving surface 24, so that the operation can be performed. When the third operation tool 8 is needed, the first fixing piece 3 is released, the connector 2 is taken out from the socket 11, the third operation tool 8 is sleeved on the inserted rod 21, then the inserted rod 21 is inserted into the socket 11, and the first fixing piece 3 is installed, so that the third operation tool 8 is clamped between the connector 2 and the telescopic rod body 1, and then the operation can be performed.
The power distribution operation and maintenance operation rod can be combined with the first operation tool 6, the second operation tool 7 or the third operation tool 8 for corresponding operation, and when the power distribution operation and maintenance operation rod is used for going out, only one power distribution operation and maintenance operation rod and the required operation tools are needed to be carried, a plurality of operation rods are not needed to be carried, the labor intensity is low, the working efficiency is high, and the use is convenient.
In this embodiment, the socket 22 is located on the top end surface of the connector 2. Specifically, the socket 22 is located at a position intermediate the top end face of the connector 2. In this embodiment, the present utility model is applicable to a variety of applications. Socket 22 is square.
In this embodiment, the first mounting portion 23 is a through hole penetrating through the socket 22 and penetrating to both sides of the connector 2. The first mounting portion 23 penetrates through the socket 22 and extends to both sides of the connector 2. The second fixing member 4 is a bolt. The bolt is installed by penetrating through the through hole, and the installation is convenient. Specifically, the first mounting portion 23 is perpendicular to the socket 22. The depth direction of the socket 22 is the same as the axial direction of the connector 2.
In this embodiment, the socket surface 24 is an annular surface, the second mounting portion 25 is a threaded hole, and the third fixing member 5 is a screw. The second type of operation tool 7 is fixed through the cooperation of screw and screw hole, easy dismounting.
In this embodiment, the socket 11 is a circular hole, and the plug 21 is adapted to the socket 11. Of course, socket 11 may also be a square hole.
In this embodiment, at least two through holes 212 are formed in the insert rod 21 and are arranged at intervals along the axial direction of the insert rod 21, mounting holes 111 penetrating the inside and the outside are formed in the hole wall of the socket 11, and the first fixing piece 3 is arranged in the mounting holes 111 and the through holes 212 in a penetrating manner. If the socket 11 is a square hole, the alignment of the through hole 212 and the mounting hole 111 is facilitated. Specifically, the through hole 212 perpendicularly intersects the axial direction of the plunger 21.
In this embodiment, the insert rod 21 is sleeved with an elastic pad 9, and the elastic pad 9 is clamped between the pressing portion 211 and the top end surface of the telescopic rod body 1. Under the elastic force of the elastic pad 9, the stability of the connector 2 can be enhanced, and the insert rod 21 of the connector 2 is prevented from axially shaking in the socket 11.
Embodiment two:
fig. 2 to 4 show an embodiment of the power distribution operation and maintenance kit of the present utility model, which includes the first type of operation tool 6, the second type of operation tool 7, the third type of operation tool 8, and the power distribution operation and maintenance operation lever of the first embodiment. The power distribution operation and maintenance kit comprises all technical characteristics of a power distribution operation and maintenance operation rod, and has all the advantages of the power distribution operation and maintenance operation rod.
In this embodiment, the first type of operation tool 6 includes a saw blade 61 and a plug-in block 62 fixed at one end of the saw blade 61, the plug-in block 62 is adapted to the socket 22, the second type of operation tool 7 includes a deicing hammer 71, a conical tip 72 disposed at one end of the deicing hammer 71, and a socket 73 disposed at the other end of the deicing hammer 71, the socket 73 is adapted to the socket surface 24, the third type of operation tool 8 includes a mounting block 81 and a brake hook 82 fixed on the mounting block 81, and the mounting block 81 is provided with a socket hole 811, and the socket hole 811 is adapted to the plug rod 21.
When the first type of operation tool 6 is required to be used, as shown in fig. 2, the plugging block 62 of the first type of operation tool 6 is inserted into the socket 22 at the top end of the connector 2, and is fixed in the socket 22 by the second fixing piece 4 penetrating through the first mounting portion 23, and corresponding positions of the plugging block 62 and the second fixing piece 4 are provided with round holes for the second fixing piece 4 to penetrate through. When the second type of operation tool 7 is needed, as shown in fig. 3, the sleeve hole 73 of the second type of operation tool 7 is sleeved on the sleeve surface 24 at the top end of the connector 2, and is fixed on the sleeve surface 24 through the third fixing piece 5 installed on the second installation part 25, and correspondingly, the hole wall of the sleeve hole 73 is provided with a hole corresponding to the third fixing piece 5 for the third fixing piece 5 to pass through. When the third type of operation tool 8 is required, as shown in fig. 4, the first fixing member 3 is released, the connector 2 is taken out from the socket 11, the elastic pad 9 and the socket 811 of the third type of operation tool 8 are sequentially sleeved on the insert rod 21, then the insert rod 21 is inserted into the socket 11, and the first fixing member 3 is mounted, so that the third type of operation tool 8 is clamped between the elastic pad 9 and the top surface of the telescopic rod body 1.
While the utility model has been described in terms of preferred embodiments, it is not intended to be limiting. Many possible variations and modifications of the disclosed technology can be made by anyone skilled in the art, or equivalent embodiments with equivalent variations can be made, without departing from the scope of the utility model. Therefore, any simple modification, equivalent variation and modification of the above embodiments according to the technical substance of the present utility model shall fall within the scope of the technical solution of the present utility model.

Claims (10)

1. The utility model provides a distribution fortune dimension action bars which characterized in that: including telescopic rod body (1), connector (2), first mounting (3), second mounting (4) and third mounting (5), telescopic rod body (1)'s top is equipped with socket (11), connector (2)'s bottom is equipped with inserted bar (21), inserted bar (21) insert locate in socket (11) and fix in socket (11) through first mounting (3), connector (2)'s top is equipped with socket (22) that supply first kind of operating tool (6) male and is used for installing first installation department (23) of second mounting (4), second mounting (4) are used for fixing first kind of operating tool (6) in socket (22), connector (2) top outer wall surface sets up to socket (24) that supply second kind of operating tool (7) to cup joint, be equipped with on socket (24) and be used for installing second installation department (25) of third mounting (5), third mounting (5) are used for pressing down first installation department (23) of operating tool (7) on socket (24) the top of third mounting (7), the outer wall of the telescopic rod body (1) is provided with a graduated scale (12) extending along the axial direction of the telescopic rod body (1).
2. The power distribution operation and maintenance operation lever according to claim 1, wherein: the socket (22) is positioned on the top end surface of the connector (2).
3. The power distribution operation and maintenance operation lever according to claim 2, wherein: the first mounting part (23) is a through hole penetrating through the socket (22) and penetrating through the two sides of the connector (2).
4. A power distribution operation and maintenance operation lever according to claim 3, characterized in that: the second fixing piece (4) is a bolt.
5. The power distribution operation and maintenance operation lever according to claim 1, wherein: the sleeving surface (24) is an annular surface, the second installation part (25) is a threaded hole, and the third fixing piece (5) is a screw.
6. The power distribution operation and maintenance operation lever according to claim 1, wherein: the socket hole (11) is a round hole or a square hole, and the inserted rod (21) is matched with the socket hole (11).
7. The power distribution operation and maintenance lever according to any one of claims 1 to 6, characterized in that: the socket rod (21) is provided with at least two through holes (212) which are axially arranged at intervals along the socket rod (21), the hole wall of the socket hole (11) is provided with an installation hole (111) which penetrates through the inside and the outside, and the first fixing piece (3) is arranged in the installation hole (111) and the through hole (212) in a penetrating mode.
8. The power distribution operation and maintenance lever according to any one of claims 1 to 6, characterized in that: the inserted link (21) is sleeved with an elastic pad (9), and the elastic pad (9) is clamped between the pressing part (211) and the top end surface of the telescopic link body (1).
9. A power distribution operation and maintenance external member, its characterized in that: comprising a first operating tool (6), a second operating tool (7), a third operating tool (8) and a power distribution operation and maintenance operating lever according to any one of claims 1 to 8.
10. The power distribution operation kit of claim 9, wherein: the utility model provides a first kind of operating tool (6) include saw sword (61) and fix grafting piece (62) in saw sword (61) one end, the adaptation of grafting piece (62) and socket (22), second kind of operating tool (7) include deicing hammer (71), locate conical tip portion (72) of deicing hammer (71) one end and locate trepanning (73) of deicing hammer (71) other end, trepanning (73) and the adaptation of cup jointing face (24), third kind of operating tool (8) include installation piece (81) and be fixed in the switching hook (82) on installation piece (81), be equipped with on installation piece (81) and cup joint hole (811), cup joint hole (811) and inserted bar (21) adaptation.
CN202320329291.3U 2023-02-27 2023-02-27 Distribution operation and maintenance operation rod and distribution operation and maintenance external member Active CN219760467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320329291.3U CN219760467U (en) 2023-02-27 2023-02-27 Distribution operation and maintenance operation rod and distribution operation and maintenance external member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320329291.3U CN219760467U (en) 2023-02-27 2023-02-27 Distribution operation and maintenance operation rod and distribution operation and maintenance external member

Publications (1)

Publication Number Publication Date
CN219760467U true CN219760467U (en) 2023-09-26

Family

ID=88072436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320329291.3U Active CN219760467U (en) 2023-02-27 2023-02-27 Distribution operation and maintenance operation rod and distribution operation and maintenance external member

Country Status (1)

Country Link
CN (1) CN219760467U (en)

Similar Documents

Publication Publication Date Title
CN106711728B (en) Spring type grounding wire clamp
CN219760467U (en) Distribution operation and maintenance operation rod and distribution operation and maintenance external member
CN201417901Y (en) Multifunctional cable maintenance grounding wire
CN208052299U (en) Beam bottom bar planting hole forming device
CN207834608U (en) A kind of Multi-angle earthing wire clip
CN212663880U (en) Short-circuit prevention device for cathode wire breakage of electric dust collector
CN213014930U (en) Suspended ceiling top construction auxiliary tool
CN212665910U (en) Nut dismounting tool
CN215701268U (en) Tool for installing cable of high-rise building
CN210550920U (en) Automatic bolt tightening and mounting structure
CN210224311U (en) Wiring device of electronic and electrical equipment
CN213366859U (en) Plug connector with good positioning effect
CN108092112B (en) Anti-slip plug and socket assembly
CN210200576U (en) Air switch convenient to wiring
CN220140963U (en) Automobile key buckle
CN211362032U (en) Special spanner
CN219337613U (en) Quick mounting tool for clamp spring
CN217521802U (en) Distribution network live working wire supporting insulator
CN203804881U (en) Graphite electrode mounting tool
CN204391578U (en) PT insures installation special tool
CN209999096U (en) Bolt replacing device
CN216214726U (en) Cable crimping device for electric power engineering
CN105322365B (en) A kind of socket
CN220358605U (en) Mounting structure of insulation monitoring sensor in switch cabinet
CN216950266U (en) Five metals drill bit with diamond coating

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant