CN219759161U - Construction progress management device for engineering consultation - Google Patents
Construction progress management device for engineering consultation Download PDFInfo
- Publication number
- CN219759161U CN219759161U CN202321144173.1U CN202321144173U CN219759161U CN 219759161 U CN219759161 U CN 219759161U CN 202321144173 U CN202321144173 U CN 202321144173U CN 219759161 U CN219759161 U CN 219759161U
- Authority
- CN
- China
- Prior art keywords
- management device
- construction progress
- progress management
- support
- columns
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 230000003014 reinforcing effect Effects 0.000 claims description 12
- 230000000694 effects Effects 0.000 claims description 9
- 238000000034 method Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Abstract
The utility model discloses a construction progress management device for engineering consultation, which comprises two bases, wherein supporting inner columns are arranged at the tops of the bases, supporting outer columns are sleeved at the tops of the supporting inner columns, the supporting outer columns are of internal hollow structures, rotating shafts are rotatably arranged on the inner sides of the two supporting outer columns, a display plate is jointly arranged between the two rotating shafts, one end of one rotating shaft penetrates through the supporting outer columns and is provided with a gear, a fixing plate is arranged at the top of the side face of the supporting outer column, a pull rod penetrates through the fixing plate, a clamping block matched with gear teeth is arranged at the bottom of the pull rod, and springs are sleeved on the surfaces of the pull rods.
Description
Technical Field
The utility model relates to the technical field of construction progress management, in particular to a construction progress management device for engineering consultation.
Background
When the construction consultation is carried out, a construction progress plan is required to be made according to construction period requirements, the construction progress plan is taken as a management target, the whole construction process is frequently checked, and meanwhile, the construction progress is required to be displayed, so that a manager can know the progress of the construction in real time. The utility model can effectively store the display board, reduce the volume of the device, facilitate the transportation operation of the device, avoid the damage to the display board in the transportation process and realize the reasonable recycling of resources, as disclosed in the publication No. CN 216817779U. However, when the utility model is used, the angle of the display board is fixed, so that the inclination angle is difficult to adjust according to the actual conditions of different users, the experience effect of the users is reduced, and therefore, the utility model is necessary to provide a construction progress management device for engineering consultation.
Disclosure of Invention
The utility model aims to provide a construction progress management device for engineering consultation, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction progress management device for engineering consultation, includes two bases, support the interior post is installed at the top of base, the top cover of supporting the interior post is equipped with the support outer column, the support outer column is inside hollow structure, two the inboard of supporting the outer column is all rotated and is installed the pivot, two install the show board jointly between the pivot, one of them the one end of pivot runs through the support outer column and installs the gear, the fixed plate is installed at the side top of supporting the outer column, run through on the fixed plate has the pull rod, install the fixture block with gear tooth assorted in the bottom of pull rod, the surface cover of pull rod is equipped with the spring.
Preferably, one end of the spring is connected with the fixed plate, the other end of the spring is connected with the clamping block, the clamping block is clamped between the two teeth at the top of the gear, and the top of the pull rod is provided with the limiting block.
Preferably, fastening bolts for fixing the two support outer columns are inserted into the side bottoms of the two support outer columns, and threaded holes matched with the fastening bolts are formed in the side bottoms of the two support inner columns.
Preferably, the front surfaces of the two support outer columns are provided with illuminating lamps.
Preferably, two reinforcing ribs are arranged at the joint of the support inner column and the base.
Preferably, two reinforcing plates are installed between the two bases.
Preferably, two universal wheels with braking effect are arranged at the bottom of the base.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the display board can be driven to rotate through the matched use of the gears and the rotating shaft, and the rotated display board can be fixed through the matched use of the fixing plate, the pull rod, the clamping block, the spring and the limiting block, so that the display board can be adjusted in inclination angle according to the actual conditions of different users, and the experience effect of the users is improved.
2. According to the utility model, through the matched use of the fastening bolt and the threaded hole, the total length of the support outer column and the support inner column can be adjusted to be the shortest when the device is not used, the volume of the device is reduced, and the transportation operation of the device is facilitated.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is an enlarged schematic view of the structure of FIG. 1A;
fig. 3 is an enlarged schematic view of the structure at B in fig. 1.
In the figure: 1. a base; 2. supporting the inner column; 3. supporting the outer column; 4. a rotating shaft; 5. a display board; 6. a gear; 7. a fixing plate; 8. a pull rod; 9. a clamping block; 10. a spring; 11. a limiting block; 12. a fastening bolt; 13. a threaded hole; 14. a lighting lamp; 15. reinforcing ribs; 16. a reinforcing plate; 17. and a universal wheel.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1:
referring to fig. 1, when carrying out engineering consultation, a construction progress plan is required to be made according to the construction period requirement specified by the contract, and the utility model provides a technical scheme that: the utility model provides a construction progress management device for engineering consultation, includes two base 1, and support inner column 2 is installed at the top of base 1, and the top cover of support inner column 2 is equipped with support outer column 3, and support outer column 3 is inside hollow structure, and pivot 4 is installed to the inboard of two support outer columns 3 all rotations, installs show board 5 jointly between two pivots 4, and show board 5 is used for showing the construction progress to the progress of engineering is known in real time to the managers.
In this embodiment, please refer to fig. 1 and 2, one end of one rotating shaft 4 runs through the support outer column 3 and installs the gear 6, fixed plate 7 is installed at the side top of support outer column 3, run through on the fixed plate 7 has pull rod 8, fixture block 9 with gear 6 tooth assorted is installed to the bottom of pull rod 8, the surface cover of pull rod 8 is equipped with spring 10, one end and the fixed plate 7 of spring 10 are connected, the other end and the fixture block 9 of spring 10 are connected, fixture block 9 card is gone into between two teeth in the top of gear 6, stopper 11 is installed at the top of pull rod 8, through upwards pulling stopper 11, make pull rod 8 upwards drive fixture block 9 and gear 6 and compress spring 10, rotate show board 5 through pivot 4, when proper inclination is adjusted to show board 5, loosen stopper 11, make pull rod 8 drive fixture block 9 card down to the tooth clearance of gear 6 under the effect of spring 10 spring force, thereby fix show board 5, make show board 5 can carry out inclination adjustment according to different user's actual conditions, user's experience has been improved.
In this embodiment, referring to fig. 1 and 3, the side bottoms of the two support outer columns 3 are inserted with fastening bolts 12 for fixing them, the side bottoms of the two support inner columns 2 are provided with threaded holes 13 matched with the fastening bolts 12, when the device is not in use, the fixing effect between the support outer columns 3 and the support inner columns 2 is released by unscrewing the fastening bolts 12, the support outer columns 3 are moved downwards, and the fastening bolts 12 are screwed into the threaded holes 13, so that the total length of the support outer columns 3 and the support inner columns 2 is adjusted to be the shortest, the volume of the device is reduced, and the transportation operation of the device is facilitated.
In this embodiment, referring to fig. 1 and 3, two reinforcing ribs 15 are installed at the connection position of the support inner column 2 and the base 1, the reinforcing ribs 15 play a role in reinforcing the support inner column 2, two reinforcing plates 16 are installed between the two bases 1, the reinforcing plates 16 play a role in reinforcing the bases 1,
in this embodiment, referring to fig. 1, two universal wheels 17 with braking effect are installed at the bottom of the base 1, and the device can flexibly move through the universal wheels 17.
Example 2:
referring to fig. 1, this embodiment differs from the first embodiment in that: the illuminating lamps 14 are arranged on the front surfaces of the two support outer columns 3, and good illumination effect can be achieved under the environment with poor light through the illuminating lamps 14, so that the display effect of the display board 5 is guaranteed.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. Construction progress management device for engineering consultation, including two bases (1), its characterized in that: support interior post (2) are installed at the top of base (1), the top cover of support interior post (2) is equipped with supports outer post (3), support outer post (3) are inside hollow structure, two the inboard of support outer post (3) is all rotated and is installed pivot (4), two install show board (5) jointly between pivot (4), one of them the one end of pivot (4) runs through support outer post (3) and installs gear (6), fixed plate (7) are installed at the side top of support outer post (3), run through on fixed plate (7) have pull rod (8), fixture block (9) with gear (6) tooth assorted are installed to the bottom of pull rod (8), the surface cover of pull rod (8) is equipped with spring (10).
2. The construction progress management device for engineering consultation according to claim 1, characterized in that: one end of the spring (10) is connected with the fixed plate (7), the other end of the spring (10) is connected with the clamping block (9), the clamping block (9) is clamped between two teeth at the top of the gear (6), and the top of the pull rod (8) is provided with the limiting block (11).
3. The construction progress management device for engineering consultation according to claim 1, characterized in that: the side bottoms of the two support outer columns (3) are inserted with fastening bolts (12) for fixing the support outer columns, and the side bottoms of the two support inner columns (2) are provided with threaded holes (13) matched with the fastening bolts (12).
4. The construction progress management device for engineering consultation according to claim 1, characterized in that: the front surfaces of the two support outer columns (3) are provided with illuminating lamps (14).
5. The construction progress management device for engineering consultation according to claim 1, characterized in that: two reinforcing ribs (15) are arranged at the joint of the support inner column (2) and the base (1).
6. The construction progress management device for engineering consultation according to claim 1, characterized in that: two reinforcing plates (16) are arranged between the two bases (1).
7. The construction progress management device for engineering consultation according to claim 1, characterized in that: two universal wheels (17) with braking effect are arranged at the bottom of the base (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321144173.1U CN219759161U (en) | 2023-05-12 | 2023-05-12 | Construction progress management device for engineering consultation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321144173.1U CN219759161U (en) | 2023-05-12 | 2023-05-12 | Construction progress management device for engineering consultation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219759161U true CN219759161U (en) | 2023-09-26 |
Family
ID=88083422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321144173.1U Active CN219759161U (en) | 2023-05-12 | 2023-05-12 | Construction progress management device for engineering consultation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219759161U (en) |
-
2023
- 2023-05-12 CN CN202321144173.1U patent/CN219759161U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219759161U (en) | Construction progress management device for engineering consultation | |
CN210440916U (en) | Multimedia mobile teaching demonstration equipment | |
CN211399234U (en) | Splicing device of display screen box body | |
CN111643865A (en) | Basketball stands are used in sports teaching | |
CN209655105U (en) | A kind of gardens street lamp | |
CN209357405U (en) | A kind of adjustable reflecting marking board | |
CN214048313U (en) | Show shelf convenient for angle adjustment | |
CN212128928U (en) | Warning sign is used in road construction with warning effect | |
CN212805119U (en) | Support is adjusted in installation of LED display screen | |
CN209560906U (en) | A kind of easy-to-dismount LED aluminium frame | |
CN210219151U (en) | Positive light-emitting LED transparent display screen | |
CN200953219Y (en) | Three-side rotary single-vertical column advertising signboard | |
CN220755270U (en) | LED display screen convenient to overhaul | |
CN218626714U (en) | Lighting device for construction site | |
CN221805017U (en) | Billboard lighting lamp group mounting structure | |
CN215570006U (en) | Computer head-shaking face light | |
CN218295635U (en) | Lighting lamp holder | |
CN216515240U (en) | Safety warning device convenient for project supervision | |
CN218866269U (en) | Liquid crystal display backlight source | |
CN216244015U (en) | Solar security lighting device | |
CN220706814U (en) | Spliced frame of borderless display | |
CN213424528U (en) | Display device for enterprise culture management | |
CN213513391U (en) | Be applied to adjustable focus track lamps and lanterns in exhibition hall | |
CN211698401U (en) | Medical microscope flash lamp support | |
CN117685546B (en) | Wisdom street lamp with mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |