CN219754699U - Auxiliary tool for installing fan tower barrel - Google Patents

Auxiliary tool for installing fan tower barrel Download PDF

Info

Publication number
CN219754699U
CN219754699U CN202321085291.XU CN202321085291U CN219754699U CN 219754699 U CN219754699 U CN 219754699U CN 202321085291 U CN202321085291 U CN 202321085291U CN 219754699 U CN219754699 U CN 219754699U
Authority
CN
China
Prior art keywords
arc
positioning
plates
fan
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321085291.XU
Other languages
Chinese (zh)
Inventor
孙晓飞
张二兵
马正坤
李中波
石金胜
王玉清
牛志立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Engineering Co Ltd
PowerChina Geothermal Development Co Ltd
Original Assignee
PowerChina Henan Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Henan Engineering Co Ltd filed Critical PowerChina Henan Engineering Co Ltd
Priority to CN202321085291.XU priority Critical patent/CN219754699U/en
Application granted granted Critical
Publication of CN219754699U publication Critical patent/CN219754699U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an auxiliary tool for installing a fan tower, which comprises three first arc-shaped plates, positioning plates and second arc-shaped plates, wherein the first arc-shaped plates are uniformly distributed outside a fan bearing platform foundation, the positioning plates are arranged outside the first arc-shaped plates, a support is connected to the positioning plates in a sliding manner, the second arc-shaped plates are fixedly connected to the inner ends of the support, and balls are embedded in the inner walls of the second arc-shaped plates. According to the utility model, the support is connected to the positioning plate in a sliding manner, the second arc-shaped plate with the balls is arranged at the inner end of the support, so that the centering of the sleeve and the bearing platform foundation can be realized, meanwhile, the unstable shaking condition of the sleeve when the sleeve is lowered is avoided, the construction safety is ensured, the use is convenient, and the operation is simple.

Description

Auxiliary tool for installing fan tower barrel
Technical Field
The utility model relates to an installation tool, in particular to an auxiliary tool for installing a fan tower, and belongs to the technical field of fan foundation installation.
Background
In the hoisting operation of the fan foundation, the hole alignment operation of the fan tower and the bearing platform foundation anchor rod is particularly important and is the most time-consuming; the existing construction method is as follows: a worker hangs the tower to the upper part of the bearing platform foundation by using a lifting appliance, then carries out hole alignment from the lower part of the tower to the upper part of the anchor rod, and lowers the tower after the hole alignment of the tower is completed; in the process, the tower is always in an unstable shaking state, the quick hole alignment of the staff is not utilized, and when the tower is lowered, equipment and staff on site can be collided, so that great potential safety hazards exist.
Disclosure of Invention
The technical problems to be solved by the utility model are as follows: overcomes the defects of the prior art, provides an auxiliary tool for installing a fan tower, can avoid the condition that a sleeve is greatly rocked during hoisting, is convenient for a worker to perform hole alignment operation, and ensures the safety of construction.
The technical scheme adopted by the utility model for solving the technical problems is as follows:
the utility model provides a fan tower section of thick bamboo installation appurtenance, includes first arc, locating plate and second arc, first arc is three, and even distribution is in the outside of fan cushion cap basis, the outside of first arc is provided with the locating plate, sliding connection has the support on the locating plate, the inner fixedly connected with second arc of support, the inner wall of second arc is inlayed and is had the ball.
The first arc-shaped plate and the positioning plate are of an integrated structure, and the first arc-shaped plate and the positioning plate are fixedly connected with the ground through positioning drills respectively.
The inner wall of the first arc-shaped plate is clung to the outer wall of the fan bearing platform foundation.
The top surface of the locating plate is provided with scales.
The positioning plate is connected with a displacement seat in a sliding manner, a support is vertically arranged on the displacement seat, and the displacement seat is fixedly connected with the positioning plate through a bolt.
The inner wall of the second arc plate is dug with a groove, and balls are embedded in the groove.
The utility model has the positive beneficial effects that:
1. according to the utility model, the support is connected onto the positioning plate in a sliding manner, the second arc-shaped plate is arranged at the inner end of the support, so that the sleeve can be prevented from shaking greatly, meanwhile, the positioning frame is moved along scales according to the outer diameter of the sleeve until the sleeve is positioned right above the fan bearing platform foundation, and then the sleeve is quickly lowered, so that the sleeve and the bearing platform foundation can be quickly centered.
2. According to the utility model, the balls are embedded in the inner wall of the second arc-shaped plate, so that multidirectional movement of the sleeve can be realized, centering of the sleeve and a fan bearing platform foundation and centering of the sleeve and the anchor rod are facilitated, the use is convenient, the operation is simple, the working efficiency is improved, and the construction safety is ensured.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a fan deck foundation structure;
wherein: the device comprises a first arc-shaped plate, a 2-positioning plate, a 3-displacement seat, a 4-bracket, a 5-second arc-shaped plate, 6-balls, 7-scales, 8-positioning drills, an A-fan bearing platform foundation and a B-anchor rod.
Detailed Description
The utility model is further explained and illustrated below with reference to the drawings:
1-2, a fan tower installs appurtenance, including first arc 1, locating plate 2 and second arc 2, first arc 1 is three, and even distribution is in fan cushion cap basis A's outside, and the outside of first arc 1 is provided with locating plate 2, and sliding connection has support 4 on the locating plate 2, and the inner fixedly connected with second arc 5 of support 4, and the inner wall of second arc 5 is inlayed and is had ball 6.
The first arc-shaped plate 1 and the positioning plate 2 are of an integrated structure, and the first arc-shaped plate 1 and the positioning plate 2 are fixedly connected with the ground through positioning drills 8 respectively.
The inner wall of the first arc-shaped plate 1 is clung to the outer wall of the fan bearing platform foundation A.
The top surface of the positioning plate 2 is provided with a scale 7.
The positioning plate 2 is connected with a displacement seat 3 in a sliding manner, a bracket 4 is vertically arranged on the displacement seat 3, and the displacement seat 3 is fixedly connected with the positioning plate 2 through bolts.
The inner wall of the second arc-shaped plate 5 is provided with a groove in a digging mode, and a ball 6 is embedded in the groove.
In the above description, the inner wall of the first arc-shaped plate is tightly attached to the outer wall of the fan bearing platform foundation, and the inner wall of the second arc-shaped plate can be tightly attached to the outer wall of the sleeve.
In the above description, the balls are embedded in the inner wall of the first arc-shaped plate, and the sleeve can move up and down along the balls or rotate 360 degrees in the horizontal direction.
In the above description, the construction site of the fan foundation is all the soil, so the first arc-shaped plate and the positioning plate can be fixed with the ground by using the positioning drill rod.
In the above description, the lower ends of the positioning pins are distributed in a sharp cone shape.
Working principle:
the first arc-shaped plate is surrounded on the outer part of the fan bearing platform foundation, and is fixed with the ground through a positioning drill rod;
then moving the brackets to the outermost ends of the positioning plates, then moving the sleeves into the space formed by the three second arc plates by using the lifting appliance, and moving each bracket to the position corresponding to the scale according to the outer diameter of the sleeve, wherein in the process, the shaking space of the sleeve gradually becomes smaller until the sleeve is fixed by the three second arc plates, and the sleeve can be lowered;
in the process of lowering, the sleeve can be horizontally rotated according to the position of the anchor rod until the position of the bolt hole on the sleeve corresponds to the position of the anchor rod.
According to the utility model, the support is connected to the positioning plate in a sliding manner, the second arc-shaped plate with the balls is arranged at the inner end of the support, so that the centering of the sleeve and the bearing platform foundation can be realized, meanwhile, the unstable shaking condition of the sleeve when the sleeve is lowered is avoided, the construction safety is ensured, the use is convenient, and the operation is simple.

Claims (6)

1. The utility model provides a fan tower section of thick bamboo installation appurtenance, includes first arc (1), locating plate (2) and second arc (5), its characterized in that: the novel fan is characterized in that the number of the first arc plates (1) is three, the first arc plates are uniformly distributed outside the fan bearing platform foundation (A), the positioning plates (2) are arranged outside the first arc plates (1), the positioning plates (2) are connected with the supports (4) in a sliding mode, the second arc plates (5) are fixedly connected to the inner ends of the supports (4), and the balls (6) are inlaid in the inner walls of the second arc plates (5).
2. The fan tower installation aid of claim 1, wherein: the first arc-shaped plate (1) and the positioning plate (2) are of an integrated structure, and the first arc-shaped plate (1) and the positioning plate (2) are fixedly connected with the ground through positioning drills (8) respectively.
3. The fan tower installation aid of claim 1, wherein: the inner wall of the first arc-shaped plate (1) is tightly attached to the outer wall of the fan bearing platform foundation (A).
4. The fan tower installation aid of claim 1, wherein: the top surface of the locating plate (2) is provided with a scale (7).
5. The fan tower installation aid of claim 1, wherein: the positioning plate (2) is connected with a displacement seat (3) in a sliding manner, a support (4) is vertically arranged on the displacement seat (3), and the displacement seat (3) is fixedly connected with the positioning plate (2) through bolts.
6. The fan tower installation aid of claim 1, wherein: the inner wall of the second arc-shaped plate (5) is dug with a groove, and a ball (6) is embedded in the groove.
CN202321085291.XU 2023-05-08 2023-05-08 Auxiliary tool for installing fan tower barrel Active CN219754699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321085291.XU CN219754699U (en) 2023-05-08 2023-05-08 Auxiliary tool for installing fan tower barrel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321085291.XU CN219754699U (en) 2023-05-08 2023-05-08 Auxiliary tool for installing fan tower barrel

Publications (1)

Publication Number Publication Date
CN219754699U true CN219754699U (en) 2023-09-26

Family

ID=88071216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321085291.XU Active CN219754699U (en) 2023-05-08 2023-05-08 Auxiliary tool for installing fan tower barrel

Country Status (1)

Country Link
CN (1) CN219754699U (en)

Similar Documents

Publication Publication Date Title
CN205296874U (en) Information -based construction monitor positioning device of stake integration
CN210766774U (en) Positioning device for steel reinforcement cage and lattice column
CN210830741U (en) Machine head guide rail device for adjusting axis deviation between pipe jacking machine and hole
CN115262865B (en) Steel reinforcement cage butt joint placing device and positioning method
CN208535312U (en) A kind of interior conduit mounting device
CN219754699U (en) Auxiliary tool for installing fan tower barrel
CN207647152U (en) Tower lifts constructing device certainly
CN203834465U (en) Pile hole construction device for cast-in-place concrete pile expanded in base by use of power-driven luoyang shovel hole-forming machine
CN201560068U (en) Lifting device of construction equipment
CN209038882U (en) A kind of moveable suspended bracket for lifting pipeline in piping lane
CN110886332A (en) Wall foundation underpinning device and construction method thereof
CN215107496U (en) Transition joint for hoisting lattice column and adjusting verticality
CN214832827U (en) Dewatering well pipe lowering tool
CN213061723U (en) Rib walking jacking device
CN110952548B (en) Drilling rod drilling guiding method for large-diameter PHC tubular pile guide hole and drilling rod thereof
CN211666301U (en) Steel constructs straightness control stop device that hangs down of post
CN207774680U (en) A kind of portable mechanism jacking apparatus
CN219170752U (en) Disassembling tool for air brake of pumped storage unit
KR101142756B1 (en) A mast support and up-down apparatus of the top-down lift
CN214365944U (en) Turnover device for installing drill rod of raise boring machine
CN113718655B (en) Steel reinforcement cage hanging and positioning device and free hanging and positioning method
CN202520239U (en) Roof bolter operation platform device
CN204148500U (en) A kind of walk by table frame
CN209799419U (en) Positioning and verticality adjusting device for structural column
CN113653262B (en) Construction method for welding and descending of anti-slide pile reinforcement cage outside well in grading manner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231213

Address after: 450051 2 North Street, Zhongyuan District, Zhengzhou, Henan

Patentee after: POWER CHINA HENAN ENGINEERING Co.,Ltd.

Patentee after: China Power Construction Geothermal Development Co.,Ltd.

Address before: 450051 2 North Street, Zhongyuan District, Zhengzhou, Henan