CN219753954U - Aluminum alloy template capable of avoiding climbing frame machine position - Google Patents

Aluminum alloy template capable of avoiding climbing frame machine position Download PDF

Info

Publication number
CN219753954U
CN219753954U CN202321184574.XU CN202321184574U CN219753954U CN 219753954 U CN219753954 U CN 219753954U CN 202321184574 U CN202321184574 U CN 202321184574U CN 219753954 U CN219753954 U CN 219753954U
Authority
CN
China
Prior art keywords
template
flanging plate
aluminum alloy
climbing frame
avoiding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321184574.XU
Other languages
Chinese (zh)
Inventor
彭晓春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Changsheng Building Technology Co ltd
Original Assignee
Foshan Changsheng Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Changsheng Building Technology Co ltd filed Critical Foshan Changsheng Building Technology Co ltd
Priority to CN202321184574.XU priority Critical patent/CN219753954U/en
Application granted granted Critical
Publication of CN219753954U publication Critical patent/CN219753954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an aluminum alloy template capable of avoiding a climbing frame machine position, which comprises a first template, a second template and a hinge, wherein an avoidance gap for avoiding a climbing frame is formed in the first template; the second template is movably arranged in the avoidance gap through the hinge so as to open or close the avoidance gap. According to the aluminum alloy template, the avoidance notch is formed in the first template, the first template and the second template are connected through the hinge, when the climbing frame needs to be avoided, the avoidance notch can be opened by turning the second template upwards, so that the climbing frame is avoided, interference with the climbing frame is avoided, the operation is simple and quick, the construction efficiency can be improved, when the climbing frame does not need to be avoided, the integrity of the aluminum alloy template can be ensured by arranging the second template in the avoidance notch, the application range is wide, and the universality is strong.

Description

Aluminum alloy template capable of avoiding climbing frame machine position
Technical Field
The utility model relates to the technical field of aluminum alloy templates, in particular to an aluminum alloy template capable of avoiding a climbing frame machine position.
Background
The aluminum alloy template has the advantages of simple installation, environment-friendly construction, short construction period, good stability, high precision, good concrete forming effect after removing the template, and the like. The climbing frame has attractive overall design and good protection effect, is matched with an aluminum mould system, can realize synchronous construction of outer wall bottom coating, railing engineering, main body engineering and bay window, can effectively penetrate, and lays a foundation for effectively controlling construction period.
In actual construction, the position of the bay window is generally designed with a climbing frame machine position, so as to avoid interference with the installation of the bay frame, a small plate is reserved on an aluminum alloy template at the outer side of the bay window for forming, and the bay frame is avoided by detaching the small plate from the aluminum alloy template. However, since the small plate is generally connected to the aluminum alloy formwork by a bolt, there are problems such as troublesome assembly and disassembly, low efficiency, and the like, which affect the construction progress.
Disclosure of Invention
In order to overcome the defects of the prior art, the utility model aims to provide the aluminum alloy template capable of avoiding the machine position of the climbing frame, which can realize rapid avoidance of the climbing frame and is beneficial to improving the construction efficiency.
The utility model adopts the following technical scheme:
the aluminum alloy template comprises a first template, a second template and a hinge, wherein an avoidance gap for avoiding the climbing frame is formed in the first template; the second template is movably arranged in the avoidance gap through the hinge so as to be capable of opening or closing the avoidance gap.
Further, the second template is adapted to the avoidance gap.
Further, when the second template is located in the avoidance gap, a gap between the first template and the second template is 1-3mm.
Further, when the second template is arranged at the avoidance notch, the cross section of the aluminum alloy template is rectangular.
Further, the cross-sections of both the first template and the second template are rectangular.
Further, the first template and the second template are both provided with flanging plates, and the flanging plates are provided with connecting holes.
Further, the first template comprises a first main body part, a first flanging plate, a second flanging plate, a third flanging plate, a fourth flanging plate and a fifth flanging plate, wherein the first flanging plate, the second flanging plate, the third flanging plate, the fourth flanging plate and the fifth flanging plate are all arranged on the same side edge of the first template and are sequentially connected, and the first main body part, the first flanging plate and the fifth flanging plate enclose the avoidance notch;
the second template comprises a second main body part and a sixth flanging plate arranged at one side edge of the second main body part, the other side of the second main body part opposite to the sixth flanging plate is connected with the first main body part through the hinge, the head end of the sixth flanging plate can be aligned with the head end of the first flanging plate, and the tail end of the sixth flanging plate can be aligned with the tail end of the fifth flanging plate.
Further, a raised line is arranged on the first main body part, and two ends of the head end of the raised line are respectively connected with the second flanging plate and the fourth flanging plate.
Further, the convex strip is parallel to the first flanging plate.
Further, at least two hinges are arranged, and two adjacent hinges are arranged at intervals.
Compared with the prior art, the utility model has the beneficial effects that:
according to the aluminum alloy template, the avoidance notch is formed in the first template, the first template and the second template are connected through the hinge, when the climbing frame needs to be avoided, the avoidance notch can be opened by turning the second template upwards, so that the climbing frame is avoided, interference with the climbing frame is avoided, the operation is simple and quick, the construction efficiency can be improved, when the climbing frame does not need to be avoided, the integrity of the aluminum alloy template can be ensured by arranging the second template in the avoidance notch, the application range is wide, and the universality is strong.
Drawings
FIG. 1 is a schematic structural view of an aluminum alloy template capable of avoiding a climbing frame machine position in a first view angle;
fig. 2 is a schematic structural view of an aluminum alloy template capable of avoiding a climbing frame machine position in a second view angle.
In the figure: 10. a first template; 11. a first body portion; 12. a first flanging plate; 13. a second flanging plate; 14. a third flanging plate; 15. a fourth flanging plate; 16. a fifth flanging plate; 17. a convex strip; 20. a second template; 21. a second body portion; 22. a sixth flanging plate; 30. a hinge; 40. avoiding the notch; 50. and a connection hole.
Detailed Description
The present utility model will be further described with reference to the accompanying drawings and detailed description, wherein it is to be understood that, on the premise of no conflict, the following embodiments or technical features may be arbitrarily combined to form new embodiments.
Referring to fig. 1-2, an aluminum alloy template capable of avoiding a machine position of a climbing frame according to a preferred embodiment of the present utility model is shown, including a first template 10, a second template 20 and a hinge 30, where an avoidance gap 40 for avoiding the climbing frame is provided on the first template 10; the second template 20 is movably arranged in the avoidance gap 40 through the hinge 30 so as to be capable of opening or closing the avoidance gap 40.
According to the aluminum alloy template, the avoidance notch 40 is formed in the first template 10, the first template 10 and the second template 20 are connected through the hinge 30, when a climbing frame is required to be avoided, the avoidance notch 40 can be opened by upwards turning the second template 20, so that the climbing frame is avoided, interference with the climbing frame is avoided, the operation is simple and quick, the construction efficiency can be improved, and when the climbing frame is not required to be avoided, the integrity of the aluminum alloy template can be ensured by arranging the second template 20 in the avoidance notch 40, the application range is wide, and the universality is strong.
As a preferred embodiment, the second template 20 and the avoidance gap 40 are matched, so that the influence on the construction quality caused by the overlarge gap between the first template 10 and the second template 20 is avoided.
More specifically, when the second template 20 is located in the avoidance gap 40, the gap between the first template 10 and the second template 20 is 1-3mm, so that concrete leakage during pouring is avoided, construction quality is improved, and later form removal is facilitated.
In a preferred embodiment, the cross section of the aluminum alloy form is rectangular when the second form 20 is disposed in the relief notch 40.
In a preferred embodiment, the cross sections of both the first template 10 and the second template 20 are rectangular, so that the molding is facilitated and the manufacturing difficulty is reduced.
As the preferred embodiment, the first template 10 and the second template 20 are both provided with the flanging plates, and the flanging plates are provided with the connecting holes 50, so that the aluminum alloy template is convenient to fixedly connect with the external aluminum alloy template through the connecting pieces inserted in the connecting holes 50, thereby being convenient for fixing the aluminum alloy template.
As a preferred embodiment, the first template 10 includes a first main body 11, a first flanging plate 12, a second flanging plate 13, a third flanging plate 14, a fourth flanging plate 15 and a fifth flanging plate 16, where the first flanging plate 12, the second flanging plate 13, the third flanging plate 14, the fourth flanging plate 15 and the fifth flanging plate 16 are all disposed at the same side edge of the first template 10 and are sequentially connected, and the first main body 11, the first flanging plate 12 and the fifth flanging plate 16 enclose an avoidance gap 40;
the second template 20 includes second main part 21 and locates the sixth turn-ups board 22 of one side edge of second main part 21, the opposite side of second main part 21 and sixth turn-ups board 22 passes through hinge 30 and first main part 11 to be connected, the head end of sixth turn-ups board 22 can be aligned with the head end of first turn-ups board 12, the tail end of sixth turn-ups board 22 can be aligned with the tail end of fifth turn-ups board 16, so, both make this aluminum alloy template can not too much weaken self structural strength when dodging the climbing frame, make this aluminum alloy template can ensure the integrality of itself when need not dodging the climbing frame again.
As the preferred embodiment, be equipped with sand grip 17 on the first main part 11, the head end both ends of sand grip 17 are connected with second flanging plate 13 and fourth flanging plate 15 respectively, and the structural strength of this aluminum alloy template can be strengthened in the setting of sand grip 17, prevents to warp to do benefit to the promotion construction quality.
More specifically, the raised strips 17 are parallel to the first flanging plate 12, which is convenient for molding and has better structural strength.
In a preferred embodiment, at least two hinges 30 are provided, and two adjacent hinges 30 are spaced apart to enhance the connection strength between the first and second forms 10 and 20. Of course, in other embodiments, one hinge 30 may be provided.
The above embodiments are only preferred embodiments of the present utility model, and the scope of the present utility model is not limited thereto, but any insubstantial changes and substitutions made by those skilled in the art on the basis of the present utility model are intended to be within the scope of the present utility model as claimed.

Claims (10)

1. The aluminum alloy template is characterized by comprising a first template, a second template and a hinge, wherein an avoidance gap for avoiding the climbing frame is formed in the first template; the second template is movably arranged in the avoidance gap through the hinge so as to be capable of opening or closing the avoidance gap.
2. The aluminum alloy template capable of avoiding a climbing frame machine position according to claim 1, wherein the second template is matched with the avoidance gap.
3. The aluminum alloy template capable of avoiding a climbing frame machine position according to claim 1, wherein a gap between the first template and the second template is 1-3mm when the second template is positioned in the avoidance gap.
4. The aluminum alloy template capable of avoiding a climbing frame machine position according to claim 1, wherein when the second template is arranged at the avoidance notch, the cross section of the aluminum alloy template is rectangular.
5. The aluminum alloy template for avoiding a climbing frame according to claim 4, wherein the cross section of the first template and the cross section of the second template are rectangular.
6. The aluminum alloy template capable of avoiding a climbing frame machine position according to claim 1, wherein a flanging plate is arranged on both the first template and the second template, and a connecting hole is formed in the flanging plate.
7. The aluminum alloy template capable of avoiding the climbing frame machine position according to claim 1, wherein the first template comprises a first main body part, a first flanging plate, a second flanging plate, a third flanging plate, a fourth flanging plate and a fifth flanging plate, the first flanging plate, the second flanging plate, the third flanging plate, the fourth flanging plate and the fifth flanging plate are all arranged on the same side edge of the first template and are sequentially connected, and the first main body part, the first flanging plate and the fifth flanging plate enclose the avoidance notch;
the second template comprises a second main body part and a sixth flanging plate arranged at one side edge of the second main body part, the other side of the second main body part opposite to the sixth flanging plate is connected with the first main body part through the hinge, the head end of the sixth flanging plate can be aligned with the head end of the first flanging plate, and the tail end of the sixth flanging plate can be aligned with the tail end of the fifth flanging plate.
8. The aluminum alloy template capable of avoiding a climbing frame machine position according to claim 7, wherein a convex strip is arranged on the first main body part, and two ends of the head end of the convex strip are respectively connected with the second flanging plate and the fourth flanging plate.
9. The aluminum alloy template capable of avoiding a climbing frame machine position according to claim 8, wherein the convex strips are parallel to the first flanging plate.
10. The aluminum alloy template capable of avoiding the climbing frame machine position according to claim 1, wherein at least two hinges are arranged, and two adjacent hinges are arranged at intervals.
CN202321184574.XU 2023-05-16 2023-05-16 Aluminum alloy template capable of avoiding climbing frame machine position Active CN219753954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321184574.XU CN219753954U (en) 2023-05-16 2023-05-16 Aluminum alloy template capable of avoiding climbing frame machine position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321184574.XU CN219753954U (en) 2023-05-16 2023-05-16 Aluminum alloy template capable of avoiding climbing frame machine position

Publications (1)

Publication Number Publication Date
CN219753954U true CN219753954U (en) 2023-09-26

Family

ID=88071585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321184574.XU Active CN219753954U (en) 2023-05-16 2023-05-16 Aluminum alloy template capable of avoiding climbing frame machine position

Country Status (1)

Country Link
CN (1) CN219753954U (en)

Similar Documents

Publication Publication Date Title
CN201502177U (en) Hinge type reserved opening formwork
CN202467189U (en) Fixed muzzle template
CN210177802U (en) Wallboard for prefabricated building containing metal window frame
CN219753954U (en) Aluminum alloy template capable of avoiding climbing frame machine position
CN206888506U (en) The cast-in-place system of formwork structure and shear wall of shear wall angle node
CN205954965U (en) Novel node of steel skeleton light floor
CN207377129U (en) A kind of reinforcing bar interspersed in template just tears reserved aperture apparatus open
CN214401377U (en) Ramp sectional type steel box girder
CN211440462U (en) Exempt from prefabricated wallboard mould of tear-open mould
CN211250567U (en) Pouring die for balcony
CN211597692U (en) Building bottom cage section bar and building bottom cage template
CN209482720U (en) Aluminum alloy mould plate back cord
CN216505805U (en) Integral core-pulling template for prefabricated hollow pier stud
CN220747679U (en) Waterproof aluminum die pull piece
CN111236634A (en) Window board concrete structure that wafts looks for slope one shot forming device
CN218406446U (en) Pulling-on piece system template
CN208803699U (en) A kind of Anti-dislocation aluminum alloy pattern plate
CN2534291Y (en) Cast-in-situ concrete cave hole shuttering for door, window and cave etc. construction and structure
CN221277031U (en) Prefabricated hollow post of assembled
CN109488016A (en) A kind of aluminium alloy inner corner trim composite shuttering of size adjustable
CN219241353U (en) Novel aluminum template pull sheet system
CN210798297U (en) Floor board connection structure is worn to crane span structure
CN210195258U (en) Reinforcing member of light-duty explosion-proof mould
CN213563302U (en) Door and window prefabricated component mould
CN114809624B (en) Template, concave template and template system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 528000, No. 28-15 Xinyue Road, Wusha Community, Daliang Street, Shunde District, Foshan City, Guangdong Province

Patentee after: FOSHAN CHANGSHENG BUILDING TECHNOLOGY Co.,Ltd.

Country or region after: China

Address before: 528300 No.2, No. 20, Tianren Industrial Park, Liandu Village, Leliu Street, Shunde District, Foshan City, Guangdong Province

Patentee before: FOSHAN CHANGSHENG BUILDING TECHNOLOGY Co.,Ltd.

Country or region before: China