CN219731714U - Stay cable anchor cylinder protection facility die - Google Patents

Stay cable anchor cylinder protection facility die Download PDF

Info

Publication number
CN219731714U
CN219731714U CN202223460835.4U CN202223460835U CN219731714U CN 219731714 U CN219731714 U CN 219731714U CN 202223460835 U CN202223460835 U CN 202223460835U CN 219731714 U CN219731714 U CN 219731714U
Authority
CN
China
Prior art keywords
mould
annular
anchor cylinder
stay cable
annular mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223460835.4U
Other languages
Chinese (zh)
Inventor
王强
吴小康
袁桂超
唐伟
谢显龙
熊廷亮
潘顺元
文兴鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju 1st Engineering Co Ltd
Original Assignee
China Railway Erju 1st Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju 1st Engineering Co Ltd filed Critical China Railway Erju 1st Engineering Co Ltd
Priority to CN202223460835.4U priority Critical patent/CN219731714U/en
Application granted granted Critical
Publication of CN219731714U publication Critical patent/CN219731714U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a stay cable anchor cylinder protection facility mould which comprises an annular mould, wherein the annular mould is formed by buckling two semi-annular moulds end to end and fixedly connected through a connecting bolt, the inner side of the annular mould is of a smooth curved surface structure with wide lower part and narrow upper part, the annular mould is sleeved on a steel anchor cylinder and buckled on a bridge deck, and gel materials are filled between the annular mould and the steel anchor cylinder. The stay cable anchor cylinder solves the problems of high construction cost, low construction efficiency, attractive appearance, difficult replacement in the later period and the like of the existing stay cable anchor cylinder. Belongs to the field of bridge construction.

Description

Stay cable anchor cylinder protection facility die
Technical Field
The utility model relates to a stay cable anchor cylinder protection facility die, and belongs to the field of bridge construction.
Background
The cable-stayed bridge cable anchor cylinder is a key component of the cable-stayed bridge, and the steel anchor cylinder is pre-buried when the box girder is constructed and is mainly used for protecting the cable-stayed cable, applying prestress and the like. After bridge construction is completed, external water sources are easy to gather at the junction of the anchor cylinder and the box girder concrete, so that the steel anchor cylinder is corroded and damaged, the traditional protection facilities are regular square concrete structures, the structural dimensions are difficult to unify, the overall appearance effect is poor after forming, the construction cost is high, the construction efficiency is low, the model reuse rate is low, and later replacement is inconvenient.
Disclosure of Invention
The utility model provides a stay cable anchor cylinder protection facility die which aims to solve the problems of high construction cost, low construction efficiency, attractive appearance, difficult replacement in the later period and the like of the existing stay cable anchor cylinder protection.
In order to achieve the above purpose, such a stay cable anchor cylinder protection facility mold is to be adopted, and comprises an annular mold, wherein the annular mold is formed by buckling two semi-annular molds end to end and is fixedly connected through a connecting bolt, the inner side of the annular mold is of a smooth curved surface structure with a wide lower part and a narrow upper part, the annular mold is sleeved on a steel anchor cylinder and buckled on a bridge deck, and gel materials are filled between the annular mold and the steel anchor cylinder.
In the protection facility mold, protruding connecting parts are arranged on the outer sides of two ends of the two semi-annular molds, and the two ends of the two semi-annular molds are fixedly connected through connecting bolts which are sequentially penetrated and fixed on the connecting parts of the two ends.
Compared with the prior art, the appearance of the molded protective measures is unified through the mold, the construction method is simple and convenient, the construction efficiency of the protective facilities is improved, the mold is repeatedly used, the construction cost is reduced, the construction of the gel filling material is convenient and fast, the cost is low, the protective effect is good, and the method has a particularly good application prospect and is worthy of popularization and application.
Drawings
FIG. 1 is a flow chart of the present utility model;
fig. 2 is a control schematic of the present utility model.
Detailed Description
For the purpose of promoting an understanding of the principles of the utility model, reference will now be made in detail to the embodiments described herein, including examples, illustrated in the accompanying drawings.
Examples
The embodiment is mainly aimed at the improvement of a stay cable anchor cylinder protection facility mould, and referring to fig. 1 to 2, the stay cable anchor cylinder protection facility mould comprises an annular mould 1, wherein the annular mould 1 is formed by buckling two semi-annular moulds 11 in an end-to-end mode and is fixedly connected through a connecting bolt 2, specifically, the outsides of two ends of the two semi-annular moulds 11 are provided with protruding connecting parts 12, the two ends of the two semi-annular moulds 11 are respectively and sequentially fixedly connected through connecting bolts 2 which are fixedly arranged on the connecting parts 12 in a penetrating mode, the inner side of the annular mould 1 is of a smooth curved surface structure with a wide lower part and a narrow upper part, the annular mould 1 is sleeved on a steel anchor cylinder 3 and buckled on a bridge deck 4, and gel materials 5 are filled between the annular mould 1 and the steel anchor cylinder 3.
The concrete construction method comprises the following steps:
firstly, sleeving an annular die 1 on a steel anchor cylinder 3, fixedly connecting two ends of two semi-annular dies 11 through a connecting bolt 2, horizontally placing the annular die 1 on a bridge deck 4, injecting a gel material 5 into a gap between the annular die 1 and the steel anchor cylinder 3, wherein the gel material 5 is at least 10cm higher than the bridge deck 4, and the gel material 5 has the characteristics of quick solidification, high strength, easy surface collection, clear light and the like, so that the effect after molding is ensured; in order to ensure the later use time of the filling material, reinforcing bars can be added to strengthen the structure; and (5) removing the connecting bolts 2 and the annular die 1 after the gel material 5 is initially set, and curing.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.

Claims (2)

1. The utility model provides a stay cable anchor section of thick bamboo protection facility mould, its characterized in that, including annular mould (1), annular mould (1) are formed by two semi-ring mould (11) end to end lock and through connecting bolt (2) fixed connection, and the inboard of annular mould (1) is wide smooth curved surface structure down, and annular mould (1) cover is located steel anchor section of thick bamboo (3) and is detained and locate bridge deck (4), and is filled with gel material (5) between annular mould (1) and the steel anchor section of thick bamboo (3).
2. The stay cable anchor barrel protection facility mold of claim 1, wherein: the outer sides of the two semi-ring shaped dies (11) are provided with protruding connecting parts (12), and the two ends of the two semi-ring shaped dies (11) are fixedly connected through connecting bolts (2) which are sequentially penetrated and fixed on the connecting parts (12) at the two ends.
CN202223460835.4U 2022-12-23 2022-12-23 Stay cable anchor cylinder protection facility die Active CN219731714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223460835.4U CN219731714U (en) 2022-12-23 2022-12-23 Stay cable anchor cylinder protection facility die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223460835.4U CN219731714U (en) 2022-12-23 2022-12-23 Stay cable anchor cylinder protection facility die

Publications (1)

Publication Number Publication Date
CN219731714U true CN219731714U (en) 2023-09-22

Family

ID=88055080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223460835.4U Active CN219731714U (en) 2022-12-23 2022-12-23 Stay cable anchor cylinder protection facility die

Country Status (1)

Country Link
CN (1) CN219731714U (en)

Similar Documents

Publication Publication Date Title
CN206309029U (en) A kind of aluminum alloy mould plate back cord fixing device
CN213732497U (en) Prevent running thick liquid wire pole mould device
CN203188113U (en) Segmental precasting assembly structure in large bent cap
CN201981780U (en) Mold for manufacturing of cylindrical structures
CN219731714U (en) Stay cable anchor cylinder protection facility die
CN110805274A (en) Steel mould of Y-shaped column and pouring method thereof
CN116201018A (en) Construction method and mold for stay cable anchor cylinder protection facility
CN212452779U (en) Circular prefabricated inspection shaft assembles template fast
CN218479878U (en) Vertical axis wind turbine blade
CN204626956U (en) A kind of combination set shaped steel formwork
CN108166398B (en) Structure and process for preventing bridge hollow slab core mould from floating upwards by utilizing existing exhaust pipe drain pipe
CN215618854U (en) Prefabricated box culvert mould
CN201209290Y (en) Precast concrete beam
CN210857721U (en) Corner plate component of prefabricated building
CN207003720U (en) A kind of assembled integral concrete shear force wall attachment structure
CN211114427U (en) Natural fiber composite pipe restraint recycled concrete post
CN203331197U (en) Composite floor slab prefabricated die
CN202117319U (en) End formwork
CN201343825Y (en) Prefabricated ordinary concrete pipe and restricted type recycled concrete core combined column
CN210148367U (en) Cross prefabricated component forming die
CN217128312U (en) Assembled calandria cable shaft
CN212359792U (en) Lining structure of round water delivery tunnel steel mould trolley
CN210210857U (en) Prestressed concrete tensioning device
CN110409709B (en) Connecting box assembled concrete beam
CN217053952U (en) Prefabricated connection structure for superimposed sheet of assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant