CN219711196U - Connection type quick-release building construction guardrail for civil engineering - Google Patents

Connection type quick-release building construction guardrail for civil engineering Download PDF

Info

Publication number
CN219711196U
CN219711196U CN202321014718.7U CN202321014718U CN219711196U CN 219711196 U CN219711196 U CN 219711196U CN 202321014718 U CN202321014718 U CN 202321014718U CN 219711196 U CN219711196 U CN 219711196U
Authority
CN
China
Prior art keywords
upright post
civil engineering
mounting
construction guardrail
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321014718.7U
Other languages
Chinese (zh)
Inventor
王浩泽
任迎滨
韩东旭
王偲丞
边占鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN202321014718.7U priority Critical patent/CN219711196U/en
Application granted granted Critical
Publication of CN219711196U publication Critical patent/CN219711196U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a connection type quick-release building construction guardrail for civil engineering, which comprises the following components: the installation upright post is internally provided with an adjusting rod, the outer side of the adjusting rod is fixedly provided with a connecting assembly, the connecting assembly comprises a fixing plate, an installation lug and a connecting rod, and the outer sides of the front end and the rear end of the connecting assembly are respectively provided with an installation frame through hinges; the spring is arranged at the inner side end of the mounting frame and positioned in the mounting upright post, a connecting block is arranged in the mounting frame, a connecting side plate is integrally and fixedly arranged at the outer side of the upper end of the connecting block, and a bottom plate is arranged at the inner side of the lower end of the connecting side plate; the first top plate is fixedly arranged on the inner side of the upper end of the connecting side plate, and a first upright post is fixedly arranged in the middle of the upper end face of the bottom plate. This civil engineering is with connection formula quick detach construction guardrail, it is comparatively convenient to dismantle the guardrail of concatenation installation, conveniently carries out the quick detach, can adjust the height of guardrail simultaneously, and adaptability is better.

Description

Connection type quick-release building construction guardrail for civil engineering
Technical Field
The utility model relates to the technical field of civil engineering, in particular to a connecting type quick-dismantling building construction guardrail for civil engineering.
Background
The civil engineering refers to engineering entities which are used for carrying out various technical works and completed engineering entities for building, reconstructing or expanding various engineering buildings, structures, related matched facilities and the like except house buildings, and people, facilities and sites can be isolated by using guardrails in the process of building construction of the civil engineering, so that the subsequent construction work is convenient to carry out;
the utility model provides a building guardrail for civil engineering is authorized to chinese patent and publication No. CN215632180U, including fixed plate and two support columns, the right-hand member fixedly connected with receiver of left support column is located, the internally connected with folding subassembly of receiver, folding subassembly includes a plurality of baffles, all articulate between every two adjacent baffles, the top and the bottom that are located the baffle of rearmost all rotate and are connected with the connecting plate, the left end of each connecting plate all with the inner wall sliding connection of receiver, the rear end fixedly connected with go-between of fixed plate, the slip is provided with the sliding ring on the go-between, the inside cooperation of two support columns is provided with the lift subassembly of keeping out wind, it is convenient for fold accomodate, portable, transport and store, the practicality is stronger, and be convenient for block the wind of eminence, can prevent that wind from getting into construction area and arousing raise dust influence constructor's health and influence the progress of construction, the reliability is stronger.
Most prior art solutions suffer from the following drawbacks: the guardrail is spliced and fixed through bolts, so that later disassembly of the guardrail is complicated, quick disassembly is inconvenient, and meanwhile, the guardrail is highly fixed and inconvenient to adjust.
Disclosure of Invention
The utility model aims to provide a connection type quick-release building construction guardrail for civil engineering, which aims to solve the problems that the guardrail is relatively complicated to detach in the later stage and inconvenient to quickly detach and is highly fixed and inconvenient to adjust due to the fact that the guardrail is spliced and fixed through bolts in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: connection formula quick detach construction guardrail for civil engineering includes:
the installation upright post is internally provided with an adjusting rod, the outer side of the adjusting rod is fixedly provided with a connecting assembly, the connecting assembly comprises a fixing plate, an installation lug and a connecting rod, and the outer sides of the front end and the rear end of the connecting assembly are respectively provided with an installation frame through hinges;
the spring is arranged at the inner side end of the mounting frame and positioned in the mounting upright post, a connecting block is arranged in the mounting frame, a connecting side plate is integrally and fixedly arranged at the outer side of the upper end of the connecting block, and a bottom plate is arranged at the inner side of the lower end of the connecting side plate;
the first top plate is fixedly arranged on the inner side of the upper end of the connecting side plate, a first upright post is fixedly arranged in the middle of the upper end surface of the bottom plate, a first upright post is arranged in the first upright post, and a fixing bolt penetrates through the upper end of the first upright post;
and the second top plate is fixedly arranged outside the upper end of the first vertical rod and is positioned outside the upper end of the first top plate.
Preferably, the outer sides of the front end and the rear end of the fixing plate are fixedly provided with mounting lugs, and connecting rods are arranged in the mounting lugs through bearings.
Preferably, the connecting rod is obliquely arranged, and the connecting rod forms a rotating structure with the mounting lug and the mounting rack through bearings respectively.
Preferably, the mounting frame forms a telescopic structure with the mounting upright post through a spring, and the inner wall end of the mounting frame is fixedly provided with a positioning strip.
Preferably, the adjusting rods are connected with the mounting upright posts in a sliding mode, and the adjusting rods are arranged in one-to-one correspondence with the mounting upright posts.
Preferably, the mounting frame is connected with the connecting block in an inserting mode, and a groove-shaped structure matched with the positioning strip is formed in the outer wall surface of the connecting block.
Preferably, the outer side of the upper end of the bottom plate is provided with second upright posts at equal intervals, and the second upright posts connected with the second top plate are connected inside the second upright posts in a sliding manner.
Preferably, the second upright post and the first upright post are arranged in parallel, and the first upright post are connected in a sliding mode.
Preferably, the right side of the first upright rod is provided with threaded hole structures which are matched with the fixing bolts at equal intervals and plays a role in adjusting the height.
Compared with the prior art, the utility model has the beneficial effects that: the connection type quick-release building construction guardrail for civil engineering is convenient to detach and install, convenient to quick-release, capable of adjusting the height of the guardrail and good in adaptability;
1. the connecting rod is obliquely arranged, the connecting rod forms a rotating structure with the mounting lug and the mounting frame through the bearing, and the adjusting rod is pressed downwards during disassembly to drive the fixing plate to move downwards, so that the connecting rod rotates with the mounting lug and the mounting frame through the bearing, the inclination angle of the connecting rod changes at the moment, the mounting frame is pushed out of the mounting upright post, the connecting block is conveniently separated from the positioning strip, and the connecting block can be quickly disassembled, so that the disassembly is more convenient;
2. the first upright post and the first upright post are connected in a sliding mode, a threaded hole structure which is matched with the fixing bolt is formed in the right side of the first upright post at equal intervals, the fixing bolt is rotated, the fixing bolt is separated from the first upright post and the first upright post respectively, the second top plate is lifted upwards, the first upright post and the second upright post are connected with the first upright post and the second upright post respectively in a sliding mode, and the fixing bolt is rotated and inserted into the first upright post and the first upright post to be fixed, so that the height of the guardrail is conveniently adjusted, and the guardrail is good in adaptability;
3. but splice through the effect of connecting the curb plate under connecting block and mounting bracket and install in the left and right sides of installation stand, the second stand is parallel arrangement with first stand simultaneously, and the second stand is equidistant setting in the upper end outside of bottom plate, conveniently makes first stand, first pole setting, second stand and second pole setting carry out the protection and separate the effect.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of the overall structure of the connection between the first upright and the first upright of the present utility model;
FIG. 3 is a schematic view of the overall structure of the mounting bracket and spring connection of the present utility model;
FIG. 4 is a schematic view of the overall structure of the connection block and the mounting frame of the present utility model;
fig. 5 is an enlarged schematic view of the structure of fig. 3 a according to the present utility model.
In the figure: 1. installing an upright post; 2. an adjusting rod; 3. a joining assembly; 301. a fixing plate; 302. a mounting ear; 303. a connecting rod; 4. a mounting frame; 5. a positioning strip; 6. a spring; 7. a connecting block; 8. connecting side plates; 9. a bottom plate; 10. a first top plate; 11. a first upright; 12. a first upright; 13. a fixing bolt; 14. a second upright; 15. a second upright; 16. and a second top plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, the present utility model provides a technical solution: the utility model provides a connection formula quick detach construction guardrail for civil engineering, the inside including installation stand 1 is provided with adjusts pole 2, and adjust the outside fixed mounting who adjusts pole 2 has linking component 3, linking component 3 includes fixed plate 301, installation ear 302 and linking rod 303, the equal fixed mounting in front and back both ends outside of fixed plate 301 has installation ear 302, and the inside of installation ear 302 is provided with connecting rod 303 through the bearing, and the front and back both ends outside of linking component 3 all is provided with mounting bracket 4 through the hinge, the inner wall fixed mounting of mounting bracket 4 has location strip 5, spring 6 sets up in the inboard end of mounting bracket 4 and is located installation stand 1, and the internally mounted of mounting bracket 4 has connecting block 7, the upper end outside integration fixed mounting of connecting block 7 has connection curb plate 8, and the lower extreme inboard of connecting curb plate 8 is provided with bottom plate 9, first roof 10 fixed mounting is inboard in the upper end of connecting curb plate 8, the up end middle part fixed mounting of bottom plate 9 has first stand 11, and the inside of first stand 11 is provided with first pole 12, and the upper end run through of first stand 11 is provided with fixing bolt 13, the upper end of bottom plate 9 equidistant outside is provided with the locating strip 5, and be located the second roof plate 16 outside of second stand 16 is connected with the second roof 14 outside of the second stand 16, the second roof 16 is connected with the second roof 16 outside of the second roof 1, the second roof is connected with the second roof 16 outside of the construction guardrail.
When the connection type quick-release building construction guardrail for civil engineering is used, as shown in fig. 1, 3 and 5, firstly, the installation upright post 1 is stably placed on the civil engineering construction ground to be installed, then the adjusting rod 2 is pressed downwards, so that the adjusting rod 2 drives the fixing plate 301 to move downwards, the connecting rod 303 rotates with the installation lug 302 and the installation frame 4 through the bearings respectively, at the moment, the inclination angle of the connecting rod 303 is changed, the installation frame 4 is pushed out of the installation upright post 1, the spring 6 is prolonged, in combination with the embodiment shown in fig. 4, because the installation frame 4 is connected with the connection block 7 in a splicing manner, the outer wall surface of the connection block 7 is provided with a groove-shaped structure which is matched with the positioning strip 5, the connection block 7 is inserted into the pushed installation frame 4, then the adjusting rod 2 is loosened, at the moment, the spring 6 rebounds, and force close to the central axis direction of the installation upright post 1 is generated on the installation frame 4, so that the positioning strip 5 is tightly connected with a groove-shaped structure arranged in the connection block 7 under the action of the installation frame 4, the firmness of the installation frame 4 is improved, and when the adjusting rod 2 is pulled out, and the connection block 7 is pressed downwards, so that quick-release work can be performed;
specifically, as shown in fig. 1 and 2, the connecting side plates 8 can be spliced and installed on the left and right sides of the installation upright 1 under the action of the connecting blocks 7 and the installation frame 4, so that the first upright 11, the first upright 12, the second upright 14 and the second upright 15 can be conveniently protected and separated, when the overall height needs to be adjusted, the fixing bolts 13 can be rotated, the fixing bolts 13 are separated from the first upright 11 and the first upright 12 respectively, the second top plate 16 is lifted upwards, the first upright 12 and the second upright 15 are in sliding connection with the first upright 11 and the second upright 14 respectively, and the fixing bolts 13 are rotationally inserted into the first upright 11 and the first upright 12 to be fixed, so that the adaptability is good, and the method for using the connecting type quick-dismantling construction guardrail for civil engineering is provided.
Standard parts used in the utility model can be purchased from the market, special-shaped parts can be customized according to the description of the specification and the drawings, the specific connection modes of all parts adopt conventional means such as mature bolts, rivets and welding in the prior art, the machinery, the parts and the equipment adopt conventional modes in the prior art, and the circuit connection adopts conventional connection modes in the prior art, so that details are not described in detail in the specification, and the utility model belongs to the prior art known to the person skilled in the art.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.

Claims (9)

1. The utility model provides a civil engineering is with connection formula quick detach construction guardrail which characterized in that includes:
the installation upright post is internally provided with an adjusting rod, the outer side of the adjusting rod is fixedly provided with a connecting assembly, the connecting assembly comprises a fixing plate, an installation lug and a connecting rod, and the outer sides of the front end and the rear end of the connecting assembly are respectively provided with an installation frame through hinges;
the spring is arranged at the inner side end of the mounting frame and positioned in the mounting upright post, a connecting block is arranged in the mounting frame, a connecting side plate is integrally and fixedly arranged at the outer side of the upper end of the connecting block, and a bottom plate is arranged at the inner side of the lower end of the connecting side plate;
the first top plate is fixedly arranged on the inner side of the upper end of the connecting side plate, a first upright post is fixedly arranged in the middle of the upper end surface of the bottom plate, a first upright post is arranged in the first upright post, and a fixing bolt penetrates through the upper end of the first upright post;
and the second top plate is fixedly arranged outside the upper end of the first vertical rod and is positioned outside the upper end of the first top plate.
2. The civil engineering connected quick release construction guardrail according to claim 1, wherein: the outer sides of the front end and the rear end of the fixing plate are fixedly provided with mounting lugs, and connecting rods are arranged in the mounting lugs through bearings.
3. The civil engineering connected quick release construction guardrail according to claim 2, wherein: the connecting rod is obliquely arranged, and the connecting rod forms a rotating structure with the mounting lug and the mounting rack through bearings respectively.
4. The civil engineering connected quick release construction guardrail according to claim 1, wherein: the mounting frame forms a telescopic structure with the mounting upright post through the spring, and the inner wall end of the mounting frame is fixedly provided with a positioning strip.
5. The civil engineering connected quick release construction guardrail according to claim 1, wherein: the adjusting rods are connected with the mounting upright posts in a sliding mode, and the adjusting rods are arranged in one-to-one correspondence with the mounting upright posts.
6. The civil engineering connected quick release construction guardrail according to claim 4, wherein: the mounting frame is connected with the connecting block in an inserting mode, and a groove-shaped structure matched with the positioning strip is formed in the outer wall surface of the connecting block.
7. The civil engineering connected quick release construction guardrail according to claim 1, wherein: second upright posts are arranged at equal intervals on the outer side of the upper end of the bottom plate, and second upright posts connected with a second top plate are connected inside the second upright posts in a sliding mode.
8. The civil engineering connected quick release construction guardrail according to claim 7, wherein: the second upright post is parallel to the first upright post, and the first upright post is connected with the first upright post in a sliding mode.
9. The civil engineering connected quick release construction guardrail according to claim 8, wherein: the right side equidistant screw hole structure that coincides with fixing bolt of seting up of first pole setting plays height-adjusting's effect.
CN202321014718.7U 2023-04-28 2023-04-28 Connection type quick-release building construction guardrail for civil engineering Active CN219711196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321014718.7U CN219711196U (en) 2023-04-28 2023-04-28 Connection type quick-release building construction guardrail for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321014718.7U CN219711196U (en) 2023-04-28 2023-04-28 Connection type quick-release building construction guardrail for civil engineering

Publications (1)

Publication Number Publication Date
CN219711196U true CN219711196U (en) 2023-09-19

Family

ID=87979784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321014718.7U Active CN219711196U (en) 2023-04-28 2023-04-28 Connection type quick-release building construction guardrail for civil engineering

Country Status (1)

Country Link
CN (1) CN219711196U (en)

Similar Documents

Publication Publication Date Title
CN111827155B (en) Noise reduction device for road and bridge construction and use method thereof
CN208363800U (en) A kind of construction guard fender
CN110528958A (en) A kind of collapsible construction guardrail of municipal administration
CN219711196U (en) Connection type quick-release building construction guardrail for civil engineering
CN111794589B (en) Safety protection bearing structure that town road bed was used
CN215055397U (en) Foundation ditch safety device for highway engineering
CN111719940A (en) Isolation protection device is built in room of steel construction lift base
CN217439524U (en) Novel protection scaffold frame auxiliary stay structure of building facade
CN108678528B (en) Auxiliary supporting device for preventing telegraph pole from toppling
CN219241568U (en) Guard railing capable of being quickly abutted
CN217812810U (en) Assembled interim safe enclosure
CN220167693U (en) Protection rack convenient to angle regulation
CN218991140U (en) Building guardrail with warning function
CN217079943U (en) Building construction place is with protection rail
CN220067300U (en) Roof photovoltaic support convenient to adjust structure
CN217712077U (en) Building protective fence convenient to install
CN213477198U (en) Expandable frame of folding house
CN212271998U (en) Reinforced connector for external sunshade roller shutter window
CN220080024U (en) Foundation pit construction supporting structure
CN220285476U (en) Insulating vertical rail convenient to installation
CN209976343U (en) Steel frame structure for large mechanical equipment to pass in and out workshop
CN220014772U (en) Concealed door handle
CN216974389U (en) Safety warning cross rod for constructional engineering
CN220117727U (en) Construction support for construction
CN219118954U (en) Rail guard for building engineering with prevent structure of inclining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant