CN219710091U - Guardrail for bridge construction - Google Patents
Guardrail for bridge construction Download PDFInfo
- Publication number
- CN219710091U CN219710091U CN202321049572.XU CN202321049572U CN219710091U CN 219710091 U CN219710091 U CN 219710091U CN 202321049572 U CN202321049572 U CN 202321049572U CN 219710091 U CN219710091 U CN 219710091U
- Authority
- CN
- China
- Prior art keywords
- fixed seat
- guardrail
- bridge construction
- seat
- upper fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及桥梁施工技术领域,具体为桥梁施工用护栏。The utility model relates to the technical field of bridge construction, specifically a guardrail for bridge construction.
背景技术Background technique
桥梁施工护栏是指用于桥梁施工时所用的防护装置,现有的护栏需要在桥梁上打孔安装,以保证护栏的固定效果,避免位移倒塌,对桥梁本身造成破坏,影响美观。Bridge construction guardrails refer to protective devices used during bridge construction. Existing guardrails need to be drilled and installed on the bridge to ensure the fixing effect of the guardrails and avoid displacement and collapse, causing damage to the bridge itself and affecting its appearance.
发明内容Contents of the invention
针对上述存在的技术不足,本实用新型的目的是提供桥梁施工用护栏,解决现有护栏需要问题。In view of the above-mentioned technical deficiencies, the purpose of this utility model is to provide guardrails for bridge construction and solve the problem of existing guardrail needs.
为解决上述技术问题,本实用新型采用如下技术方案:In order to solve the above technical problems, the present utility model adopts the following technical solutions:
本实用新型提供桥梁施工用护栏,包括固定座、立柱、横梁,所述固定座由上固定座、下固定座组成,所述立柱固定设置在上固定座上,所述上固定座和下固定座之间设置有支撑柱,所述支撑柱的两端分别通过转轴和上固定座、下固定座连接,所述上固定座和下固定座之间设置有螺杆,所述下固定座的上表面固定设置有转动座,所述转动座和螺杆的一端可转动连接,所述上固定座和螺杆之间设置有滑套,所述螺杆的另一端设置有驱动螺杆转动的把手把手。The utility model provides a guardrail for bridge construction, which includes a fixed base, a column, and a cross beam. The fixed base is composed of an upper fixed base and a lower fixed base. The upright column is fixedly arranged on the upper fixed base, and the upper fixed base and the lower fixed base are fixed. A support column is provided between the seats. The two ends of the support column are connected to the upper fixed seat and the lower fixed seat respectively through the rotating shaft. A screw rod is provided between the upper fixed seat and the lower fixed seat. The upper fixed seat of the lower fixed seat is A rotating base is fixed on the surface, and the rotating base is rotatably connected to one end of the screw. A sliding sleeve is provided between the upper fixed base and the screw. The other end of the screw is provided with a handle that drives the screw to rotate.
优选的,所述立柱和上固定座之间设置有加强筋。Preferably, reinforcing ribs are provided between the upright column and the upper fixed base.
优选的,所述上固定座的上表面为斜面。Preferably, the upper surface of the upper fixed seat is an inclined surface.
优选的,所述下固定座的下表面为斜面。Preferably, the lower surface of the lower fixed seat is an inclined surface.
优选的,所述立柱为空心柱。Preferably, the upright column is a hollow column.
优选的,所述横梁为空心梁。Preferably, the cross beam is a hollow beam.
优选的,所述横梁表面为红色。Preferably, the surface of the beam is red.
本实用新型的有益效果在于:本实用新型中的护栏通过上固定座和下固定座夹紧设置在桥梁边缘位置,方便拆装,无需打孔破坏桥梁。The beneficial effects of the utility model are: the guardrail in the utility model is clamped and arranged at the edge of the bridge through the upper fixing seat and the lower fixing seat, making it easy to disassemble and assemble without drilling holes to damage the bridge.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description These are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting creative efforts.
图1为本实用新型实施例提供的桥梁施工用护栏的立体结构图;Figure 1 is a three-dimensional structural view of a guardrail for bridge construction provided by an embodiment of the present utility model;
图2为本实用新型实施例提供的桥梁施工用护栏螺杆的结构示意图。Figure 2 is a schematic structural diagram of a guardrail screw for bridge construction provided by an embodiment of the present utility model.
附图标记说明:1、上固定座;2、加强筋;3、立柱;4、横梁;5、滑套;6、下固定座;7、桥梁;8、螺杆;9、转动座;10、转轴;11、支撑柱;12、把手。Explanation of reference signs: 1. Upper fixed seat; 2. Reinforcement rib; 3. Column; 4. Cross beam; 5. Sliding sleeve; 6. Lower fixed seat; 7. Bridge; 8. Screw; 9. Rotating seat; 10. Rotating shaft; 11. Support column; 12. Handle.
实施方式Implementation
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.
实施例1,如图1至图2所示,桥梁7施工用护栏,包括固定座、立柱3、横梁4,所述固定座由上固定座1、下固定座6组成,所述立柱3固定设置在上固定座1上,所述上固定座1和下固定座6之间设置有支撑柱11,所述支撑柱11的两端分别通过转轴10和上固定座1、下固定座6连接,所述上固定座1和下固定座6之间设置有螺杆8,所述下固定座6的上表面固定设置有转动座9,所述转动座9和螺杆8的一端可转动连接,所述上固定座1和螺杆8之间设置有滑套5,所述螺杆8的另一端设置有驱动螺杆8转动的把手12把手12。Embodiment 1, as shown in Figures 1 to 2, a guardrail for bridge 7 construction includes a fixed base, a column 3, and a beam 4. The fixed base is composed of an upper fixed base 1 and a lower fixed base 6. The vertical column 3 is fixed. It is arranged on the upper fixed base 1. A support column 11 is provided between the upper fixed base 1 and the lower fixed base 6. The two ends of the support column 11 are connected to the upper fixed base 1 and the lower fixed base 6 through the rotating shaft 10 respectively. , a screw 8 is provided between the upper fixed base 1 and the lower fixed base 6, and a rotating base 9 is fixedly provided on the upper surface of the lower fixed base 6. One end of the rotating base 9 and the screw 8 is rotatably connected, so A sliding sleeve 5 is provided between the fixed base 1 and the screw rod 8. The other end of the screw rod 8 is provided with a handle 12 for driving the screw rod 8 to rotate.
进一步的,所述立柱3和上固定座1之间设置有加强筋2。Furthermore, reinforcing ribs 2 are provided between the upright column 3 and the upper fixed base 1 .
进一步的,所述上固定座1的上表面为斜面。Furthermore, the upper surface of the upper fixed base 1 is an inclined surface.
进一步的,所述下固定座6的下表面为斜面。Furthermore, the lower surface of the lower fixed seat 6 is an inclined surface.
进一步的,所述立柱3为空心柱。Furthermore, the upright column 3 is a hollow column.
进一步的,所述横梁4为空心梁。Furthermore, the cross beam 4 is a hollow beam.
进一步的,所述横梁4表面为红色。Furthermore, the surface of the beam 4 is red.
使用时,初始状态下,上固定座1和下固定座6张开,将其卡在桥梁7边缘位置,转动把手12,把手12转动带动螺杆8转动,螺杆8转动带动上固定座1向上移动,增大上固定座1和下固定座6之间的距离,由于支撑柱11的支撑力,上固定座1和下固定座6靠近桥梁7的一侧箱内收紧,进而整个护栏固定在桥梁7边缘位置,无需在桥梁7上额外开孔,安装方便。When in use, in the initial state, the upper fixed base 1 and the lower fixed base 6 are opened, and they are stuck at the edge of the bridge 7. Turn the handle 12, and the handle 12 rotates to drive the screw 8 to rotate, and the screw 8 rotates to drive the upper fixed base 1 to move upward. , increase the distance between the upper fixed seat 1 and the lower fixed seat 6. Due to the support force of the support column 11, the upper fixed seat 1 and the lower fixed seat 6 are tightened in the box on the side close to the bridge 7, and then the entire guardrail is fixed on The edge of the bridge 7 eliminates the need to open additional holes on the bridge 7 and is easy to install.
本实用新型中的护栏通过上固定座和下固定座夹紧设置在桥梁边缘位置,方便拆装,无需打孔破坏桥梁。The guardrail in the utility model is clamped and arranged at the edge of the bridge through the upper fixing seat and the lower fixing seat, which is convenient for disassembly and assembly without drilling holes to damage the bridge.
显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. In this way, if these modifications and variations of the present utility model fall within the scope of the claims of the present utility model and equivalent technologies, the present utility model is also intended to include these modifications and variations.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321049572.XU CN219710091U (en) | 2023-05-05 | 2023-05-05 | Guardrail for bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321049572.XU CN219710091U (en) | 2023-05-05 | 2023-05-05 | Guardrail for bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219710091U true CN219710091U (en) | 2023-09-19 |
Family
ID=88004401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321049572.XU Expired - Fee Related CN219710091U (en) | 2023-05-05 | 2023-05-05 | Guardrail for bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219710091U (en) |
-
2023
- 2023-05-05 CN CN202321049572.XU patent/CN219710091U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219710091U (en) | Guardrail for bridge construction | |
CN207538580U (en) | A kind of drilling machine enclosure device for geotechnical investigation | |
CN204720108U (en) | Wind resistance automatically resets warning sign | |
CN209167805U (en) | A projection screen for network teaching | |
CN209163602U (en) | A kind of bridge construction safety alarm device | |
CN211578303U (en) | Billboard fixing device | |
CN209496584U (en) | An engineering bidding device | |
CN212184465U (en) | A tree fixing device for gardens | |
CN110847061B (en) | A kind of auxiliary tool for installing bridge pier cap template in bridge construction process | |
CN222542170U (en) | A kind of electric power construction safety fence | |
CN216304518U (en) | Stop device of municipal administration road bridge design | |
CN219040020U (en) | Display device with telescopic storage function | |
CN213183206U (en) | Public management science teaching information display device | |
CN220433455U (en) | Intelligent traffic sign display board | |
CN219218963U (en) | Cable support steel-pipe pile assembly | |
CN211186260U (en) | Music book placing frame for western union | |
CN217869964U (en) | Bridge repairing and suspending device for municipal bridge engineering | |
CN223034690U (en) | Road and bridge protector | |
CN216902071U (en) | A mobile identification sign | |
CN216405190U (en) | A warning device for municipal road and bridge construction | |
CN218813297U (en) | A New Signboard for Highway Traffic | |
CN221799416U (en) | Foundation pit guardrail | |
CN218291661U (en) | Bridge anti-wind guiding mechanism | |
CN219887147U (en) | Reinforced concrete frame | |
CN218780116U (en) | Pre-buried formula foundation ditch guardrail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230919 |