CN219710003U - Curb mounting callipers - Google Patents

Curb mounting callipers Download PDF

Info

Publication number
CN219710003U
CN219710003U CN202320781828.XU CN202320781828U CN219710003U CN 219710003 U CN219710003 U CN 219710003U CN 202320781828 U CN202320781828 U CN 202320781828U CN 219710003 U CN219710003 U CN 219710003U
Authority
CN
China
Prior art keywords
curb
rule
vertical
clamping seat
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320781828.XU
Other languages
Chinese (zh)
Inventor
罗荣臻
林宗谕
李营
蒙文光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Guitong Engineering Management Group Co ltd
Original Assignee
Guangxi Guitong Engineering Management Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Guitong Engineering Management Group Co ltd filed Critical Guangxi Guitong Engineering Management Group Co ltd
Priority to CN202320781828.XU priority Critical patent/CN219710003U/en
Application granted granted Critical
Publication of CN219710003U publication Critical patent/CN219710003U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a curb mounting caliper, which relates to the technical field of road construction and aims at playing a certain stabilizing role on a curb to prevent the curb from tilting and tilting, limiting a gap between two curbs to meet the requirement of construction standards and measuring the material for caulking so as to save the cost.

Description

Curb mounting callipers
Technical Field
The utility model relates to the technical field of road construction, in particular to a curb mounting caliper.
Background
With the development of the current urban construction level, the requirements on municipal road surfaces are higher and higher, and places such as sidewalks, squares and the like usually need to be paved with flat floor tiles and curbs in a large area. Currently, the paving of floor tiles and curbs generally adopts purely manual operation or a combination of machinery and manpower.
For the construction of most municipal facilities at present, mainly manual work is mainly, tools are auxiliary, and especially some small infrastructures, such as pavements, guardrails, bus kiosks and the like are built by stacking, so that a mounting caliper for assisting workers to build pavement curbs is needed, gaps between two curbs can be limited to meet the requirements of construction specifications, and the cost of caulking materials can be conveniently measured.
Disclosure of Invention
The utility model aims to provide a curb mounting caliper which can play a certain role in stabilizing a curb to prevent the curb from tilting and skewing, limit a gap between two curbs to meet the requirements of construction standards and approximately obtain the length of a part exceeding the top surface of the curb so as to measure the gap filling material to save cost.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the curb mounting caliper comprises a clamping seat and a vertical ruler, wherein the vertical ruler is arranged at the middle point of the top surface of the clamping seat, and an included angle between the clamping seat and the vertical ruler is 90 degrees.
Through adopting above-mentioned technical scheme, the combination of cassette and riser can block between two curb during the construction, and then prevents that the curb slope from falling, also can inject the interval of stone seam so that it satisfies construction specification requirement.
Further, the clamping seat is provided with clamping protrusions extending out of two sides of a position at a distance from the forefront end.
By adopting the technical scheme, the clamping convex can be clamped at the inner side edge of the curb, so that the stability of the curb can be more firmly enhanced, and the curb is prevented from deflecting.
Further, the upper half part of the vertical ruler is provided with a plurality of saw cuts at intervals of 10mm from the top end, and a plurality of ruler blocks are formed between the saw cuts.
By adopting the technical scheme, the distance between saw cuts is fixed, so that the size of each ruler block is consistent, the length of a part of vertical ruler can be measured when in construction according to actual requirements, and the control of materials in subsequent filling construction operation is facilitated, and the cost is saved.
In summary, the beneficial technical effects of the utility model are as follows:
1. the clamping seat is adopted for placing the caliper on the pavement base layer, and has a certain degree of stabilizing effect on the curb;
2. the vertical ruler is used and placed on the side face of the curb, so that the curb can be prevented from toppling, and gaps among the curb can meet the requirements of construction specifications;
3. the ruler blocks and the saw cuts are selected, the parts, exceeding the top surface of the curb, of the vertical ruler can be conveniently folded down after the curb is arranged, the construction requirements can be met, the rough height of the curb can be directly obtained according to the number of the ruler blocks of the folded down parts, the measuring of the mud materials required for joint filling is facilitated, and the materials are saved.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic diagram of the structure of the present utility model;
1. a clamping seat; 2. a vertical ruler; 3. a clamping protrusion; 4. a ruler block; 5. saw cut.
Detailed Description
The present utility model will be described in further detail with reference to the accompanying drawings.
The utility model discloses a curb stone installation caliper which comprises a clamping seat 1 and a vertical ruler 2, wherein the vertical ruler 2 is arranged in the middle of the clamping seat 1, the vertical ruler 2 can play roles in preventing toppling and limiting the size of a stone gap when being installed in construction, a clamping protrusion 3 is arranged at a small distance from the forefront end of the clamping seat 1, the clamping protrusion 3 can be used for clamping the inner side edge of a curb stone, and the subsequent construction operation of filling mortar is facilitated, as shown in fig. 1.
The above-mentioned vertical rule 2 is provided with a plurality of saw cuts 5 at intervals of 10mm from the top end, a first rule block 4 is formed between the first saw cut 5 at the uppermost position and the top surface of the vertical rule 2, a second rule block 4 is formed between the second saw cut 5 at the lower position and the first saw cut 5, and so on, the saw cuts 5 correspond to the plurality of rule blocks 4, and as the distance between the saw cuts 5 is fixed, the length of the vertical rule 2 is approximately visible when the curb is placed according to actual requirements, which can be beneficial to subsequent filling construction operation, and particularly, fig. 2.
Examples
The installation and use flow is as follows:
1. firstly, setting a first curb on a pavement base layer, then flatly leaning a clamping seat 1 of a curb mounting caliper against the inner side of the edge of the first curb along the top surface of the pavement base layer, clamping a clamping protrusion 3 at the front end of the clamping seat 1 against the inner side edge of the first curb, then tightly adhering a vertical rule 2 to the side surface of the curb, then plastering mortar onto the side surface of the first curb, then mounting a second curb, tightly leaning against the first curb, extruding redundant mortar as much as possible, and limiting the thickness of the mortar in a mounting seam to be near the width of the vertical rule 2, thereby meeting the requirements of related construction specifications.
2. According to the curb mounting height, the upper part of the curb mounting caliper which is higher than the curb is broken, and the scale value is recorded, so that the measuring of the consumption of the filler can be facilitated, the follow-up construction operation is facilitated, and the cost is saved.
3. And scraping redundant mortar of the installation joint by utilizing a pointing scraper, installing the next curb, and repeating the construction steps until the required installation quantity of the curbs reaches the requirement.
The embodiments of the present utility model are all preferred embodiments of the present utility model, and are not intended to limit the scope of the present utility model in this way, therefore: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.

Claims (3)

1. Curb installation slide caliper rule, including cassette (1) and riser (2), its characterized in that: the vertical ruler (2) is arranged at the middle point of the top surface of the clamping seat (1), and an included angle between the clamping seat (1) and the vertical ruler (2) is 90 degrees.
2. The curb mounting calliper of claim 1, wherein: the two sides of the clamping seat (1) at a distance from the forefront end are extended with clamping protrusions (3).
3. The curb mounting calliper of claim 1, wherein: the upper half of the vertical rule (2) is provided with a plurality of saw cuts (5) at intervals of 10mm from the top end, a first rule block (4) is formed between the first saw cut (5) at the uppermost position of the vertical rule (2) and the top surface of the vertical rule (2), a second rule block (4) is formed between the second saw cut (5) at the lower position and the first saw cut (5), and the like, and the upper half of the vertical rule (2) is provided with a plurality of rule blocks (4).
CN202320781828.XU 2023-04-11 2023-04-11 Curb mounting callipers Active CN219710003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320781828.XU CN219710003U (en) 2023-04-11 2023-04-11 Curb mounting callipers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320781828.XU CN219710003U (en) 2023-04-11 2023-04-11 Curb mounting callipers

Publications (1)

Publication Number Publication Date
CN219710003U true CN219710003U (en) 2023-09-19

Family

ID=88004837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320781828.XU Active CN219710003U (en) 2023-04-11 2023-04-11 Curb mounting callipers

Country Status (1)

Country Link
CN (1) CN219710003U (en)

Similar Documents

Publication Publication Date Title
EP0000642A1 (en) A method of sealing bridge deck joints
CN219710003U (en) Curb mounting callipers
KR20030075452A (en) Construction method of latex modified concrete for the use of a paving equipment
CN102071614B (en) Stone block road construction method and guiding rule for same
US20130302088A1 (en) Paver with interlocking spacer
KR101200528B1 (en) Pavement Method For Racing Track Pavement
CN112500039A (en) Construction method of steel slag permeable pavement brick
JP6474626B2 (en) Curb structure and its construction method
CN209619781U (en) A kind of rock asphalt road structure
JP3045073U (en) Paving blocks
Ghafoori et al. Bridge deck asphalt plug joints: problems and solutions
CN211079899U (en) Precast block for bridge expansion joint
US10280569B2 (en) Golf course modular bunker paver blocks
CN113026473A (en) Road widening construction method
CN221721355U (en) Supporting device for reserving longitudinal drainage grooves
CN221441570U (en) Filling type invisible well lid z-shaped clamping column
Scherocman Construction of durable longitudinal joints
CN208815367U (en) A kind of heavy resurfacing structure for handling different carriageway surfacing road conditions and differing greatly
CN110629634A (en) Anti-warping rapid-drainage sidewalk brick and curb device and integral assembling method
IT201600095976A1 (en) METHOD FOR THE CONSOLIDATION OF ROAD FLOORING IN CONCRETE AND METHODS FOR RESTORING ROAD FLOORING IN CONCRETE THAT USE THE CONSOLIDATION METHOD
CN217629253U (en) Urban road curb mounting structure
CN211815411U (en) Road edge brick laying tool
CN216007588U (en) Stone-like brick step
CN219045072U (en) Concrete pouring road
CN107988873B (en) Curb of drainage is promoted in anti falling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant