CN219697112U - Municipal cable laying installation rack - Google Patents

Municipal cable laying installation rack Download PDF

Info

Publication number
CN219697112U
CN219697112U CN202320707539.5U CN202320707539U CN219697112U CN 219697112 U CN219697112 U CN 219697112U CN 202320707539 U CN202320707539 U CN 202320707539U CN 219697112 U CN219697112 U CN 219697112U
Authority
CN
China
Prior art keywords
anchor clamps
cable laying
installation frame
municipal
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320707539.5U
Other languages
Chinese (zh)
Inventor
武焕刚
宋立功
刘娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Linhai Construction Group Co.,Ltd.
Original Assignee
Qingdao Linhai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Linhai Construction Engineering Co ltd filed Critical Qingdao Linhai Construction Engineering Co ltd
Priority to CN202320707539.5U priority Critical patent/CN219697112U/en
Application granted granted Critical
Publication of CN219697112U publication Critical patent/CN219697112U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a municipal cable laying installation frame, which comprises an installation assembly and a fixing assembly, wherein the installation assembly comprises an installation frame and an installation frame body arranged on the front surface of the installation frame, the fixing assembly comprises a lower clamp symmetrically arranged on the top of the installation frame body, a positioning pin symmetrically arranged on the top of the lower clamp, an upper clamp movably arranged on the top of the positioning pin, a half-arc groove formed on one side of the lower clamp and one side of the upper clamp, a ball groove formed on the inner wall of the half-arc groove and a sliding ball movably arranged in the ball groove.

Description

Municipal cable laying installation rack
Technical Field
The utility model relates to the technical field of cable installation frames, in particular to a municipal cable laying installation frame.
Background
In municipal construction process, the cable is often all laid underground, and the environment of underground is comparatively moist, in order to form good protection to the cable, prolongs its life, often erects it through cable laying mounting bracket in cable laying process to this reaches the purpose of keeping away from ground, and cable laying mounting bracket can divide into according to the difference of structure: buried cable brackets, screw type cable brackets, modular cable brackets, etc.
Most of the existing cable laying installation frames cannot perform good limiting effect on cables in the using process, so that multiple cables are staggered in the cable laying process, and a plurality of difficulties are caused for subsequent use.
Disclosure of Invention
The utility model aims to provide a municipal cable laying installation frame which solves the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a municipal cable lays mounting bracket, includes erects subassembly and fixed subassembly, erect the subassembly including erect the frame and install at erecting the positive mounting bracket body of frame, fixed subassembly is including the symmetry installation at the below anchor clamps at mounting bracket body top, the locating pin at below anchor clamps top, movable mounting at the top anchor clamps at locating pin top, run through the threaded rod of installing at top anchor clamps top, set up the half arc groove in below anchor clamps and top anchor clamps one side, set up the ball groove and the movable mounting slip ball in the ball inslot at half arc groove inner wall.
Preferably, the threaded rod passes through the top of the lower clamp, and the threaded rod is positioned between the positioning pins.
Preferably, the top of the mounting frame body is symmetrically provided with a separation plate, and the separation plate is positioned in front of the lower clamp.
Preferably, the front symmetry of erect the frame has seted up the regulation hole, the fastening bolt is installed to the front symmetry of mounting bracket body, the outside and the inner wall in regulation hole of fastening bolt contact each other.
Preferably, the side fixing plates are arranged on two sides of the erection frame, and the front surfaces of the side fixing plates are provided with thread grooves.
Preferably, a rotary handle is mounted on top of the threaded rod.
By adopting the technical scheme, the beneficial effects obtained by the utility model are as follows:
according to the utility model, the lower clamp, the upper clamp, the threaded rod, the ball groove and the sliding ball are arranged, when a cable is laid, a worker can drive the threaded rod to rotate through the rotary handle, so that the upper clamp is lifted to a certain position, then the cable passes through the half-arc groove, and then the rotary handle is rotated reversely to close the upper clamp, so that the cable is erected and limited, the lower clamp and the upper clamp play a role in limiting and fixing the cable, and when the cable is required to be pulled and moved, even if the lower clamp and the upper clamp have a limiting and fixing effect on the cable, the arranged sliding ball can rotate along with the movement of the cable, so that the device can limit and fix the cable, and meanwhile, the pulling and moving of the cable can not be influenced, and great convenience is provided for the cable laying work.
Drawings
Fig. 1 is a schematic perspective view of the whole device of the present utility model.
Fig. 2 is a schematic perspective view of a fixing assembly of the present utility model.
Fig. 3 is a perspective view of a ball groove according to the present utility model.
In the figure: 100. erecting an assembly; 101. erecting a frame; 102. a mounting frame body; 103. a partition plate; 104. an adjustment aperture; 105. a fastening bolt; 106. a side fixing plate; 107. a thread groove;
200. a fixing assembly; 201. a lower clamp; 202. a positioning pin; 203. an upper clamp; 204. a threaded rod; 205. a half arc groove; 206. a ball groove; 207. sliding balls; 208. the handle is rotated.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples:
referring to fig. 1-3, a municipal cable laying mount;
including below anchor clamps 201, top anchor clamps 203, threaded rod 204, ball groove 206 and slip ball 207, the mounting bracket body 102 is installed to the front of erect frame 101, division board 103 is installed to the top symmetry of mounting bracket body 102, division board 103 is located the place ahead of below anchor clamps 201, adjust hole 104 has been seted up to the front symmetry of erect frame 101, fastening bolt 105 is installed to the front symmetry of mounting bracket body 102, the outside and the inner wall of adjust hole 104 contact each other of fastening bolt 105, side fixed plate 106 is installed to the both sides of erect frame 101, threaded groove 107 has been seted up to the front of side fixed plate 106, below anchor clamps 201 are installed to the top symmetry of erect frame body 102, locating pin 202 is installed to the top movable mounting of locating pin 202, threaded rod 204 is installed in the top run through of top anchor clamps 203, threaded rod 204 runs through the top of Fang Gaju down, threaded rod 204 is located between the locating pin 202, half arc groove 205 has been seted up to one side of below anchor clamps 201 and top anchor clamps 203, ball groove 206 has been seted up to the inner wall of half arc groove 205, the inside movable mounting of ball groove 206 has the top 208, rotatory ball 208 has been installed at the top 208.
Specifically, when the device is used, the erection frame 101, the erection frame body 102 and the side fixing plates 106 form a main structure of the device, the device is used for providing mounting positions for other structures, the stability of other structures in operation is guaranteed, when cables are laid, workers can drive the threaded rods 204 to rotate through the rotary handles 208, thereby raising the upper clamp 203 to a certain position, then the cables pass through the half arc grooves 205, and then rotate the rotary handles 208 in the opposite direction, the upper clamp 203 is closed, thereby completing the erection limit for the cables, the stability of the cables in the operation process is guaranteed, the erection frame 101 provides mounting positions for the erection frame body 102, good stability of the cables in operation is guaranteed, the erection frame body 102 is fixed on the erection frame 101 through the fastening bolts 105, and the regulation holes 104 are formed in the erection frame 101, so that the workers can regulate or freely increase and decrease the positions between the erection frame body 102 according to the requirements of the actual construction process, the number of the erection frame body 102 is formed into a convenient and fast-detachable structure, the device can meet the construction requirements, the device can meet the requirements of most of the construction, the device can be fixed on the upper clamp 203 through the fixing plates 203, the whole position-limiting pins are not influenced by the fixing pins 203, the position-limiting pins are fixed on the upper clamp 203 through the side fixing plates 203, the whole device is fixed on the upper clamp 203 through the upper side fixing plates and the fixing pins 201 and the fixing plates are not normally arranged on the upper clamp 201, and the fixing pins are fixed on the upper clamp 201 in the position of the position-limiting device through the position-fixing plates and the position-limiting device is fixed on the upper side of the position-down structures and can be fixed on the position. The staff can control the rising and descending of the upper clamp 203 through changing the rotating direction of the threaded rod 204, the device is very flexible, the ball grooves 206 are formed in the inner walls of the lower clamp 201 and the upper clamp 203 and used for sliding the balls 207, stability of the sliding balls 207 in rotation is guaranteed, when the cable is required to be pulled and moved, even if the lower clamp 201 and the upper clamp 203 have a limiting and fixing effect on the cable, the sliding balls 207 can rotate along with the movement of the cable, and therefore the device can limit and fix the cable and can not influence pulling movement of the cable, and great convenience is provided for the cable laying work.
Working principle: when a cable is laid, a worker rotates the rotary grip 208 to drive the threaded rod 204 to lift the upper clamp 203 to a certain position, then the cable passes through the half-arc groove 205, and then rotates the rotary grip 208 in the opposite direction to close the upper clamp 203, so that the cable erection limit is completed, when the cable is required to be pulled and moved, even if the lower clamp 201 and the upper clamp 203 have the effect of limiting and fixing the cable, the installed sliding ball 207 can rotate along with the movement of the cable, so that the device can limit and fix the cable, and meanwhile, the pulling movement of the cable is not influenced, and great convenience is provided for the cable laying work.
It will be apparent to those skilled in the art that various modifications and variations can be made to the present utility model without departing from the spirit or scope of the utility model. Thus, it is intended that the present utility model also include such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.

Claims (6)

1. A municipal cable laying mounting rack, comprising:
the erection assembly (100) comprises an erection frame (101) and an installation frame body (102) arranged on the front surface of the erection frame (101);
fixed subassembly (200), including symmetry install below anchor clamps (201) at mounting bracket body (102) top, symmetry install locating pin (202) at below anchor clamps (201) top, movable mounting is at top anchor clamps (203) at locating pin (202) top, run through threaded rod (204) of installing at top anchor clamps (203), set up half arc groove (205) in below anchor clamps (201) and above anchor clamps (203) one side, set up ball groove (206) and movable mounting at inside slip ball (207) of ball groove (206) at half arc groove (205) inner wall.
2. The municipal cabling rack according to claim 1, wherein the threaded rod (204) extends through the top of the lower Fang Gaju (201), the threaded rod (204) being located between the locating pins (202).
3. The municipal cable laying mounting frame according to claim 1, wherein the top of the mounting frame body (102) is symmetrically provided with a partition plate (103), and the partition plate (103) is positioned in front of the lower clamp (201).
4. The municipal cable laying installation frame according to claim 1, wherein the front side of the installation frame (101) is symmetrically provided with adjusting holes (104), the front side of the installation frame body (102) is symmetrically provided with fastening bolts (105), and the outer sides of the fastening bolts (105) are in contact with the inner walls of the adjusting holes (104).
5. The municipal cable laying installation frame according to claim 1, wherein two sides of the erection frame (101) are provided with side fixing plates (106), and a thread groove (107) is formed in the front surface of each side fixing plate (106).
6. The municipal cabling rack of claim 1, wherein a swivel grip (208) is mounted on top of the threaded rod (204).
CN202320707539.5U 2023-04-03 2023-04-03 Municipal cable laying installation rack Active CN219697112U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320707539.5U CN219697112U (en) 2023-04-03 2023-04-03 Municipal cable laying installation rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320707539.5U CN219697112U (en) 2023-04-03 2023-04-03 Municipal cable laying installation rack

Publications (1)

Publication Number Publication Date
CN219697112U true CN219697112U (en) 2023-09-15

Family

ID=87940983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320707539.5U Active CN219697112U (en) 2023-04-03 2023-04-03 Municipal cable laying installation rack

Country Status (1)

Country Link
CN (1) CN219697112U (en)

Similar Documents

Publication Publication Date Title
CN219697112U (en) Municipal cable laying installation rack
CN208088976U (en) A kind of easy-to-mount protective fence in construction site
CN219268325U (en) Paying-off pulley with braking function
CN214619860U (en) Outer quick-witted mounting structure of air conditioner
CN215674403U (en) Changeable floor equipment arrangement device
CN220335889U (en) Connecting device for foundation pit supporting pipe
CN219633837U (en) Robot inspection guide rail device
CN217656353U (en) Cable bridge cover plate convenient for wiring
CN217656355U (en) Cable testing bridge of scalable regulation
CN219489297U (en) Wall-plate type elevator wall-attached angle adjusting support
CN210369474U (en) Hyperboloid aluminum plate molding curtain construction equipment
CN218914504U (en) Installation and adjustment structure for projector in multimedia classroom
CN221030189U (en) Foundation pit safety protection device
CN220100793U (en) Building engineering frame roof beam reinforcing apparatus
CN219622355U (en) Auxiliary support for curtain wall keel installation
KR200496200Y1 (en) Support holder for laser leveler
CN219345170U (en) Combined middle wallboard
CN219281229U (en) Supporting and reinforcing device for building construction support
CN220874186U (en) Bracket bridge convenient to install
CN216921171U (en) Clamping piece adjusting foot with adjustable size
CN219711046U (en) Node connection structure of assembled concrete building
CN220469313U (en) Horizontal decoration auxiliary tool
CN216306958U (en) Fire-fighting pipeline support convenient to installation
CN220666504U (en) High strength curtain built-in fitting
CN219976050U (en) Self-adaptation regulation cable installation construction vertical monitor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.68, Pinghu Road, Tieshan sub district office, Huangdao District, Qingdao City, Shandong Province 266000

Patentee after: Qingdao Linhai Construction Group Co.,Ltd.

Country or region after: China

Address before: No.68, Pinghu Road, Tieshan sub district office, Huangdao District, Qingdao City, Shandong Province 266000

Patentee before: Qingdao Linhai Construction Engineering Co.,Ltd.

Country or region before: China