CN219691163U - Shear wall crack repair maintenance device - Google Patents
Shear wall crack repair maintenance device Download PDFInfo
- Publication number
- CN219691163U CN219691163U CN202320704392.4U CN202320704392U CN219691163U CN 219691163 U CN219691163 U CN 219691163U CN 202320704392 U CN202320704392 U CN 202320704392U CN 219691163 U CN219691163 U CN 219691163U
- Authority
- CN
- China
- Prior art keywords
- fixed
- pressure pump
- helical gear
- wall
- backup pad
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000008439 repair process Effects 0.000 title claims description 15
- 238000012423 maintenance Methods 0.000 title claims description 12
- 239000003292 glue Substances 0.000 claims abstract description 20
- 230000003028 elevating effect Effects 0.000 claims description 13
- 238000010030 laminating Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 230000007246 mechanism Effects 0.000 abstract description 11
- 230000009194 climbing Effects 0.000 abstract description 3
- 238000004026 adhesive bonding Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 235000004443 Ricinus communis Nutrition 0.000 description 2
- 238000010009 beating Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a shear wall crack repairing and curing device which comprises an L-shaped supporting plate, wherein the lower end of the L-shaped supporting plate is movably provided with a movable caster, one side of the L-shaped supporting plate is fixedly provided with a lifting mechanism, a glue containing box and a tool box, the tool box is positioned on one side of the glue containing box, the lifting mechanism is positioned at the rear end of the glue containing box, the upper end of the glue containing box is positioned and provided with a pressure pump supporting frame and a connector, and the upper end of the pressure pump supporting frame is positioned and provided with a pressure pump. According to the shear wall crack repairing and maintaining device, through the lifting mechanism, when a worker encounters a crack of a higher wall body, the outer lifting rod can be driven by the control motor to move up and down, the glue gun clamped at the upper end of the outer lifting rod is adjusted to move up and down according to the height of the crack, and the crack is aligned for repairing, so that the climbing operation of the worker is avoided, and the potential safety hazard is reduced.
Description
Technical Field
The utility model relates to the technical field of wall crack repairing devices, in particular to a shear wall crack repairing and maintaining device.
Background
The shear wall is also called wind-resistant wall, anti-seismic wall or structural wall, the wall body of horizontal load and vertical load mainly bearing wind load or earthquake effect in house or structure, prevent the structural shear damage, also called anti-seismic wall, generally make by reinforced concrete, it divides plane shear wall and cylinder shear wall, the plane shear wall is used in reinforced concrete frame structure, lift plate structure, flat floor system, in order to increase rigidity, intensity and collapse resistance of the structure, can cast-in-place or prefabricate and assemble reinforced concrete shear wall in some positions, cast-in-place shear wall and peripheral beam, column pour at the same time, the wholeness is good, the cylinder shear wall is used in the high-rise building, high-rise structure and suspension structure, by the spacer wall of the elevator room, stairwell, apparatus and auxiliary room, the cylinder wall is cast-in-place reinforced concrete wall, its rigidity and intensity can bear the great horizontal load than the plane shear wall.
The existing shear wall crack repairing device needs workers to climb up to work when facing wall cracks at higher positions, potential safety hazards exist when the wall crack repairing tool is carried at the higher positions to be used, and certain adverse effects are brought to the using process of people.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a shear wall crack repairing and maintaining device which is provided with a lifting mechanism, when facing to a wall crack at a higher position, a worker can adjust the height of a glue gun up and down according to the height of the wall crack to repair the crack wall, the worker is not required to climb up to work, the potential safety hazard caused by climbing up is avoided, and the problem in the background art can be effectively solved.
Technical proposal
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows: the utility model provides a maintenance device is repaired to shear force wall crack, includes L type backup pad, the lower extreme movable mounting of L type backup pad has the movable caster, one side fixed mounting of L type backup pad has the handle, elevating system, hold gluey case and toolbox are installed to the upper end location of L type backup pad, the toolbox is located one side that holds the gluey case, elevating system is located the rear end that holds the gluey case, pressure pump support frame and connector are installed to the upper end location that holds the gluey case, the connector is located one side of pressure pump support frame, pressure pump is installed to the upper end location of pressure pump support frame, the connector is connected with the connecting pipe, the connecting pipe is connected with the gluing rifle, and the gluing rifle block is in elevating system's upper end.
Preferably, four corners of L type backup pad lower extreme and the upper end of removing the truckle pass through bearing rotary motion, one side surface of L type backup pad passes through welded fastening with the one end of handle, the upper end surface of L type backup pad passes through bolt seat fixed connection with elevating system, holds the lower extreme of gluing case and toolbox, hold the upper end of gluing case and pass through welded fastening connection with the lower extreme of pressure pump support frame and connector, the lower extreme of pressure pump passes through bolt seat fixed connection with the upper end of pressure pump support frame, the connecting pipe intercommunication holds gluing case and beats the gluey rifle.
Preferably, the elevating system is including control base, swivelling joint pole, stopper, helical gear No. two, internal thread pole, outer lifter, spliced pole, anticreep piece, control motor, bracing piece, fixed slot, fixed screw hole, fixed thread bolt, fixed block, anticreep clamp piece and anti-slip rubber, control motor is located the one end of control base, the swivelling joint pole is located the one end of control motor and is located the inside of control base, the stopper is located the one end of swivelling joint pole, helical gear No. one is located the outer wall of swivelling joint pole, helical gear No. two and helical gear interlock each other, the spliced pole is located the upper end of helical gear No. two, the anticreep piece is located the bottom of internal thread pole outer wall, outer lifter is located the outer wall of internal thread pole.
Preferably, the supporting rod is located the outer wall of outer lifter, the fixed slot is seted up in the upper end of supporting rod, the fixed screw hole is seted up in the front end of supporting rod, anticreep clamp block is located the upper end of fixed block, anti-skidding rubber is located the inboard surface of anticreep clamp block.
Preferably, one end of the control motor is fixedly connected with one end of the control base through a bolt seat, the control motor drives the rotary connecting rod to rotate, one end of the rotary connecting rod is fixedly connected with the limiting block, the rotary connecting rod drives the internal threaded rod to rotate through a first bevel gear, a second bevel gear and a connecting column, and the external lifting rod moves up and down on the outer wall of the internal threaded rod.
Preferably, the outer wall of bracing piece and outer lifter is fixed a position through the welding, anticreep clamp block is fixed a position with the bracing piece through fixed block, fixed slot, fixed screw hole and fixed screw bolt, anti-skidding rubber and anticreep clamp block pass through powerful glue laminating location.
Advantageous effects
Compared with the prior art, the utility model provides a shear wall crack repairing and maintaining device, which has the following beneficial effects:
1. this maintenance device is repaired to shear force wall crack, through the elevating system who sets up, when the staff is when using, has encountered the crack of higher wall body, can open the control motor and drive outer lifter reciprocates, adjusts the play gluey rifle of its upper end block according to crack height and reciprocates, and the alignment crack is repaired, has avoided the staff operation of climbing, reduces the potential safety hazard.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the shear wall crack repair and maintenance device of the utility model.
Fig. 2 is a schematic structural view of a lifting mechanism of the shear wall crack repairing and curing device.
FIG. 3 is a partially exploded view of the lifting mechanism of the shear wall crack repair curing device of the present utility model.
FIG. 4 is a schematic plan view of a portion of the lifting mechanism of the shear wall crack repair curing device of the present utility model.
In the figure: 1. an L-shaped support plate; 2. moving casters; 3. a lifting mechanism; 4. a handle; 5. a glue container; 6. a tool box; 7. a pressure pump support; 8. a pressure pump; 9. a connector; 10. a connecting pipe; 11. a glue gun; 301. a control base; 302. rotating the connecting rod; 303. a limiting block; 304. a first helical gear; 305. a helical gear II; 306. an internal threaded rod; 307. an outer lifting rod; 308. a connecting column; 309. an anti-falling block; 310. controlling a motor; 311. a support rod; 312. a fixing groove; 313. fixing the threaded holes; 314. a fixed threaded bolt; 315. a fixed block; 316. anti-falling clamping blocks; 317. an anti-slip rubber.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in figures 1-4, the shear wall crack repairing and curing device comprises an L-shaped supporting plate 1, a movable castor 2 is movably arranged at the lower end of the L-shaped supporting plate 1, a lifting mechanism 3 is fixedly arranged at one side of the L-shaped supporting plate 1, a glue containing box 5 and a tool box 6 are arranged at the upper end of the L-shaped supporting plate 1 in a positioning manner, the tool box 6 is positioned at one side of the glue containing box 5, the lifting mechanism 3 is positioned at the rear end of the glue containing box 5, a pressure pump supporting frame 7 and a connector 9 are fixedly arranged at the upper end of the glue containing box 5, the connector 9 is positioned at one side of the pressure pump supporting frame 7, a pressure pump 8 is fixedly arranged at the upper end of the pressure pump supporting frame 7, the connector 9 is connected with a connecting pipe 10, the connecting pipe 10 is connected with a glue gun 11, the glue gun 11 is clamped at the upper end of the lifting mechanism 3, four corners of the lower end of the L-shaped supporting plate 1 and the upper end of the movable castor 2 are rotatably moved through a bearing, one side surface of L type backup pad 1 passes through welded fastening connection with the one end of handle 4, the upper end surface of L type backup pad 1 passes through bolt seat fixed connection with elevating system 3, hold gluey case 5 and the lower extreme of toolbox 6, the upper end of holding gluey case 5 passes through welded fastening connection with the lower extreme of pressure pump support frame 7 and connector 9, the lower extreme of pressure pump 8 passes through bolt seat fixed connection with the upper end of pressure pump support frame 7, connecting pipe 10 intercommunication holds gluey case 5 and beats gluey rifle 11, make things convenient for out the glue, elevating system 3 is including control base 301, rotatory connecting rod 302, stopper 303, helical gear 304 No. one, helical gear 305 No. two, internal thread rod 306, outer lifter 307, spliced pole 308, anticreep piece 309, control motor 310, bracing piece 311, fixed slot 312, fixed screw hole 313, fixed thread bolt 314-, the fixed block 315, the anti-slip clamp block 316 and the anti-slip rubber 317, the control motor 310 is positioned at one end of the control base 301, the rotary connecting rod 302 is positioned at one end of the control motor 310 and inside the control base 301, the limiting block 303 is positioned at one end of the rotary connecting rod 302, the first helical gear 304 is positioned on the outer wall of the rotary connecting rod 302, the second helical gear 305 is meshed with the first helical gear 304, the connecting column 308 is positioned at the upper end of the second helical gear 305, the anti-slip block 309 is positioned at the bottom of the outer wall of the internal threaded rod 306, the external lifting rod 307 is positioned on the outer wall of the internal threaded rod 306 and matched with each other, the supporting rod 311 is positioned on the outer wall of the external lifting rod 307, the fixing groove 312 is arranged at the upper end of the supporting rod 311, the fixing threaded hole 313 is arranged at the front end of the supporting rod 311, the anti-slip clamp block 316 is positioned at the upper end of the fixed block 315, the anti-slip rubber 317 is positioned on the inner side surface of the anti-slip clamp block 316, prevent the slippage, reinforcing frictional force, control motor 310's one end passes through bolt carrier fixed connection with control base 301's one end, control motor 310 drive swivelling joint pole 302 rotates, swivelling joint pole 302's one end and stopper 303 fixed connection, swivelling joint pole 302 passes through helical gear 304 and helical gear 305 and spliced pole 308 drive internal thread pole 306 rotation No. two, external lifter 307 reciprocates in the outer wall of internal thread pole 306, the bracing piece on it reciprocates of control, thereby the control gluing rifle reciprocates, bracing piece 311 is fixed a position through the welding with the outer wall of external lifter 307, anticreep clamp 316 is fixed a position through fixed block 315, fixed slot 312, fixed screw hole 313 and fixed screw bolt 314 and bracing piece 311, antislip rubber 317 and anticreep clamp 316 pass through powerful glue laminating location, increase the fastness.
Principle of operation
The utility model provides a maintenance device is repaired to shear force wall crack, the staff can promote handle 4, make L type backup pad 1 remove through the movable caster 2 of its bottom, hold the wall body crack repair liquid in glue case 5, the staff can place some instruments that get at ordinary times in toolbox 6, pressure pump support frame 7 is used for supporting pressure pump 8 and makes it stable, start pressure pump 8, make the repair liquid in glue case 5 pass through connector 9 and connecting pipe 10 and transmit the rifle head that is used for repairing the wall body to beating rifle 11, when the staff runs into higher wall body and has the crack to need repair, can open control motor 310, control motor 310 drives rotation connecting rod 302, first helical gear 304 of its outer wall is rotated when rotating connecting rod 302, helical gear 304 and No. two helical gear 305 interlock each other, no. two helical gear 305 rotate and can drive connecting column 308 and internal threaded rod 306 rotate, the stopper 303 prevent the slippage of connecting rod 302, anti-disengaging block 309 prevents the slippage of internal threaded rod 306, outer lift rod 307 rotation and thereby reciprocate, outer lift rod 307 reciprocates and can drive the crack of beating rifle 11 with its outer wall body and need be repaired, the high friction stop block 311 can be driven to the fixed stop block 316 is passed through to the fixed stop block 311, the fixed slot of anti-slip joint is realized to the high friction stop block 316, the fixed stop joint is realized to the fixed stop joint is avoided to the fixed stop joint between the fixed stop joint of the high-slip joint between the wall body and the fixed stop joint 316 and the fixed stop joint between the wall body and the fixed stop joint is 316 and the high-slip joint between the fixed stop joint between the stop joint and the stop joint.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (6)
1. Shear force wall crack repair maintenance device, including L backup pad (1), its characterized in that: the utility model provides a movable caster (2) is installed to lower extreme movable mounting of L type backup pad (1), one side fixed mounting of L type backup pad (1) has handle (4), elevating system (3), hold gluey case (5) and toolbox (6) are installed in the upper end location of L type backup pad (1), toolbox (6) are located one side that holds gluey case (5), elevating system (3) are located the rear end that holds gluey case (5), pressure pump support frame (7) and connector (9) are installed in the upper end location of holding gluey case (5), connector (9) are located one side of pressure pump support frame (7), pressure pump (8) are installed in the upper end location of pressure pump support frame (7), connector (9) are connected with connecting pipe (10), connecting pipe (10) are connected with and beat gluey rifle (11), and beat gluey rifle (11) block in the upper end of elevating system (3).
2. The shear wall crack repair and maintenance device according to claim 1, wherein: the utility model discloses a rubber gun, including L type backup pad, connecting pipe, screw seat fixed connection is passed through with the upper end of removing truckle (2) in the four corners of L type backup pad (1) lower extreme, one side surface of L type backup pad (1) passes through welded fastening connection with the one end of handle (4) with the upper end of removing truckle (2), the upper end surface of L type backup pad (1) passes through screw seat fixed connection with elevating system (3), holds gluey case (5) and toolbox (6), the upper end of holding gluey case (5) passes through welded fastening connection with the lower extreme of pressure pump support frame (7) and connector (9), the lower extreme of pressure pump (8) passes through screw seat fixed connection with the upper end of pressure pump support frame (7), connecting pipe (10) intercommunication holds gluey case (5) and beats rifle (11).
3. The shear wall crack repair and maintenance device according to claim 1, wherein: elevating system (3) including control base (301), swivelling joint pole (302), stopper (303), helical gear (304) No. two helical gears (305), internal thread pole (306), outer lifter (307), spliced pole (308), anticreep piece (309), control motor (310), bracing piece (311), fixed slot (312), fixed screw hole (313), fixed screw bolt (314), fixed block (315), anticreep clamp piece (316) and anti-slip rubber (317), control motor (310) are located the one end of control base (301), swivelling joint pole (302) are located the one end of control motor (310) and are located the inside of control base (301), stopper (303) are located the one end of swivelling joint pole (302), helical gear (304) are located the outer wall of swivelling joint pole (302), the upper end of helical gear (305) and helical gear (304) interlock each other, spliced pole (308) are located the upper end of helical gear (305), anticreep piece (309) are located the bottom of inner thread pole (306) outer wall, helical gear (307) are located the outer wall of helical gear (306).
4. The shear wall crack repair and maintenance device according to claim 3, wherein: the supporting rod (311) is located the outer wall of outer lifter (307), fixed slot (312) are seted up in the upper end of supporting rod (311), fixed screw hole (313) are seted up in the front end of supporting rod (311), anticreep clamp block (316) are located the upper end of fixed block (315), anti-skidding rubber (317) are located the inboard surface of anticreep clamp block (316).
5. The shear wall crack repair and maintenance device according to claim 3, wherein: one end of the control motor (310) is fixedly connected with one end of the control base (301) through a bolt seat, the control motor (310) drives the rotary connecting rod (302) to rotate, one end of the rotary connecting rod (302) is fixedly connected with the limiting block (303), the rotary connecting rod (302) drives the internal threaded rod (306) to rotate through a helical gear (304), a helical gear (305) and a connecting column (308), and the external lifting rod (307) moves up and down on the outer wall of the internal threaded rod (306).
6. The shear wall crack repair and maintenance device according to claim 4, wherein: the outer wall of bracing piece (311) and outer lifter (307) is fixed a position through the welding, anticreep clamp block (316) are fixed a position with bracing piece (311) through fixed block (315), fixed slot (312), fixed screw hole (313) and fixed screw bolt (314), anti-skidding rubber (317) are through powerful glue laminating location with anticreep clamp block (316).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320704392.4U CN219691163U (en) | 2023-04-03 | 2023-04-03 | Shear wall crack repair maintenance device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320704392.4U CN219691163U (en) | 2023-04-03 | 2023-04-03 | Shear wall crack repair maintenance device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219691163U true CN219691163U (en) | 2023-09-15 |
Family
ID=87970027
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320704392.4U Active CN219691163U (en) | 2023-04-03 | 2023-04-03 | Shear wall crack repair maintenance device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219691163U (en) |
-
2023
- 2023-04-03 CN CN202320704392.4U patent/CN219691163U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021007884A1 (en) | Vertical plate installing and carrying mechanical arm apparatus | |
WO2021109188A1 (en) | "portable" mobile plate laying and transferring device | |
CN219691163U (en) | Shear wall crack repair maintenance device | |
CN212726260U (en) | Cable erecting device for building electromechanical installation | |
CN206801063U (en) | A kind of light dismantled and assembled bricklaying robot | |
CN211688114U (en) | Building lift platform for interior decoration | |
CN111705892B (en) | Concrete sewage pipes connects erection equipment | |
CN105804376A (en) | Intelligent wall plastering robot | |
CN106629470A (en) | Lifting type level gage overhaul device | |
CN213710277U (en) | Liftable handling frame | |
CN218396776U (en) | Crane chassis welding positioning device for building engineering | |
CN221093658U (en) | Hydraulic lifting platform with locking mechanism | |
CN220412757U (en) | Hoisting support convenient to installation is assisted to science and technology factory building ALC wallboard | |
CN219730415U (en) | Lifting and lifting device for building steel structure | |
CN216638722U (en) | Hoisting device for steel structure machining | |
CN110757121B (en) | Installation line suitable for installation of large glass | |
CN118206001B (en) | Hoisting device for building steel structure assembly | |
CN219622205U (en) | Lifting type supporting component | |
CN220150782U (en) | Installation device suitable for multi-layer building window | |
CN221168814U (en) | Wall crack processing apparatus is maintained to building | |
CN217175607U (en) | Adjustable scaffold for constructional engineering | |
CN220098329U (en) | Hoisting construction tool capable of sliding for curtain wall | |
CN219546569U (en) | Lifting frame for building construction | |
CN210687506U (en) | Jack increases appurtenance | |
CN221627691U (en) | Steel member pre-assembled structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |