CN219673671U - Pipeline construction maintenance is to mouthful structure - Google Patents

Pipeline construction maintenance is to mouthful structure Download PDF

Info

Publication number
CN219673671U
CN219673671U CN202321091747.3U CN202321091747U CN219673671U CN 219673671 U CN219673671 U CN 219673671U CN 202321091747 U CN202321091747 U CN 202321091747U CN 219673671 U CN219673671 U CN 219673671U
Authority
CN
China
Prior art keywords
supporting
groups
pipeline
pipeline construction
half arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321091747.3U
Other languages
Chinese (zh)
Inventor
缪忠华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Coastal Municipal Engineering Co ltd
Original Assignee
Nantong Coastal Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Coastal Municipal Engineering Co ltd filed Critical Nantong Coastal Municipal Engineering Co ltd
Priority to CN202321091747.3U priority Critical patent/CN219673671U/en
Application granted granted Critical
Publication of CN219673671U publication Critical patent/CN219673671U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline construction maintenance alignment structure, which relates to the technical field of pipeline construction maintenance, and comprises a support assembly, wherein the upper surface of the support assembly is provided with an alignment assembly, so that the problem that eight bolts are required to be rotated to finish the fixing of a pipeline when the conventional pipeline maintenance alignment device is used, if the bolts are rotated with great force, the bolts can cause scratches on the surface of the pipeline is solved, two groups of pipelines to be aligned are placed on arc grooves formed in the upper surfaces of two groups of support plates, one group of half arc plates are rotated to drive the other three groups of half arc plates to rotate simultaneously, the other three groups of half arc plates are clamped on the upper surfaces of the pipelines, the pipelines are firmly locked through fastening nails, and the two groups of pipelines are prevented from moving and deviating through the arrangement of an anti-skid pad B and an anti-skid pad A.

Description

Pipeline construction maintenance is to mouthful structure
Technical Field
The utility model relates to the technical field of pipeline construction and maintenance, in particular to a pipeline construction and maintenance butt joint structure.
Background
The pipeline installation is a novel technology cited by all-electromechanical equipment, and comprises common data, pipes, pipe fittings, flanges and basic operation technology of pipeline installation, the common nonmetallic pipeline and anti-corrosion lining pipeline installation, instrument pipeline installation and the anti-corrosion and heat insulation of the pipeline, and in the installation process, the pipelines are required to be in butt joint. The existing pipeline maintenance is with setting up the device, when setting up the during operation, need rotate eight bolts and accomplish the fixed of pipeline, if rotate the bolt with great strength, the bolt can cause the mar to the pipeline surface, causes the problem that the later stage pipeline used the surface damaged for a long time.
Disclosure of Invention
The utility model aims to provide a pipeline construction maintenance contra-port structure, which adopts the device to work, thereby solving the problems that the prior contra-port device for pipeline maintenance in the background needs to rotate eight bolts to finish the fixation of a pipeline during contra-port work, and if the bolts are rotated with great force, the bolts can scratch the surface of the pipeline and cause the surface damage of the pipeline in the later period of use.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a pipeline construction maintenance is to mouthful structure, includes supporting component, and supporting component's upper surface is provided with the subassembly that is to mouthful, and supporting component's lower surface is provided with the altitude mixture control subassembly;
the opening aligning assembly comprises a supporting mechanism arranged on the upper surface of the supporting assembly, a limiting mechanism is arranged on the side face of the supporting mechanism, the supporting mechanism plays a supporting role on the pipeline, and the limiting mechanism plays an opening aligning role on the supporting mechanism.
Preferably, the support assembly is including setting up the supporting seat and setting up the connection between the supporting seat inner wall and placing the board, and the alignment groove has been seted up to the upper surface of supporting seat, and four groups have been seted up to the alignment groove, and the inner wall one end in alignment groove is provided with electric putter, and electric putter's one end is provided with slider A, and slider A's side is provided with the connecting rod, and the one end of connecting rod is provided with slider B.
Preferably, the supporting mechanism comprises standing seats arranged on the upper surfaces of the sliding blocks A and B, the upper surfaces of the two groups of standing seats which are vertically arranged are provided with supporting plates, the upper surfaces of the supporting plates are provided with arc grooves, and the upper surfaces of the arc grooves are provided with anti-slip pads A.
Preferably, the limiting mechanism comprises a half arc plate arranged at the upper end of the vertical seat, an anti-slip pad B is arranged on the inner wall of the half arc plate, fastening nails are arranged on the upper surface threads of the half arc plate in a penetrating mode, the half arc plate is connected with the upper surface threads of the supporting plate through the fastening nails, the limiting mechanism further comprises side rods arranged on the side face of the supporting plate, two groups of side rods are arranged, a connecting round rod is arranged between the two groups of fastening nails, and a sleeve plate is movably sleeved on the outer surface of the anti-slip pad B.
Preferably, the external surface screw thread of cover board runs through and is provided with the screw, and the cover board passes through screw and the external surface threaded connection of half arc board, wherein two sets of the upper surface of half arc board be provided with the connecting block, the activity runs through between two sets of connecting blocks and is provided with the locating lever, the both ends threaded connection of locating lever has the restriction piece.
Preferably, the height adjusting assembly comprises a placing mechanism arranged at the lower end of the supporting seat and a movable adjusting mechanism arranged on the upper surface of the placing mechanism, the placing mechanism comprises a bottom plate arranged at the lower end of the supporting seat, and the upper surface of the bottom plate is provided with a placing groove.
Preferably, the movable adjusting mechanism comprises upright posts arranged inside the placing groove, four groups of upright posts are arranged on the upright posts, side grooves are formed in the outer surfaces of the upright posts, electric lifting rods are arranged on the bottom surfaces of the inner walls of the side grooves, sliding columns are arranged at one ends of the electric lifting rods, connecting cross rods are arranged between the two groups of sliding columns, supporting rods are arranged on the upper surfaces of the sliding columns, one ends of the supporting rods are movably connected with the upper surfaces of the upright posts in a penetrating mode, and one ends of the supporting rods are connected with the lower surfaces of the supporting seats.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the pipeline construction maintenance aligning structure, through the arrangement of the supporting component, the supporting mechanism and the limiting mechanism, two groups of pipelines to be aligned are placed on the arc grooves formed in the upper surfaces of the two groups of supporting plates, one group of half arc plates are rotated, the other three groups of half arc plates are driven to rotate simultaneously, so that the pipelines are clamped on the upper surfaces of the pipelines, the pipelines are firmly locked through the fastening nails, the problems that the bolts are rotated with larger force, scratches are not caused on the surfaces of the pipelines, time is saved, and working efficiency is improved are solved, and through the arrangement of the anti-slip pad B and the anti-slip pad A, when the two groups of pipelines are aligned, the sliding block A is pushed by starting the electric push rod after the fixing is finished, the two groups of pipelines can be aligned, and the four groups of supporting plates are positioned on the same horizontal line, so that the aligning accuracy is guaranteed.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a block diagram of a support assembly of the present utility model;
FIG. 3 is a block diagram of an interface assembly of the present utility model;
fig. 4 is a block diagram of a height adjustment assembly of the present utility model.
In the figure: 1. a support assembly; 11. a support base; 111. connecting the placing plates; 1111. an alignment groove; 1112. an electric push rod; 1113. a sliding block A; 1114. a connecting rod; 1115. a sliding block B; 2. an alignment assembly; 21. a support mechanism; 211. a vertical seat; 2111. a support plate; 2112. an arc groove; 2113. a non-slip mat A; 22. a restriction mechanism; 221. a half-arc plate; 2211. a non-slip mat B; 2212. a fastening nail; 222. a side bar; 2221. connecting round rods; 2222. a sleeve plate; 2223. a screw; 223. a connecting block; 2231. a positioning rod; 2232. a limiting block; 3. a height adjustment assembly; 31. a placement mechanism; 311. a bottom plate; 3111. a placement groove; 32. a movement adjustment mechanism; 321. a column; 3211. a side groove; 3212. an electric lifting rod; 3213. a sliding column; 3214. connecting the cross bars; 3215. a supporting rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
For a further understanding of the present utility model, the present utility model will be described in detail with reference to the drawings.
Referring to fig. 1, the pipeline construction maintenance contra-port structure comprises a support assembly 1, wherein a contra-port assembly 2 is arranged on the upper surface of the support assembly 1, and a height adjusting assembly 3 is arranged on the lower surface of the support assembly 1.
The utility model is further described below with reference to examples.
Embodiment one:
referring to fig. 2-3, a pipeline construction maintenance contra-mouth structure, the contra-mouth assembly 2 comprises a supporting mechanism 21 arranged on the upper surface of the supporting assembly 1, a limiting mechanism 22 is arranged on the side surface of the supporting mechanism 21, the supporting mechanism 21 plays a role in supporting a pipeline, the limiting mechanism 22 plays a contra-mouth role on the supporting mechanism 21, the supporting assembly 1 comprises a supporting seat 11 and a connecting placing plate 111 arranged between the inner walls of the supporting seat 11, an alignment groove 1111 is arranged on the upper surface of the supporting seat 11, four groups of alignment grooves 1111 are arranged, an electric push rod 1112 is arranged at one end of the inner wall of the alignment groove 1111, a sliding block A1113 is arranged at one end of the electric push rod 1112, a connecting rod 1114 is arranged on the side surface of the sliding block A1113, a sliding block B is arranged at one end of the connecting rod 1114, the supporting mechanism 21 comprises a stand 211 arranged on the upper surfaces of the sliding block A1113 and the sliding block B1115, the upper surfaces of the two groups of vertical seats 211 are provided with support plates 2111, the upper surfaces of the support plates 2111 are provided with arc grooves 2112, the upper surfaces of the arc grooves 2112 are provided with anti-slip pads A2113, the limiting mechanism 22 comprises a half arc plate 221 arranged at the upper end of the vertical seats 211, the inner wall of the half arc plate 221 is provided with anti-slip pads B2211, the upper surfaces of the half arc plate 221 are threaded through with fastening nails 2212, the half arc plate 221 is in threaded connection with the upper surfaces of the support plates 2111 through the fastening nails 2212, the limiting mechanism 22 also comprises side rods 222 arranged at the side surfaces of the support plates 2111, the side rods 222 are provided with two groups, connecting round rods 2221 are arranged between the two groups of fastening nails 2212, the outer surfaces of the anti-slip pads B2211 are movably sleeved with sleeve plates 2222, the outer surfaces of the sleeve plates 2222 are threaded through screws 2223, the sleeve plates 2222 are in threaded connection with the outer surfaces of the half arc plates 221, the upper surfaces of the two groups of the half arc plates 221 are provided with connecting blocks 223, the two groups of connecting blocks 223 are movably penetrated and provided with the positioning rods 2231, the two ends of the positioning rods 2231 are connected with the limiting blocks 2232 in a threaded manner, when the two groups of pipelines to be aligned are placed on the arc grooves 2112 formed in the upper surfaces of the two groups of supporting plates 2111, one group of half arc plates 221 are rotated, the other three groups of half arc plates 221 are driven to rotate simultaneously, so that the pipelines are clamped on the upper surfaces of the pipelines, the pipelines are firmly locked through the fastening nails 2212, the problem that the pipelines are scratched when the bolts are rotated with large force is solved, the time is saved, the working efficiency is improved, the anti-slip pads B2211 and A2113 are arranged, the moving deviation is prevented when the two groups of pipelines are aligned, after the two groups of pipelines are fixed, the electric pushing rods 1112 are started to push the sliding blocks A1113, the two groups of pipelines can be aligned, the four groups of supporting plates 2111 are positioned on the same horizontal line through the positioning rods 2231, and the accuracy of alignment is guaranteed.
Embodiment two:
referring to fig. 1 and 4, a pipeline construction maintenance is to mouthful structure, height adjustment assembly 3 is including setting up the mechanism 31 of placing at the supporting seat 11 lower extreme and set up the removal adjustment mechanism 32 at the mechanism 31 upper surface of placing, the mechanism 31 is including setting up the bottom plate 311 at supporting seat 11 lower extreme, standing groove 3111 has been seted up to the upper surface of bottom plate 311, remove adjustment mechanism 32 including setting up at the inside stand 321 of standing groove 3111, stand 321 is provided with four sets of, side channel 3211 has been seted up to the surface of stand 321, the inner wall bottom surface of side channel 3211 is provided with electric lift rod 3212, electric lift rod 3212's one end sets up sliding column 3213, be provided with connecting cross bar 3214 between two sets of sliding column 3213, sliding column 3215's upper surface is provided with branch 3215, the one end and the upper surface activity through connection of stand 321, the one end of branch 3215 is connected with the lower surface of supporting seat 11, when using, when realizing to mouthful through the pipeline to different co-altitude, drive branch 3215, branch 3215 is driven through starting electric lift rod 3215, supporting seat 11 has been driven to the supporting seat 11, the high side channel assembly is driven to the whole device has been realized to the time simply when the high to change, and the device is very convenient to realize to change the problem, and the whole is to be used to be compared to the high, and the device has been realized.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The pipeline construction maintenance opposite opening structure comprises a supporting component (1), and is characterized in that an opposite opening component (2) is arranged on the upper surface of the supporting component (1), and a height adjusting component (3) is arranged on the lower surface of the supporting component (1);
the opening aligning assembly (2) comprises a supporting mechanism (21) arranged on the upper surface of the supporting assembly (1), a limiting mechanism (22) is arranged on the side face of the supporting mechanism (21), the supporting mechanism (21) plays a role in supporting a pipeline, and the limiting mechanism (22) plays an opening aligning role on the supporting mechanism (21).
2. The pipeline construction repair butt joint structure according to claim 1, wherein: the supporting component (1) comprises a supporting seat (11) and a connecting placing plate (111) arranged between the inner walls of the supporting seat (11), an alignment groove (1111) is formed in the upper surface of the supporting seat (11), four groups of alignment grooves (1111) are formed in the upper surface of the supporting seat, an electric push rod (1112) is arranged at one end of the inner wall of the alignment groove (1111), a sliding block A (1113) is arranged at one end of the electric push rod (1112), a connecting rod (1114) is arranged on the side face of the sliding block A (1113), and a sliding block B (1115) is arranged at one end of the connecting rod (1114).
3. The pipeline construction repair butt joint structure according to claim 2, wherein: the supporting mechanism (21) comprises vertical seats (211) arranged on the upper surfaces of the sliding blocks A (1113) and B (1115), supporting plates (2111) are arranged on the upper surfaces of the two groups of vertical seats (211), arc grooves (2112) are formed in the upper surfaces of the supporting plates (2111), and anti-slip pads A (2113) are arranged on the upper surfaces of the arc grooves (2112).
4. A pipeline construction repair butt joint structure according to claim 3, wherein: the limiting mechanism (22) comprises a half arc plate (221) arranged at the upper end of the vertical seat (211), an anti-slip pad B (2211) is arranged on the inner wall of the half arc plate (221), fastening nails (2212) are arranged on the upper surface of the half arc plate (221) in a threaded penetrating mode, the half arc plate (221) is connected with the upper surface of the supporting plate (2111) through the fastening nails (2212) in a threaded mode, the limiting mechanism (22) further comprises side rods (222) arranged on the side face of the supporting plate (2111), two groups of side rods (222) are arranged, connecting round rods (2221) are arranged between the two groups of fastening nails (2212), and sleeve plates (2222) are movably sleeved on the outer surface of the anti-slip pad B (2211).
5. The pipeline construction repair butt joint structure according to claim 4, wherein: the outer surface screw thread of cover board (2222) runs through and is provided with screw (2223), and cover board (2222) pass through screw (2223) and the outer surface threaded connection of half arc board (221), wherein two sets of the upper surface of half arc board (221) be provided with connecting block (223), the activity runs through between two sets of connecting blocks (223) and is provided with locating lever (2231), the both ends threaded connection of locating lever (2231) has restriction piece (2232).
6. The pipeline construction repair butt joint structure according to claim 5, wherein: the height adjusting assembly (3) comprises a placing mechanism (31) arranged at the lower end of the supporting seat (11) and a moving adjusting mechanism (32) arranged on the upper surface of the placing mechanism (31), the placing mechanism (31) comprises a bottom plate (311) arranged at the lower end of the supporting seat (11), and a placing groove (3111) is formed in the upper surface of the bottom plate (311).
7. The pipeline construction repair butt joint structure according to claim 6, wherein: remove adjustment mechanism (32) including setting up stand (321) inside standing groove (3111), stand (321) are provided with four sets of, lateral groove (3211) have been seted up to the surface of stand (321), the inner wall bottom surface of lateral groove (3211) is provided with electric lift pole (3212), the one end of electric lift pole (3212) sets up sliding column (3213), be provided with between two sets of sliding column (3213) and connect horizontal pole (3214), the upper surface of sliding column (3213) is provided with branch (3215), the one end of branch (3215) is connected with the upper surface activity run-through of stand (321), the one end of branch (3215) is connected with the lower surface of supporting seat (11).
CN202321091747.3U 2023-05-09 2023-05-09 Pipeline construction maintenance is to mouthful structure Active CN219673671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321091747.3U CN219673671U (en) 2023-05-09 2023-05-09 Pipeline construction maintenance is to mouthful structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321091747.3U CN219673671U (en) 2023-05-09 2023-05-09 Pipeline construction maintenance is to mouthful structure

Publications (1)

Publication Number Publication Date
CN219673671U true CN219673671U (en) 2023-09-12

Family

ID=87895785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321091747.3U Active CN219673671U (en) 2023-05-09 2023-05-09 Pipeline construction maintenance is to mouthful structure

Country Status (1)

Country Link
CN (1) CN219673671U (en)

Similar Documents

Publication Publication Date Title
CN206241144U (en) A kind of high-precision building bar bender
CN219673671U (en) Pipeline construction maintenance is to mouthful structure
CN218136442U (en) Universal gantry fixture for rack
CN216066217U (en) Flange and C template positioning device of steel pipe tower
CN213448960U (en) Building shock isolation device
CN220380730U (en) Scaffold fastener test mounting frame
CN212804544U (en) Auxiliary device for pipeline connection
CN219673522U (en) Civil engineering pipeline strutting arrangement
CN219432635U (en) Cross pipeline support
CN215564998U (en) Detachable noise prevention and control board for construction
CN220207309U (en) Tensile swivel nut testing arrangement that pulls out
CN114525807B (en) Large steel structure embedded part
CN219401831U (en) Positioning and clamping device for processing inclined beam connecting piece of subway evacuation platform
CN219548089U (en) Novel metal surface composite partition plate keel
CN217631405U (en) Wall masonry device for adjusting platform and constructional engineering
CN219281365U (en) Caisson prefabricated plate fixing frame
CN214786285U (en) Steel constructs formula people's villa of installation of being convenient for
CN217711886U (en) Adjustable supporting mechanism for steel bar truss floor bearing plate
CN220286774U (en) Swift formula construction is with pipeline support
CN218581184U (en) Anti-tilting device for supporting building template
CN219316457U (en) Wall body builds auxiliary device by laying bricks or stones
CN214091074U (en) Quick positioner of steel construction installation
CN221034293U (en) Pipeline connection supporting device
CN219041263U (en) Adjustable cable positioning piece for power construction
CN219494430U (en) Detachable base of flat-plate solar water heater

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant