CN219672060U - Wall attaching structure of heightened climbing frame at bay window part - Google Patents

Wall attaching structure of heightened climbing frame at bay window part Download PDF

Info

Publication number
CN219672060U
CN219672060U CN202320099419.1U CN202320099419U CN219672060U CN 219672060 U CN219672060 U CN 219672060U CN 202320099419 U CN202320099419 U CN 202320099419U CN 219672060 U CN219672060 U CN 219672060U
Authority
CN
China
Prior art keywords
bay window
wall
heightening
climbing frame
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320099419.1U
Other languages
Chinese (zh)
Inventor
郑民伟
王琳
周必武
向往
邰振平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN202320099419.1U priority Critical patent/CN219672060U/en
Application granted granted Critical
Publication of CN219672060U publication Critical patent/CN219672060U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)

Abstract

The utility model discloses a floating window part heightening climbing frame wall attaching structure, which aims to solve the problems that the traditional floating window climbing frame wall attaching structure is complex in construction mode, long in construction time and high in cost, and quality risk is improved due to the fact that construction is needed again; the upper side of the heightening support structure, which is close to one side of the floating window, is obliquely pulled with the head end of the steel pipe pull rod, and the tail end of the steel pipe pull rod is fixed at the bottom end of the upper floating window floor slab corresponding to the lower floating window floor slab through the pull rod wall-attached support. The utility model is especially suitable for wall climbing construction of the position of the building bay window, and has higher social use value and application prospect.

Description

Wall attaching structure of heightened climbing frame at bay window part
Technical Field
The utility model relates to the technical field of buildings, in particular to a wall attaching structure with a raised climbing frame at a bay window part.
Background
In high-rise building construction, because the window structure design load that wafts of building is less, can't directly form stable connection with the attached type between climbing the frame, namely waft the window structure and can't satisfy the load that attaches the wall support to give promptly, traditional construction method improves the load for after reinforcing the reinforcement to waft the window, carries out the support construction that attached type climbs the frame afterwards, and the construction method is complicated, and construction time consuming increases, and the cost increases, and because need construction once more, the quality risk also can improve thereupon. Therefore, we propose a kind of window position increases and climbs a wall structure.
Disclosure of Invention
The present utility model aims to solve or at least alleviate the problems of the prior art.
The utility model provides a wall attaching structure of a floating window part heightening climbing frame, which comprises a building wall, a plurality of floating windows which are integrally formed on the outer wall of the building wall and are vertically distributed, and an attached climbing frame which is distributed along the outer side of the building wall and is vertically distributed, wherein one heightening support structure with one end extending out of the floating window and fixed with the inner wall of the attached climbing frame is arranged on a lower layer floating window floor;
the upper side of the heightening support structure, which is close to one side of the floating window, is obliquely pulled with the head end of the steel pipe pull rod, and the tail end of the steel pipe pull rod is fixed at the bottom end of the upper floating window floor slab corresponding to the lower floating window floor slab through the pull rod wall-attached support.
Optionally, the pull rod wall-attached support is fixed at the bottom end of the upper bay window floor slab through a plurality of anchor bolts.
Optionally, the heightening support structure comprises at least two heightening pieces arranged on the lower bay window floor slab, the top ends of the heightening pieces are fixed with a horizontal steel structure beam which is arranged horizontally through a plurality of lengthened fastening bolts, and one ends of the horizontal steel structure beam extend out of the bay window and are fixed with the inner wall of the attached climbing frame.
Optionally, one end of the horizontal steel structure beam extending out of the bay window is fixed with a triangular reinforcing plate, and the other end of the triangular reinforcing plate is fixed with a wall attaching support through a plurality of short bolts, and the wall attaching support is fixed with the inner wall of the attached climbing frame.
Optionally, the heightening piece comprises two parallel trapezoidal frames, and the two trapezoidal frames are fixedly connected through a plurality of connecting cross bars.
Optionally, a reinforcing diagonal rod for fixing the inner frame is fixed inside the trapezoid frame.
Optionally, the steel pipe pull rod extends upwards from the bay window part in an inclined way, and the inclination angle between the steel pipe pull rod and the horizontal plane is 55-75 degrees.
Optionally, the steel pipe pull rod comprises an internally threaded steel pipe, two adjusting screws respectively screwed on the head end and the tail end of the internally threaded steel pipe, and a connecting end rotatably arranged at the free end of the adjusting screws.
The utility model has the following advantages:
the lengthened fastening bolt is fixed with the next layer structure (lower bay window floor) of the building, so that the horizontal fixing of the horizontal steel structure beam is ensured, the attached climbing frame is supported through the bay window, and the steel pipe pull rod is combined with the upper layer structure (upper bay window floor) of the building to carry out drawknot, so that the integral stability of the installation of the attached climbing frame is ensured, the structural stress of the floor at the bay window position is reduced, the safety is improved, the construction is simple, the economy and the rationality are realized, the bolts are only needed to be embedded at the floor, destructive construction is not needed, and the quality risk is not generated.
Drawings
The above characteristics, technical features, advantages and implementation modes of a structure for attaching a wall to a high climbing frame at a bay window will be further described in a clear and understandable manner by referring to the preferred embodiments described in the accompanying drawings.
FIG. 1 is a schematic diagram of the structure of the present utility model;
fig. 2 is a schematic structural view of the heightening element in the present utility model.
In the figure: lower bay window floor 10, upper bay window floor 20, raised support structure 30, raised elements 301, ladder frames 311, connecting cross bars 312, reinforcing diagonal bars 313, elongated fastening bolts 302, horizontal steel structural beams 303, triangular reinforcing plates 304, wall attachment supports 40, steel pipe tie rods 50, tie rod wall attachment supports 60, anchor bolts 70.
Detailed Description
The utility model is further illustrated by the following examples in conjunction with figures 1-2:
example 1
1-2, including the building wall, a plurality of integrated into one piece in the building wall on the outer wall of vertical distribution of the floating window, and along the building wall outside distribution and vertical distribution of the attached climbing frame a, it can be understood, taking standing on a certain floor of the building as an example, visible including lower layer floating window floor 10 (floor) and upper layer floating window floor 20 (ceiling), the said lower layer floating window floor 10 is installed with one end extends out of the floating window and fixed with the attached climbing frame a's inner wall the heightened support structure 30;
the upper side of the heightening support structure 30, which is close to one side of the bay window, is obliquely provided with the head end of a steel pipe pull rod 50 through a lifting lug, and the tail end of the steel pipe pull rod 50 is fixed at the bottom end of the upper bay window floor slab 20 through a pull rod wall-attached support 60; the pull rod wall-attached support 60 is fixed at the bottom end of the upper bay window floor slab 20 corresponding to the lower bay window floor slab 10 through a plurality of anchor bolts 70;
in this embodiment, as shown in fig. 1-2, the raised support structure 30 includes at least two raised members 301 disposed on the lower bay window floor 10, and the top ends of the raised members 301 are fixed with the same horizontal steel structure beam 303 arranged horizontally through a plurality of elongated fastening bolts 302, and one end of the horizontal steel structure beam 303 extends out of the bay window and is fixed with the inner wall of the attached climbing frame a.
Wherein, one end of the horizontal steel structure beam 303 extending out of the bay window is fixed with a triangular reinforcing plate 304, and the other end of the triangular reinforcing plate 304 is fixed with a wall attaching support 40 through a plurality of short bolts, and the wall attaching support 40 is fixed with the inner wall of the attached climbing frame a.
In this embodiment, the lug board is through steel pipe pull rod 50 and the last layer structure of building (upper strata bay window floor 20) drawknot, reduce the floor structural stress at bay window position, improve the security, simultaneously because the setting of heightening support structure 30, it is fixed with the next layer structure of building (lower floor bay window floor 10) through extension fastening bolt 302, the level that has guaranteed horizontal steel structure roof beam 303 is to fixed and to support attached type climbing frame a through bay window, guarantee attached type climbing frame a's overall stability of installation, the construction is simple, the security is high, economy is reasonable, and only need at floor pre-buried bolt, can not produce the quality risk.
In this embodiment, as shown in fig. 2, the heightening element 301 includes two parallel ladder frames 311, and the two ladder frames 311 are fixedly connected by a plurality of connecting cross bars 312; the reinforcing diagonal rods 313 for fixing the inner frame are fixed in the trapezoid frames 311, so that the stability of the heightening piece 301 and the horizontal stable installation of the horizontal steel structure beam 303 are effectively guaranteed.
Example 2
The difference between this embodiment and embodiment 1 is that, as shown in fig. 1, the steel pipe pull rod 50 extends obliquely upward from the bay window, and the inclination angle between the steel pipe pull rod 50 and the horizontal plane is 55 ° -75 °; the steel pipe pull rod 50 comprises an internally threaded steel pipe, two adjusting screws which are respectively screwed on the head end and the tail end of the internally threaded steel pipe, and a connecting end which is rotatably arranged at the free end of the adjusting screws;
in this embodiment, the middle part of internal thread steel pipe is the platykurtic or adds establishes flat handle to flexible regulation is convenient for, and it can be understood that rotating internal thread steel pipe can realize two adjusting screw synchronous extension or synchronous shrink, thereby adjusts the cable-stayed elasticity of steel pipe pull rod 50, guarantees the overall stability of the installation of attached climbing frame a.
Other undescribed structures refer to embodiment 1.
Finally, it should be noted that: the above examples are only specific embodiments of the present utility model, and are not intended to limit the scope of the present utility model, but it should be understood by those skilled in the art that the present utility model is not limited thereto, and that the present utility model is described in detail with reference to the foregoing examples: any person skilled in the art may modify or easily conceive of the technical solution described in the foregoing embodiments, or perform equivalent substitution of some of the technical features, while remaining within the technical scope of the present disclosure; such modifications, changes or substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present utility model, and are intended to be included in the scope of the present utility model. Therefore, the protection scope of the present utility model shall be subject to the protection scope of the claims.

Claims (8)

1. The utility model provides a bay window position increases and climbs a wall structure, includes building wall, a plurality of integrated into one piece and climbs the window of vertical distribution on building wall outer wall to and along building wall outside distribution and take vertical distribution's attached climbing frame (a), wherein, bay window includes lower floor bay window floor (10) and upper bay window floor (20), its characterized in that, one of them lower floor bay window floor (10) is installed one end and extends bay window and climb a high support structure (30) that the inner wall phase of frame (a) is fixed with attached climbing;
the upper side of the heightening support structure (30) close to one side of the floating window is obliquely pulled with the head end of the steel pipe pull rod (50), and the tail end of the steel pipe pull rod (50) is fixed at the bottom end of the upper floating window floor (20) corresponding to the lower floating window floor (10) through the pull rod wall-attached support (60).
2. The bay window site heightening climbing frame wall attachment structure of claim 1, wherein: the pull rod wall-attached support (60) is fixed at the bottom end of the upper bay window floor slab (20) through a plurality of anchor bolts (70).
3. The bay window site heightening climbing frame wall attachment structure of claim 1, wherein: the heightening support structure (30) comprises at least two heightening pieces (301) arranged on the lower bay window floor slab (10), the top ends of the heightening pieces (301) are fixed with one horizontal steel structure beam (303) which is horizontally arranged through a plurality of lengthened fastening bolts (302), and one end of each horizontal steel structure beam (303) extends out of the bay window and is fixed with the inner wall of the attached climbing frame (a).
4. A bay window site heightened climbing frame wall attachment structure as defined in claim 3, wherein: one end of the horizontal steel structure beam (303) extending out of the bay window is fixed with a triangular reinforcing plate (304), the other end of the triangular reinforcing plate (304) is fixed with a wall-attached support (40) through a plurality of short bolts, and the wall-attached support (40) is fixed with the inner wall of the attached climbing frame (a).
5. A bay window site heightened climbing frame wall attachment structure as defined in claim 3, wherein: the heightening piece (301) comprises two trapezoid frames (311) which are arranged in parallel, and the two trapezoid frames (311) are fixedly connected through a plurality of connecting cross bars (312).
6. The bay window site heightening climbing frame wall attachment structure of claim 5, wherein: a reinforcing diagonal (313) for fixing the inner frame is fixed in the trapezoid frame (311).
7. The bay window site heightening climbing frame wall attachment structure of claim 1, wherein: the steel pipe pull rod (50) extends upwards from the bay window part in an inclined mode, and the inclination angle between the steel pipe pull rod (50) and the horizontal plane is 55-75 degrees.
8. The bay window site heightened rack wall attachment structure of any one of claims 1-7, wherein: the steel pipe pull rod (50) comprises an internally threaded steel pipe, two adjusting screws which are respectively screwed on the head end and the tail end of the internally threaded steel pipe, and a connecting end which is rotatably arranged at the free end of the adjusting screw.
CN202320099419.1U 2023-02-02 2023-02-02 Wall attaching structure of heightened climbing frame at bay window part Active CN219672060U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320099419.1U CN219672060U (en) 2023-02-02 2023-02-02 Wall attaching structure of heightened climbing frame at bay window part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320099419.1U CN219672060U (en) 2023-02-02 2023-02-02 Wall attaching structure of heightened climbing frame at bay window part

Publications (1)

Publication Number Publication Date
CN219672060U true CN219672060U (en) 2023-09-12

Family

ID=87891501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320099419.1U Active CN219672060U (en) 2023-02-02 2023-02-02 Wall attaching structure of heightened climbing frame at bay window part

Country Status (1)

Country Link
CN (1) CN219672060U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118346037A (en) * 2024-06-17 2024-07-16 山西五建集团有限公司 Climbing frame auxiliary lifting system for large overhanging staggered floor balcony and overhanging windowsill part

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118346037A (en) * 2024-06-17 2024-07-16 山西五建集团有限公司 Climbing frame auxiliary lifting system for large overhanging staggered floor balcony and overhanging windowsill part

Similar Documents

Publication Publication Date Title
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN205444446U (en) Assembled industrialization steel construction house
CN211447708U (en) Super high-rise building construction elevator feeding platform support system that encorbelments
CN103437423B (en) Controllable quantitative release connection method and structure for steel truss
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
WO2023240812A1 (en) Overall construction platform structure and method for adding core tube wall body in air
CN109944371B (en) Double-cable net steel beam combined structure of super high-rise large plate curtain wall
CN219672060U (en) Wall attaching structure of heightened climbing frame at bay window part
CN218467052U (en) Auxiliary frame for climbing frame
CN207892092U (en) A kind of curtain wall support structure
CN106437261B (en) A kind of concrete frame seismic reinforcing structure using expanded metal lath
CN107355087A (en) The extending old building steelframe structure of energy-efficient environment-friendly multifunctional
CN214462401U (en) Double-layer protection frame with novel structure
CN115262917A (en) Method for enhancing wind resistance and water resistance of elevator shaft and construction method thereof
CN209568359U (en) A kind of falsework for the construction of outer-enwraped type Guard fence base
CN211899232U (en) External hanging wallboard of prestressed steel pipe truss and wall manufactured and installed by using same
CN210887683U (en) Assembled wall body frame with large-span entrance to a cave
CN208965744U (en) For the steel roof truss of single story building and the connecting node of reinforced column
CN214785815U (en) Double-deck protection frame system for building
CN206844303U (en) A kind of house frame of light section steel structure and light floor assembly system
CN213143656U (en) Be applied to combination ladder roof beam of steel construction precast concrete stair
CN213265226U (en) Construction elevator attaches wall convenient to installation attaches wall device
CN213865133U (en) Tower crane attaches wall and increases formula steel construction system
CN114427290B (en) Super high-rise reinforced concrete core tube aluminum mould climbing frame and construction method
CN216973902U (en) Full-assembly type insulation protection shed tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant