CN219653859U - Engineering construction blow off pipeline - Google Patents

Engineering construction blow off pipeline Download PDF

Info

Publication number
CN219653859U
CN219653859U CN202321181309.6U CN202321181309U CN219653859U CN 219653859 U CN219653859 U CN 219653859U CN 202321181309 U CN202321181309 U CN 202321181309U CN 219653859 U CN219653859 U CN 219653859U
Authority
CN
China
Prior art keywords
sewage
pipe
collecting box
sewage collecting
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321181309.6U
Other languages
Chinese (zh)
Inventor
董蕾
张冬晓
杨明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haoyue Construction Engineering Shandong Co ltd
Original Assignee
Haoyue Construction Engineering Shandong Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haoyue Construction Engineering Shandong Co ltd filed Critical Haoyue Construction Engineering Shandong Co ltd
Priority to CN202321181309.6U priority Critical patent/CN219653859U/en
Application granted granted Critical
Publication of CN219653859U publication Critical patent/CN219653859U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses an engineering construction sewage pipeline, which relates to the technical field of building construction and comprises a middle pipe, wherein a sewage collecting pipe is arranged in the middle of the middle pipe, at least one filter screen is arranged in the middle pipe to filter garbage in the sewage discharging process of engineering construction, the filter screen is positioned at one side of a water inlet of the sewage collecting pipe so that the garbage falls into the sewage collecting pipe after being blocked by the filter screen, the end part of the sewage collecting pipe is provided with a sewage collecting assembly, and a pipeline valve is arranged on the sewage collecting pipe and positioned between the sewage collecting assembly and the middle pipe so as not to influence the normal sewage discharging and filtering work of the middle pipe when the garbage of the sewage collecting assembly is cleaned. The device has simple structure, can effectively intercept the garbage in the sewage disposal process, is convenient to clean after interception, does not influence the normal water inlet and outlet work of the pipeline in the cleaning process, and has simple operation and good using effect.

Description

Engineering construction blow off pipeline
Technical Field
The utility model relates to the technical field of building construction, in particular to a sewage pipeline for engineering construction.
Background
At present, sewage pipes are arranged on the site of engineering construction, particularly in low-lying areas, so that rainwater in the low-lying areas can be timely discharged in rainy days, and the influence of accumulated water on engineering construction is avoided. Because of the complex environment of the construction site, part of concrete blocks, sand particles, construction waste and the like are mixed into rainwater to form sewage and flow into the drain pipe together. In order to avoid the condition that the pipeline is blocked, a fence is arranged in a sewage pipeline on the market at present, so that large garbage is intercepted, and the phenomenon that the garbage flows into a drainage system to cause blocking is avoided.
The engineering construction sewage drain pipe disclosed in China patent CN218028100U is provided with a mounting seat and drain pipes which are butted at two sides of the mounting seat through flange plates, a slot is arranged above the mounting seat, and two sides of the mounting seat are provided with guide holes which are communicated with the slot and the drain pipes; a mounting frame is vertically inserted in the slot in a sliding way, and two ports of the mounting frame are aligned with the two guide holes respectively; a collecting cylinder is transversely fixed in the mounting frame through a fixing frame, one end of the collecting cylinder is in an opening shape, a water inlet port of the collecting cylinder is right opposite to an upstream diversion hole, and a filtering hole for filtering garbage is formed in the collecting cylinder; the water inlet port is fixedly provided with a funnel-shaped backflow prevention pipe through a fastening bolt B, and the backflow prevention pipe extends into the collecting cylinder; a collecting cavity for collecting smaller garbage is formed between the outer wall of the anti-backflow pipe and the inner wall of the collecting cylinder. The device has realized intercepting filtration, collection treatment's effect to rubbish, avoids causing the condition of jam to sewage piping system, but in the use, this kind of pipeline has the inconvenient condition of taking out after the garbage collection, and the operation is very inconvenient, and in case take out the clearance back with the collecting vessel, this kind of pipeline just does not possess rubbish clearance function.
Disclosure of Invention
The utility model aims to solve the problems in the background technology, and further provides an engineering construction sewage drain pipe.
The technical scheme adopted for solving the technical problems is as follows:
the utility model provides an engineering construction blow off pipeline, includes the intermediate pipe, and the intermediate pipe middle part is equipped with a dirt collecting pipe, is provided with at least one filter screen in the intermediate pipe in order to realize the filtration to rubbish in the engineering construction blowdown process, and the filter screen is in the one side of dirt collecting pipe water inlet so that rubbish falls into dirt collecting pipe after the filter screen stops, and dirt collecting pipe end is equipped with dirt collecting assembly, is equipped with the pipeline valve on the dirt collecting pipe, and the pipeline valve is in between dirt collecting assembly and the intermediate pipe so that when the rubbish clearance to dirt collecting assembly does not influence the normal blowdown filtration work of intermediate pipe.
Further, the dirt collecting assembly comprises a dirt collecting box, a sealing cover and a collecting box, wherein the dirt collecting box is communicated with the dirt collecting pipe, an opening is formed in one side of the dirt collecting box so that the collecting box can be taken and placed through the opening, the sealing cover for sealing the opening is arranged on the dirt collecting box, the collecting box is placed in the dirt collecting box, and a feeding hole of the collecting box is located below a feeding hole of the dirt collecting box.
Further, the collecting box is provided with a liquid leakage hole.
Compared with the prior art, the utility model has the beneficial effects that:
the utility model has simple structure, can effectively intercept garbage in the sewage discharge process, is convenient to clean after interception, and does not influence the normal water inlet and outlet operation of the pipeline in the cleaning process; sewage enters from one end of the middle pipe, is discharged from the other end of the middle pipe after being filtered by the filter screen, the filter screen plays a role in blocking garbage, the blocked garbage enters the sewage collecting assembly through the sewage collecting pipe to be collected, when the sewage collecting assembly needs to be cleaned, the pipeline valve is closed, at the moment, the garbage is settled at the pipeline valve, water can normally enter and exit from the middle pipe, the sealing cover is opened, the collecting box can be taken out for cleaning, the operation is simple, and the using effect is good.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the internal structure of the present utility model;
FIG. 3 is a perspective view of the collection box;
wherein: 1. a middle tube; 2. a dirt collecting pipe; 3. a filter screen; 4. a pipeline valve; 5. a dirt collection box; 51. an opening; 52. sealing cover; 53. a collection box; 531. and a liquid leakage hole.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model. The utility model will be further described with reference to the accompanying drawings and examples:
as shown in fig. 1 and 2, an engineering construction sewage pipeline comprises a middle pipe 1, two ends of the middle pipe 1 are respectively in butt joint with two sewage pipes through flange plates to play a role in connecting the two sewage pipes, a sewage collecting pipe 2 is arranged in the middle of the middle pipe 1, a structure formed by the middle pipe 1 and the sewage collecting pipe 2 is similar to a tee joint, at least one filter screen 3 is arranged in the middle pipe 1 to filter garbage in the engineering construction sewage process, the filter screen 3 is positioned at one side of a water inlet of the sewage collecting pipe 2 so that the garbage can fall into the sewage collecting pipe 2 after being blocked by the filter screen 3, a sewage collecting assembly is arranged at the end part of the sewage collecting pipe 2, a pipeline valve 4 is arranged on the sewage collecting pipe 2, and the pipeline valve 4 is positioned between the sewage collecting assembly and the middle pipe 1 so as not to influence normal sewage filtering operation of the middle pipe 1 when the garbage of the sewage collecting assembly is cleaned.
Specifically, as shown in fig. 2 and 3, the dirt collecting assembly comprises a dirt collecting box 5, a sealing cover 52 and a collecting box 53, wherein the dirt collecting box 5 is communicated with the dirt collecting pipe 2, one side of the dirt collecting box 5 is provided with an opening 51 so that the collecting box 53 can be taken and placed through the opening 51, the dirt collecting box 5 is provided with the sealing cover 52 for sealing the opening 51, the collecting box 53 is placed in the dirt collecting box 5, a feeding port of the collecting box 53 is located below a feeding port of the dirt collecting box 5, and a liquid leakage hole 531 is formed in the collecting box 53.
It should be noted that, during cleaning of the dirt collecting assembly, the pipeline valve 4 is in a closed state, and during the dirt discharging engineering, the pipeline valve 4 is in an open state; in the specific implementation process, sewage enters from one end of the middle pipe 1, is discharged from the other end of the middle pipe 1 after being filtered by the filter screen 3, the filter screen 3 plays a role in blocking garbage, the blocked garbage enters into the sewage collecting assembly through the sewage collecting pipe 2 and is collected, when the sewage collecting assembly needs to be cleaned, the pipeline valve 4 is closed, at the moment, the garbage is settled at the pipeline valve 4, the middle pipe 1 can normally enter and discharge water, and then the collecting box 53 can be taken out for cleaning by opening the sealing cover 52.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the foregoing examples, and that the foregoing description and description are merely illustrative of the principles of this utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (3)

1. The utility model provides an engineering construction blow off pipeline, including intermediate tube (1), intermediate tube (1) middle part is equipped with a dirt collection pipe (2), a serial communication port, be provided with at least one filter screen (3) in intermediate tube (1), filter screen (3) are in one side of dirt collection pipe (2) water inlet so that rubbish falls into dirt collection pipe (2) after filter screen (3) stop, dirt collection pipe (2) tip is equipped with dirt collection subassembly, be equipped with pipeline valve (4) on dirt collection pipe (2), pipeline valve (4) are in between dirt collection subassembly and intermediate tube (1) so that do not influence the normal blowdown filtration work of intermediate tube (1) when the clearance of dirt collection subassembly rubbish.
2. The engineering construction sewage drain pipe according to claim 1, wherein the sewage collecting assembly comprises a sewage collecting box (5), a sealing cover (52) and a collecting box (53), the sewage collecting box (5) is communicated with the sewage collecting pipe (2), an opening (51) is formed in one side of the sewage collecting box (5) so that the collecting box (53) can be taken and placed through the opening (51), the sealing cover (52) for sealing the opening (51) is arranged on the sewage collecting box (5), the collecting box (53) is placed in the sewage collecting box (5), and a feed inlet of the collecting box (53) is located below a feed inlet of the sewage collecting box (5).
3. An engineering construction drain according to claim 2, wherein the collection box (53) is provided with a weeping hole (531).
CN202321181309.6U 2023-05-15 2023-05-15 Engineering construction blow off pipeline Active CN219653859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321181309.6U CN219653859U (en) 2023-05-15 2023-05-15 Engineering construction blow off pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321181309.6U CN219653859U (en) 2023-05-15 2023-05-15 Engineering construction blow off pipeline

Publications (1)

Publication Number Publication Date
CN219653859U true CN219653859U (en) 2023-09-08

Family

ID=87860806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321181309.6U Active CN219653859U (en) 2023-05-15 2023-05-15 Engineering construction blow off pipeline

Country Status (1)

Country Link
CN (1) CN219653859U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117244291A (en) * 2023-11-20 2023-12-19 献县本斋德利清真油脂有限公司 Filtering device for grease production and filtering method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117244291A (en) * 2023-11-20 2023-12-19 献县本斋德利清真油脂有限公司 Filtering device for grease production and filtering method thereof

Similar Documents

Publication Publication Date Title
CN219653859U (en) Engineering construction blow off pipeline
CN108951831B (en) Propeller type mouth discharging and sewage intercepting device
CN208586084U (en) A kind of sewage disposal device
CN207314489U (en) A kind of catch-basin of environment-protecting clean
CN218204830U (en) Town road drainage device
CN207794246U (en) A kind of discharge filtering device applied to urban road
CN214781672U (en) Oil collecting and separating device
CN213508413U (en) Foundation is handled with sewage collecting pipe convenient to change
CN213192708U (en) Waste water filtering and purifying device
CN208161184U (en) Water return filter and the sewage disposal system for using the device
CN206970424U (en) Exhaust system is collected in a kind of percolate sealing of garbage feeding bucket
CN221645943U (en) Building water supply and drainage anti-blocking device
CN218814263U (en) Sewage pipeline filtering device
CN220779326U (en) High-efficient low resistance exhaust scrubbing device
CN220847904U (en) Shunt drain pipe
CN214344742U (en) Municipal administration sewage discharge pipeline prevents stifled desilting device
CN218492654U (en) Anti-blocking and shunting type waste water drainage pipe
CN220814170U (en) Environment-friendly municipal administration water supply and drainage engineering waste fitting discharging
CN218562539U (en) Sewage blocking device for water channel mouth
CN219579982U (en) Solid garbage collection device for preventing and treating water environment pollution
CN213335772U (en) Permanent-magnet dirt remover
CN221491644U (en) Filtering equipment for recycling muddy water of building site
CN220953638U (en) Photovoltaic workshop rainwater recovery system
CN217773432U (en) Filter with replaceable filter screen
CN219343447U (en) Municipal works are with having filtration's inlet for stom water