CN219652508U - Hoisting equipment for construction - Google Patents

Hoisting equipment for construction Download PDF

Info

Publication number
CN219652508U
CN219652508U CN202222898027.XU CN202222898027U CN219652508U CN 219652508 U CN219652508 U CN 219652508U CN 202222898027 U CN202222898027 U CN 202222898027U CN 219652508 U CN219652508 U CN 219652508U
Authority
CN
China
Prior art keywords
fixedly connected
column
fixed
motor
belt pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222898027.XU
Other languages
Chinese (zh)
Inventor
王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Vocational University Of Engineering And Technology
Original Assignee
Shanxi Vocational University Of Engineering And Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Vocational University Of Engineering And Technology filed Critical Shanxi Vocational University Of Engineering And Technology
Priority to CN202222898027.XU priority Critical patent/CN219652508U/en
Application granted granted Critical
Publication of CN219652508U publication Critical patent/CN219652508U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

The utility model relates to the technical field of hoisting devices and discloses hoisting equipment for construction, which comprises a mounting column and a mounting plate, wherein the left side and the right side of the inside of the mounting column are respectively and rotatably connected with a transmission rod, the outside of the transmission rod is fixedly connected with two worms, the front end of the mounting column is provided with a first motor, the output end of the first motor is fixedly connected with a first belt pulley, the first belt pulley is connected with a second belt pulley through a belt, four corners of the bottom of the mounting column are respectively and fixedly connected with a fixed block, the inside of each fixed block is connected with a sliding column in a sliding manner, and the bottom of each sliding column is fixedly connected with a travelling wheel. According to the lifting device, the lifting effect on the travelling wheels is achieved, so that the lifting device is convenient to move, convenience is provided for workers, the practicability is high, meanwhile, building materials can be effectively fixed and clamped, the clamping effect is high, the working efficiency is improved, and the lifting device is convenient for people to use.

Description

Hoisting equipment for construction
Technical Field
The utility model relates to the field of lifting devices, in particular to lifting equipment for construction.
Background
Civil engineering is a general term of science and technology for building various land engineering facilities, is the engineering discipline of building various facilities and places for activities such as human life, production, protection, at present, in the course of civil engineering construction, often need hoist building material to be convenient for install, through retrieving, the patent number CN214989839U of authorizing discloses a hoisting equipment of building civil engineering construction, including hydraulic pump, hoist hook, play davit, stabilising mass and revolving stage, the revolving stage upper end is provided with the workstation, the workstation upper end is provided with the mount, the mount inboard is provided with the pivot, and this patent plays the function of being convenient for remove hoisting equipment through addding multiunit pneumatic cylinder, has solved that current hoisting equipment is mostly fixed, is inconvenient for removing, use flexibility is relatively poor shortcoming, however the inventor discovers that above-mentioned patent hoisting equipment can play the function of removing, and through retrieving, and the cost is high, and can't guarantee that the universal wheel is in same horizontal plane, leads to the stability of removal, is inconvenient for carrying out fixing building material, causes damage to building material surface easily in the course of centre gripping, reduces the work efficiency of hoisting material installation work of this kind of building material and uses this technical personnel to solve this field.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides hoisting equipment for construction.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a lifting device for construction, includes erection column and mounting panel, the inside left and right sides of erection column is all rotated and is connected with the transfer line, two worms of outside fixedly connected with of transfer line, first motor is installed to the front end of erection column, the output fixedly connected with first belt pulley of first motor, first belt pulley passes through the belt and is connected with the second belt pulley, the equal fixedly connected with fixed block in bottom four corners department of erection column, the inside sliding connection of fixed block has the sliding column, the bottom fixedly connected with walking wheel of sliding column, the screw thread groove has been seted up to the inside of sliding column, the inner wall threaded connection of screw thread groove has the screw thread post, the top and the fixedly connected with worm wheel of fixed block are run through to the top of screw thread post, the top left side fixedly connected with of erection column, the inside rotation of mount is connected with the take-up reel, the outside of take-up reel is provided with the steel cable, the second motor is installed to the front end of mount, the mounting panel is located the top of erection column.
As a further description of the above technical solution:
the inside rotation of mounting panel is connected with two-way threaded rod, two thread bush are connected with to the outside screw thread of two-way threaded rod, the bottom fixedly connected with splint of thread bush, the third motor is installed to the right-hand member of mounting panel, the right-hand member of two-way threaded rod runs through the right-hand member of mounting panel and fixed connection is at the output of third motor.
As a further description of the above technical solution:
the top middle part fixedly connected with fixed column of erection column, the right side top fixedly connected with fixed plate of fixed column, the equal fixedly connected with fixed pulley in the right-hand member of fixed plate and the top of fixed column.
As a further description of the above technical solution:
the other end of the steel rope is connected with the middle part of the top end of the sliding column along the outer walls of the two fixed pulleys in sequence.
As a further description of the above technical solution:
the four worms are respectively meshed with the four worm gears at the corresponding positions.
As a further description of the above technical solution:
the output end of the second motor penetrates through the outside of the fixing frame and is fixedly connected with the winding roll.
As a further description of the above technical solution:
the front end of the transmission rod on the right side penetrates through the front part of the mounting column and is fixedly connected with the second belt pulley.
The utility model has the following beneficial effects:
1. according to the lifting device, the lifting effect on the travelling wheels can be achieved through the mutual matching of the structures such as the worm wheel, the worm, the first motor, the first belt pulley, the second belt pulley, the transmission rod, the threaded column, the threaded groove, the fixed block and the sliding column, so that the lifting device can be conveniently moved, the movement is more stable, convenience is provided for staff, and the practicability is higher.
2. According to the utility model, the building materials can be effectively fixed and clamped by the mutual matching of the structures such as the third motor, the clamping plate, the thread sleeve, the bidirectional threaded rod, the mounting plate and the like, so that the clamping effect is higher, the working efficiency is improved, and the use of people is facilitated.
Drawings
Fig. 1 is a perspective view of a hoisting device for construction according to the present utility model;
fig. 2 is a schematic structural diagram of a winding roll of the hoisting equipment for construction according to the present utility model;
FIG. 3 is a front cross-sectional view of a mounting plate of a lifting device for construction according to the present utility model;
fig. 4 is a front cross-sectional view of a mounting column of the hoisting device for construction according to the present utility model;
FIG. 5 is a top cross-sectional view of a mounting column of the hoisting equipment for construction according to the present utility model;
fig. 6 is an enlarged view at a in fig. 4.
Legend description:
1. a fixed pulley; 2. fixing the column; 3. a steel rope; 4. a winding roll; 5. a fixing frame; 6. a first pulley; 7. a first motor; 8. a second motor; 9. a second pulley; 10. a mounting column; 11. a clamping plate; 12. a sliding column; 13. a mounting plate; 14. a fixing plate; 15. a threaded column; 16. a thread sleeve; 17. a two-way threaded rod; 18. a third motor; 19. a fixed block; 20. a thread groove; 21. a walking wheel; 22. a worm; 23. a transmission rod; 24. a worm wheel.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, one embodiment provided by the present utility model is: the utility model provides a lifting device for construction, including erection column 10 and mounting panel 13, erection column 10 plays the effect of bearing fixed column 2 on the one hand, on the other hand plays the effect of setting up worm wheel 24 and worm 22, the inside left and right sides of erection column 10 all rotates and is connected with transfer line 23, the outside fixedly connected with two worm 22 of transfer line 23, drive worm 22 through the rotation of transfer line 23 and take place to rotate, first motor 7 is installed to the front end of erection column 10, the output fixedly connected with first belt pulley 6 of first motor 7, first belt pulley 6 is connected with second belt pulley 9 through the belt, start first motor 7, thereby make left side transfer line 23 take place to rotate, and further drive first belt pulley 6 take place to rotate, and make second belt pulley 9 take place to rotate through the effect of belt, and further make right side transfer line 23 take place to rotate, the four corners of the bottom of the installation column 10 are fixedly connected with fixing blocks 19, the function of bearing the fixing column 2 is achieved, the inside of the fixing blocks 19 is slidably connected with sliding columns 12, the bottoms of the sliding columns 12 are fixedly connected with travelling wheels 21, threaded grooves 20 are formed in the insides of the sliding columns 12, the inner walls of the threaded grooves 20 are in threaded connection with threaded columns 15, the top ends of the threaded columns 15 penetrate through the tops of the fixing blocks 19 and are fixedly connected with worm wheels 24, when four worms 22 rotate, the engaged and connected worm wheels 24 rotate, the threaded columns 15 rotate further, the inner walls of the threaded grooves 20 move downwards along the outer walls of the threaded columns 15, the sliding columns 12 are driven to move synchronously, the travelling wheels 21 move downwards and contact the ground, a group of fixing frames 5 are fixedly connected to the left side of the top end of the installation column 10, which is convenient for workers to move, the inside rotation of mount 5 is connected with take-up reel 4, and the outside of take-up reel 4 is provided with steel cable 3, and second motor 8 is installed to the front end of mount 5, and mounting panel 13 is located the top of erection column 10, through starting second motor 8 to make take-up reel 4 take-up reel rotate, thereby make steel cable 3 shrink, under the effect through fixed pulley 1, play the hoist and mount effect to mounting panel 13.
The inside rotation of mounting panel 13 is connected with two-way threaded rod 17, also known as different line threaded rod this is the prior art so repeated repeating here, the outside threaded connection of two-way threaded rod 17 has two thread bush 16, the bottom fixedly connected with splint 11 of thread bush 16, the third motor 18 is installed to the right-hand member of mounting panel 13, the right-hand member of two-way threaded rod 17 runs through the right-hand member of mounting panel 13 and fixed connection is at the output of third motor 18, thereby make two-way threaded rod 17 take place to rotate through starting third motor 18, thereby be close to each other with two thread bush 16 along the outer wall of two-way threaded rod 17, thereby drive splint 11 and be close to each other, effectively fix civil engineering department material, and the centre gripping effect is better, the top middle part fixedly connected with fixed column 2 of erection column 10, play the effect of supplementary hoist and mount, the right side top fixedly connected with fixed plate 14 of fixed column 2, the right-hand member of fixed plate 14 and the equal fixedly connected with fixed pulley 1 in top of fixed column 2, the other end of steel cable 3 is continuous with the top middle part of the top of two fixed pulley 1 in proper order of sliding column 12 at last, thereby four worm 22 correspond position and worm wheel 22 take-up pulley 24 take place the rotation, thereby take place the reel 9 is rotated with the fixed connection of four worm wheel drive wheel 2, the fixed pulley 2, the reel 9 takes place the fixed connection is realized through the fixed connection of four worm wheel drive wheel 2, the fixed connection is realized through the fixed pulley 2, the fourth drive pulley 2, the drive pulley 2 rotates the drive pulley 9, thereby take-down the drive pulley is connected with the second reel 9, the drive pulley is rotated through the fixed pulley 9, thereby take-down 5, the drive end is connected through the drive pulley is connected through the drive end is connected through the drive pulley and has the drive end.
Working principle: when the device is specifically used, the first motor 7 is started when the device needs to move, so that the left transmission rod 23 rotates, the first belt pulley 6 is further driven to rotate, the second belt pulley 9 rotates under the action of a belt, the right transmission rod 23 is further driven to rotate, the four worms 22 rotate, the worm wheel 24 connected in a meshed mode rotates, the threaded column 15 further rotates, the inner wall of the threaded groove 20 moves downwards along the outer wall of the threaded column 15, the sliding column 12 is driven to synchronously move, the travelling wheel 21 moves downwards and contacts the ground, the working personnel conveniently move, the bidirectional threaded rod 17 rotates through the starting of the third motor 18, the two threaded sleeves 16 are mutually close to each other along the outer wall of the bidirectional threaded rod 17, the clamping plates 11 are driven to be mutually close, materials at the civil engineering are effectively fixed, and the clamping effect is better.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (7)

1. Hoisting equipment for construction, including erection column (10) and mounting panel (13), its characterized in that: the utility model discloses a wire winding reel, including installation post (10), fixed block (19) are all rotated in the inside left and right sides of installation post (10), two worm (22) of outside fixedly connected with of transmission post (23), first motor (7) are installed to the front end of installation post (10), the output fixedly connected with first belt pulley (6) of first motor (7), first belt pulley (6) are connected with second belt pulley (9) through the belt, the equal fixedly connected with fixed block (19) in bottom four corners department of installation post (10), the inside sliding connection of fixed block (19) has sliding column (12), the bottom fixedly connected with walking wheel (21) of sliding column (12), screw thread groove (20) have been seted up to the inside of sliding column (12), the inner wall threaded connection of screw thread groove (20) has screw thread post (15), the top of screw thread post (15) runs through the top of fixed block (19) and fixedly connected with mount (24), the top left side fixedly connected with worm wheel (5) of installation post (10), the inside sliding connection of fixed block (19) has wire winding reel (4), the wire winding reel (4) is provided with the wire winding reel (8), the mounting plate (13) is located above the mounting column (10).
2. The hoisting device for construction according to claim 1, wherein: the inside rotation of mounting panel (13) is connected with two-way threaded rod (17), the outside threaded connection of two-way threaded rod (17) has two thread bush (16), the bottom fixedly connected with splint (11) of thread bush (16), third motor (18) are installed to the right-hand member of mounting panel (13), the right-hand member of two-way threaded rod (17) runs through the right-hand member of mounting panel (13) and fixed connection is at the output of third motor (18).
3. A lifting device for construction according to claim 2, characterized in that: the fixed pulley is characterized in that a fixed column (2) is fixedly connected to the middle of the top end of the mounting column (10), a fixed plate (14) is fixedly connected to the top of the right side of the fixed column (2), and fixed pulleys (1) are fixedly connected to the right end of the fixed plate (14) and the top of the fixed column (2).
4. A lifting device for construction according to claim 3, wherein: the other end of the steel rope (3) is sequentially connected with the middle part of the top end of the sliding column (12) along the outer walls of the two fixed pulleys (1).
5. The hoisting device for construction according to claim 1, wherein: the four worms (22) are respectively meshed with four worm gears (24) at corresponding positions.
6. The hoisting device for construction according to claim 1, wherein: the output end of the second motor (8) penetrates through the outside of the fixing frame (5) and is fixedly connected with the winding roll (4).
7. The hoisting device for construction according to claim 1, wherein: the front end of the right transmission rod (23) penetrates through the front part of the mounting column (10) and is fixedly connected with the second belt pulley (9).
CN202222898027.XU 2022-11-01 2022-11-01 Hoisting equipment for construction Active CN219652508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222898027.XU CN219652508U (en) 2022-11-01 2022-11-01 Hoisting equipment for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222898027.XU CN219652508U (en) 2022-11-01 2022-11-01 Hoisting equipment for construction

Publications (1)

Publication Number Publication Date
CN219652508U true CN219652508U (en) 2023-09-08

Family

ID=87878057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222898027.XU Active CN219652508U (en) 2022-11-01 2022-11-01 Hoisting equipment for construction

Country Status (1)

Country Link
CN (1) CN219652508U (en)

Similar Documents

Publication Publication Date Title
CN111980423A (en) Semi-automatic assembly type building assembly equipment and use method thereof
CN219652508U (en) Hoisting equipment for construction
CN211522821U (en) Good removal invert trestle of stability
CN112320686A (en) Heavy object handling device for construction
CN217297041U (en) Gantry crane
CN210262760U (en) Handling frame is used in bridge maintenance
CN116142984A (en) Portable movable novel lifting equipment
CN210396174U (en) Mounting structure of prefabricated plate
CN111532881B (en) Municipal works cable interlude device
CN212802716U (en) Civil engineering construction supporting structure
CN214780348U (en) Plate hoisting device for building construction
CN212740410U (en) Assembled building hoist device
CN210637722U (en) Movable transformer substation monitoring device
CN214270047U (en) Mine elevating gear is used in geological survey
CN212356346U (en) Hoisting accessory is used in chemical industry equipment overhaul
CN209815532U (en) Lifting device for building engineering
CN210127042U (en) Transformer substation equipment lifting device
CN112983117A (en) Fence is kept apart to electric power facility
CN219569786U (en) Safety fence for electric equipment installation
CN220131556U (en) Building construction site pay-off rack for civil engineering
CN214141187U (en) Hoisting mechanism of box-type substation
CN215801101U (en) Device is demolishd to support for bridge construction
CN218881519U (en) Lifting scaffold capable of moving horizontally
CN213037313U (en) Building assembly lifting device
CN213171182U (en) Hoisting overhead traveling crane for cement telegraph pole production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant