CN219650010U - PE gas pipe breaker - Google Patents
PE gas pipe breaker Download PDFInfo
- Publication number
- CN219650010U CN219650010U CN202320545971.9U CN202320545971U CN219650010U CN 219650010 U CN219650010 U CN 219650010U CN 202320545971 U CN202320545971 U CN 202320545971U CN 219650010 U CN219650010 U CN 219650010U
- Authority
- CN
- China
- Prior art keywords
- box
- rotating shaft
- shaped fixing
- fixing plate
- cutting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005520 cutting process Methods 0.000 claims abstract description 75
- 238000010030 laminating Methods 0.000 claims 1
- 239000004698 Polyethylene Substances 0.000 abstract 2
- -1 polyethylene Polymers 0.000 abstract 1
- 229920000573 polyethylene Polymers 0.000 abstract 1
- 238000000034 method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 4
- 210000005056 cell body Anatomy 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/62—Plastics recycling; Rubber recycling
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses a PE (polyethylene) gas pipe breaker which comprises a first box body and a second box body, wherein one side of the first box body is provided with two convex ends, one side of the second box body is provided with two concave ends, the convex ends and the concave ends are attached, a first fastening bolt is inserted into the upper wall surface of the second box body, a pair of columns is arranged on the side wall surface of the second box body, a cutting device is arranged on the side wall surface of the other end of each column, a first pipe driven device is arranged on the side wall surface of the other end of the second box body, a second pipe driven device is arranged on the side wall surface of the first box body, which is close to the side wall surface of the other end of the second box body, and the first fastening bolt is screwed to pull the first box body and the second box body, so that the first box body and the second box body are separated, the round hole end between the first box body and the second box body is adjusted to be in proper size, and the first fastening bolt is screwed again at the moment, so that the round hole end is fixed in size.
Description
Technical Field
The utility model relates to the technical field of pipe cutting, in particular to a PE gas pipe breaker.
Background
With the development of technology, pipelines of different materials are also developed, the technology of PE pipelines is mature nowadays, the situation that cutting is needed in the application process is met, a cutting device is needed to be used for cutting, various pipe breakers exist in the prior art, such as a novel utility model in China with the patent number of CN201820620459.5, a portable pipe breaker is disclosed, the portable pipe breaker comprises a pipe breaker body, the pipe breaker body comprises a fixing seat, a connecting rod and a base, the connecting rod is installed at one end of the base, and a through hole is formed in the fixing seat.
When the pipe breaker meets the conditions of different hardness and cutting requirements, the pipe breaker is provided with only one cutting tool, so that when the pipe breaker meets the conditions, the pipe breaker can only cut through an external tool device, and the pipe breaker has the problems of inconvenient cutting when the pipe breaker has different hardness and different cutting requirements.
In the use process of the pipe breaker, when encountering long pipe cutting, the pipe breaker is not provided with an auxiliary pipe conveying device, so that the pipe is pushed and cut at one side, and when encountering the pipe which is inconvenient to push, a plurality of manpower are required for auxiliary operation, and the pipe breaker has the problem that a plurality of manpower are required when the pipe is inconvenient to push and cut.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides the PE gas pipe breaker, which solves the technical problems that when the existing 1-type pipe breaker meets different hardness and cutting requirements, the pipe breaker is only provided with one cutting tool, so that when the situation is met, the pipe breaker can only be cut through an external tool device, and the pipe breaker is inconvenient to cut when the hardness and the cutting requirements are different. 2. In the use process of the pipe breaker, when encountering long pipe cutting, the pipe breaker is not provided with an auxiliary pipe conveying device, so that the pipe is pushed and cut at one side, and when encountering the pipe which is inconvenient to push, a plurality of workers are required for auxiliary operation, and the pipe breaker has the technical problem that a plurality of workers are required when the pipe is inconvenient to push and cut.
In order to achieve the above purpose, the utility model is realized by the following technical scheme: PE gas pipe breaker, including first box and second box, first box one side is two convex ends, second box one side is two concave ends, convex end and concave end laminate mutually, first fastening bolt is inserted to the second box upper wall, a pair of cylinder is installed to second box lateral wall, cutting device is installed to cylinder other end lateral wall, first pipe driven device is installed to second box other end lateral wall, second pipe driven device is installed to the lateral wall that the other end lateral wall that the first box is close to the second box.
Preferably, the cutting device comprises a first cutting mechanism, a second cutting mechanism and a cutting moving mechanism, wherein the cutting moving mechanism comprises a first annular plate body, a concave box, a handle, a telescopic rod, a second fastening bolt, a second annular plate body, a fifth rotating shaft, a bearing and a third roller, a pair of grooves are formed in the concave box, the first annular plate body is arranged on the side wall surface of the other end of the column body, sliding grooves are formed in the two side wall surfaces of the end of the first annular plate body, the bearings are respectively sleeved at two ends of the fifth rotating shaft and are respectively inserted into the grooves of the concave box, the third roller is respectively sleeved on the fifth rotating shaft, the third roller is slidably mounted in the sliding grooves, the telescopic rod is divided into a sleeve and a barrel body, the sleeve is sleeved on the outer wall surface of the barrel body, the second fastening bolt is inserted on the outer wall surface of the barrel body, a pair of grooves are formed in the side wall surface of one end of the telescopic rod, the other end of the telescopic rod is arranged on the side wall surface of the second annular plate body, the other end of the telescopic rod is respectively sleeved on the side wall surface of the concave box, the other end of the telescopic rod is arranged on the side wall surface of the concave box, the second rotating shaft is respectively, the other end of the telescopic rod is arranged on the side wall surface of the concave mechanism, and the cutting mechanism is respectively.
Preferably, the first cutting mechanism comprises a first cutting wheel, a first Y-shaped fixing plate, a first rotating shaft and a third fastening bolt, wherein the first Y-shaped fixing plate is inserted into the groove body, the first cutting wheel is sleeved on the first rotating shaft and is inserted into one end of the first Y-shaped fixing plate, and the third fastening bolt is inserted into the other groove body.
Preferably, the second cutting mechanism comprises a second cutting wheel, a second rotating shaft, a fourth fastening bolt and a second Y-shaped fixing plate, wherein the second Y-shaped fixing plate is inserted into the groove body, the second cutting wheel is sleeved on the second rotating shaft, the second rotating shaft is inserted into one end of the second Y-shaped fixing plate, and the fourth fastening bolt is inserted into the other groove body.
Preferably, the first pipe body driven device comprises a fourth Y-shaped fixing plate, a fourth rotating shaft and a second roller, the second roller is sleeved on the fourth rotating shaft, the fourth rotating shaft is inserted on the fourth Y-shaped fixing plate, and the fourth Y-shaped fixing plate is arranged on the side wall surface of the second box body.
Preferably, the second pipe body driven device comprises a third Y-shaped fixing plate, a first roller and a third rotating shaft, the first roller is sleeved on the third rotating shaft, the third rotating shaft is inserted on the third Y-shaped fixing plate, and the third Y-shaped fixing plate is arranged on the side wall surface of the first box body and the side wall surface of the first box body.
The utility model provides a PE gas pipe breaker, in the use process, when the conditions of less manpower and longer pipeline which is inconvenient to process are met, a first fastening bolt is screwed and then a first box body and a second box body are pulled, so that the first box body and the second box body are separated, the round hole end between the first box body and the second box body is adjusted to be proper in size, the first fastening bolt is screwed again at the moment, the round hole end is fixed, at the moment, the pipeline is conveyed in an auxiliary mode through a fourth Y-shaped fixing plate on the side wall surfaces of the first box body and the second box body and a first roller and a second roller on a third Y-shaped fixing plate, and the pipeline is conveyed smoothly from the second through the round hole end between the first box body and the second box body, so that single-person convenient operation is realized, and the problem that a plurality of manpower is needed when the pipe breaker is inconvenient to push and cut is solved.
The utility model provides a PE gas pipe breaker, in the use process, when a pipeline is conveyed to the middle of a first annular plate body, at the moment, a concave box arranged on the first annular plate body is moved, so that the second annular plate body is adjusted, a telescopic rod is adopted, a first cutting wheel is attached to the pipeline, a handle is gripped at the moment, the concave box is driven to move on the first annular plate body through the moving handle, the second annular plate body arranged on the telescopic rod is driven to rotate, cutting of the pipeline is completed, when different cutting tools are required to cut the pipeline, at the moment, a third fastening bolt is screwed, so that the first Y-shaped fixing plate is moved between two groove bodies of the second annular plate body, at the moment, the third fastening bolt is screwed, the first Y-shaped fixing plate is fixed inside the second annular plate body, at the moment, a fourth fastening bolt is screwed, the second Y-shaped fixing plate is driven to move inside a groove body of the second annular plate body, when the second Y-shaped fixing plate body is moved to the position, and when the second Y-shaped fixing plate is screwed, the second Y-shaped fixing plate is not required to be manually cut, and the problem is solved.
Drawings
Fig. 1 is a schematic diagram of a front view structure of a PE gas pipe breaker according to the present utility model.
Fig. 2 is a schematic structural diagram of an annular plate body of the PE gas pipe breaker.
Fig. 3 is a schematic diagram of a concave box structure of the PE gas pipe breaker according to the present utility model.
Fig. 4 is a schematic diagram of a first box structure of the PE gas pipe breaker according to the present utility model.
In the figure: 1-a first box; 2-a second box; 3-a first fastening bolt; 4-column; 5-a first annular plate body; 6-a concave box; 7-a handle; 8-a telescopic rod; 9-a second fastening bolt; 10-a first Y-shaped fixing plate; 11-a first cutting wheel; 12-a first rotating shaft; 13-a third fastening bolt; 14-a second Y-shaped fixing plate; 15-fourth fastening bolts; 16-a second cutting wheel; 17-a second rotating shaft; 18-a third Y-shaped fixing plate; 19-a first roller; 20-a third rotating shaft; 21-a fourth Y-shaped fixing plate; 22-a fourth rotating shaft; 23-a second roller; 24-a fifth rotating shaft; 25-bearings; 26-a third roller; 27-a second annular plate body.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution: PE gas pipe breaker, including 1, first box 1 and second box 2, 1 one side of first box is two convex ends, 2 one side of second box is two concave ends, convex end and concave end laminate mutually, the first fastening bolt 3 of wall cartridge has on the second box 2, a pair of cylinder 4 is installed to 2 lateral wall of second box, cutting device is installed to 4 other end lateral wall of cylinder, first body slave unit is installed to 2 other end lateral wall of second box, 1, second body slave unit is installed to the lateral wall that first box 1 is close to 2 other end lateral wall of second box, installs cutting device and can carry out auxiliary cutting with the body through cutting device.
Further, the cutting device comprises a first cutting mechanism, a second cutting mechanism and a cutting moving mechanism, the cutting moving mechanism comprises a first annular plate body 5, a concave box 6, a handle 7, a telescopic rod 8, a second fastening bolt 9, a second annular plate body 27, a fifth rotating shaft 24, a bearing 25 and a third roller 26, a pair of grooves are formed in the concave box 6, the first annular plate body 5 is mounted on the side wall surface of the other end of the column 4, sliding grooves are formed in the side wall surfaces of the two ends of the first annular plate body 5, the two pairs of bearings 25 are respectively sleeved at the two ends of the fifth rotating shaft 24 and are respectively inserted into the grooves of the concave box 6, the pair of third rollers 26 are respectively sleeved on the pair of fifth rotating shafts 24, the pair of third gyro wheel 26 slidable mounting is inside the spout, telescopic link 8 divide into sleeve and barrel and sleeve suit on the barrel outer wall, second fastening bolt 9 cartridge is on the sleeve outer wall, a pair of cell bodies has been seted up on second annular plate 27 on telescopic link 8 one end lateral wall face, telescopic link 8 other end lateral wall face is installed on spill case 6 lateral wall face, handle 7 is installed on spill case 6 other end lateral wall face, first cutting mechanism and second cutting mechanism are installed respectively in fifth pivot 24's cell body inside, and installation cutting device can carry out the auxiliary cutting with the body through cutting device.
Further, the first cutting mechanism comprises a first cutting wheel 11, a first Y-shaped fixing plate 10, a first rotating shaft 12 and a third fastening bolt 13, the first Y-shaped fixing plate 10 is inserted into the groove body, the first cutting wheel 11 is sleeved on the first rotating shaft 12 and is inserted into one end of the first Y-shaped fixing plate 10, the third fastening bolt 13 is inserted into the other groove body, and the first cutting mechanism can cut pipes with different hardness through the first cutting wheel when being installed.
Further, the second cutting mechanism comprises a second cutting wheel 16, a second rotating shaft 17, a fourth fastening bolt 15 and a second Y-shaped fixing plate 14, the second Y-shaped fixing plate 14 is inserted into the groove body, the second cutting wheel 16 is sleeved on the second rotating shaft 17, the second rotating shaft 17 is inserted into one end of the second Y-shaped fixing plate 14, the fourth fastening bolt 15 is inserted into the other groove body, and the second cutting mechanism can cut pipes with different hardness through the second cutting wheel when installed.
Further, the first pipe body driven device comprises a fourth Y-shaped fixing plate 21, a fourth rotating shaft 22 and a second roller 23, the second roller 23 is sleeved on the fourth rotating shaft 22, the fourth rotating shaft 22 is inserted on the fourth Y-shaped fixing plate 21, the fourth Y-shaped fixing plate 21 is arranged on the side wall surface of the second box body 2, and the first pipe body driven device can assist in moving the pipe body through the second roller.
Further, the second pipe body driven device comprises a third Y-shaped fixing plate 18, a first roller 19 and a third rotating shaft 20, the first roller 19 is sleeved on the third rotating shaft 20, the third rotating shaft 20 is inserted on the third Y-shaped fixing plate 18, the third Y-shaped fixing plate 18 is arranged on the side wall surface of the first box body 1, and the second pipe body driven device is arranged to assist in moving the pipe body through the first roller.
The detailed connection means are known in the art, and the following mainly describes the working principle and process, and the specific work is as follows.
Examples: when the conditions that the labor is less and the pipeline is long and inconvenient to process are met, the first fastening bolt 3 is screwed to pull the first box body 1 and the second box body 2 again, so that the first box body 1 and the second box body 2 are separated, the round hole end between the first box body 1 and the second box body 2 is adjusted to be proper in size, the first fastening bolt 3 is screwed again at the moment, the round hole end is fixed, the pipeline is conveyed in an auxiliary mode through the first roller 19 and the second roller 23 on the fourth Y-shaped fixing plate 21 and the third Y-shaped fixing plate 18 on the side wall surfaces of the first box body 1 and the second box body 2, the pipeline is conveyed smoothly from the second through the round hole end between the first box body 1 and the second box body 2, so that convenient operation is achieved, when the pipeline is conveyed to the middle of the first annular plate body 5, the concave box 6 mounted on the first annular plate body 5 is moved at the moment, the second annular plate body 27 is adjusted, the telescopic rod 8 is adopted, the first cutting wheel 11 is attached to the pipeline, the handle 7 is gripped, the concave box 6 is driven to move on the first annular plate body 5 by moving the handle 7, the second annular plate body 27 mounted on the telescopic rod 8 is driven to rotate, the pipeline is cut, when different cutting tools are required to be used for cutting the pipeline, the third fastening bolt 13 is screwed, the first Y-shaped fixing plate 10 is moved on two groove bodies of the second annular plate body 27, the third fastening bolt 13 is screwed at the moment to fix the first Y-shaped fixing plate 10 inside the second annular plate body 27 when the first Y-shaped fixing plate 10 is moved to the side position, the fourth fastening bolt 15 is screwed at the moment, the second Y-shaped fixing plate 14 is driven to move inside the groove bodies of the second annular plate body 27, when moving to the cutting position, the fourth fastening bolts 15 are screwed at this time to fix the second Y-shaped fixing plate 14 inside the groove of the second annular plate body 27, thereby performing the cutting process.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.
Claims (6)
- PE gas pipe breaker, including 1, first box (1) and second box (2), its characterized in that, 1, first box (1) one side is two convex ends, second box (2) one side is two concave ends, convex end and concave end laminating mutually, first fastening bolt (3) are inserted on second box (2) upper wall, a pair of cylinder (4) are installed to second box (2) lateral wall, cutting device is installed to cylinder (4) other end lateral wall, first body driven device is installed to second box (2) other end lateral wall, second body driven device is installed to the lateral wall that 1, first box (1) are close to second box (2) other end lateral wall.
- 2. The PE gas pipe breaker according to claim 1, wherein the cutting device comprises a first cutting mechanism, a second cutting mechanism and a cutting moving mechanism, the cutting moving mechanism comprises a first annular plate body (5), a concave box (6), a handle (7), a telescopic rod (8), a second fastening bolt (9), a second annular plate body (27), a fifth rotating shaft (24), a bearing (25) and a third roller (26), a pair of grooves are formed in the concave box (6), the first annular plate body (5) is mounted on the side wall surface of the other end of the column body (4), sliding grooves are formed in the two side wall surfaces of the end of the first annular plate body (5), the two pairs of bearings (25) are respectively sleeved at the two ends of the fifth rotating shaft (24) and are respectively inserted into the grooves of the concave box (6), the pair of third rollers (26) are respectively sleeved on the pair of fifth rotating shafts (24), the pair of third rollers (26) are slidably mounted in the sliding grooves, the sleeve (8) and the annular plate body (27) are respectively sleeved on the outer wall surface of the second annular plate body (8) and the second annular plate body (27), the sleeve body (8) is sleeved on the side wall surface of the second annular plate body (8), the handle (7) is arranged on the side wall surface of the other end of the concave box (6), and the first cutting mechanism and the second cutting mechanism are respectively arranged in the groove body of the fifth rotating shaft (24).
- 3. The PE gas pipe breaker according to claim 2, characterized in that the first cutting mechanism comprises a first cutting wheel (11), a first Y-shaped fixing plate (10), a first rotating shaft (12) and a third fastening bolt (13), wherein the first Y-shaped fixing plate (10) is inserted into the groove body, the first cutting wheel (11) is sleeved on the first rotating shaft (12) and is inserted into one end of the first Y-shaped fixing plate (10), and the third fastening bolt (13) is inserted into the other groove body.
- 4. The PE gas pipe breaker according to claim 2, characterized in that the second cutting mechanism comprises a second cutting wheel (16), a second rotating shaft (17), a fourth fastening bolt (15) and a second Y-shaped fixing plate (14), wherein the second Y-shaped fixing plate (14) is inserted into the groove body, the second cutting wheel (16) is sleeved on the second rotating shaft (17), the second rotating shaft (17) is inserted into one end of the second Y-shaped fixing plate (14), and the fourth fastening bolt (15) is inserted into the other groove body.
- 5. The PE gas pipe breaker according to claim 1, wherein the first pipe body driven device comprises a fourth Y-shaped fixing plate (21), a fourth rotating shaft (22) and a second roller (23), the second roller (23) is sleeved on the fourth rotating shaft (22), the fourth rotating shaft (22) is inserted on the fourth Y-shaped fixing plate (21), and the fourth Y-shaped fixing plate (21) is mounted on the side wall surface of the second box body (2).
- 6. The PE gas pipe breaker according to claim 1, wherein the second pipe body driven device comprises a third Y-shaped fixing plate (18), a first roller (19) and a third rotating shaft (20), the first roller (19) is sleeved on the third rotating shaft (20), the third rotating shaft (20) is inserted on the third Y-shaped fixing plate (18), and the third Y-shaped fixing plate (18) is mounted on the side wall surface of the first box body (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320545971.9U CN219650010U (en) | 2023-03-20 | 2023-03-20 | PE gas pipe breaker |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320545971.9U CN219650010U (en) | 2023-03-20 | 2023-03-20 | PE gas pipe breaker |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219650010U true CN219650010U (en) | 2023-09-08 |
Family
ID=87859338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320545971.9U Active CN219650010U (en) | 2023-03-20 | 2023-03-20 | PE gas pipe breaker |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219650010U (en) |
-
2023
- 2023-03-20 CN CN202320545971.9U patent/CN219650010U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219650010U (en) | PE gas pipe breaker | |
CN108533877B (en) | Non-underground operation machinery water plugging device | |
CN208662354U (en) | A kind of plate shearing machine feeding device | |
CN200942499Y (en) | Hand-operated angle spanner | |
CN206202689U (en) | A kind of folding spray rod of plant protection unmanned plane | |
CN205278638U (en) | Hydraulic equipment crossover sub | |
CN208408122U (en) | The curved tooling of Bai | |
CN115388267A (en) | Pipeline opening device for sealing and stabilizing pipeline | |
CN205414021U (en) | Seamless steel pipe bending machine | |
CN112095769A (en) | Robot device for cleaning pipeline | |
CN208321626U (en) | A kind of top backing up roll changing rig | |
CN212203485U (en) | Novel unequal-diameter seamless steel pipe | |
CN211310269U (en) | Stock form bundling support frame | |
CN215697077U (en) | Rolling machine for seamless steel pipe production and processing | |
CN219257409U (en) | Fiber cement composite wallboard transfer device | |
CN212595843U (en) | Hydraulic part test bed | |
CN218618092U (en) | Building engineering pipe strutting arrangement | |
CN220186030U (en) | Butt joint auxiliary tool for installing water conveying pipeline | |
CN215544074U (en) | Steel pipe spinning machine | |
CN210830832U (en) | Sound absorption composite construction tuber pipe of modularization installation | |
CN2920475Y (en) | Three roll reeling machine | |
CN221033493U (en) | Environment-friendly spliced corrugated steel plate | |
CN211940739U (en) | Tool for butting corrugated pipes | |
CN204942914U (en) | A kind of can the pipeline tractor of obstacle detouring voluntarily | |
CN220992016U (en) | Automatic rollback belt cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |