CN219620751U - Construction lifting appliance - Google Patents
Construction lifting appliance Download PDFInfo
- Publication number
- CN219620751U CN219620751U CN202321071572.XU CN202321071572U CN219620751U CN 219620751 U CN219620751 U CN 219620751U CN 202321071572 U CN202321071572 U CN 202321071572U CN 219620751 U CN219620751 U CN 219620751U
- Authority
- CN
- China
- Prior art keywords
- driving device
- construction
- construction hoist
- lifting
- lifting rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本实用新型提供了一种施工吊具,所属架空线路检修技术领域,施工吊具包括:滑轮组件、吊绳和驱动装置;该吊具通过将滑轮组件安装在杆塔的横担上,不仅改变了力的方向,还利用驱动装置重力抵消部分拉力,将电气设备较大的重力变为滑轮组件上较小的拉力,而且用电能和机械能代替了人力劳动,无需频繁倒换绳索,降低了作业人员的劳动强度,提高了作业人员的工作效率,缩短了施工时间。该吊具提高了作业人员的工作效率,缩短了施工时间,减少了停电时间,提升了居民用户的电力获得感。该吊具适用于架空线路施工、检修、抢修的设备吊装,应用范围广,实用性强。
The utility model provides a construction sling, which belongs to the technical field of overhead line maintenance. The construction sling includes: a pulley assembly, a suspension rope and a driving device; the sling not only changes the The direction of the force is also used to offset part of the pulling force by the gravity of the driving device, changing the greater gravity of the electrical equipment into a smaller pulling force on the pulley assembly, and replacing the manual labor with electrical energy and mechanical energy, without the need to frequently switch ropes, reducing the number of operators. The labor intensity is reduced, the work efficiency of the operators is improved, and the construction time is shortened. The spreader improves the working efficiency of the operators, shortens the construction time, reduces the power outage time, and improves the power acquisition sense of the resident users. The spreader is suitable for hoisting equipment for overhead line construction, inspection and repair, and has a wide range of applications and strong practicability.
Description
技术领域technical field
本实用新型属于架空线路检修技术领域,具体涉及一种施工吊具。The utility model belongs to the technical field of maintenance of overhead lines, in particular to a construction spreader.
背景技术Background technique
电力线路是在发电厂、变电站和电力用户间用来传送电能的线路,是供电系统的重要组成部分,担负着输送和分配电能的任务。线路运行的好坏直接关系到对用户供电的可靠性,为提高对用户供电可靠性,一般会定期对电力线路进行检修维护或升级改造。Power lines are lines used to transmit electric energy between power plants, substations and power users. They are an important part of the power supply system and are responsible for the task of transmitting and distributing electric energy. The quality of line operation is directly related to the reliability of power supply to users. In order to improve the reliability of power supply to users, the power lines are generally repaired, maintained or upgraded on a regular basis.
目前,在35kV及以下架空线路中,施工队在杆塔上吊装一般都采用纯人工的施工方式。作业人员需携带吊绳爬到杆塔顶端,先将吊绳的一端系在横担上,然后利用吊绳将设备自地面吊至杆塔顶端,最后再进行安装。在安装不同相序的设备前,需要频繁倒换绳索,导致高空作业劳动强度高、体能消耗大。At present, in the overhead lines of 35kV and below, the construction team generally adopts a purely manual construction method for hoisting on the tower. Operators need to carry a sling to climb to the top of the tower, first tie one end of the sling to the cross arm, then use the sling to hoist the equipment from the ground to the top of the tower, and finally install it. Before installing equipment with different phase sequences, the ropes need to be switched frequently, resulting in high labor intensity and high physical consumption for high-altitude operations.
实用新型内容Utility model content
为了解决上述现有技术中存在的安装不同相序的设备前,需要频繁倒换绳索,导致高空作业劳动强度高、体能消耗大等问题,本实用新型提供一种施工吊具,通过将滑轮组件安装在杆塔的横担上,将电气设备较大的重力变为滑轮组件上较小的拉力,用电能和机械能代替了人力劳动,无需频繁倒换绳索,降低了作业人员的劳动强度,提高了作业人员的工作效率,缩短了施工时间。其具体技术方案为:In order to solve the problems in the above prior art that the ropes need to be frequently switched before installing equipment with different phase sequences, resulting in high labor intensity and high physical energy consumption for high-altitude operations, the utility model provides a construction spreader. By installing the pulley assembly On the cross-arm of the pole tower, the greater gravity of the electrical equipment is changed into a smaller pulling force on the pulley assembly, and the human labor is replaced by electric energy and mechanical energy. There is no need to change the rope frequently, which reduces the labor intensity of the operators and improves the operation efficiency. The work efficiency of personnel is improved, and the construction time is shortened. Its specific technical plan is:
一种施工吊具,施工吊具包括:滑轮组件、吊绳和驱动装置;滑轮组件可拆卸地连接在横担上;吊绳绕过滑轮组件,吊绳的第一端与待起吊设备可拆卸连接;驱动装置设置在地面上,驱动装置与吊绳的第二端相连接,驱动装置用于盘卷吊绳。A construction spreader, the construction spreader includes: a pulley assembly, a suspension rope and a driving device; the pulley assembly is detachably connected to the cross arm; the suspension rope goes around the pulley assembly, and the first end of the suspension rope is detachable from the equipment to be hoisted Connection; the driving device is arranged on the ground, the driving device is connected with the second end of the suspension rope, and the driving device is used for coiling the suspension rope.
另外,本实用新型提供的上述技术方案中的一种施工吊具还可以具有如下附加技术特征:In addition, a construction spreader in the above technical solution provided by the utility model can also have the following additional technical features:
可选的,施工吊具还包括:底座组件;底座组件设置在驱动装置的下方,底座组件用于移动驱动装置。Optionally, the construction spreader further includes: a base assembly; the base assembly is arranged below the driving device, and the base assembly is used to move the driving device.
可选的,施工吊具还包括:配重块;配重块可拆卸地设置在底座组件上。Optionally, the construction spreader further includes: counterweights; the counterweights are detachably arranged on the base assembly.
可选的,底座组件包括:安装架、移动轮和刹车轮;移动轮均匀设置在安装架上;至少一个刹车轮设置在安装架上,刹车轮用于固定安装架。Optionally, the base assembly includes: a mounting frame, a moving wheel and a brake wheel; the moving wheel is evenly arranged on the mounting frame; at least one brake wheel is arranged on the mounting frame, and the braking wheel is used to fix the mounting frame.
可选的,移动轮为定向轮;刹车轮为万向轮。Optionally, the moving wheel is a directional wheel; the brake wheel is a universal wheel.
可选的,施工吊具还包括:把手;把手设置在安装架上。Optionally, the construction spreader also includes: a handle; the handle is arranged on the installation frame.
可选的,滑轮组件包括:第一吊钩和定滑轮;第一吊钩与横担可拆卸连接;定滑轮与第一吊钩可转动连接,吊绳从定滑轮的上方绕过,定滑轮用于支撑吊绳。Optionally, the pulley assembly includes: a first hook and a fixed pulley; the first hook is detachably connected to the cross arm; the fixed pulley is rotatably connected to the first hook, and the suspension rope passes over the fixed pulley, and the fixed pulley Used to support the sling.
可选的,横担上设有安装孔,第一吊钩穿过安装孔。Optionally, a mounting hole is provided on the cross arm, and the first hook passes through the mounting hole.
可选的,驱动装置包括:绞盘和电源;绞盘用于盘卷吊绳;电源用于给绞盘供电。Optionally, the driving device includes: a winch and a power supply; the winch is used to coil the suspension rope; the power supply is used to supply power to the winch.
可选的,吊绳包括:钢丝绳和第二吊钩;第二吊钩与钢丝绳相连接,第二吊钩用于连接待起吊设备。Optionally, the lifting rope includes: a wire rope and a second hook; the second hook is connected to the wire rope, and the second hook is used to connect to the equipment to be lifted.
本实用新型的一种施工吊具,与现有技术相比,有益效果为:Compared with the prior art, a construction hanger of the present utility model has the following beneficial effects:
该吊具通过将滑轮组件安装在杆塔的横担上,不仅改变了力的方向,还利用驱动装置重力抵消部分拉力,将电气设备较大的重力变为滑轮组件上较小的拉力,而且用电能和机械能代替了人力劳动,无需频繁倒换绳索,降低了作业人员的劳动强度,提高了作业人员的工作效率,缩短了施工时间。By installing the pulley assembly on the cross arm of the tower, the spreader not only changes the direction of the force, but also uses the gravity of the driving device to offset part of the pulling force, so that the greater gravity of the electrical equipment becomes a smaller pulling force on the pulley assembly. Electric energy and mechanical energy replace human labor, without frequent switching of ropes, which reduces the labor intensity of operators, improves the work efficiency of operators, and shortens the construction time.
该吊具提高了作业人员的工作效率,缩短了施工时间,减少了停电时间,提升了居民用户的电力获得感。The spreader improves the working efficiency of the operators, shortens the construction time, reduces the power outage time, and improves the power acquisition sense of the resident users.
该吊具适用于架空线路施工、检修、抢修的设备吊装,应用范围广,实用性强。The spreader is suitable for hoisting equipment for overhead line construction, inspection and repair, and has a wide range of applications and strong practicability.
附图说明Description of drawings
图1为本实用新型一个实施例的一种施工吊具的结构示意图;Fig. 1 is the structural representation of a kind of construction spreader of an embodiment of the utility model;
图2为本实用新型一个实施例的一种施工吊具的底座组件的主视图;Fig. 2 is a front view of a base assembly of a construction spreader according to an embodiment of the present invention;
图3为本实用新型一个实施例的一种施工吊具的底座组件的俯视图;Fig. 3 is a top view of a base assembly of a construction spreader according to an embodiment of the present invention;
图4为本实用新型一个实施例的一种施工吊具的底座组件的侧视图;Fig. 4 is a side view of a base assembly of a construction spreader according to an embodiment of the present invention;
其中,图1至图4中的附图标记与部件名称之间的对应关系为:Wherein, the corresponding relationship between the reference numerals and the part names in Fig. 1 to Fig. 4 is:
10、横担;11、滑轮组件;111、第一吊钩;112、定滑轮;12、吊绳;121、钢丝绳;122、第二吊钩;13、驱动装置;131、绞盘;132、电源;14、底座组件;141、安装架;142、移动轮;143、刹车轮;15、配重块;16、把手。10. Cross arm; 11. Pulley assembly; 111. First hook; 112. Fixed pulley; 12. Hanging rope; 121. Steel wire rope; 122. Second hook; 13. Driving device; 131. Winch; 132. Power supply ; 14, base assembly; 141, mounting frame; 142, moving wheel; 143, brake wheel; 15, counterweight block; 16, handle.
具体实施方式Detailed ways
在本申请的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present application, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " Orientation or position indicated by "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. The relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, Therefore, it cannot be understood as a limitation of the present utility model.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present utility model, "plurality" means two or more, unless otherwise specifically defined.
在本申请中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In this application, terms such as "installation", "connection", "connection" and "fixation" should be interpreted in a broad sense, for example, it can be a fixed connection or a detachable connection, unless otherwise clearly specified and limited. , or integrally connected; it may be mechanically connected or electrically connected; it may be directly connected or indirectly connected through an intermediary, and it may be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model according to specific situations.
以下结合附图对本实用新型的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本实用新型,并不用于限定本实用新型。The preferred embodiments of the present utility model are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described here are only used to illustrate and explain the present utility model, and are not intended to limit the present utility model.
结合参见图1至图4所示,根据本申请的实施例,一种施工吊具,施工吊具包括:滑轮组件11、吊绳12和驱动装置13;滑轮组件11可拆卸地连接在横担10上;吊绳12绕过滑轮组件11,吊绳12的第一端与待起吊设备可拆卸连接;驱动装置13设置在地面上,驱动装置13与吊绳12的第二端相连接,驱动装置13用于盘卷吊绳12。整个驱动装置13放置在地面上,吊绳12的一端固定在驱动装置13上,另一端通过横担10上的滑轮组件11进行支撑,与待吊装设备相连,利用驱动装置13对吊绳12的收放,完成对电气设备的吊运。不仅改变了力的方向,还利用驱动装置13重力抵消部分拉力,将电气设备较大的重力变为滑轮组件11上较小的拉力,无需频繁倒换绳索,节省了大量的人力,降低作业人员的劳动强度,提高了作业人员的工作效率,缩短了施工时间,保证电网及时供电,提高了供电可靠性。Referring to Figures 1 to 4, according to an embodiment of the present application, a construction spreader includes: a pulley assembly 11, a suspension rope 12 and a driving device 13; the pulley assembly 11 is detachably connected to the cross arm 10; the sling 12 bypasses the pulley assembly 11, and the first end of the sling 12 is detachably connected to the equipment to be hoisted; the driving device 13 is arranged on the ground, and the driving device 13 is connected with the second end of the sling 12 to drive The device 13 is used to coil the suspension rope 12 . The whole driving device 13 is placed on the ground, one end of the suspension rope 12 is fixed on the driving device 13, and the other end is supported by the pulley assembly 11 on the cross arm 10, and is connected with the equipment to be hoisted. Stretch and unwind to complete the lifting of electrical equipment. Not only the direction of the force is changed, but also the gravity of the driving device 13 is used to offset part of the pulling force, so that the greater gravity of the electrical equipment is changed into a smaller pulling force on the pulley assembly 11, without frequent switching of the ropes, which saves a lot of manpower and reduces the workload of operators. Reduce labor intensity, improve the working efficiency of operators, shorten the construction time, ensure timely power supply of the grid, and improve the reliability of power supply.
使用时,作业人员在施工前需要将吊具运输到施工现场。将驱动装置13放置在地面上,使施工吊具牢固平稳。高空作业人员携带滑轮组件11和吊绳12攀登杆塔,地面作业人员操控驱动装置13,随着高空作业人员攀登展放吊绳12,直至高空作业人员到达作业高度。将滑轮组件11安装到杆塔的横担10上,高空作业人员将需要更换的设备用绳子系好挂在吊钩上,地面作业人员通过操作把手16控制驱动装置13正反转,从而实现对设备的吊运。When in use, operators need to transport the spreader to the construction site before construction. The driving device 13 is placed on the ground so that the construction spreader is firm and stable. The high-altitude worker carries the pulley assembly 11 and the suspension rope 12 to climb the pole tower, and the ground operator controls the driving device 13, and the high-altitude worker climbs and spreads the suspension rope 12 until the high-altitude worker reaches the working height. Install the pulley assembly 11 on the cross arm 10 of the pole tower, and the workers at heights will tie the equipment that needs to be replaced with a rope and hang it on the hook. lifting.
作为一种实施例,底座组件14设置在驱动装置13的下方,底座组件14用于移动驱动装置13。通过设置底座组件14对驱动装置13进行支撑,同时能够增大配重,分担吊装所需的部分拉力,防止驱动装置13脱离地面,以提高驱动装置13的稳定性,且运输方便。As an embodiment, the base assembly 14 is disposed under the driving device 13 , and the base assembly 14 is used to move the driving device 13 . By setting the base assembly 14 to support the driving device 13, the counterweight can be increased at the same time to share part of the tension required for hoisting and prevent the driving device 13 from breaking off the ground, so as to improve the stability of the driving device 13 and facilitate transportation.
配重块15可拆卸地设置在底座组件14上。通过配重块15增大底座组件14的重量,以提高驱动装置13的稳定性,便于起吊一些重量较大的设备,扩大吊具的适用范围,提高实用性。The counterweight 15 is detachably disposed on the base assembly 14 . The weight of the base assembly 14 is increased by the counterweight 15 to improve the stability of the driving device 13, facilitate the lifting of some heavy equipment, expand the scope of application of the sling, and improve practicability.
进一步的,配重块15与底座组件14通过螺栓锁紧固定,能够快速拆卸。Further, the counterweight 15 and the base assembly 14 are fastened and fixed by bolts, which can be quickly disassembled.
移动轮142均匀设置在安装架141上;至少一个刹车轮143设置在安装架141上,刹车轮143用于固定安装架141。通过在安装架141底部设置移动轮142和刹车轮143,起吊前通过移动轮142和刹车轮143调整驱动装置13,使驱动装置13靠近杆塔;起吊时,利用刹车轮143固定底座组件14,防止驱动装置13移动,保证起吊设备时的稳定性,防止驱动装置13突然移动导致设备下坠,提高施工现场的安全性。The moving wheels 142 are evenly arranged on the installation frame 141 ; at least one brake wheel 143 is arranged on the installation frame 141 , and the brake wheel 143 is used to fix the installation frame 141 . By setting the moving wheel 142 and the brake wheel 143 at the bottom of the mounting frame 141, the driving device 13 is adjusted by the moving wheel 142 and the braking wheel 143 before lifting, so that the driving device 13 is close to the pole tower; The movement of the driving device 13 ensures the stability when lifting the equipment, prevents the sudden movement of the driving device 13 and causes the equipment to fall, and improves the safety of the construction site.
刹车轮143为万向轮,便于调整和锁紧安装架141的移动方向,以将驱动装置13快速移动至所需位置;移动轮142为定向轮,确保刹车轮143锁紧后移动轮142不会转向,保证驱动装置13的稳定性。The brake wheel 143 is a universal wheel, which is convenient to adjust and lock the moving direction of the mounting frame 141, so that the driving device 13 is quickly moved to the desired position; Can turn to, guarantee the stability of driving device 13.
进一步的,安装架141为正方形,边框由四段优选的角钢焊接而成,角钢厚度为4mm,每段长度为34cm,以保证安装架141的支撑强度。Further, the mounting frame 141 is square, and the frame is welded by four sections of preferred angle steel, the thickness of the angle steel is 4mm, and the length of each section is 34cm, so as to ensure the support strength of the mounting frame 141 .
进一步的,无刹车定滑轮112和有刹车万向轮焊接在角钢的底侧,两只无刹车定滑轮112在前,两只有刹车万向轮在后,便于调整底座组件14的移动方向。Further, the fixed pulley 112 without brake and the universal wheel with brake are welded on the bottom side of the angle steel.
把手16设置在安装架141上。通过在安装架141设置把手16,便于对安装架141的移动方向进行操控,调节方便,省力高效。The handle 16 is disposed on the mounting frame 141 . By setting the handle 16 on the mounting frame 141 , it is convenient to control the moving direction of the mounting frame 141 , the adjustment is convenient, labor-saving and efficient.
进一步的,把手16是由钢条制成,安装在安装架141角钢的外侧,在角钢和钢条上打孔,用螺栓连接固定,可根据需求进行灵活拆装,使用方便。Further, the handle 16 is made of steel bars, installed on the outside of the angle steel of the mounting frame 141, holes are punched on the angle steel and the steel bars, and fixed with bolts, which can be flexibly disassembled and assembled according to requirements, and are easy to use.
作为另一种实施例,第一吊钩111与横担10可拆卸连接;定滑轮112与第一吊钩111可转动连接,吊绳12从定滑轮112的上方绕过,定滑轮112用于支撑吊绳12。定滑轮112通过第一吊钩111与横担10连接,在高空时单手即可完成拆装滑轮组件11的动作,降低高空作业人员的安全风险。As another embodiment, the first hook 111 is detachably connected to the cross arm 10; the fixed pulley 112 is rotatably connected to the first hook 111, and the suspension rope 12 passes over the fixed pulley 112, and the fixed pulley 112 is used to Support hanging rope 12. The fixed pulley 112 is connected with the cross arm 10 through the first hook 111, and the action of disassembling and assembling the pulley assembly 11 can be completed with one hand at high altitude, reducing the safety risk of workers working at high altitude.
横担10上设有安装孔,第一吊钩111穿过安装孔。无需高空作业人员打孔,利用横担10上原有的安装孔,即可完成滑轮组件11的安装,减少吊装前的准备工序,缩短施工时间,减少停电时间,提高居民用户的电力获得感。The cross arm 10 is provided with a mounting hole, and the first hook 111 passes through the mounting hole. The installation of the pulley assembly 11 can be completed by using the original installation holes on the cross arm 10 without the need for high-altitude workers to drill holes, reducing the preparation process before hoisting, shortening the construction time, reducing the power outage time, and improving the sense of power acquisition of residents.
绞盘131用于盘卷吊绳12;电源132用于给绞盘131供电。通过给绞盘131设置单独的电源132,使用时不受位置限制,实用性强。The winch 131 is used to coil the suspension rope 12 ; the power supply 132 is used to supply power to the winch 131 . By providing a separate power supply 132 for the winch 131, it is not limited by the location during use, and has strong practicability.
进一步的,绞盘131为电动绞盘131,电动绞盘131的额定空载转速为30m/min,通过调节电动绞盘131中的行星齿轮可以调节电机转速。电动绞盘131具有操作手柄,单人即可完成操作,实现电气设备的吊运。电动绞盘131具有断电保护功能,能够防止吊装的电气设备坠落。Further, the winch 131 is an electric winch 131 , the rated no-load speed of the electric winch 131 is 30 m/min, and the speed of the motor can be adjusted by adjusting the planetary gear in the electric winch 131 . The electric winch 131 has an operating handle, and a single person can complete the operation to realize the lifting of electrical equipment. The electric winch 131 has a power-off protection function, which can prevent the hoisted electrical equipment from falling.
进一步的,电源132为铅酸蓄电池,电池的额定电压为12V,额定容量为100AH,以保证绞盘131供电时长和供电量足够。Further, the power supply 132 is a lead-acid battery with a rated voltage of 12V and a rated capacity of 100AH, so as to ensure that the winch 131 has sufficient power supply time and power supply.
第二吊钩122与钢丝绳121相连接,第二吊钩122用于连接待起吊设备。通过在钢丝绳121上设置第二吊钩122,便于将钢丝绳121与待起吊设备快速连接,连接简单方便,缩短检修周期,以快速回复供电。The second hook 122 is connected with the wire rope 121, and the second hook 122 is used for connecting the equipment to be lifted. By setting the second hook 122 on the wire rope 121, it is convenient to quickly connect the wire rope 121 to the equipment to be hoisted, the connection is simple and convenient, the maintenance period is shortened, and the power supply is restored quickly.
进一步的,钢丝绳121选用直径3mm,长度为70m的钢丝绳121,能够承载大部分设备的重量,足以将设备吊装到杆塔顶部的横担10上。Further, the wire rope 121 is a steel wire rope 121 with a diameter of 3 mm and a length of 70 m, which can carry the weight of most equipment and is enough to hoist the equipment to the cross arm 10 on the top of the tower.
本领域的技术人员容易理解的是,在不冲突的前提下,上述各有利方式可以自由地组合、叠加。Those skilled in the art can easily understand that, on the premise of no conflict, the above-mentioned advantageous modes can be freely combined and superimposed.
以上仅为本申请的较佳实施例而已,并不用以限制本申请,凡在本申请的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本申请的保护范围之内。以上仅是本申请的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本申请技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本申请的保护范围。The above are only preferred embodiments of the application, and are not intended to limit the application. Any modifications, equivalent replacements and improvements made within the spirit and principles of the application should be included in the protection scope of the application. Inside. The above are only the preferred embodiments of the present application. It should be pointed out that for those of ordinary skill in the art, some improvements and modifications can be made without departing from the technical principle of the application. These improvements and modifications should also be It is regarded as the scope of protection of this application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321071572.XU CN219620751U (en) | 2023-05-06 | 2023-05-06 | Construction lifting appliance |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321071572.XU CN219620751U (en) | 2023-05-06 | 2023-05-06 | Construction lifting appliance |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219620751U true CN219620751U (en) | 2023-09-01 |
Family
ID=87793623
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321071572.XU Withdrawn - After Issue CN219620751U (en) | 2023-05-06 | 2023-05-06 | Construction lifting appliance |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219620751U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119873659A (en) * | 2023-10-24 | 2025-04-25 | 中国石油天然气股份有限公司 | Lifting tool for tower tray of methanol recovery device and construction method |
-
2023
- 2023-05-06 CN CN202321071572.XU patent/CN219620751U/en not_active Withdrawn - After Issue
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119873659A (en) * | 2023-10-24 | 2025-04-25 | 中国石油天然气股份有限公司 | Lifting tool for tower tray of methanol recovery device and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202346637U (en) | Holding rod of double-flat-arm spinning self-lifting seat | |
| CN103832933B (en) | A kind of group tower tower crane with auxiliary | |
| CN201990404U (en) | Portable roof hoist frame | |
| CN113668937B (en) | Waist ring device and lifting system for inner suspension holding rod hoisting tower set | |
| CN203728443U (en) | Combined tower crane with main and auxiliary boom structure | |
| CN219620751U (en) | Construction lifting appliance | |
| CN109205481A (en) | The outer lifting device of transformer of household portable | |
| CN118183521B (en) | Hoisting tool for pole-mounted transformer | |
| CN105347201A (en) | Transformer substation hoisting device with adjustable hoisting arm | |
| CN208980209U (en) | The outer lifting device of transformer of household portable | |
| CN111170170A (en) | Lifting device for transporting goods in high-altitude fan cabin | |
| CN102219148A (en) | Hanger for hoisting equipment | |
| CN218345026U (en) | Transformer substation framework lifting appliance | |
| CN206188298U (en) | Transformer lifting device | |
| CN212450358U (en) | A kind of lifting machinery and equipment for building construction | |
| CN105384097B (en) | A kind of operating platform structure being applied to high-tension line operation | |
| CN110697585A (en) | A mechanism for self-detaching attachment device | |
| CN220283436U (en) | Hoisting mechanism, wind power device thereof and full-automatic tower crane | |
| CN210944589U (en) | Self-detaching attachment mechanism | |
| CN205676052U (en) | Bench type transformer crane device | |
| CN206051406U (en) | The disconnecting switch hoisting apparatus of tiltable section | |
| CN211226088U (en) | Portable substation column equipment hoisting device | |
| CN205346692U (en) | Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke | |
| CN211733665U (en) | Lifting device for transporting goods in high-altitude fan cabin | |
| CN208791082U (en) | A kind of light-duty lifting Work tool of 10KV overhead distribution equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20230901 Effective date of abandoning: 20231225 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20230901 Effective date of abandoning: 20231225 |