CN219611252U - Bridge wire slot vertical installation assembly - Google Patents

Bridge wire slot vertical installation assembly Download PDF

Info

Publication number
CN219611252U
CN219611252U CN202320785632.8U CN202320785632U CN219611252U CN 219611252 U CN219611252 U CN 219611252U CN 202320785632 U CN202320785632 U CN 202320785632U CN 219611252 U CN219611252 U CN 219611252U
Authority
CN
China
Prior art keywords
bridge wire
wire groove
groove
bridge
wire slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320785632.8U
Other languages
Chinese (zh)
Inventor
李佳欣
袁宝
许洋
孙浩然
汤和强
陈连鹏
禹旺
胡晓博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group First Construction Co ltd
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group First Construction Co ltd
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group First Construction Co ltd, China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group First Construction Co ltd
Priority to CN202320785632.8U priority Critical patent/CN219611252U/en
Application granted granted Critical
Publication of CN219611252U publication Critical patent/CN219611252U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge wire slot vertical installation component, which comprises: the bridge wire slot is vertically arranged; the cover plate is also vertically arranged and covers the bridge wire slot; one end of the bracket is used for supporting the bridge wire slot, and the other end of the bracket is used for being fixed on the wall surface; the 7-shaped buckles are arranged on 7-shaped buckle holes formed in two sides of the bridge wire groove and used for pressing the cover plate on the bridge wire groove; the two ends of the supporting plate are respectively fixed with the two spaced brackets and are used for leveling the bridge wire grooves; the inverted L-shaped hooks are fixed on the back of the bridge wire slot at intervals and pass through the supporting plate in an adaptive manner. The utility model can be installed by leaning on the wall, can be installed in sections in a hanging way, is convenient and is beneficial to improving the installation efficiency.

Description

Bridge wire slot vertical installation assembly
Technical Field
The utility model relates to the field of bridge wire grooves, in particular to a bridge wire groove vertical installation assembly.
Background
For example, CN 208608669U discloses a cable bridge cover plate fixing structure, in the prior art, when a bridge wire slot is generally fixed by a wall, a boom is adopted for a lot, and in this fixing mode, the boom is completely used for bearing weight, so that the boom is too large in concentrated force, and under the condition of accumulation in daily life, the position where the upper end of the boom is fixed with a structural floor slab is cracked, or the position bolts fixed by other steel trusses are more easily loosened.
Disclosure of Invention
The utility model aims to solve the technical problem of providing a bridge wire slot vertical installation component which can be installed by a wall, can be installed in a segmented mode in a hanging mode, is convenient and is beneficial to improving the installation efficiency.
To solve the above problems, a bridge wire slot vertical installation assembly is adopted, which comprises:
the bridge wire slot is vertically arranged;
the cover plate is also vertically arranged and covers the bridge wire slot;
one end of the bracket is used for supporting the bridge wire slot, and the other end of the bracket is used for being fixed on the wall surface;
the 7-shaped buckles are arranged on 7-shaped buckle holes formed in two sides of the bridge wire groove and used for pressing the cover plate on the bridge wire groove;
the two ends of the supporting plate are respectively fixed with the two spaced brackets and are used for leveling the bridge wire grooves;
the inverted L-shaped hooks are fixed on the back of the bridge wire slot at intervals and pass through the supporting plate in an adaptive manner.
By adopting the structure, the bridge wire slot can be hung on the supporting plate, and the installation is more convenient.
As the further improvement of the vertical installation component of the bridge wire slot, the bracket comprises a seat leg fixed with the wall surface and a screw rod fixed with the seat leg, the screw rod penetrates through the supporting plate, nuts are arranged on the front side and the rear side of the supporting plate, the nuts are in threaded connection with the screw rod, and the nuts are screwed on the front side and the rear side of the supporting plate so as to adjust the interval between the supporting plate and the wall surface.
By adopting the structure, the distance between the bridge wire slot and the wall surface can be adjusted.
As a further improvement of the bridge wire slot vertical installation assembly, the inverted L-shaped hook is fixed with the supporting plate through a second bolt.
By adopting the structure, the cable slot of the bridge after the hanging can be fixed.
As a further improvement of the bridge wire groove vertical installation assembly, the end part of the bridge wire groove is provided with a joint wire groove, the upper side and the lower side of the joint wire groove are provided with long grooves, when the joint wire groove is overlapped with the bridge wire groove, the end part of the joint wire groove stretches into the bridge wire groove, the end part of the bridge wire groove penetrates through the end part of the bridge wire groove to be in butt joint with the long grooves by adopting a bolt and nut assembly, and the bolt and nut assembly can slide in the long grooves.
By adopting the structure, the joint wire slot is positioned at the expansion joint, which is favorable for adapting to the expansion and contraction of the bridge wire slot.
As a further improvement of the vertical installation component of the bridge wire groove, a first base plate is arranged at the end part of the bridge wire groove, a second base plate is arranged on the middle of the joint wire groove, and a spring is arranged between the first base plate and the second base plate.
By adopting the structure, the reset of the joint wire slot is facilitated.
As a further improvement of the bridge wire slot vertical installation component, the bolt and nut components are arranged at the positions spaced at the end parts of the long slots when being connected in a penetrating way.
By adopting the structure, a part of space is reserved, so that the bridge wire groove is contracted, and the joint wire groove is prevented from being broken or pulled apart.
The utility model can be installed by leaning on the wall, can be installed in sections in a hanging way, is convenient and is beneficial to improving the installation efficiency.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment.
Reference numerals: 1. bridge wire slot; 2. a cover plate; 3. a bracket; 31. a seat leg; 32. a screw; 33. a nut; 4. 7, buckling; 5. a supporting plate; 6. an inverted L-shaped hook; 7. a second bolt; 8. a joint wire slot; 9. a long groove; 10. a bolt and nut assembly; 11. 7-shaped buckling holes; 12. a first backing plate; 13. a second backing plate; 14. and (3) a spring.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that, directions or positional relationships indicated by terms such as "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are based on directions or positional relationships shown in the drawings, are merely for convenience of description and simplification of description, and do not indicate or imply that the apparatus or element to be referred to must have a specific direction, be constructed and operated in the specific direction, and thus should not be construed as limiting the present utility model; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; furthermore, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Example 1
As shown in fig. 1, a bridge wire chase vertical mounting assembly comprising:
the bridge wire slot 1 is vertically arranged;
the cover plate 2 is also vertically arranged and covers the bridge wire slot 1;
one end of the bracket 3 is used for supporting the bridge wire slot 1, and the other end is used for being fixed on a wall surface;
the 7-shaped buckles 4 are arranged on 7-shaped buckle holes 11 formed in two sides of the bridge wire groove 1 and used for pressing the cover plate 2 on the bridge wire groove 1;
the two ends of the supporting plate 5 are respectively fixed with the two spaced brackets 3 and are used for leveling the bridge wire grooves;
the inverted L-shaped hooks 6 are fixed on the back of the bridge wire slot 1 at intervals and are penetrated by the supporting plate 5 in an adapting way.
By adopting the structure, the bridge wire slot 1 can be hung on the supporting plate 5, and the installation is convenient.
In this embodiment, the bracket 3 includes a seat leg 31 fixed to the wall surface, and a screw rod 32 fixed to the seat leg 31, the screw rod 32 penetrates through the supporting plate 5, nuts 33 are disposed on front and rear sides of the supporting plate 5, and the nuts 33 are screwed with the screw rod 32 and tightened on front and rear sides of the supporting plate 5 to adjust the interval between the supporting plate 5 and the wall surface.
With such a structure, the distance between the bridge wire groove 1 and the wall surface can be adjusted.
In this embodiment, the inverted L-shaped hook 6 is fixed to the pallet 5 by a second bolt 7.
By adopting the structure, the cable slot of the bridge after the hanging can be fixed.
In this embodiment, the end of the bridge wire slot 1 is provided with a joint wire slot 8, the upper side and the lower side of the joint wire slot 8 are provided with long slots 9, when the joint wire slot 8 is overlapped with the bridge wire slot 1, the end of the joint wire slot 8 stretches into the bridge wire slot 1, and a bolt and nut assembly 10 passes through the end of the bridge wire slot 1 to be in butt joint with the long slots 9, and the bolt and nut assembly 10 can slide in the long slots 9.
By adopting the structure, the joint wire slot 8 is positioned at the expansion joint, which is beneficial to adapting to the expansion with heat and contraction with cold of the bridge wire slot 1.
In this embodiment, a first pad 12 is disposed at an end of the bridge wire slot 1, a second pad 13 is disposed on the middle of the joint wire slot 8, and a spring 14 is disposed between the first pad 12 and the second pad 13.
With such a structure, the reset of the joint line groove 8 is facilitated.
In this embodiment, the bolt and nut assembly 10 is disposed at a position spaced apart from the end of the elongated slot 9 when being connected.
By adopting the structure, a part of space is reserved, so that the bridge wire slot 1 is contracted, and the joint wire slot 8 is prevented from being broken or pulled apart.
When the bridge wire slot is installed, the following measures are needed:
(1) Material control measures
The metal trunking, the truss and accessories thereof are shaped products which are galvanized; the specification and model of the product meet the design requirements. The inside and outside of the wire slot and the bridge should be smooth and flat, no edge thorn, no distortion, edge warping and other deformation phenomena are caused. The steel used should be straight and free of distortion. The length deviation after blanking is within the range of 5mm, and the incision has no curled edge and burrs.
(2) Bridge wire slot installation control measure
The wire casing should install firmly, does not have distortion, and various connection screw in the wire casing all need wear from inside to outside, should make the head of bolt and wire casing inner wall parallel and level as far as possible to do benefit to the laying, damage the insulating sheath of wire when not laying the line. After the wiring of the cable bridge is finished, the bridge cover plate should be covered in time.
The foregoing is a further detailed description of the utility model in connection with the preferred embodiments, and it is not intended that the utility model be limited to the specific embodiments described. It will be apparent to those skilled in the art that several equivalent substitutions and obvious modifications can be made without departing from the spirit of the utility model, and the same should be considered to be within the scope of the utility model.

Claims (6)

1. A bridge wire chase vertical mounting assembly, comprising:
the bridge wire slot (1) is vertically arranged;
the cover plate (2) is also vertically arranged and covers the bridge wire groove (1);
one end of the bracket (3) is used for supporting the bridge wire slot (1), and the other end is used for being fixed on the wall surface;
the 7-shaped buckles (4) are arranged on 7-shaped buckle holes (11) formed in two sides of the bridge wire groove (1) and used for pressing the cover plate (2) on the bridge wire groove (1);
two ends of the supporting plate (5) are respectively fixed with two spaced brackets (3) and are used for leveling the bridge wire grooves;
the inverted L-shaped hooks (6) are fixed on the back of the bridge wire slot (1) at intervals and are penetrated by the supporting plate (5) in an adapting way.
2. The bridge wire slot vertical installation assembly according to claim 1, wherein the bracket (3) comprises a seat leg (31) fixed with the wall surface and a screw rod (32) fixed with the seat leg (31), the screw rod (32) penetrates through the supporting plate (5), nuts (33) are arranged on the front side and the rear side of the supporting plate (5), the nuts (33) are in threaded connection with the screw rod (32) and are screwed on the front side and the rear side of the supporting plate (5) so as to adjust the interval between the supporting plate (5) and the wall surface.
3. The bridge wire trough vertical mounting assembly according to claim 2, characterized in that the inverted L-shaped hooks (6) are fixed with the pallet (5) by means of second bolts (7).
4. A bridge wire groove vertical installation assembly according to claim 3, wherein a joint wire groove (8) is arranged at the end part of the bridge wire groove (1), a long groove (9) is arranged at the upper side and the lower side of the joint wire groove (8), when the joint wire groove (8) is overlapped with the bridge wire groove (1), the end part of the joint wire groove (8) stretches into the bridge wire groove (1), and a bolt and nut assembly (10) penetrates through the end part of the bridge wire groove (1) to be in butt joint with the long groove (9), and the bolt and nut assembly (10) can slide in the long groove (9).
5. The bridge wire groove vertical installation assembly according to claim 4, wherein a first base plate (12) is arranged on the end part of the bridge wire groove (1), a second base plate (13) is arranged on the middle upper surface of the joint wire groove (8), and a spring (14) is arranged between the first base plate (12) and the second base plate (13).
6. The bridge wire trough vertical mounting assembly according to claim 5, wherein the bolt and nut assembly (10) is disposed at spaced apart locations at the ends of the elongated slot (9) when engaged.
CN202320785632.8U 2023-04-11 2023-04-11 Bridge wire slot vertical installation assembly Active CN219611252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320785632.8U CN219611252U (en) 2023-04-11 2023-04-11 Bridge wire slot vertical installation assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320785632.8U CN219611252U (en) 2023-04-11 2023-04-11 Bridge wire slot vertical installation assembly

Publications (1)

Publication Number Publication Date
CN219611252U true CN219611252U (en) 2023-08-29

Family

ID=87750367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320785632.8U Active CN219611252U (en) 2023-04-11 2023-04-11 Bridge wire slot vertical installation assembly

Country Status (1)

Country Link
CN (1) CN219611252U (en)

Similar Documents

Publication Publication Date Title
US5484076A (en) Load bearing mounting bracket for hanging a light fixture from a mounting rail of a grid ceiling system
CN219611252U (en) Bridge wire slot vertical installation assembly
CN208072857U (en) A kind of building wall body insulating board dedicated hanging part structure
CN112112336A (en) Connecting structure of curtain wall and main body structure and construction method thereof
CN219247403U (en) Electronic engineering winding displacement device
RU2754397C2 (en) Console for mounting facade elements
CN210628982U (en) Fireproof plastic-sprayed cable bridge
CN112582890A (en) Boats and ships electrical equipment installation fixing device
JP3181079U (en) Base plate support bracket for solar panel installation
CN218275684U (en) Convenient adjustable installing support of wall-hanging electronic box
CN109216968B (en) Ground wire clamp with adjustable angle
CN203645236U (en) Bus duct angle iron hanging bracket
US3228644A (en) Radiator hanger
CN220623601U (en) Non-bearing wall mounting bracket
CN213185450U (en) Lightning-arrest area strutting arrangement with adjustable
CN219812232U (en) Adjustable telescopic support hanging bracket
CN216692976U (en) Data communication transmission device
CN212849688U (en) Non-deformable's cable guard shield adjusts structure
CN215945737U (en) Pull wire protection rope supporting device of belt conveyor
CN219954504U (en) Multidirectional adjusting bracket for fire-fighting water pipe
CN214958496U (en) Indoor cable crane span structure of hoist and mount formula
CN219627295U (en) Cable bridge
CN211447434U (en) Double-layer suspended ceiling structure
CN220457100U (en) Lightning-arrest area support with adjustable height
CN216851114U (en) Adjustable mineral cable obviously applies fixed bolster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant