CN219604996U - Segment Liang Guance tower - Google Patents

Segment Liang Guance tower Download PDF

Info

Publication number
CN219604996U
CN219604996U CN202223511791.3U CN202223511791U CN219604996U CN 219604996 U CN219604996 U CN 219604996U CN 202223511791 U CN202223511791 U CN 202223511791U CN 219604996 U CN219604996 U CN 219604996U
Authority
CN
China
Prior art keywords
base frame
tower
guance
liang
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223511791.3U
Other languages
Chinese (zh)
Inventor
刘宇君
苟田
李政
陈卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd, Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN202223511791.3U priority Critical patent/CN219604996U/en
Application granted granted Critical
Publication of CN219604996U publication Critical patent/CN219604996U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a segment Liang Guance tower, comprising: a base pre-buried in the ground; the base includes: a rectangular main body base frame and a side extension base frame, the side extension base frame being arranged at both sides of the rectangular main body base frame and welded with the rectangular main body base frame; the top of the side-extension base frame is provided with two groups of bearing columns with a certain distance, the upper half parts of the bearing columns are positioned above the ground, and the parts above the ground are poured into a girder bearing pedestal for bearing the segmental girders. The utility model redesigns the base, namely, the two sides of the cuboid main body base frame extend out of the side-extension base frames, and utilizes the side-extension base frames to build the girder supporting pedestal, and utilizes the weight of the segmental girder to reinforce the foundation part of the observation tower, so that the integral stability can be ensured, the structure is simple, the cost is low, the building mode is simple, and the utility model is suitable for temporary building of the segmental Liang Guance tower.

Description

Segment Liang Guance tower
Technical Field
The utility model relates to the technical field of bridge preparation, in particular to a segment Liang Guance tower.
Background
Because the section beam has the same cross section shape and dimension, the beam is prefabricated by a short line method, namely, each section of the hole beam is not required to be prefabricated on a full-length pedestal at one time, each set of pedestal is prefabricated with one section at a time, the beam is suitable for factory standardization and modularized construction, and the manufacturing of a large-batch replication mode is realized, so that the equipment utilization rate is improved, and the cost is reduced.
At present, a segmental beam prefabrication site is generally selected to be near a bridge construction position, so that an observation tower for observing segmental beams is also required to be constructed temporarily, the existing observation tower is constructed by a plurality of steel pipe piles, the existing observation tower is relatively simple and crude and has poor stability, and therefore, a person skilled in the art proposes a plurality of stable ultrahigh observation towers for prefabrication measurement, and although the stability is greatly improved, a complex foundation structure is required to support a tower main body which is high enough, and the construction is complicated and the cost is high.
Disclosure of Invention
To solve the above technical problems, the present utility model provides a segment Liang Guance tower. The following presents a simplified summary in order to provide a basic understanding of some aspects of the disclosed embodiments. This summary is not an extensive overview and is intended to neither identify key/critical elements nor delineate the scope of such embodiments. Its sole purpose is to present some concepts in a simplified form as a prelude to the more detailed description that is presented later.
The utility model adopts the following technical scheme:
there is provided a segmented Liang Guance tower comprising: a base pre-buried in the ground; the base includes: a rectangular main body base frame and a side extension base frame, the side extension base frame being arranged at both sides of the rectangular main body base frame and welded with the rectangular main body base frame; the top of the side-extension base frame is provided with two groups of bearing columns with a certain distance, the upper half parts of the bearing columns are positioned above the ground, and the parts above the ground are poured into a girder bearing pedestal for bearing the segmental girders.
Further, the segment Liang Guance tower further comprises: the device comprises a cuboid main body base frame, a stabilizing bearing platform and a tower body, wherein the stabilizing bearing platform is arranged on the upper surface of the cuboid main body base frame, and the tower body is arranged on a supporting part of the stabilizing bearing platform on the ground.
Preferably, the stabilizing bearing platform is of an inverted U shape, the stabilizing bearing platform of the inverted U shape is buckled at the top of the cuboid main body base frame, and the bottoms of the two sides of the stabilizing bearing platform are connected with the side-extension base frame.
Preferably, the segment Liang Guance tower further comprises: side lacing wires; one end of the side lacing wire is connected with the top edge position of the stable bearing platform, and the other end of the side lacing wire stretches into the ground to be connected with the side extension base frame.
Further, the segment Liang Guance tower further comprises: an observation table, a shed and an operation table; the observation table is arranged at the top of the tower body, the baffle shed and the operation table are arranged on the observation table, and the operation table is positioned in the baffle shed.
Further, the segment Liang Guance tower further comprises: combined safety ladder and protective guard; the combined safety ladder is arranged on the side face of the tower body, and the guard rail is arranged around the combined safety ladder.
Further, the segment Liang Guance tower further comprises: a plurality of hanging plates; the tower body is provided with a plurality of hanging plates which are uniformly distributed on the outer surface of the tower body; the hanging plate is provided with a light reflecting strip and a lamp strip.
The utility model has the beneficial effects that: the base is redesigned, namely the side-extension base frames extend from two sides of the cuboid main body base frame, the side-extension base frames are utilized to build the girder supporting pedestal, the foundation part of the observation tower is reinforced by the weight of the segmental girder, the overall stability can be guaranteed, the structure is simple, the cost is low, the building mode is simple, and the method is suitable for temporary building of the segmental Liang Guance tower.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic illustration of the construction of a segment Liang Guance tower of the present utility model in accordance with a first embodiment;
FIG. 2 is a schematic illustration of the structure of a segment Liang Guance tower of the present utility model in a second embodiment;
fig. 3 is a schematic view of the structure of a segment Liang Guance tower of the present utility model in a third embodiment.
Detailed Description
Embodiments of the present utility model will be described in detail below with reference to the accompanying drawings. It should be understood that the described embodiments are merely some, but not all, embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one:
as shown in fig. 1, the present embodiment provides a segment Liang Guance tower comprising: base 1, accept post 2, firm cushion cap 3, tower body 4, observation platform 5, fender canopy 6, operation panel 7, combination formula safety cat ladder 8, rail guard 9, link 10.
The base 1 is pre-buried underground and is formed by welding and assembling steel pipes, and pouring and reinforcing can be selectively performed after the assembling is completed. The base 1 includes: the cuboid main body base frame 101 and two side extension base frames 102 respectively arranged on two sides of the cuboid main body base frame 101, specifically, the side extension base frames 102 are welded on the side face of the cuboid main body base frame 101, and the lower surfaces of the cuboid main body base frame 101 and the side extension base frames are on the same horizontal plane.
Two groups of receiving columns 2 with certain intervals are arranged at the top of the side-extension base frame 102, and the number and the interval distance of each group of receiving columns 2 are designed on site according to the size of the section beam. The upper half part of the receiving column 2 is positioned above the ground, the lower half part is positioned below the ground, and the part of the receiving column 2 positioned above the ground is poured into the bolster pedestals 11, namely, the ground above each side-by-side base frame 102 is provided with two bolster pedestals 11 which are arranged in parallel, and the space between the two bolster pedestals 11 can be used for ventilation and drainage. The bolster seat 11 is used for stacking the prepared segment beams or the segment beams in the preparation process, and the concrete pouring mode is just the existing mode, and is not repeated herein.
The two sides of the cuboid main body base frame 101 extend to form the side-extension base frames 102, the side-extension base frames 102 are utilized to build the girder bearing pedestal 11, the foundation part of the observation tower is reinforced by utilizing the weight of the segmental girder, the stability of the observation tower can be ensured without a complex foundation structure, the cost is reduced, and the building mode is simple.
The firm cushion cap 3 sets up the upper surface at cuboid main part bed frame 101, and the tower body 4 sets up on the supporting part 301 that firm cushion cap 3 is located above ground, and firm cushion cap 3 provides the reference plane for building tower body 4, further guarantees the stability after the establishment. A plurality of hanging plates 10 are arranged on the tower body 4, and the hanging plates 10 are uniformly distributed on the outer surface of the tower body 4; the hanging plate 10 is provided with a reflecting strip 12 and a lamp strip 13, which play a role in warning.
The observation stand 5 is provided on the top of the tower body 4, and a worker observes the observation stand 5. The canopy 6 and the operation panel 7 are arranged on the observation platform 5, the canopy 6 is a rectangular frame assembled by steel pipes, the bottom end of the rectangular frame is beaten on the surface of the observation platform 5 through expansion bolts, and the rain-proof cloth is covered to realize the wind and rain shielding. The operation panel 7 is located the fender canopy 6, and operation panel 7 is used for placing observation instrument and equipment, and the operating personnel of being convenient for uses, also accessible expansion bolts fixes on the observation platform 5.
The combined safety cat ladder 8 is arranged on the side face of the tower body 4, and the guard rail 9 is arranged around the combined safety cat ladder 8, so that a protection effect is achieved, and the safety of going up and down stairs is improved. The combined safety cat ladder 8 can adopt any existing prefabricated stair structure, is installed on one side of the tower body 4 in a hoisting mode, and is reinforced by using a hoop.
Embodiment two:
as shown in fig. 2, the present embodiment provides a segment Liang Guance tower, unlike the first embodiment, the stabilizing support 3 in the present embodiment is inverted U-shaped, and the inverted U-shaped stabilizing support 3 is fastened to the top of the rectangular main body base frame 101, and the upper half of the rectangular main body base frame 101 is wrapped inside and welded. Meanwhile, the bottoms of the two sides of the stable bearing platform 3 are connected with the side-extension base frame 102, and specifically, steel bars can be reserved at the bottoms of the two sides of the stable bearing platform 3 and are connected with the side-extension base frame 102 in a binding or welding mode. The structural design can further improve the stability of the tower body.
Embodiment III:
as shown in fig. 3, this embodiment provides a segment Liang Guance tower, which further includes, on the basis of the second embodiment: side tie bars 14; one end of the side tie bar 14 is connected with the top edge position of the stable bearing platform 3, and the other end of the side tie bar extends into the ground to be connected with the side extension base frame 102, so that the stability of the stable bearing platform 3 is ensured.
The foregoing is merely illustrative of the present utility model, and the present utility model is not limited thereto, and any changes or substitutions easily contemplated by those skilled in the art within the scope of the present utility model should be included in the present utility model. Therefore, the protection scope of the utility model is subject to the protection scope of the claims.

Claims (7)

1. A segmented Liang Guance tower comprising: a base pre-buried in the ground; characterized in that the base comprises: a rectangular main body base frame and a side extension base frame, the side extension base frame being arranged at both sides of the rectangular main body base frame and welded with the rectangular main body base frame; the top of the side-extension base frame is provided with two groups of bearing columns with a certain distance, the upper half parts of the bearing columns are positioned above the ground, and the parts above the ground are poured into a girder bearing pedestal for bearing the segmental girders.
2. A segment Liang Guance tower according to claim 1, further comprising: the device comprises a cuboid main body base frame, a stabilizing bearing platform and a tower body, wherein the stabilizing bearing platform is arranged on the upper surface of the cuboid main body base frame, and the tower body is arranged on a supporting part of the stabilizing bearing platform on the ground.
3. A segment Liang Guance tower according to claim 2, wherein the said support is inverted U-shaped and the said inverted U-shaped support is fastened to the top of the said rectangular main body base frame, and the bottoms of the said support are connected to the said side frames.
4. A segment Liang Guance tower according to claim 3, further comprising: side lacing wires; one end of the side lacing wire is connected with the top edge position of the stable bearing platform, and the other end of the side lacing wire stretches into the ground to be connected with the side extension base frame.
5. A segment Liang Guance tower according to claim 4, further comprising: an observation table, a shed and an operation table; the observation table is arranged at the top of the tower body, the baffle shed and the operation table are arranged on the observation table, and the operation table is positioned in the baffle shed.
6. A segment Liang Guance tower according to claim 5, further comprising: combined safety ladder and protective guard; the combined safety ladder is arranged on the side face of the tower body, and the guard rail is arranged around the combined safety ladder.
7. The segment Liang Guance tower according to claim 6, wherein a plurality of hanging plates are arranged on the tower body, and the hanging plates are uniformly distributed on the outer surface of the tower body; the hanging plate is provided with a light reflecting strip and a lamp strip.
CN202223511791.3U 2022-12-28 2022-12-28 Segment Liang Guance tower Active CN219604996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223511791.3U CN219604996U (en) 2022-12-28 2022-12-28 Segment Liang Guance tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223511791.3U CN219604996U (en) 2022-12-28 2022-12-28 Segment Liang Guance tower

Publications (1)

Publication Number Publication Date
CN219604996U true CN219604996U (en) 2023-08-29

Family

ID=87749857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223511791.3U Active CN219604996U (en) 2022-12-28 2022-12-28 Segment Liang Guance tower

Country Status (1)

Country Link
CN (1) CN219604996U (en)

Similar Documents

Publication Publication Date Title
CN110886227B (en) Main tower cast-in-place lower cross beam support system and construction method
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN109812051A (en) A kind of shed deckhead returns back to top support frame and its construction method
CN219604996U (en) Segment Liang Guance tower
CN112049235A (en) High-altitude large-span cantilever structure construction platform and method
CN217652373U (en) Super high-rise building roof platform of unloading
CN116480184A (en) Tree-shaped supporting system at main entrance of steel structure and construction method thereof
CN216892017U (en) Tie beam integral casting template in template connecting piece and lower stand
CN114108641B (en) Construction method for common foundation pit of bridge bearing platform and underground structure
CN215052133U (en) Steel case roof beam is alternately construction supporting structure from top to bottom
CN213682477U (en) Upper cover structure system applied to track operation line
CN112049253B (en) Truss body and concrete structure connecting node, truss and method
CN212561216U (en) Steel trestle
CN211313380U (en) Ultrahigh independent frame beam template supporting system
CN112095780A (en) Upper cover structure system applied to track operation line and implementation method thereof
CN113356882A (en) Large-section tunnel wall support and construction method
CN220504665U (en) Ectopic assembled H-shaped steel tower
CN217678621U (en) Foundation structure of standard H-shaped steel tower
CN219931744U (en) Supporting system of cast-in-situ concrete beam plate structure of large pipeline
CN216892039U (en) A bent cap epitaxial operation platform for going up stride railway precast beam and erect
CN203500656U (en) River-crossing bridge frame for cables
CN219080110U (en) Steel-pipe column support construction safety platform device
CN111172883B (en) Assembly type box girder assembled temporary buttress and construction method thereof
CN103453219B (en) Cable crosses the river crane span structure
CN214005440U (en) Assembled double-layer truss bent cap support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant