CN219601965U - Support for storing steel pipe piles - Google Patents

Support for storing steel pipe piles Download PDF

Info

Publication number
CN219601965U
CN219601965U CN202321218284.2U CN202321218284U CN219601965U CN 219601965 U CN219601965 U CN 219601965U CN 202321218284 U CN202321218284 U CN 202321218284U CN 219601965 U CN219601965 U CN 219601965U
Authority
CN
China
Prior art keywords
buttress
steel pipe
pipe piles
connecting plate
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321218284.2U
Other languages
Chinese (zh)
Inventor
王昭
邵祥
唐国庆
杨小华
郑绍枫
葛朋钊
韩静
石军文
郑秋幸
周其浩
刘梦迪
许鸿程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN202321218284.2U priority Critical patent/CN219601965U/en
Application granted granted Critical
Publication of CN219601965U publication Critical patent/CN219601965U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/80Packaging reuse or recycling, e.g. of multilayer packaging

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of auxiliary equipment for storing steel pipe piles, and particularly discloses a support for storing steel pipe piles, wherein a first buttress comprises an upper buttress and a lower buttress; the lower part of the upper buttress and the upper part of the lower buttress are respectively provided with an arc-shaped groove; the locking pair penetrating pieces are respectively arranged at the left and right parts of the upper buttress and the lower buttress; each locking pair penetrating pull rod is connected with the locking pair penetrating piece of the upper buttress at one end and connected with the locking pair penetrating piece at the same side of the lower buttress at the other end; one hole of the porous connecting plate is connected to the mounting hole of the first buttress by one connecting bolt, and the other hole of the porous connecting plate is connected to the mounting hole of the second buttress by the other connecting bolt. According to the utility model, the steel pipe piles are limited by arranging the buttresses, so that displacement is prevented when the steel pipe piles are stored, and a plurality of buttresses are connected together to form a storage bracket, so that the storage space is saved; meanwhile, the steel wire rope directly penetrates through the porous connecting plate to hoist, so that damage to the pile body of the steel pipe pile is avoided.

Description

Support for storing steel pipe piles
Technical Field
The utility model relates to the technical field of auxiliary equipment for storing steel pipe piles, in particular to a support for storing steel pipe piles.
Background
In a port terminal, a terminal or a ship lift platform is arranged, and the structure is mainly characterized by a long and narrow terminal structure which is discharged to the water surface outside the terminal, and the sides of the terminal and the ship lift platform can be used for berthing a large number of ships. The structure is that steel pipes are driven into under water to serve as supporting piles of the upper structure of the stacking head, and because the steel pipe pile is long and large in diameter, a stable support system is needed for fixing the steel pipe pile when the steel pipe pile is transported and stored, so that the steel pipe pile is prevented from slipping during transportation and storage, and damage to the steel pipe pile and accidents are avoided.
The traditional steel pipe pile storage supporting component adopts a wood pier, the middle of the wood pier is provided with a circular groove, and the steel pipe pile is placed in the middle of the groove, so that the steel pipe pile storage supporting component has the defects that the wood pier can only be used for supporting the steel pipe pile, if a pile body needs to be bound by a rope during steel pipe pile lifting, a protective layer on the surface of the pile body is easy to damage, and the general adopted solution is to weld a lifting ring on a steel pipe on a construction site so as to facilitate lifting, but an anti-corrosion layer at the position can be damaged during the lifting ring welding; due to the consideration of storage safety and protection of the anti-corrosion layer, only one layer of steel pipe pile can be placed on the wood pier, and the steel pipe pile cannot be placed layer by layer, so that the storage field is wasted.
In order to maximize the use of a steel pipe pile storage site, reduce the occupied storage site of the steel pipe pile, simplify the steel pipe pile hoisting procedure and better protect a steel pipe pile protection layer, a novel steel pipe pile storage bracket device is needed, so that the steel pipe pile is simple to hoist, the protection layer is not damaged, the storage site is occupied less through accumulation and placement, and the device has a simple structure and is convenient to assemble.
Disclosure of Invention
The utility model aims to solve the technical problems that a support for storing steel pipe piles is large in occupied space when steel pipe piles are stored in a wharf, the steel pipe piles are stacked together to be easy to displace, pile bodies are required to be bound during hoisting, and damage is easy to cause.
In order to solve the technical problems, the utility model adopts the following technical scheme: a support for storing steel pipe piles comprises a first buttress and a second buttress which are identical in structure;
a first buttress comprising an upper buttress and a lower buttress; the lower part of the upper buttress and the upper part of the lower buttress are respectively provided with an arc-shaped groove;
the device also comprises four locking pair penetrating pieces and four locking pair penetrating pull rods; the locking pair penetrating pieces are respectively arranged at the left and right parts of the upper buttress and the lower buttress; each locking pair penetrating pull rod is connected with the locking pair penetrating piece of the upper buttress at one end and connected with the locking pair penetrating piece at the same side of the lower buttress at the other end; the mounting holes are formed in the upper part of the upper buttress and the lower part of the lower buttress;
the multi-hole connecting plate is characterized by further comprising a multi-hole connecting plate, one hole of the multi-hole connecting plate is connected to the mounting hole of the first buttress through one connecting bolt, and the other hole of the multi-hole connecting plate is connected to the mounting hole of the second buttress through the other connecting bolt.
As a further technical scheme of the above scheme, the first buttress and the second buttress are arranged side by side, and the porous connecting plate of the first buttress is connected to the upper buttress of the second buttress.
As a further technical scheme of the above scheme, the first buttress and the second buttress are arranged up and down, and the porous connecting plate of the first buttress is connected to the lower buttress of the second buttress.
As a further technical scheme of the scheme, the multi-hole connecting plate further comprises a third buttress and a fourth buttress, wherein the third buttress and the fourth buttress are connected with the first buttress and the second buttress in an aligned mode, and the multi-hole connecting plate is a four-hole connecting plate.
As a further technical scheme of the scheme, the multi-hole connecting plate further comprises a fifth buttress, the fifth buttress is arranged above the first buttress and the second buttress in a staggered mode, and the multi-hole connecting plate is a three-hole connecting plate.
As a further technical scheme of the scheme, a plurality of mounting holes and the porous connecting plates are arranged.
As a further technical scheme of the scheme, the buttress is provided with a plurality of buttresses for respectively supporting the front end, the middle part and the rear end of the steel pipe pile.
As a further technical scheme of the scheme, the hydraulic pile further comprises flexible rubber which is arranged on the contact surface of the buttress and the steel pipe pile.
Compared with the prior art, the utility model has the following advantages and beneficial effects: according to the utility model, the steel pipe piles are limited by arranging the buttresses, so that displacement is prevented when the steel pipe piles are stored, and a plurality of buttresses are connected together to form a storage bracket, so that the storage space is saved; meanwhile, the steel wire rope directly penetrates through the porous connecting plate to hoist, so that damage to the pile body of the steel pipe pile is avoided.
Drawings
Fig. 1 is a schematic view of a hoisting use state of the utility model.
Fig. 2 is a schematic view of the present utility model for storing a steel pipe pile.
Fig. 3 is a schematic perspective view of the buttress.
Fig. 4 is a schematic perspective view of the components of the buttress.
Fig. 5 is a schematic front view of the present utility model when a steel pipe pile is stored.
The definitions of the various numbers in the figures are: buttress-1; an upper buttress-11; a lower buttress-12; a mounting hole-13; locking the opposite wearing piece-2; locking the pull rod-3; a porous connecting plate-4; a connecting bolt-5; flexible rubber-6.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the drawings in the embodiments of the present utility model, so as to further understand the concept of the present utility model, the technical problems to be solved, the technical features constituting the technical solutions, and the technical effects brought thereby.
As shown in fig. 1-5, a support for storing a steel pipe pile comprises a first buttress 1 and a second buttress, when the steel pipe pile is stored, a lower buttress 12 is placed, the steel pipe pile is placed in the lower buttress 12, an upper buttress 11 is placed above the steel pipe pile downwards in an opening manner, and the upper buttress 11 and the lower buttress 12 form a package clamp for the steel pipe pile; the locking pair penetrating piece 2 penetrates through the upper buttress 11 and the lower buttress 12 respectively, the four locking pair penetrating pull rods 3 are connected with the left end and the right end of the upper locking pair penetrating piece 2 respectively, the fixing of the upper buttress 11 and the lower buttress 12 is achieved, and the storage of one steel pipe pile is completed. When carrying out subsequent steel-pipe pile installation, install the second buttress according to above-mentioned order, use porous connecting plate 4 to connect first buttress 1 and second buttress, continue to connect the installation buttress when a plurality of steel-pipe piles are deposited, be convenient for deposit a plurality of steel-pipe piles, when need lifting by crane, hoist through the porous connecting plate 4 wire rope of buttress top, need not process steel-pipe pile body, influence steel-pipe pile quality.
As shown in fig. 5, when the first buttress 1 and the second buttress are disposed side by side, the porous connecting plate 4 is horizontally disposed to connect the first buttress 1 and the second buttress.
As shown in fig. 5, when the first and second piers 1 and 1 are disposed up and down, the porous connecting plate 4 is vertically disposed to connect the first and second piers 1 and 4.
As shown in fig. 5, in order to save the space, a plurality of piers 1 are installed in an overlapping manner, and the porous connection plate 4 is provided as a four-hole connection plate, and the four-hole connection plate can simultaneously connect a third pier and a fourth pier which are arranged side by side and overlapped up and down.
As shown in fig. 5, when stacking steel pipe piles, the buttresses 1 of the upper and lower rows may be staggered, and the porous connection plates 4 are set to be three-hole connection plates when connected, and the buttresses of the two bottoms and the fifth buttresses are connected through the three-hole connection plates to form a stable structure.
As shown in fig. 3 and 4, the mounting holes 13 and the porous connection plate 4 may be provided in plural for more stable mounting, and the connection is more stable.
As shown in fig. 1 and 2, the steel pipe pile is supported at the front, middle and rear ends of the steel pipe pile, respectively, so as to be more stable when the steel pipe pile is stored, and the steel pipe pile is better stabilized.
As shown in fig. 4, a flexible rubber 6 is arranged on the contact surface of the buttress and the steel pipe pile, and the flexible rubber 6 can wrap the steel pipe pile to avoid damaging the anti-corrosion layer.
The terms "connected" and "fixed" used in the description of the present utility model may be fixed, formed, welded, or mechanically connected, and the specific meaning of the terms in the present utility model is understood in specific cases.
In the description of the present utility model, the terms "center," "upper," "lower," "horizontal," "inner," "outer," and the like are used merely for convenience in describing the present utility model and to simplify the description, and do not denote or imply a particular orientation that the device or element in question must have, and thus should not be construed as limiting the utility model.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present utility model, and are not limiting; although the utility model has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art will appreciate that; the technical scheme described in the foregoing embodiments can be modified or some or all of the technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit of the utility model.

Claims (8)

1. A support for storing steel pipe piles, which is characterized in that: comprises a first buttress (1) and a second buttress which are the same in structure;
the first buttress (1) comprises an upper buttress (11) and a lower buttress (12); the lower part of the upper buttress (11) and the upper part of the lower buttress (12) are respectively provided with an arc-shaped groove;
the device also comprises four locking pair penetrating pieces (2) and four locking pair penetrating pull rods (3); the locking pair penetrating piece (2) is respectively arranged at the left and right parts of the upper buttress (11) and the lower buttress (12); each locking pair penetrating pull rod (3) is connected with a locking pair penetrating piece of the upper buttress (11) at one end and connected with a locking pair penetrating piece (2) on the same side of the lower buttress (12) at the other end; the device also comprises mounting holes (13) arranged at the upper part of the upper buttress (11) and the lower part of the lower buttress (12);
the multi-hole connecting device further comprises a multi-hole connecting plate (4), one hole of the multi-hole connecting plate (4) is connected to the mounting hole (13) of the first buttress (1) through one connecting bolt (5), and the other hole of the multi-hole connecting plate (4) is connected to the mounting hole of the second buttress through the other connecting bolt.
2. A rack for storing steel pipe piles as claimed in claim 1, wherein: the first buttress (1) and the second buttress are arranged side by side, and the porous connecting plate (4) of the upper buttress (11) of the first buttress (1) is connected to the upper buttress of the second buttress.
3. A rack for storing steel pipe piles as claimed in claim 1, wherein: the first buttress (1) and the second buttress are arranged up and down, and the porous connecting plate (4) of the buttress (11) on the first buttress (1) is connected to the lower buttress of the second buttress.
4. A rack for storing steel pipe piles as claimed in claim 1, wherein: still include third buttress and fourth buttress, third buttress, fourth buttress are all aligned with first buttress (1), second buttress and are connected, porous connecting plate (4) are four hole connecting plates.
5. A rack for storing steel pipe piles as claimed in claim 1, wherein: the multi-hole connecting plate (4) is a three-hole connecting plate.
6. A rack for storing steel pipe piles as claimed in claim 1, wherein: the mounting holes (13) and the porous connecting plates (4) are provided with a plurality of mounting holes.
7. A rack for storing steel pipe piles as claimed in claim 1, wherein: the buttress (1) is provided with a plurality of supporting steel pipe piles, and the front end, the middle part and the rear end of the steel pipe piles are respectively supported.
8. A rack for storing steel pipe piles as claimed in claim 1, wherein: the pile further comprises flexible rubber (6) which is arranged on the contact surface of the buttress and the steel pipe pile.
CN202321218284.2U 2023-05-19 2023-05-19 Support for storing steel pipe piles Active CN219601965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321218284.2U CN219601965U (en) 2023-05-19 2023-05-19 Support for storing steel pipe piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321218284.2U CN219601965U (en) 2023-05-19 2023-05-19 Support for storing steel pipe piles

Publications (1)

Publication Number Publication Date
CN219601965U true CN219601965U (en) 2023-08-29

Family

ID=87754672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321218284.2U Active CN219601965U (en) 2023-05-19 2023-05-19 Support for storing steel pipe piles

Country Status (1)

Country Link
CN (1) CN219601965U (en)

Similar Documents

Publication Publication Date Title
WO2018171284A1 (en) Wind power steel pipe pile lifting transportation process
CN109319041B (en) Method for turning over irregular U-shaped block of chemical tanker
CN108708267A (en) Long span assembled Bailey beam bridge and its erection method
CN219601965U (en) Support for storing steel pipe piles
CN220337006U (en) Roll-on and roll-off and marine transportation tool for jacket foundation
CN214114628U (en) Frock is stood up in hoist and mount of LNG ship containment system plane module
CN212500911U (en) Device for stacking ship-leaning structure
CN115744675A (en) Large member hoisting equipment for offshore shallow water area and hoisting method thereof
CN114857358B (en) Suspension type cable reversing system
CN212267780U (en) Offshore wind power pile vertical pile construction ship
CN216275506U (en) Continuous type leans on ship component mounting structure
CN214243421U (en) Multipurpose assembled steel structure hoisting goods shelf
CN111547197B (en) Marine wind power pile erection construction ship and pile erection construction method
CN211055704U (en) Auxiliary transportation device for bridge construction precast beam
CN213572000U (en) Steel boxed cofferdam
CN202124427U (en) Hoisting lift cover
CN112319725B (en) Method for hoisting and docking annular main section of fishery scientific investigation ship
CN214985974U (en) A transportation frock for suction pile jacket basis
CN221138533U (en) Cable guiding tool for loading semi-submersible ship
CN111152899B (en) Method for leveling 3000-ton floating crane main arm frame by using semi-submersible barge and floating crane
CN209939402U (en) Bracket for transportation of storage tank plates
CN218562307U (en) Assembly type large-diameter double-layer steel reinforcement cage lowering sleeve frame
CN210162437U (en) Special-shaped steel pipe arch section bearing device
CN215755349U (en) Quick shipment frock of marine riser
CN205653029U (en) Superimposed sheet storage rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant