CN219589444U - Device convenient to change yellow phosphorus electric stove eye electrode - Google Patents
Device convenient to change yellow phosphorus electric stove eye electrode Download PDFInfo
- Publication number
- CN219589444U CN219589444U CN202320198013.9U CN202320198013U CN219589444U CN 219589444 U CN219589444 U CN 219589444U CN 202320198013 U CN202320198013 U CN 202320198013U CN 219589444 U CN219589444 U CN 219589444U
- Authority
- CN
- China
- Prior art keywords
- furnace
- water
- drilling machine
- drill bit
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Vertical, Hearth, Or Arc Furnaces (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The utility model provides a device for conveniently replacing a yellow phosphorus electric furnace hole electrode, wherein the furnace hole electrode is positioned in a furnace hole flange, the furnace hole flange is connected with a furnace hole center positioner through a bolt, the center position of the furnace hole center positioner is connected with one end of a water drilling machine lengthening rail bracket, the other end of the water drilling machine lengthening rail bracket is connected with a push rod fixing frame, the top end of the push rod fixing frame is fixedly connected with a top end fixing pull rod, one end of the top end fixing pull rod is fixedly connected with a furnace wall, the other end of the top end fixing pull rod is fixedly connected with a transverse support rod, and two ends of the transverse support rod are respectively fixedly connected with upright posts on two sides of the furnace door; the water drilling machine lengthening rail bracket is sleeved with a water drilling machine sliding sleeve assembly, the water drilling machine sliding sleeve assembly is fixedly connected with a water drilling machine head, and the water drilling machine head is connected with a lengthening water drill bit through a bolt. The utility model has accurate positioning, accurate drilling aperture and depth, simple operation, high drilling efficiency, long service life of the water drill bit and high safety coefficient, can effectively shorten the time of stopping production and overhauling of the electric furnace, and can create huge economic benefit.
Description
Technical Field
The utility model belongs to the technical field of overhaul of yellow phosphorus electric furnaces, and particularly relates to a device convenient for replacing a yellow phosphorus electric furnace hole electrode
Background
Yellow phosphorus has wide application and is one of very important chemical raw materials. The total scale, yield and export of yellow phosphorus production in China are the first world, yellow phosphorus production enterprises in China mostly adopt an electric furnace method for preparing phosphorus, phosphate ore, white coal and silica are added into an electric furnace according to a certain proportion, wherein the silica is used as a fluxing agent, the white coal is used as a reducing agent and a conductor, electric energy is introduced to convert the electric energy into heat energy to melt the heat energy to generate chemical reduction reaction, and a large amount of yellow phosphorus gas is generated at the same time of generating yellow phosphorus. The furnace body inevitably presents damage with different degrees in the operation process of the electric furnace, so that the service life of the electric furnace is seriously influenced, and the normal operation of the electric furnace is hindered. Besides erosion thinning of refractory materials of the furnace bottom and the furnace wall, the electrode of the electric furnace is eroded and corroded by slag and ferrophosphorus water at about 1450 ℃ for a long time, the erosion of the hole diameter of the furnace is large, when the hole diameter of the furnace exceeds 150mm, the flow rate of slag passing through the furnace hole is greatly increased in the discharging process of the electric furnace, the slag is emptied in a short time, the furnace of the yellow phosphorus electric furnace is instantaneously and largely collapsed, the electrode of the furnace cover is triggered to be askew, and the electrode breakage accident is seriously generated; meanwhile, after the slag discharge amount is greatly increased, the capability of the slag quenching system for treating and cooling high-temperature slag is exceeded, so that slag is collected and floodwater is caused in the U-shaped slag flushing ditch, and the high-temperature slag has the safety risks of high-temperature scalding after overflowing the operating platform in front of the furnace and uncooled ferrophosphorus exploding in water to hurt people; meanwhile, excessive high-temperature slag does not cool the quenching slag in time, so that equipment accidents of damaging a dehydrator are easy to occur; in addition, a large amount of furnace gas instantaneously leaks along with high-temperature furnace slag, and the pollution of the furnace front gas caused by the incomplete treatment of a furnace hole gas fan can be caused; particularly, the difficulty of blocking the furnace is increased after the electrode furnace hole is enlarged, the safety risk is high, and the furnace hole is easy to overflow.
Aiming at a plurality of defects of yellow phosphorus electric furnace electrodes after serious furnace eyes are corroded, in order to ensure safe and stable operation of the electric furnace, yellow phosphorus production enterprises usually plan to stop production for half a year to replace and overhaul furnace eyes.
The electric furnace hole structure is mainly formed by building refractory materials such as furnace hole carbon bricks, clay bricks, high-alumina bricks and the like, and is plugged by self-made water stemming with electrode paste slag, clay and water which are uniformly mixed. Therefore, when the furnace hole electrode is replaced, the furnace hole electrode is rotated by adopting the general bulk methods such as pneumatic pick enlarging hammer, steel drill and the like. The operator is required to perform wheel battle, the whole electrode is crushed and hollowed from outside to inside (A of figure 1), and the maintenance mode has the defects that the time is long, and generally, 4-5 days are required for drilling one furnace hole; secondly, the labor intensity is high, the personnel demand is high, two shifts are required to be carried out without interruption, 6 people are required to be carried out in each shift, and the total number of the people is 12; thirdly, the consumable is more, because the total length of the furnace hole electrode is 1400mm, the special pneumatic pick drill (B in figure 1) with different lengths of 300mm, 500mm, 1000mm and 1500mm is needed to replace from outside to inside, because the stopping time of the electric furnace is shorter, the high-temperature carbon electrode furnace hole wears the tip of the pneumatic pick drill more quickly, and the breaking and replacing frequency is higher; fourthly, the positioning is difficult, the drilling technical requirement is high, the drilling deviation, slipping and the blocking of the pick drill bit are easy, the inner wall of the drill hole is rugged (C in figure 1), and the installation of a new furnace hole and the pouring of electrode paste are inconvenient; fifthly, the construction process has more potential safety hazards, and the risk of difficult prognosis caused by high-temperature scalding, smashing injury, sliding, heatstroke and cross operation can exist. Chinese patent CN207894254U discloses a device for replacing an electrode of an electric furnace, which is to fix an auxiliary electrode when replacing the electrode by a hoop, shorten the electrode cooling time during electrode maintenance by a cooling pipeline, and improve the electrode maintenance efficiency. However, at present, no device capable of accelerating the breaking of the old furnace eye electrode and improving the electrode replacement efficiency exists.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a device for conveniently replacing the yellow phosphorus electric furnace hole electrode, which can greatly shorten the time for drilling the furnace hole electrode, thereby shortening the time for stopping production and overhauling the electric furnace, improving the accuracy of drilling hole diameter and depth, simultaneously reducing the temperature, cooling water and reducing the temperature, improving the operation environment and avoiding the risks of high Wen Zhongshu, scalding and yellow phosphorus burn.
The technical scheme adopted by the utility model is as follows:
the device is characterized in that the device is convenient for replacing the yellow phosphorus electric furnace hole electrode, the furnace hole electrode is positioned in a furnace hole flange, the furnace hole flange is connected with a furnace hole center locator through bolts, the center position of the furnace hole center locator is connected with one end of a water drilling machine lengthening rail bracket, the other end of the water drilling machine lengthening rail bracket is connected with a push rod fixing frame, the top end of the push rod fixing frame is fixedly connected with a top end fixing pull rod, one end of the top end fixing pull rod is fixedly connected with a furnace wall, the other end of the top end fixing pull rod is fixedly connected with a transverse support rod, and two ends of the transverse support rod are respectively fixedly connected with upright posts on two sides of the furnace door; the water drilling machine lengthening rail bracket is sleeved with a water drilling machine sliding sleeve assembly, the water drilling machine sliding sleeve assembly is fixedly connected with a water drilling machine head, and the water drilling machine head is connected with a lengthening water drill bit through a bolt.
Preferably, the water drill head can be connected with a drill bit lengthening connecting rod through bolts, and the drill bit lengthening connecting rod is connected with a lengthening water drill bit through bolts.
Preferably, the water drill head is also provided with a cooling water pipe.
Preferably, the other end of the lengthened track support of the water drilling machine is connected with a track support adjusting screw rod, the track support adjusting screw rod is inserted into a universal connecting sleeve, the universal connecting sleeve is fixedly connected with a lifting sliding sleeve assembly, and the lifting sliding sleeve assembly is arranged on the ejector rod fixing frame in a sleeved mode.
Preferably, one end of the ejector rod fixing frame is fixed on the ground support, the other end of the ejector rod fixing frame is connected with an upper and lower adjusting screw rod of the ejector rod, the upper and lower adjusting screw rod is inserted into a cross anchor ear buckle fixing groove, and the cross anchor ear buckle is fixedly connected with the top fixing pull rod.
Preferably, the outer part of the furnace hole flange is an inner wall of the electric furnace built by carbon bricks in the electric furnace, and the outer part of the inner wall is provided with an electric furnace wall.
Preferably, the outside of the lengthened water drill bit is provided with a water drill bit dredging drill rod for dredging.
Preferably, a drill bit dismounting wrench for dismounting is arranged outside the water drilling machine head.
Preferably, the center position of the furnace hole center locator is in an inner conical shape, and the water drilling machine lengthening rail bracket can freely rotate in the inner conical shape.
The utility model has the beneficial effects that:
1. the furnace hole center locator is arranged on the furnace hole flange outside the furnace hole electrode for auxiliary locating, so that the accuracy of drilling is improved; meanwhile, the universal connecting sleeve is adopted to enable the water drill head and the lengthened water drill bit which are fixed on the lengthened track support of the water drill to freely adjust deflection angles around the center point of the furnace hole electrode, so that the error of the drilling diameter is shortened.
2. The lengthened track bracket and the ejector rod fixing frame of the water drilling machine are arranged, and the water drilling machine head and the lengthened water drill bit can move back and forth and left and right through the sliding sleeve assembly sleeved on the lengthened track bracket and the ejector rod fixing frame, so that the position of the drill bit can be conveniently adjusted, the time brought by reinstalling equipment due to the change of the drilling position is shortened, the operation difficulty is reduced, and meanwhile, the operation efficiency is improved; meanwhile, the stability of the whole device is improved through the lengthened track support of the water drilling machine, the ejector rod fixing frame, the ejector rod fixing pull rod, the transverse supporting rods and the upright posts on the two sides of the furnace door, and the stable operation of the device is ensured.
3. Adopt the water driller head and connect the cooling water pipe on the water driller head, cool down the protection in the operation period of device, prolonged the life of water driller bit, reduced wearing and tearing change rate and working cost, let in simultaneously and cool down the water can cool down the stove eye electrode, improve the operational environment, avoided safety risks such as high Wen Zhongshu, scald, yellow phosphorus burn.
4. The utility model has simple operation and can be mastered by simple training; meanwhile, the efficiency is high, only 8 hours are needed for one furnace hole of the water drill, and 6 operators can finish the operation, compared with the traditional operation mode of enlarging a hammer and a steel drill by a pneumatic air pick, a large amount of manpower and material resources are saved, the time for stopping production and overhauling of the electric furnace is greatly shortened, the electric furnace can be normally produced in advance, and huge economic benefits are created.
Drawings
Fig. 1 is a working schematic diagram of the prior art, wherein a is a schematic diagram of an electrode of a pneumatic air pick crushing furnace, B is a schematic diagram of external crushing and punching, and C is a schematic diagram of internal crushing and punching.
Fig. 2 is a cross-sectional view of the overall structure of the present utility model.
Fig. 3 is a right side view of the present utility model, wherein a is a right side view of the whole structure, and B is a right side view of the furnace eye electrode.
Fig. 4 is a schematic diagram of a first hole drilling operation.
Fig. 5 is a schematic diagram of a first hole secondary drilling operation.
Fig. 6 is a schematic operation diagram of the present utility model, wherein a is a schematic rotation direction of a water drill head, B is a schematic dredging structure of a water drill bit, C is a schematic structure of a drill bit dismounting wrench, D is a schematic sequence of punching holes of a furnace hole electrode, E is a schematic hole adjusting and punching diagram of a furnace hole center positioner, and F is a schematic hole electrode after hole rotation.
In the figure: a furnace hole electrode 1; furnace hole flange 2; a furnace hole center locator 3; a water drilling machine lengthening rail bracket 4; lifting sliding sleeve assembly 5; the ejector rod is used for fixing the pull rod 6; a transverse support bar 7; a hydrodrill head 8; a universal connecting sleeve 9; lengthening the water drill bit 10; a cooling water pipe 11; a drill bit extension bar 12; a hydrodrill slide sleeve assembly 13; a cross hoop buckle 14; a rail bracket adjusting screw 15; the ejector rod is used for adjusting the screw rod 16 up and down; an electric furnace wall 17; upright posts 18 on two sides of the furnace door; a bit removal wrench 19; carbon bricks 20 in the electric furnace; a water drill bit dredging drill rod 21; pneumatic pick 22; a hole electrode 23 after drilling; ejector pin mount 24.
DETAILED DESCRIPTION OF EMBODIMENT (S) OF INVENTION
The following examples are only preferred embodiments of the present utility model, and should not be construed as limiting the utility model, and the scope of the utility model is defined by the claims, and equivalent alternatives to technical features in the claims are defined as the scope of the utility model, i.e. equivalent modifications within the scope of the utility model.
Example 1
As shown in figures 2-3, the device for conveniently replacing the yellow phosphorus electric furnace hole electrode is characterized in that the furnace hole electrode 1 is positioned in the furnace hole flange 2, one side of the furnace hole flange 2 is provided with a plurality of screw holes which can be connected with the furnace hole center locator 3 through bolts, and the center point of the drilling hole of the furnace hole electrode is determined. The center position of the furnace hole center positioner 3 is connected with one end of a water rig lengthening rail bracket 4, the other end of the water rig lengthening rail bracket 4 is connected with a push rod fixing frame 24, the top end of the push rod fixing frame 24 is fixedly connected with a top end fixing pull rod 6, one end of the top end fixing pull rod 6 is fixedly connected with a furnace wall 17, the other end of the push rod fixing frame is fixedly connected with a transverse supporting rod 7, and two ends of the transverse supporting rod 7 are respectively fixed on upright posts 18 on two sides of a furnace door; the water drilling machine lengthening rail bracket 4 is sleeved with a water drilling machine sliding sleeve assembly 13, the water drilling machine sliding sleeve assembly 13 is fixedly connected with the water drilling machine head 8, and the water drilling machine sliding sleeve assembly 13 can slide back and forth on the water drilling machine lengthening rail bracket 4 so as to drive the water rotating machine head 8 to horizontally move; the water drill head 8 is connected with the lengthened water drill head 10 by bolts, and can be freely assembled and disassembled according to the requirement to drill holes at the shallower positions of the furnace hole electrode 1.
Preferably, the water drill head 8 can be connected with the drill bit extension connecting rod 12 through bolts, the drill bit extension connecting rod 12 is connected with the extension water drill bit 10 through bolts, and the water drill head can be freely disassembled and assembled according to the requirement to drill the deep position of the furnace hole electrode 1.
Preferably, the water drill head 8 is further provided with a cooling water pipe 11, when the water drill head 8 works, cooling water is continuously conveyed to the working position, the temperature of the working position is reduced, dust is reduced, the working environment is improved, and meanwhile safety risks caused by high temperature are avoided.
Preferably, the other end of the water drilling machine lengthening rail bracket 4 is connected with a rail bracket adjusting screw rod 15, the rail bracket adjusting screw rod 15 is inserted into a universal connecting sleeve 9, the universal connecting sleeve 9 is fixedly connected with a lifting sliding sleeve assembly 5, and the lifting sliding sleeve assembly 5 is sleeved on a push rod fixing frame 24, so that the water drilling machine lengthening rail bracket 4 can freely rotate, and the water drilling machine head 8 is driven to rotate and move; meanwhile, the lifting sliding sleeve assembly 5 can move up and down on the ejector rod fixing frame 24 according to the height of the furnace hole electrode, the height of the whole device is adjusted, the fact that the lengthened track support 4 of the water drilling machine and the circle center tracing of the furnace hole electrode 1 are located on the same horizontal line is guaranteed, and the accuracy of drilling is guaranteed.
Preferably, one end of the ejector rod fixing frame 24 is fixed on the ground support, the other end of the ejector rod fixing frame is connected with the ejector rod upper and lower adjusting screw rod 16, the upper and lower adjusting screw rod 16 is inserted into a fixing groove of the cross anchor ear buckle 14, the cross anchor ear buckle 14 is fixedly connected with the top end fixing pull rod 6, the position of the ejector rod fixing frame 24 is ensured to be always fixed during operation, the stability of the device is improved, and the accuracy of drilling is ensured.
Preferably, the outer part of the furnace hole flange 2 is an inner wall of the electric furnace built by carbon bricks 20 in the electric furnace, and the outer part of the inner wall is an electric furnace wall 17.
Preferably, the outside of the lengthened water drill bit 10 is provided with a water drill bit dredging drill rod 21 for dredging, so as to remove and dredge broken residues in the lengthened water drill bit 10, and avoid affecting the operation efficiency.
Preferably, the outside of the water drill head 8 is provided with a drill bit disassembling wrench 19 special for disassembling and assembling, so that the disassembling and assembling efficiency of the lengthened water drill bit 10 is improved.
Preferably, the center position of the furnace hole center locator 3 is in an inner conical shape, and the water drilling machine lengthening rail bracket 4 can freely rotate in the inner conical shape.
Example 2
When the first hole is drilled for the first time, the installation device according to embodiment 1 is described, wherein the hole center positioner 3 is installed horizontally, and the water drill head 8 is directly connected with the lengthened water drill bit 10 through bolts. The positions of the water drill head and the lengthened water drill bit 10 are adjusted to be positioned right in front of the furnace hole electrode and close to the top (as shown in figure 3), the water drill head 8 is started to drive the lengthened water drill bit 10 to drill holes, and cooling water is introduced through the cooling water pipe 11; when the lengthened water drill bit 10 cannot continue to be deepened (fig. 4), the water drill bit 8 is closed, the water drill bit head and the lengthened water drill bit 10 are horizontally moved to the position where the lengthened water drill bit 10 completely exits from the drilling hole through the water drill sliding sleeve assembly 13, then the lengthened water drill bit 10 is detached by the drill bit detaching spanner 19, then the drill bit lengthened connecting rod 12 is mounted on the water drill bit 8, then the lengthened water drill bit 10 is mounted on the drill bit lengthened connecting rod 12, a secondary hole turning is prepared, and the steps are the same as before until the furnace hole electrode 1 (fig. 5) is opened, and the drilling hole of the first furnace hole is completed.
After the first hole is drilled, the water drilling machine head 8 and cooling water are closed, the lengthened water drill bit 10 is withdrawn, the drill bit lengthened connecting rod 12 is detached, the water drilling machine lengthened track bracket 4 is rotated, the water drilling machine head 8 and the lengthened water drill bit 10 are driven to rotate to the position of the next hole, and the hole drilling operation is repeated until the hole drilling operation on the periphery of the hole center locator 3 is completed (figure 6).
After most of the drilling work, the water drilling machine lengthening rail bracket 4 is separated from the furnace hole center locator 3 and the universal connecting sleeve 9 through the rail bracket adjusting screw rod 15, and the furnace hole center locator 3 at the horizontal position is changed into a vertical position to be fixed, and then drilling is continued until the state of E as shown in fig. 6 is reached.
Finally, the whole device is disassembled, the hole electrode 23 after drilling is taken out, a small amount of hole electrode remained on the inner wall of the hole flange 2 is removed or not removed through the pneumatic air pick 22, then a new cylindrical hole electrode 1 is inserted into the hole flange 2, and the hole electrode is fixed by pouring electrode paste.
Preferably, when the lengthened water drill bit 10 is blocked during the drilling process, the water drill bit 8 is closed, the lengthened water drill bit 10 is withdrawn, then the skewer 21 is dredged by the water drill bit, the blocking is removed, and then the operation is continued.
Claims (9)
1. The utility model provides a device convenient to change yellow phosphorus electric stove eye electrode which characterized in that: the furnace hole flange (2) is connected with the furnace hole center positioner (3) through bolts, the center position of the furnace hole center positioner (3) is connected with one end of the water drilling machine lengthening rail bracket (4), the other end of the water drilling machine lengthening rail bracket (4) is connected with the ejector rod fixing frame (24), the top end of the ejector rod fixing frame (24) is fixedly connected with the top end fixing pull rod (6), one end of the top end fixing pull rod (6) is fixedly connected with the furnace wall (17), the other end of the top end fixing pull rod is fixedly connected with the transverse support rod (7), and two ends of the transverse support rod (7) are respectively fixedly connected with upright posts (18) on two sides of the furnace door; the water drilling machine lengthening rail bracket (4) is sleeved with a water drilling machine sliding sleeve assembly (13), the water drilling machine sliding sleeve assembly (13) is fixedly connected with a water drilling machine head (8), and the water drilling machine head (8) is connected with a lengthening water drill bit (10) through bolts.
2. The device for facilitating replacement of the yellow phosphorus electric furnace eye electrode according to claim 1, wherein: the water drill head (8) can be connected with a drill bit lengthening connecting rod (12) through bolts, and the drill bit lengthening connecting rod (12) is connected with a lengthening water drill bit (10) through bolts.
3. A device for facilitating replacement of an electrode of a yellow phosphorus electric furnace according to claim 1 or 2, characterized in that: the water drill head (8) is also provided with a cooling water pipe (11).
4. The device for facilitating replacement of the yellow phosphorus electric furnace eye electrode according to claim 1, wherein: the other end of the water drilling machine lengthening rail bracket (4) is connected with a rail bracket adjusting screw rod (15), the rail bracket adjusting screw rod (15) is inserted into a universal connecting sleeve (9), the universal connecting sleeve (9) is fixedly connected with a lifting sliding sleeve assembly (5), and the lifting sliding sleeve assembly (5) is sleeved on a push rod fixing frame (24).
5. The device for facilitating replacement of the yellow phosphorus electric furnace eye electrode according to claim 1, wherein: one end of the ejector rod fixing frame (24) is fixed on the ground support, the other end of the ejector rod fixing frame is connected with the ejector rod upper and lower adjusting screw rod (16), the upper and lower adjusting screw rod (16) is inserted into the fixing groove of the cross anchor ear buckle (14), and the cross anchor ear buckle (14) is fixedly connected with the top fixing pull rod (6).
6. The device for facilitating replacement of the yellow phosphorus electric furnace eye electrode according to claim 1, wherein: the outer part of the furnace hole flange (2) is an electric furnace inner wall built by carbon bricks (20) in the electric furnace, and an electric furnace wall (17) is arranged outside the inner wall.
7. The device for facilitating replacement of the yellow phosphorus electric furnace eye electrode according to claim 1, wherein: the outside of the lengthened water drill bit (10) is provided with a water drill bit dredging drill bit (21) for dredging.
8. The device for facilitating replacement of the yellow phosphorus electric furnace eye electrode according to claim 1, wherein: the outside of the water drill head (8) is provided with a drill bit dismounting wrench (19) for dismounting.
9. The device for facilitating replacement of the yellow phosphorus electric furnace eye electrode according to claim 1, wherein: the center position of the furnace hole center positioner (3) is in an inner conical shape, and the water drilling machine lengthening track bracket (4) can freely rotate in the furnace hole center positioner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320198013.9U CN219589444U (en) | 2023-02-13 | 2023-02-13 | Device convenient to change yellow phosphorus electric stove eye electrode |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320198013.9U CN219589444U (en) | 2023-02-13 | 2023-02-13 | Device convenient to change yellow phosphorus electric stove eye electrode |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219589444U true CN219589444U (en) | 2023-08-25 |
Family
ID=87686316
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320198013.9U Active CN219589444U (en) | 2023-02-13 | 2023-02-13 | Device convenient to change yellow phosphorus electric stove eye electrode |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219589444U (en) |
-
2023
- 2023-02-13 CN CN202320198013.9U patent/CN219589444U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101570802B (en) | Replacing method of blast furnace shell and water wall | |
CN102676730A (en) | Converter bottom blowing air brick, special drilling machine and quick thermal replacement method of air brick | |
CN219589444U (en) | Device convenient to change yellow phosphorus electric stove eye electrode | |
CN209850791U (en) | Structure for disassembling cooling device of blast furnace | |
CN106048120A (en) | Taphole cooling wall capable of being replaced integrally and replacement method | |
CN212421129U (en) | Water pump dismounting device | |
CN203904257U (en) | Improved coal gas weight connecting rod for coke oven exchange shutter | |
CN208748128U (en) | A kind of super-huge blast furnace overhaul quickly takes off furnace system | |
CN215804695U (en) | Remote control impact type crushing device | |
KR100862810B1 (en) | An apparatus for penetrating dust in dust catcher | |
CN112815712A (en) | Local maintenance method for flash furnace bottom arch foot brick | |
CN101157958A (en) | Method for removing blast furnace bottom coagulated remainder iron | |
CN111635971A (en) | Device for dismounting blast furnace blowpipe | |
CN220583191U (en) | Skinning cleaning device for blanking pipe of preheater | |
CN214735879U (en) | Special device for online quick disassembly of converter sliding plate slag stopping mechanism | |
CN2292628Y (en) | Oxygen lance cutting machine | |
CN115505664B (en) | Using method of blast furnace tuyere small sleeve disassembling tool | |
CN220999695U (en) | Emergency plugging device for blast furnace | |
CN218989299U (en) | Drilling device for blast furnace iron residue discharge | |
CN220300224U (en) | Fireproof and heat-insulating device for gantry hook | |
CN213680769U (en) | Material spray gun replacing device for smelting reduction process | |
CN219563753U (en) | Crusher | |
CN212004287U (en) | Automatic flow discharge device | |
CN118516504A (en) | Blast furnace taphole mud sleeve breaker capable of being recycled | |
CN214836179U (en) | Device for quickly and safely replacing drill rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |