CN219586564U CN202320509630.6U CN202320509630U CN219586564U CN 219586564 U CN219586564 U CN 219586564U CN 202320509630 U CN202320509630 U CN 202320509630U CN 219586564 U CN219586564 U CN 219586564U
Authority
CN
China
Prior art keywords
wall
rod
support
construction support
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320509630.6U
Other languages
Chinese (zh)
Inventor
黄华
黄海清
周波
张建红
任家伟
梁雨龙
王译
张悸豪
陈思鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Road & Bridge Engineering Giant Construction Group Co ltd
Original Assignee
Chongqing Road & Bridge Engineering Giant Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Road & Bridge Engineering Giant Construction Group Co ltd filed Critical Chongqing Road & Bridge Engineering Giant Construction Group Co ltd
Priority to CN202320509630.6U priority Critical patent/CN219586564U/en
Application granted granted Critical
Publication of CN219586564U publication Critical patent/CN219586564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge bent cap construction support, which comprises: the support comprises a support body, wherein a mounting plate is fixedly mounted on the inner wall of the support body, an electric push rod is fixedly mounted on the outer wall of the mounting plate, a mounting block is fixedly mounted on the outer wall of the support assembly in a sleeved mode, a rotating rod is movably connected with the outer wall of the mounting block, an extension rod is slidably connected with the inner wall of the rotating rod, and a sliding block is fixedly connected with one end of the electric push rod, far away from the mounting plate. According to the utility model, the support assembly is sleeved and arranged on the outer wall of the column pier, the electric push rod is started to push the sliding block to move along the inner wall of the support body to drive the extension rod to rotate, and then the rotation rod is driven to rotate around the joint with the mounting plate, so that a triangle is formed between the rotation rod and the extension rod and the support body, the support is conveniently provided for the support body, the mounting stability of the support body for cap beam construction is improved, and the longer support body is prevented from shaking.

Description

Bridge bent cap construction support
Technical Field
The utility model relates to the technical field of construction supports, in particular to a bridge bent cap construction support.
Background
The bent cap refers to a cross beam arranged at the top of a bent pile pier for supporting, distributing and transmitting the load of an upper structure, and mainly aims to support the upper structure of a bridge and transmit the whole load to a lower structure, so that when the bridge bent cap is constructed, a construction bracket is required to be used for temporary support, and a working place is provided for construction workers. But when current bridge bent cap construction support uses, through a set of staple bolt fixed mounting construction support for the installation stability of construction support is relatively poor, and longer messenger when the support, the construction support is because relatively poor emergence of stability rocks easily, exists certain danger during the use.
The existing bridge bent cap construction support has the following defects:
patent document CN214423181U discloses a construction support for bridge pier capping beam, the claim of protection "including support longeron, two sets of steel trusses, distribution longeron, two sets of bent frame and many pull rods, the support longeron is fixed on the mound top working face of bridge pier body, and two sets of steel trusses are arranged the both ends around the support longeron, the distribution longeron is arranged on the top surface of the left and right sides of steel truss, the bent frame is arranged on the distribution longeron, many pull rods will steel truss, bent frame and support longeron are connected as an organic wholely. But the bent cap construction support that proposes in above-mentioned patent document will be under construction the support and install in the bent cap outer wall through a set of staple bolt, and when the support was longer, the installation stability of support was relatively poor.
Therefore, the bridge bent cap construction support is provided, and the installation stability of the construction support is improved by installing the support component.
Disclosure of Invention
The utility model aims to provide a bridge bent cap construction support, which aims to solve the technical problem of poor installation stability when the existing bridge bent cap construction support provided in the background art is used.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a bridge cap beam construction support comprising:
the support comprises a support body, wherein a mounting plate is fixedly arranged on the inner wall of the support body;
the outer wall of the mounting plate is fixedly provided with the electric push rod;
the support assembly is sleeved with the outer wall of the column pier, the outer wall of the support assembly is fixedly provided with a mounting block, the outer wall of the mounting block is movably connected with a rotating rod, the inner wall of the rotating rod is slidably connected with an extension rod, one end of the electric push rod, which is far away from the mounting plate, is fixedly connected with a sliding block, the outer wall of the sliding block is attached to the inner wall of the support body, and the top end of the extension rod is movably connected with the bottom of the sliding block.
Preferably, the support body is fixedly mounted at the top of the first hoop.
Preferably, the first hoop is sleeved and arranged on the outer wall of the column pier.
Preferably, a cross beam is fixedly arranged at the top of the bracket body.
Preferably, a working platform is fixedly arranged at the top of the cross beam.
Preferably, the top of the cross beam is fixedly provided with a plug rod.
Preferably, the inserted bar runs through the bottom of rail guard, and the bottom fixed mounting of rail guard has the stopper, and the outer wall of stopper and the laminating of the outer wall of crossbeam, and the outer wall through-connection of crossbeam has the threaded rod, and the outer wall through-connection of crossbeam has the guide bar, and the guide bar is located one side of threaded rod, and the outer wall through-connection of threaded rod has the dead lever, and the dead lever runs through the outer wall of limiting plate.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the support assembly, the rotating rod and the sliding block are arranged, the support assembly is sleeved and arranged on the outer wall of the pier, the electric push rod is started to push the sliding block to move along the inner wall of the bracket body, the extending rod is driven to rotate, and then the rotating rod is driven to rotate around the joint of the mounting plate, so that a triangle is formed between the rotating rod and the bracket body, the bracket body is conveniently supported, the installation stability of the capping beam construction bracket body is improved, and the longer bracket body is prevented from shaking;
2. according to the utility model, the guard rail, the limiting blocks and the fixing rods are arranged on the top of the cross beam, so that the limiting blocks at the bottom of the guard rail are respectively attached to the outer walls of the two sides of the cross beam, the inserted link penetrates through the bottom of the guard rail, the threaded rod is rotated to drive the fixing edge to move along the outer wall of the guide link, and the guard rail is fixed by penetrating through the outer walls of the cross beam and the limiting plates, thereby realizing the aim of facilitating installation, protection and pulling and improving the installation efficiency of the bridge bent cap construction support.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic diagram of the front structure of the present utility model;
FIG. 3 is a schematic view of a portion of a slider according to the present utility model;
FIG. 4 is a schematic view of a limiting plate according to the present utility model;
FIG. 5 is a schematic view of the beam portion structure of the present utility model;
fig. 6 is a schematic view of a portion of a fixing rod according to the present utility model.
In the figure: 1. a bracket body; 101. the first hoop; 2. a column pier; 3. a support assembly; 301. a mounting block; 302. a rotating lever; 303. an extension rod; 304. a sliding block; 305. a mounting plate; 306. an electric push rod; 4. a working platform; 5. a cross beam; 6. a guard rail; 601. a threaded rod; 602. a limiting block; 603. a rod; 604. a guide rod; 605. and a fixing rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1 and 2, a bridge capping beam construction support includes: the support body 1, the installation group number of support body 1 is two sets, and the cross-section of first support is the I shape, support body 1 fixed mounting is in first staple bolt 101 top, first staple bolt 101 cover is established and is installed in 2 outer walls of pier, and two sets of support bodies 1 are about pier stud bilateral symmetry distribution, first staple bolt 101 passes through bolted connection, make first staple bolt 101 fixed mounting in the outer wall that is close to pier stud top, the top fixed mounting of support body 1 has crossbeam 5, the installation group number of crossbeam 5 is a plurality of groups, the top fixed mounting of crossbeam 5 has work platform 4, through installing crossbeam 5, provide the support for work platform 4, be convenient for make the workman be located work platform 4 top and carry out bridge bent cap construction.
Referring to fig. 2 and 3, an installation plate 305 is fixedly installed on the inner wall of the bracket body 1, two side outer walls of the installation plate 305 are fixedly connected with one side inner wall of the two groups of brackets, which are close to each other, an electric push rod 306 is fixedly installed on the outer wall of the installation plate 305, the installation plate 305 provides an installation place for the electric push rod 306, a supporting component 3 is sleeved on the outer wall of the column pier 2, the supporting component 3 is a second group of pier column hoops, the supporting component 3 is positioned below the first hoop 101, an installation block 301 is fixedly installed on the outer wall of the supporting component 3, the number of the installation blocks 301 is two, the installation blocks are distributed symmetrically about the pier column, a rotating rod 302 is movably connected with the outer wall of the installation block 301, the number of the installation blocks of the rotating rod 302 is two, the installation blocks are distributed symmetrically about the column pier 2, the extending rod 303 penetrates through the top of the rotating rod 302 and extends to the inner wall of the rotating rod 302, the inner wall of the rotating rod 302 is connected with the extending rod 303 in a sliding manner, the electric push rod 306 is fixedly connected with the sliding block 304 at one end far away from the mounting plate 305, the outer wall of the sliding block 304 is attached to the inner wall of the bracket body 1, the top end of the extension rod 303 is movably connected with the bottom of the sliding block 304, the supporting component 3 is sleeved and mounted on the outer wall of the pier 2, the electric push rod 306 is started to push the two groups of sliding blocks 304 to move along the inner wall of the bracket body 1 towards the two sides far away from the outer wall of the pier 2, the sliding blocks 304 drive the extension rod 303 to rotate and slide upwards along the inner wall of the rotating rod 302 to drive the rotating rod 302 to rotate around the joint with the mounting plate 305, the rotating rod 302, the extension rod 303 and the bracket body 1 form a triangle, the position of the sliding block 304 can be adjusted according to the length of the bracket body 1, the triangle shape is changed, the support is conveniently provided for the bracket body 1, the mounting stability of the capping beam construction bracket body 1 is improved, the longer bracket body 1 is prevented from shaking.
Referring to fig. 4, 5 and 6, the insert rod 603 is fixedly installed at the top of the cross beam 5, the insert rod 603 penetrates through the bottom of the guard rail 6, the guard rail 6 is installed at the top of the cross beam 5, the number of installation groups of the guard rail 6 is two, the two sides of the working platform 4 are installed, the bottom of the guard rail 6 is fixedly provided with the limiting blocks 602, the number of installation groups of the limiting blocks 602 is several groups, the outer walls of the limiting blocks 602 are attached to the outer walls of the two sides of the cross beam 5, the threaded rod 601 penetrates through the outer walls of the cross beam 5, threads are not arranged at the penetrating connection positions of the threaded blocks and the cross beam 5, threads are arranged at the portions between the two adjacent groups of the cross beam 5, the guide rods 604 penetrate through the outer walls of the cross beam 5, the guide rods 604 are located at one side of the guide rods 601, the outer walls of the threaded rod 601 penetrate through the fixing rods 605, the fixing rods 605 penetrate through the outer walls of the limiting plates, the fixing rods 605 penetrate through the outer walls of the cross beam 5, the guard rail 6 are placed at the top of the cross beam 5, the limiting blocks 602 at the bottom of the guard rail 6 are respectively attached to the outer walls of the two sides of the cross beam 5, the insert rod 603 penetrates through the bottom of the guard rail 6, the outer walls, the guide rods 601 are driven to move along the outer walls 604, the guide rods and the guide rods 5 penetrate through the guide plates and the guide plates 5, the guide plates penetrate through the guide rods and the guide plates 6, the guide frames are fixed to install the guide frames.
When the bridge capping beam construction support is used, the first anchor ear 101 is fixedly arranged on the outer wall close to the top of a pier, the cross beam 5 is fixedly arranged at the top of the support body 1, the working platform 4 is fixedly arranged at the top of the cross beam 5, a worker is conveniently positioned at the top of the working platform 4 to carry out bridge capping beam construction, the support assembly 3 is sleeved and arranged on the outer wall of the pier 2, the electric push rod 306 is started, the sliding block 304 is pushed to move along the inner wall of the support body 1 towards the two sides away from the outer wall of the pier 2, the sliding block 304 drives the extension rod 303 to rotate, the rotating rod 302 is driven to rotate around the joint with the mounting plate 305, the positions of the rotating rod 302, the extension rod 303 and the support body 1 are enabled to form a triangle, the triangle can be changed according to the length of the support body 1, the triangle is conveniently provided for supporting the support body 1, the installation stability of the capping beam construction support body 1 is improved, the guard rail 6 is prevented from shaking, the limiting blocks 602 at the bottom of the guard rail 6 are respectively attached to the two side outer walls of the cross beam 5, the inserting rod 603 penetrates through the bottom of the guard rail 6, the guide plate 604 is driven to penetrate through the outer wall of the guide rail 5, and the installation efficiency of the bridge capping beam is conveniently fixed, and the installation efficiency of the bridge capping beam is conveniently and fixed.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a bridge bent cap construction support which characterized in that includes:
the bracket comprises a bracket body (1), wherein a mounting plate (305) is fixedly arranged on the inner wall of the bracket body (1);
the electric push rod (306) is fixedly arranged on the outer wall of the mounting plate (305);
supporting component (3), supporting component (3) cover is established and is installed and pier (2) outer wall, the outer wall fixed mounting of supporting component (3) has installation piece (301), the outer wall swing joint of installation piece (301) has dwang (302), the inner wall sliding connection of dwang (302) has extension rod (303), the one end fixedly connected with sliding block (304) of mounting panel (305) is kept away from to electric putter (306), and the inner wall laminating of support body (1) is used to the outer wall of sliding block (304) to the top and the bottom swing joint of sliding block (304) of extension rod (303).
2. The bridge cap beam construction support according to claim 1, wherein: the support body (1) is fixedly arranged at the top of the first hoop (101).
3. The bridge cap beam construction support according to claim 2, wherein: the first anchor ear (101) is sleeved and arranged on the outer wall of the column pier (2).
4. The bridge cap beam construction support according to claim 1, wherein: the top of the bracket body (1) is fixedly provided with a cross beam (5).
5. The bridge cap beam construction support according to claim 4, wherein: the top of the cross beam (5) is fixedly provided with a working platform (4).
6. The bridge cap beam construction support according to claim 4, wherein: the top of the cross beam (5) is fixedly provided with a plug rod (603).
7. The bridge cap beam construction support according to claim 6, wherein: the inserted link (603) runs through the bottom of rail guard (6), the bottom fixed mounting of rail guard (6) has stopper (602), and the outer wall laminating of stopper (602) and crossbeam (5), the outer wall through-connection of crossbeam (5) has threaded rod (601), the outer wall through-connection of crossbeam (5) has guide bar (604), and guide bar (604) are located one side of threaded rod (601), the outer wall through-connection of threaded rod (601) has dead lever (605), and dead lever (605) run through the outer wall of limiting plate.
CN202320509630.6U 2023-03-16 2023-03-16 Bridge bent cap construction support Active CN219586564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320509630.6U CN219586564U (en) 2023-03-16 2023-03-16 Bridge bent cap construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320509630.6U CN219586564U (en) 2023-03-16 2023-03-16 Bridge bent cap construction support

Publications (1)

Publication Number Publication Date
CN219586564U true CN219586564U (en) 2023-08-25

Family

ID=87698498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320509630.6U Active CN219586564U (en) 2023-03-16 2023-03-16 Bridge bent cap construction support

Country Status (1)

Country Link
CN (1) CN219586564U (en)

Similar Documents

Publication Publication Date Title
CN209261234U (en) A kind of truss floor support plate automatic assembling apparatus
CN112064780A (en) Splicing device for overhead gallery bridge
CN202227701U (en) Spliced type horizontal channel device
CN219586564U (en) Bridge bent cap construction support
CN209874663U (en) Construction adjustable rail guard is built in room
CN112271637A (en) Detachable movable crossing frame
CN218581129U (en) Construction platform is removed in installation of stand cantilever beam
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN214506350U (en) Live working insulating operation platform
CN214786571U (en) Mounting structure of glass guardrail
CN215402720U (en) Double-rail hoisting system for curtain wall
CN210342627U (en) Connecting structure for preventing falling and protective frame
CN210342629U (en) Protection frame and lifting structure thereof
CN218027198U (en) Steel case roof beam tractive quick construction equipment
CN217997835U (en) Rust-resistant instrument that loses of protection reinforcing bar
CN110217520A (en) A kind of connection structure and connection method of refuse compaction equipment seedling box mover
CN219464641U (en) Bracket device for binding reinforcing steel bars
CN221546419U (en) Steel construction safety protection support
CN212644781U (en) Outer quick-witted base device of portable house air conditioner
CN211522917U (en) Adjustable and movable assembly type construction operation platform
CN220551157U (en) Tunnel portal wall construction channel device
CN215803751U (en) Be suitable for fender device that encloses of ground reconnaissance
CN219652561U (en) Steel mesh frame structure lifting equipment
CN219175812U (en) Beam side rear embedded part construction operation platform
CN221479216U (en) Counterweight guide rail bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant