CN219585724U - Fixed pulley combination of metallurgical crane - Google Patents

Fixed pulley combination of metallurgical crane Download PDF

Info

Publication number
CN219585724U
CN219585724U CN202321502797.6U CN202321502797U CN219585724U CN 219585724 U CN219585724 U CN 219585724U CN 202321502797 U CN202321502797 U CN 202321502797U CN 219585724 U CN219585724 U CN 219585724U
Authority
CN
China
Prior art keywords
fixed
fixed pulleys
crane
shaft
end part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321502797.6U
Other languages
Chinese (zh)
Inventor
韩红安
刘征斌
于海洋
郭富强
项鑫
唐坤
许俊杰
张书敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Weihua Heavy Machinery Co Ltd
Original Assignee
Henan Weihua Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Weihua Heavy Machinery Co Ltd filed Critical Henan Weihua Heavy Machinery Co Ltd
Priority to CN202321502797.6U priority Critical patent/CN219585724U/en
Application granted granted Critical
Publication of CN219585724U publication Critical patent/CN219585724U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Jib Cranes (AREA)

Abstract

The fixed pulleys of the metallurgical crane comprise two fixed pulleys of the crane, the fixed pulleys of the crane comprise rotating shafts, a plurality of fixed pulleys are fixed on the rotating shafts, the axes of the rotating shafts of the fixed pulleys of the two cranes are coincident, the end part of a top shaft is fixed at the end part of one rotating shaft, and the other end part of the top shaft contacts with the end part of the other rotating shaft. The end of the rotating shaft is welded at the end of the top shaft. Compared with the prior art, the utility model has the technical effects that the top shaft is arranged between the central shafts of the two fixed pulleys, so that the central shafts of the two fixed pulleys are prevented from deviating towards the middle, and the abrasion of the steel wire rope and the fixed pulleys is not increased.

Description

Fixed pulley combination of metallurgical crane
Technical Field
The utility model relates to a fixed pulley combination of a metallurgical crane.
Background
The metallurgical crane is an indispensable equipment of steelworks, has the effect of lifting weight, and is busy in work and severe in environment, and in use, as shown in fig. 1, the central shafts of two fixed pulleys 10 and fixed pulleys thereof deviate towards the middle (see arrow direction in the figure), so that the abrasion of a steel wire rope and the fixed pulleys is increased, and accessories such as bearings, pulleys and the like are required to be replaced frequently, thereby influencing production and reducing production efficiency.
The problems are: how to prevent the central axes of the two crown blocks 10 from deviating towards the middle.
Disclosure of Invention
The utility model aims to solve the technical problems: how to design a fixed pulley combination of a metallurgical crane, and prevent the central axes of two fixed pulleys 10 from deviating towards the middle.
The technical scheme of the utility model is as follows:
the fixed pulleys of the metallurgical crane comprise two fixed pulleys of the crane, the fixed pulleys of the crane comprise rotating shafts, a plurality of fixed pulleys are fixed on the rotating shafts, the axes of the rotating shafts of the fixed pulleys of the two cranes are coincident, the end part of a top shaft is fixed at the end part of one rotating shaft, and the other end part of the top shaft contacts with the end part of the other rotating shaft.
The end of the rotating shaft is welded at the end of the top shaft.
Compared with the prior art, the utility model has the technical effects that the top shaft is arranged between the central shafts of the two fixed pulleys, so that the central shafts of the two fixed pulleys are prevented from deviating towards the middle, and the abrasion of the steel wire rope and the fixed pulleys is not increased.
Drawings
Fig. 1 is a schematic diagram of the prior art.
FIG. 2 is a schematic diagram of the present utility model.
Detailed Description
The utility model will be described in detail below with reference to the drawings and detailed description thereof.
Referring to fig. 2, a metallurgical crane fixed pulley assembly comprises two crane fixed pulleys 10, wherein the crane fixed pulleys 10 comprise rotating shafts 12, a plurality of fixed pulleys 13 are fixed on the rotating shafts 12, the axes of the rotating shafts 12 of the two crane fixed pulleys 10 are coincident, the end part of one rotating shaft 12 is fixed with the end part of a top shaft 11, and the other end part of the top shaft 11 is contacted with the end part of the other rotating shaft 12.
For the sake of firmness, the end of the shaft 12 is welded to the end of the top shaft 11.
The working principle is as follows:
because the top shaft is arranged between the central shafts of the two fixed pulleys, the top shaft can reduce and eliminate the axial force of the fixed pulley block of the crane, reduce the axial force born by the bearing of the fixed pulley block, improve the structural stress and prolong the service life of the bearing.
Meanwhile, the top shaft does not influence the work of the fixed pulley of the crane.
See the prior art for further content.
The foregoing is merely a preferred embodiment of the present utility model, and it should be noted that it will be apparent to those skilled in the art that several changes and modifications can be made without departing from the general inventive concept, and these should also be regarded as the scope of the utility model.

Claims (2)

1. The utility model provides a metallurgical crane fixed pulley combination, includes two hoist fixed pulleys (10), and hoist fixed pulley (10) include pivot (12), fixed a plurality of fixed pulleys (13) on pivot (12), the axis coincidence of pivot (12) of two hoist fixed pulleys (10), its characterized in that, the tip of tip fixed top axle (11) of one of them pivot (12), the tip of another tip contact another pivot (12) of top axle (11).
2. A metallurgical crane crown block assembly according to claim 1, wherein the end of the shaft (12) is welded to the end of the crown shaft (11).
CN202321502797.6U 2023-06-13 2023-06-13 Fixed pulley combination of metallurgical crane Active CN219585724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321502797.6U CN219585724U (en) 2023-06-13 2023-06-13 Fixed pulley combination of metallurgical crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321502797.6U CN219585724U (en) 2023-06-13 2023-06-13 Fixed pulley combination of metallurgical crane

Publications (1)

Publication Number Publication Date
CN219585724U true CN219585724U (en) 2023-08-25

Family

ID=87690938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321502797.6U Active CN219585724U (en) 2023-06-13 2023-06-13 Fixed pulley combination of metallurgical crane

Country Status (1)

Country Link
CN (1) CN219585724U (en)

Similar Documents

Publication Publication Date Title
WO2019071948A1 (en) Super-tonnage split lifting hook
CN219585724U (en) Fixed pulley combination of metallurgical crane
CN202164042U (en) Grab bucket capable of preventing steel wire rope from falling off
CN202785207U (en) Moving head sheave device for mining lifting winch
CN202296878U (en) Anti-wear protective device for steel wire rope
CN206607266U (en) A kind of converter movable hood lifts tension balanced device
CN211039594U (en) Chain wheel set device on upper part of elevator
CN203682925U (en) Protection device for grab bucket steel wire rope
CN101760587A (en) Spheroidizing furnace with furnace cover and lifting arm
CN212334388U (en) Novel simple hoisting tool
CN218909715U (en) Avoid lifting machine chain case connection structure of wearing and tearing
CN215831032U (en) Crane buffering device
CN2397309Y (en) Elevator balancing compensating chain through steel rope
CN204416891U (en) A kind of head four rope lifting wheels
CN211393677U (en) Special lifting speed reducer for steel plant
CN221191367U (en) Chain belt replacing device of pig machine
CN219827603U (en) Roller chain link for mine metallurgy
CN213679437U (en) Movable pulley device of small-sized hoisting equipment
CN204454260U (en) A kind of fixed type suspension hook group
CN210209718U (en) Grinding head device for deep hole machining
CN204675620U (en) A kind of swing crane Suspension hook structure
CN212953988U (en) Balance crane for cable production
CN219363944U (en) Novel carrier roller structure
CN211310585U (en) Rotation adjusting device for wheel set of crane
CN213475184U (en) Double-pin-shaft bushing type swing arm assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant