CN219577147U - Road surface construction monitoring device - Google Patents

Road surface construction monitoring device Download PDF

Info

Publication number
CN219577147U
CN219577147U CN202223454822.6U CN202223454822U CN219577147U CN 219577147 U CN219577147 U CN 219577147U CN 202223454822 U CN202223454822 U CN 202223454822U CN 219577147 U CN219577147 U CN 219577147U
Authority
CN
China
Prior art keywords
shell
baffle
rain cover
filter screen
subassembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223454822.6U
Other languages
Chinese (zh)
Inventor
王光瑞
于正荣
黄言爱
汪立柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Jiaoke Engineering Consultation Co ltd
Original Assignee
Wuhan Jiaoke Engineering Consultation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Jiaoke Engineering Consultation Co ltd filed Critical Wuhan Jiaoke Engineering Consultation Co ltd
Priority to CN202223454822.6U priority Critical patent/CN219577147U/en
Application granted granted Critical
Publication of CN219577147U publication Critical patent/CN219577147U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model discloses a road construction monitoring device, which comprises a protection component, wherein the protection component comprises a shell and a rain cover, a monitoring mechanism is arranged on the inner side of the shell, a blowing component is arranged on the top of the inner side of the shell, the blowing component comprises a partition plate and a fan, a filtering component is arranged on one side of the partition plate, the filtering component comprises a filter screen and a baffle plate, an ash removing component is arranged on the filter screen, and a blowing component is arranged at the bottom of one side of the partition plate.

Description

Road surface construction monitoring device
Technical Field
The utility model relates to the technical field of pavement construction monitoring equipment, in particular to a pavement construction monitoring device.
Background
When carrying out the construction work on road surface, in order to ensure the real-time supervision work to construction work, the utility model patent of patent application number CN202220542450.3, a monitoring device for highway engineering construction is disclosed, this a monitoring device for highway engineering construction, through setting up the fixed knot who is convenient for install constructs, easy operation is convenient for carry out the construction in the high air, can shorten monitoring device's installation time, and high installation effectiveness, this a monitoring device for highway engineering construction, through setting up the battery in one side of monitoring device, on the one hand, make monitoring device's both sides keep balanced, make its work more stable, on the other hand can provide the reserve power to monitoring device, make monitoring device still can keep good operating condition under the circumstances of external outage, be favorable to using widely, according to its disclosed technical scheme, on the one hand, when carrying out the road surface construction work on road, can often the conveyer belt a large amount of raise dust, and then cause the raise dust to cover the lens of monitor easily, and then lead to the control slowly to blocking, be unfavorable for guaranteeing the control picture, when monitoring is carried out the high temperature, on the other hand, the filter screen is difficult to be blocked up in the high temperature, the filter screen is easy to be cooled down, the heat dissipation is easy, and the safety is easy is cooled down.
Therefore, how to design a road construction monitoring device becomes a problem to be solved currently.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model aims to provide a road construction monitoring device which solves the problems in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a road surface construction monitoring device, includes the monitoring device body, monitoring device body protection subassembly, protection subassembly includes shell and rain cover, monitoring mechanism is installed to the inboard of shell, monitoring mechanism includes the monitor, the subassembly of blowing is installed at the top of the inboard of shell, the subassembly of blowing includes baffle and fan, filter component is installed to one side of baffle, filter component includes filter screen and baffle, install the deashing subassembly on the filter screen, the deashing subassembly includes scraper blade and wind cup, the subassembly of blowing is installed to the bottom of one side of baffle, the subassembly of blowing includes the opening and blows the board.
Further, the base is installed to the bottom of shell, the bottom welding of shell has branch, the bottom of branch is installed in the center department of base through the pivot.
Further, the monitor is mounted on the inner wall of the bottom of the housing by bolts, the rain cover is welded on the top and both sides of one end of the housing, and one end of the monitor penetrates the housing and extends to the outer side of the housing.
Further, the baffle welds at the top of the inboard of shell, one side of baffle passes the shell and extends to the inboard of rain cover, the baffle welds in the bottom of rain cover, the filter screen passes through the bolt and installs between baffle and baffle.
Further, the top of the fan is arranged on the inner wall of the top of the shell through a bracket, and the rain cover is positioned on the top of the partition plate.
Further, the guide plates are mounted on the inner side of the shell and alternately mounted on the top and the bottom of the monitor, and the guide plates are clamped on the outer side of the monitor.
Further, the scraper blade card is in the bottom of filter screen, the center department welding of scraper blade has the bull stick, the top of bull stick passes filter screen and rain cover in proper order and extends to the top of rain cover, the wind cup bonds the top at the bull stick.
Further, the through hole is formed in one end of the shell, the through hole is located at the bottom of the partition board, the blowing plate is welded at the bottom of the partition board, and the blowing plate is located on one side of the through hole.
The beneficial effects are that: 1. this road surface construction monitoring device owing to be provided with shell, base, branch, rain cover, watch-dog, baffle, filter screen, scraper blade, wind cup, fan, guide plate, opening and blowing the board, can effectively utilize the air after filtering to form the air curtain in the camera lens department of watch-dog when carrying out monitoring work, and then avoid the dust to adhere to on the camera lens of watch-dog effectively, prevent that the dust from interfering with monitoring work, ensure the definition of control picture.
2. This road surface construction monitoring device owing to be provided with shell, base, branch, rain cover, watch-dog, baffle, filter screen, scraper blade, wind cup, fan, guide plate, opening, blow board, bull stick, can be in the monitoring operation, outwards dispel because of the heat that solar insolation and watch-dog generate heat produced in the shell outside through ventilation effectively to clear up the dust on the filter screen automatically, avoid the filter screen to block up, ensure ventilation radiating efficiency, and then ensure monitor's work safety.
3. The road surface construction monitoring device is reasonable in design, is relatively efficient and convenient in use, and is suitable for monitoring work of road surface construction.
Drawings
FIG. 1 is a cross-sectional view of a pavement construction monitoring apparatus according to the present utility model;
FIG. 2 is a side cross-sectional view of a housing of a pavement construction monitoring apparatus according to the present utility model;
in the figure: 1. a housing; 2. a base; 3. a support rod; 4. a rain cover; 5. a monitor; 6. a partition plate; 7. a baffle; 8. a filter screen; 9. a scraper; 10. a wind cup; 11. a blower; 12. a deflector; 13. a through port; 14. blowing a plate; 15. and (5) rotating the rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1 to 2, the present utility model provides a technical solution: the utility model provides a road surface construction monitoring device, includes the monitoring device body, the monitoring device body protection subassembly, the protection subassembly includes shell 1 and rain cover 4, monitoring mechanism is installed to the inboard of shell 1, monitoring mechanism includes watch-dog 5, the subassembly of blowing is installed at the top of the inboard of shell 1, the subassembly of blowing includes baffle 6 and fan 11, filter unit is installed to one side of baffle 6, filter unit includes filter screen 8 and baffle 7, install the deashing subassembly on the filter screen 8, the deashing subassembly includes scraper blade 9 and cup 10, the subassembly of blowing is installed to the bottom of one side of baffle 6, the subassembly of blowing includes opening 13 and blowing board 14, base 2 is installed to the bottom of shell 1, the bottom welding of shell 1 has branch 3, the bottom of branch 3 is installed in the center department of base 2 through the pivot, the monitor 5 is mounted on the inner wall of the bottom of the shell 1 through bolts, the rain cover 4 is welded on the top and two sides of one end of the shell 1, one end of the monitor 5 passes through the shell 1 and extends to the outer side of the shell 1, the partition 6 is welded on the top of the inner side of the shell 1, one side of the partition 6 passes through the shell 1 and extends to the inner side of the rain cover 4, the baffle 7 is welded on the bottom of the rain cover 4, the filter screen 8 is mounted between the baffle 7 and the partition 6 through bolts, the scraping plate 9 is clamped on the bottom of the filter screen 8, a rotating rod 15 is welded at the center of the scraping plate 9, the top ends of the rotating rod 15 sequentially pass through the filter screen 8 and the rain cover 4 and extend to the top of the rain cover 4, the wind cup 10 is adhered to the top ends of the rotating rod 15, when in use, the shell 1 is fixedly mounted through the base 2 for monitoring work, the fan 11 work produces suction to the left side of baffle 6, and then make the filtration back of air through filter screen 8 for dust in the air is filtered in the bottom of filter screen 8, the air of purifying ventilates the inboard of shell 1 through the top of baffle 6, and then ventilate and dispel the heat work to monitor 5 effectively, outwards dispel because of the heat that solar insolates and monitor 5 generate heat in with shell 1 effectively through the ventilation, utilize natural wind to blow wind cup 10, wind cup 10 drives scraper blade 9 through bull stick 15 and rotates, the dust clearance that filters the bottom of filter screen 8 is fallen, avoid filter screen 8 to be stopped up, ensure ventilation and heat dissipation's efficiency, and then ensure monitor 5's work safety.
In this embodiment, the top of the fan 11 is mounted on the inner wall of the top of the housing 1 through a bracket, the rain cover 4 is located at the top of the partition board 6, the guide plates 12 are mounted on the inner side of the housing 1, the guide plates 12 are alternately mounted on the top and the bottom of the monitor 5, the guide plates 12 are clamped on the outer side of the monitor 5, the through holes 13 are formed in one end of the housing 1, the through holes 13 are located at the bottom of the partition board 6, the blowing plate 14 is welded at the bottom of the partition board 6, the blowing plate 14 is located at one side of the through holes 13, air flows downwards through the right side of the partition board 6 and flows upwards and downwards on the outer side of the monitor 5 under the limit of the guide plates 12, heat dissipation uniformity is guaranteed, finally the air flows downwards from the inner side of the housing 1 through the through holes 13 and flows downwards along the lens of the outer side of the monitor 5 under the limit of the blowing plate 14, the filtered air is effectively utilized to form an air curtain at the lens of the monitor 5, the dust is effectively avoided from attaching to the monitor 5, the dust is prevented from interfering with the monitor screen clearly, and the monitoring work is clearly monitored.
This road surface construction monitoring device provides the electric energy for the consumer through external power supply, when using, carry out fixed mounting with shell 1 through base 2, when carrying out monitoring work, fan 11 work produces suction to the left side of baffle 6, and then make the dust in the air filtered in the bottom of filter screen 8 after the filtration of filter screen 8, the air of purifying carries out ventilation to the inboard of shell 1 through the top of baffle 6, and then carry out ventilation and heat dissipation work to monitor 5 effectively, the heat that produces because of sun insolation and monitor 5 generate heat in with shell 1 outwards dispels through the ventilation effectively, utilize natural wind to blow wind cup 10, wind cup 10 passes through bull stick 15 and drives scraper blade 9 rotation, the dust clearance that filters the bottom of filter screen 8 is removed, avoid filter screen 8 to be stopped up, ensure ventilation and heat dissipation's efficiency, and then, the safe operation of monitor 5, the air flows down in the right side of baffle 6, and under the spacing of deflector 12, the air current flows down in the outside of monitor 5, and even nature, the air current flows out from shell 1 through opening 13, and prevent that the dust from following the monitor from flowing down in the outside of monitor 5 is effectively, the monitor lens is avoided to the dust is blown down in the air curtain 5, the air curtain is further to the monitor's is formed to the monitor and is clear, the dust is prevented from flowing down the monitor and is blown down to the monitor 5.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (8)

1. The utility model provides a road surface construction monitoring device, includes the monitoring device body, monitoring device body protection subassembly, protection subassembly includes shell (1) and rain cover (4), monitoring mechanism is installed to the inboard of shell (1), monitoring mechanism includes watch-dog (5), its characterized in that: the utility model discloses a fan, including shell (1), filter unit is installed to the top of the inboard of shell (1), the subassembly of blowing includes baffle (6) and fan (11), filter unit is installed to one side of baffle (6), filter unit includes filter screen (8) and baffle (7), install the deashing subassembly on filter screen (8), the deashing subassembly includes scraper blade (9) and wind cup (10), the subassembly of blowing is installed to the bottom of one side of baffle (6), the subassembly of blowing includes opening (13) and blows board (14).
2. The pavement construction monitoring apparatus according to claim 1, wherein: the base (2) is installed to the bottom of shell (1), the bottom welding of shell (1) has branch (3), the bottom of branch (3) is installed in the center department of base (2) through the pivot.
3. The pavement construction monitoring apparatus according to claim 2, wherein: the monitor (5) is mounted on the inner wall of the bottom of the shell (1) through bolts, the rain cover (4) is welded on the top and two sides of one end of the shell (1), and one end of the monitor (5) penetrates through the shell (1) and extends to the outer side of the shell (1).
4. A pavement construction monitoring apparatus according to claim 3, wherein: the waterproof rain cover is characterized in that the baffle plate (6) is welded at the top of the inner side of the shell (1), one side of the baffle plate (6) penetrates through the shell (1) and extends to the inner side of the rain cover (4), the baffle plate (7) is welded at the bottom of the rain cover (4), and the filter screen (8) is installed between the baffle plate (7) and the baffle plate (6) through bolts.
5. The pavement construction monitoring apparatus according to claim 4, wherein: the top of the fan (11) is arranged on the inner wall of the top of the shell (1) through a bracket, and the rain cover (4) is positioned at the top of the partition plate (6).
6. The pavement construction monitoring apparatus according to claim 5, wherein: the inside of shell (1) is installed guide plate (12), guide plate (12) are installed in the top and the bottom of watch-dog (5) in turn, guide plate (12) card is in the outside side of watch-dog (5).
7. The pavement construction monitoring apparatus according to claim 6, wherein: the scraper blade (9) card is in the bottom of filter screen (8), the center department welding of scraper blade (9) has bull stick (15), the top of bull stick (15) passes filter screen (8) and rain cover (4) in proper order and extends to the top of rain cover (4), wind cup (10) bond the top at bull stick (15).
8. The pavement construction monitoring apparatus according to claim 7, wherein: the utility model discloses a shell, including shell (1), through-hole (13), blow board (14) and one side that is located through-hole (13), through-hole (13) are offered in the one end of shell (1), through-hole (13) are located the bottom of baffle (6), blow board (14) welding in the bottom of baffle (6).
CN202223454822.6U 2022-12-23 2022-12-23 Road surface construction monitoring device Active CN219577147U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223454822.6U CN219577147U (en) 2022-12-23 2022-12-23 Road surface construction monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223454822.6U CN219577147U (en) 2022-12-23 2022-12-23 Road surface construction monitoring device

Publications (1)

Publication Number Publication Date
CN219577147U true CN219577147U (en) 2023-08-22

Family

ID=87652073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223454822.6U Active CN219577147U (en) 2022-12-23 2022-12-23 Road surface construction monitoring device

Country Status (1)

Country Link
CN (1) CN219577147U (en)

Similar Documents

Publication Publication Date Title
CN110190539B (en) Be used for portable heat abstractor of electric power cabinet
CN210840519U (en) High-efficient radiating electrical equipment dustproof protection case
CN212012153U (en) Low-voltage reactive compensation control box
CN218456233U (en) Dustproof electric power cabinet
CN207853272U (en) A kind of power distribution cabinet with bird dispelling function
CN219577147U (en) Road surface construction monitoring device
CN212784326U (en) Power distribution cabinet with self-cleaning function
CN212064134U (en) Security protection surveillance camera machine that heat dispersion is good
CN210273958U (en) Automatic snow removing device for solar photovoltaic panel
CN216647843U (en) AI voice control device that radiating effect is good
CN115764627A (en) Outdoor distribution box with rainproof structure
CN211083891U (en) New forms of energy street lamp shaft tower
CN114600747A (en) Irrigation equipment for forest protection based on thing networking
CN211907998U (en) Sealing and waterproof mechanism used inside power distribution cabinet
CN210624796U (en) Ventilation unit for building energy conservation
CN208411881U (en) It is a kind of with the agricultural machinery mud guard for quickly removing mud
CN112261372A (en) Intelligent community security monitoring equipment based on Internet of things
CN112495104A (en) Intelligent filtering device for wind driven generator
CN207134651U (en) A kind of dustproof distributor box
CN211790232U (en) Energy-saving comprehensive distribution box
CN218720944U (en) LED street lamp with fault prompting and positioning device
CN221126601U (en) Wall-mounted power distribution control cabinet
CN210985327U (en) Dustproof device for transformer box
CN216981321U (en) Box-type substation with waterproof function
CN211502578U (en) Anticorrosive equipment of new forms of energy panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant