CN219549934U - Impervious reinforced concrete drain pipe - Google Patents
Impervious reinforced concrete drain pipe Download PDFInfo
- Publication number
- CN219549934U CN219549934U CN202320678718.0U CN202320678718U CN219549934U CN 219549934 U CN219549934 U CN 219549934U CN 202320678718 U CN202320678718 U CN 202320678718U CN 219549934 U CN219549934 U CN 219549934U
- Authority
- CN
- China
- Prior art keywords
- extension rod
- communicating pipe
- fixing ring
- filter screen
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 17
- 241000883990 Flabellum Species 0.000 claims abstract description 9
- 238000007789 sealing Methods 0.000 claims description 11
- 230000008859 change Effects 0.000 abstract description 11
- 238000000034 method Methods 0.000 abstract description 7
- 230000008569 process Effects 0.000 abstract description 6
- 238000012545 processing Methods 0.000 abstract description 2
- 239000007787 solid Substances 0.000 description 7
- 238000009434 installation Methods 0.000 description 4
- 239000004567 concrete Substances 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 239000010865 sewage Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Retaining Walls (AREA)
- Centrifugal Separators (AREA)
Abstract
The utility model discloses a impervious reinforced concrete drain pipe, which has the technical scheme that: the device comprises a communicating pipe, wherein a filter screen is detachably clamped in the communicating pipe, one side of the filter screen is provided with a through hole, and an extension rod is movably sleeved in the through hole; the circulation subassembly, the circulation subassembly sets up the outer wall of communicating pipe for zero-time circulation when the unable timely processing of jam, through setting up the extension rod, can conveniently take out the filter screen through carrying the extension rod when the filter screen is blockked up, the process of convenient clean change, through setting up the through hole, can conveniently dismantle the change to the drainage tube after using the drainage tube through hole and spring, through setting up the flabellum, can drive it through rivers and rotate, the jam condition of filter screen is alleviated as far as through centrifugal force through the flabellum, through setting up the pull ring, can conveniently carry the extension rod application of force to the staff when carrying the extension rod through the pull ring.
Description
Technical Field
The utility model relates to the technical field of drainage pipes, in particular to a impervious reinforced concrete drainage pipe.
Background
Along with the continuous development of urban construction, underground pipe bodies of modern cities are also increasing, and most of underground pipe bodies use reinforced concrete pipes, such as underground drainage pipes, wherein the underground concrete drainage pipes are pipes made of concrete or reinforced concrete and are used for underground drainage. The existing concrete drain pipe is poor in tightness, and leakage is easy to occur at the joint between the drain pipes, so that the use of the drain pipe is affected, and impervious treatment is generally carried out at the joint between the pipelines.
The existing impervious reinforced concrete drain pipe on the market generally relies on the hookup location of reinforced concrete pipeline to add seal cover and go-between, through the cooperation between seal cover and the go-between, the go-between strengthens the relation of connection between the pipeline, reduces the probability that the pipeline seepage condition took place to a certain extent through the seal cover, but in the in-process of in-service use, the problem that the pipeline jam can not appear but can not clear up in time, can not clear up in time and very probably cause sewage to flow back, influences other effective resources, therefore we propose a drain pipe.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a impervious reinforced concrete drain pipe, which solves the problems that in the actual use process, the pipeline is blocked and can not be cleaned in time, and the problem that sewage is likely to flow back and affect other effective resources is caused by the fact that the pipeline can not be cleaned in time.
The technical aim of the utility model is realized by the following technical scheme:
a reinforced concrete drain pipe having resistance to seepage, comprising: the inside of the communicating pipe is detachably clamped with a filter screen, a first through hole is formed in one side of the filter screen, and an extension rod is movably sleeved in the first through hole; and the circulation assembly is arranged on the outer wall surface of the communicating pipe and used for zero-time circulation when the blockage cannot be handled in time.
Through adopting above-mentioned technical scheme, through setting up the extension rod, can conveniently take out the filter screen through drawing the extension rod when the filter screen is blockked up, the process of convenient clean change through drawing the extension rod.
Preferably, the flow-through assembly comprises: the drainage tube, the drainage tube sets up the outer wall of communicating pipe, two second through holes have been seted up to the outer wall of communicating pipe, the drainage tube passes through second through hole detachable joint is in the outer wall of communicating pipe, the equal movable sleeve in both ends of drainage tube is equipped with the spring, the one end movable sleeve of extension rod is equipped with the flabellum.
Through adopting above-mentioned technical scheme, through setting up the second through-hole, can conveniently dismantle the change to the drainage tube after using the drainage tube through second through-hole and spring, through setting up the flabellum, can drive it through rivers through the flabellum and rotate, alleviate the jam condition of filter screen as far as possible through centrifugal force.
Preferably, a pull ring is fixedly arranged at one end of the extension rod, and a limiting block is fixedly arranged at one end of the extension rod away from the pull ring.
Through adopting above-mentioned technical scheme, through setting up the pull ring, can conveniently carry the extension rod time staff to the extension rod application of force through the pull ring for the staff pulls out the filter screen easily and washs the change.
Preferably, the outer wall surface movable sleeve of the communicating pipe is provided with an upper fixing ring, the outer wall surface movable sleeve of the communicating pipe is provided with a lower fixing ring, and the inside of the upper fixing ring is fixedly provided with two sealing rings.
Through adopting above-mentioned technical scheme, through setting up solid fixed ring, through last solid fixed ring and down gu between the fixed ring cooperation, can strengthen the relation of connection between device and the device through the installation relation between the two, through setting up the sealing washer, can reduce the seepage condition that produces between the pipeline connection gap as far as possible through the sealing washer.
Preferably, the outer wall surfaces of the upper fixing ring and the lower fixing ring are provided with two rotating holes, and two sides of the upper fixing ring are detachably clamped with rotating rods.
Through adopting above-mentioned technical scheme, through setting up the rotation hole, through the cooperation between rotation hole and the dwang, can effectually consolidate the relation of connection between upper fixed ring and the lower fixed ring for the relation of connection between the device is inseparabler.
Preferably, the outer wall surfaces of the upper fixing ring and the lower fixing ring are provided with a plurality of clamping holes, two adjacent clamping holes are a group, and two clamping blocks are fixedly arranged on the outer wall surface of the rotating rod.
Through adopting above-mentioned technical scheme, through setting up the joint hole, through the cooperation between joint hole and the joint piece, the joint relation can be more convenient dismantle last solid fixed ring and lower solid fixed ring for the device is more convenient when dismantling the maintenance.
In summary, the utility model has the following advantages:
through setting up the extension rod, can conveniently take out the filter screen through carrying the extension rod when the filter screen blocks up, the process of convenient clean change through setting up the second through-hole, can conveniently dismantle the change to the drainage tube after using the drainage tube through second through-hole and spring, through setting up the flabellum, can drive it through rivers through the flabellum and rotate, the jam condition of filter screen is alleviated as far as through centrifugal force, through setting up the pull ring, can conveniently carry the extension rod time staff to the application of force of extension rod through the pull ring for the staff pulls out the filter screen easily and washs the change.
Through setting up solid fixed ring, through last solid fixed ring and down gu cooperate between the fixed ring, can consolidate the relation of connection between device and the device through the installation relation between the two, through setting up the sealing washer, can reduce the seepage condition that produces between the pipeline joint gap as far as possible through the sealing washer, through setting up the swivelling joint hole, through cooperation between swivelling joint hole and the dwang, can effectually consolidate the relation of connection between last solid fixed ring and the fixed ring down for the relation of connection between the device is inseparabler.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic view of a split construction of the present utility model;
FIG. 3 is a schematic view of the structure of the extension rod of the present utility model;
fig. 4 is a schematic structural view of the upper fixing ring of the present utility model.
Reference numerals: 1. a communicating pipe; 2. a filter screen; 3. a first through hole; 4. an extension rod; 5. a drainage tube; 6. a second through hole; 7. a spring; 8. a fan blade; 9. a pull ring; 10. a limiting block; 11. an upper fixing ring; 12. a lower fixing ring; 13. a seal ring; 14. a rotation hole; 15. a rotating lever; 16. a clamping hole; 17. and a clamping block.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, fig. 2 and fig. 3, a impervious reinforced concrete drain pipe, including communicating pipe 1, the inside detachable joint of communicating pipe 1 has filter screen 2, first through hole 3 has been seted up to one side of filter screen 2, first through hole 3's inside movable sleeve is equipped with extension rod 4, communicating pipe 1's outer wall is provided with the circulation subassembly for zero time circulation when the unable timely processing of jam, the circulation subassembly includes drainage tube 5, drainage tube 5 sets up at communicating pipe 1's outer wall, two second through holes 6 have been seted up to communicating pipe 1's outer wall, drainage tube 5 passes through second through hole 6 detachable joint at communicating pipe 1's outer wall, the equal movable sleeve in both ends of drainage tube 5 is equipped with spring 7, spring 7 is for the prior art and does not do not make for here, extension rod 4's one end movable sleeve is equipped with flabellum 8, through setting up extension rod 4, can conveniently be taken out filter screen 2 through carrying out extension rod 4 when filter screen 2 blocks up, the process of convenient clean change, through setting up second through hole 6, drainage tube 5 can conveniently through second through hole 6 and spring 7 after 5 through use drainage tube 5 has seted up two second through the filter tube through the setting up through 8, can be rotated through the filter screen 8 to change through the filter screen 8, can be passed through the filter screen 8 is passed through the filter that the filter has been changed through the filter screen has been changed.
Referring to fig. 2, fig. 3 and fig. 4, pull ring 9 is fixedly installed at one end of extension rod 4, stopper 10 is fixedly installed at one end of extension rod 4 away from pull ring 9, outer wall movable sleeve of communicating pipe 1 is equipped with fixed ring 11, outer wall movable sleeve of communicating pipe 1 is equipped with fixed ring 12 down, the inside fixed mounting of fixed ring 11 has two sealing washer 13, sealing washer 13 is for prior art and is not described here, through setting up pull ring 9, can conveniently carry extension rod 4 when the staff applies a force to extension rod 4 through pull ring 9, make the staff pull out filter screen 2 easily and wash the change, through setting up fixed ring 11, cooperate between fixed ring 11 and the fixed ring 12 down, can consolidate the relation of connection between device and the device through the installation relation between the two, through setting up sealing washer 13, leakage condition that produces between the pipe connection gap through sealing washer 13 can be reduced as far as possible.
Referring to fig. 2, 3 and 4, two rotation holes 14 are respectively formed in the outer wall surfaces of the upper fixing ring 11 and the lower fixing ring 12, a rotation rod 15 is detachably clamped on two sides of the upper fixing ring 11, a plurality of clamping holes 16 are respectively formed in the outer wall surfaces of the upper fixing ring 11 and the lower fixing ring 12, two adjacent clamping holes 16 are a group, two clamping blocks 17 are fixedly mounted on the outer wall surface of the rotation rod 15, through the arrangement of the rotation holes 14 and the cooperation between the rotation holes 14 and the rotation rod 15, the connection relation between the upper fixing ring 11 and the lower fixing ring 12 can be effectively reinforced, the connection relation between devices is tighter, the clamping holes 16 are arranged, the upper fixing ring 11 and the lower fixing ring 12 can be detached more conveniently through the cooperation between the clamping holes 16 and the clamping blocks 17, and the devices are more convenient to detach and overhaul.
Working principle: referring to fig. 1-4, when in use, the device and the pipeline are required to be connected and installed through the upper fixing ring 11 and the lower fixing ring 12, the filter screen 2 can be conveniently pulled out through lifting the extension rod 4 when the filter screen 2 is blocked through the extension rod 4 by arranging the extension rod 4, the cleaning and replacement process is convenient, the drainage tube 5 can be conveniently detached and replaced after the drainage tube 5 is used through arranging the second through hole 6 and the spring 7, the fan blades 8 are arranged, the fan blades 8 can be driven to rotate through water flow, the blocking condition of the filter screen 2 is relieved as much as possible through centrifugal force, the pull ring 9 is arranged, the force applied to the extension rod 4 by a worker when the extension rod 4 is lifted can be conveniently, the filter screen 2 is easily pulled out for cleaning and replacement through the pull ring 9, the upper fixing ring 11 is arranged, the filter screen 2 is matched with the lower fixing ring 12 through the upper fixing ring 11, the connection relation between the device and the device can be reinforced through the installation relation between the upper fixing ring 11 and the lower fixing ring 12, the leakage condition generated between the pipeline connection gap can be reduced as much as possible through the sealing ring 13.
Through setting up the rotation hole 14, through the cooperation between rotation hole 14 and the dwang 15, can effectually consolidate the relation of connection between upper fixed ring 11 and the lower fixed ring 12 for the relation of connection between the device is inseparabler
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. A reinforced concrete drain pipe having resistance to seepage, comprising:
the device comprises a communicating pipe (1), wherein a filter screen (2) is detachably clamped in the communicating pipe (1), a first through hole (3) is formed in one side of the filter screen (2), and an extension rod (4) is movably sleeved in the first through hole (3);
and the circulation assembly is arranged on the outer wall surface of the communicating pipe (1) and used for zero-time circulation when the blockage cannot be treated in time.
2. A reinforced concrete drain pipe having resistance to seepage according to claim 1, wherein said flow-through assembly comprises:
drainage tube (5), drainage tube (5) set up the outer wall of communicating pipe (1), two second through holes (6) have been seted up to the outer wall of communicating pipe (1), drainage tube (5) are in through second through holes (6) detachable joint communicating pipe (1) outer wall, the both ends of drainage tube (5) all movable sleeve is equipped with spring (7), the one end movable sleeve of extension rod (4) is equipped with flabellum (8).
3. A reinforced concrete drain pipe with impermeability according to claim 1, characterized in that, a pull ring (9) is fixedly installed at one end of the extension rod (4), and a limit block (10) is fixedly installed at one end of the extension rod (4) far away from the pull ring (9).
4. The impervious reinforced concrete drain pipe according to claim 1, wherein an upper fixing ring (11) is movably sleeved on the outer wall surface of the communicating pipe (1), a lower fixing ring (12) is movably sleeved on the outer wall surface of the communicating pipe (1), and two sealing rings (13) are fixedly installed in the upper fixing ring (11).
5. The impermeable reinforced concrete drain pipe according to claim 4, wherein the outer wall surfaces of the upper fixing ring (11) and the lower fixing ring (12) are provided with two rotating holes (14), and two sides of the upper fixing ring (11) are detachably clamped with rotating rods (15).
6. The impervious reinforced concrete drain pipe according to claim 5, wherein the outer wall surfaces of the upper fixing ring (11) and the lower fixing ring (12) are provided with a plurality of clamping holes (16), two adjacent clamping holes (16) are in a group, and the outer wall surface of the rotating rod (15) is fixedly provided with two clamping blocks (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320678718.0U CN219549934U (en) | 2023-03-29 | 2023-03-29 | Impervious reinforced concrete drain pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320678718.0U CN219549934U (en) | 2023-03-29 | 2023-03-29 | Impervious reinforced concrete drain pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219549934U true CN219549934U (en) | 2023-08-18 |
Family
ID=87705080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320678718.0U Active CN219549934U (en) | 2023-03-29 | 2023-03-29 | Impervious reinforced concrete drain pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219549934U (en) |
-
2023
- 2023-03-29 CN CN202320678718.0U patent/CN219549934U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209779855U (en) | Sewage pipe network purification treatment device | |
CN219080536U (en) | Discharge cleaning device convenient to sewer line | |
CN108591674A (en) | A kind of water conservancy cleaning pipeline being convenient to clean | |
CN219621730U (en) | Water environment treatment and purification device | |
CN219549934U (en) | Impervious reinforced concrete drain pipe | |
CN211273661U (en) | Automatic cleaning device for high-density sedimentation tank inclined plate/pipe accumulated mud | |
CN210251490U (en) | Filter with self-cleaning function | |
CN217027426U (en) | Municipal garden drainage pipe rubbish cleaning device | |
CN214531023U (en) | Urban rainwater collection and utilization device | |
CN216689725U (en) | A scrubbing device for water supply and drainage pipeline | |
CN221321177U (en) | Sewage pipe network structure convenient to clean | |
CN218713611U (en) | Floor water cut-off device capable of being used in turnover mode | |
CN214738613U (en) | Drainage device that municipal works were used | |
CN221027738U (en) | Sealing cover for preventing grid slag leakage of squeezer of sewage treatment plant | |
CN215559654U (en) | PC rod iron heat treatment effluent treatment plant | |
CN217079088U (en) | Pipeline dredging mechanism for municipal sewage treatment engineering | |
CN221627242U (en) | Bilge well basket grid | |
CN221118643U (en) | Overhead pipeline sewage disposal device capable of avoiding water resource waste | |
CN220953740U (en) | Multifunctional drainage pipeline | |
CN219169147U (en) | Desilting device for hydraulic engineering | |
CN103601264B (en) | A kind of deoiling method | |
CN213518008U (en) | Constructed wetland water level control structure | |
CN216713271U (en) | Municipal drainage pipe | |
CN221244220U (en) | Pipeline filter | |
CN217601646U (en) | Water seal well with sewage intercepting function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |