CN219546479U - Vehicle-mounted new energy steel hoisting device - Google Patents

Vehicle-mounted new energy steel hoisting device Download PDF

Info

Publication number
CN219546479U
CN219546479U CN202320489559.XU CN202320489559U CN219546479U CN 219546479 U CN219546479 U CN 219546479U CN 202320489559 U CN202320489559 U CN 202320489559U CN 219546479 U CN219546479 U CN 219546479U
Authority
CN
China
Prior art keywords
frame
fixedly connected
lifting
hanging
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320489559.XU
Other languages
Chinese (zh)
Inventor
凡俊超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Xinrui Construction Co ltd
Original Assignee
Hubei Xinrui Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Xinrui Construction Co ltd filed Critical Hubei Xinrui Construction Co ltd
Priority to CN202320489559.XU priority Critical patent/CN219546479U/en
Application granted granted Critical
Publication of CN219546479U publication Critical patent/CN219546479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model relates to the field of steel transportation and discloses a vehicle-mounted new energy steel hoisting device which comprises a hoisting rope frame and a hoisting hook fixedly connected to the hoisting rope frame, wherein a hoisting frame assembly is fixedly connected to the hoisting rope frame, the hoisting frame assembly comprises a hoisting frame, the inner top and two sides of the hoisting frame are fixedly connected with pressing plates, a storage cavity is formed by the three pressing plates at one side far away from the inner wall of the hoisting frame, a guide rod is connected between one side of the pressing plates, far away from the storage cavity, of the pressing plates and the hoisting frame, a guide hole for the guide rod to extend out from one end of the pressing plates is formed in the wall of the hoisting frame, and a plurality of buffer springs are fixedly connected between the pressing plates and the hoisting frame. The utility model has the following advantages and effects: can stably hoist and mount steel, make things convenient for the unloading.

Description

Vehicle-mounted new energy steel hoisting device
Technical Field
The utility model relates to the field of steel transportation, in particular to a vehicle-mounted new energy steel hoisting device.
Background
In the construction industry, steel is indispensable equipment, the demand is big, in the job site, steel needs frequent transportation, handling and installation, the work load is big, current hoist and mount in-process, generally adopt rope hoist and mount, adopt this kind of hoist and mount mode, steel easily drops in hoist and mount in-process, chinese patent application publication No. CN108726354a discloses a steel lifting means, including the wire rope connector, wire rope, the basket bolt, the screw hole, stock and push pedal, the wire rope connector passes through the pin pole and is connected with mount pad one, the wire rope lower extreme is installed on the wire rope connector, and the wire rope upper end is installed on the basket bolt, the basket bolt is installed on mount pad two, the screw hole is seted up respectively at lifting frame front end face and rear end face, the stock is assembled at threaded hole respectively, the push pedal is installed on the stock. The above device has the following disadvantages: after placing steel on hanging the frame, twist and move the long bolt of hanging the frame upper both sides, make long bolt remove in hanging the frame under the effect of screw hole to promote the push pedal, make the push pedal compress tightly steel, this operation process need twist in proper order and move the long bolt of hanging the frame both sides, and long bolt is established to a plurality of, and the operation process is comparatively inconvenient.
Disclosure of Invention
The utility model aims to provide a vehicle-mounted new energy steel hoisting device which has the effects of being convenient for hoisting steel in a fastening way and being convenient for blanking.
The technical aim of the utility model is realized by the following technical scheme: including hanging rope frame and fixed connection in lifting hook on the rope frame, fixedly connected with hangs the frame subassembly on the rope frame, it includes and hangs the frame to hang the frame subassembly, it is three to hang top and two side fixedly connected with clamp plates in the frame the clamp plate is kept away from hang frame inner wall one side and is constituteed and deposit the chamber, the clamp plate keep away from deposit chamber one side with hang and be connected with the guide bar between the frame, hang and have the confession on the frame wall the guide bar is kept away from the guiding hole that clamp plate one end stretched out, the clamp plate with hang fixedly connected with a plurality of buffer springs between the frame.
Through adopting above-mentioned technical scheme, when transporting steel, put steel to hang the intracavity of depositing on the frame, when steel was put to depositing the intracavity, three side clamp plates extrude steadily steel, and buffer spring is to hanging frame inner wall extrusion simultaneously, and the guide bar leads the flexible of clamp plate and buffer spring, makes to deposit and transport process more stable, and deposit process convenient and fast more.
The utility model is further provided with: the lifting frame is characterized in that a blanking opening is formed in the bottom of the lifting frame, fixing plates fixed to the bottom of the lifting frame are arranged on two sides of the blanking opening, sliding grooves are formed in the fixing plates, and sliding plates are connected in the sliding grooves in a sliding mode.
Through adopting above-mentioned technical scheme, hang when the frame transports steel to the destination, through the sliding plate of pulling both sides, the sliding plate of both sides slides to the opposite direction in the spout respectively, can open from this and hang frame bottom feed opening, and steel falls out from the feed opening unloading, and this unloading process convenient and fast, labour saving and time saving.
The utility model is further provided with: the sliding plate is far away from feed opening one side fixedly connected with connecting rod, the connecting rod is far away from sliding plate one end stretch out in hang frame outer wall face and articulated have the handle.
Through adopting above-mentioned technical scheme, thereby the pulling can be convenient for pulling the sliding plate of pulling handle that links to each other with the connecting rod opens the feed opening, when not using the connecting rod, can rotate the laminating with the connecting rod and pack up in hanging the frame wall to avoid influencing the hoist and mount transportation and cause the hindrance.
The utility model is further provided with: and the pressing plate is fixedly connected with an anti-abrasion pad.
Through adopting above-mentioned technical scheme, when the steel sheet is deposited to depositing chamber and clamp plate and is contacted, the friction between steel sheet and the clamp plate can be reduced to the abrasionproof pad.
The utility model is further provided with: the hanging frame is provided with a feeding port, and chamfer angles are arranged on two sides of the feeding port, which are positioned by the pressing plate.
Through adopting above-mentioned technical scheme, establish the chamfer on the clamp plate and make steel can directly deposit to deposit the intracavity in the clamp plate through laminating.
The utility model is further provided with: the number of the hanging frame assemblies is two, and the two hanging frame assemblies are positioned on the same horizontal line of the hanging rope frame.
Through adopting above-mentioned technical scheme, two hang frame group and accept the removal steel, make steel hoist and mount process more stable.
The utility model is further provided with: the device comprises a hanging frame assembly, a hanging frame and a regulating assembly, wherein the hanging frame assembly is arranged on the hanging frame assembly, the regulating assembly is fixedly connected between the hanging frame assembly and the hanging frame assembly, the regulating assembly comprises a threaded cylinder body and threaded rods which are connected with two ends of the threaded cylinder body in a threaded mode, and one ends of the threaded rods, far away from the threaded cylinder body, are fixedly connected onto the hanging frame.
Through adopting above-mentioned technical scheme, when steel overlength or too short, rotatable screw thread barrel to the threaded rod at screw thread barrel both ends outwards or inwards removes, makes the distance between two hanging frame can lengthen or shorten, also can nimble pulling when the distance between two hanging frames of hanging rope on the rope frame changes, makes two hanging frame components can accept steel stability, reduces the instability in the steel transportation.
The beneficial effects of the utility model are as follows: 1. during hoisting and transportation, the steel is extruded and fixed through the three-side pressing plate, the buffer spring and the guide rod, so that the steel can not move at will in the transportation process, and the steel is more stable; 2. the two sliding plates can slide in opposite directions by pulling the handle so as to open the blanking opening, so that the steel is convenient and quick to use, and time and labor are saved; 3. the distance between two hanging frame components can be adjusted according to the length of steel, so that the two hanging frame components can stably bear the steel, and shaking in the moving process is reduced.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings required for the description of the embodiments will be briefly described below, and it is apparent that the drawings in the following description are only some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural diagram of the present embodiment 1.
Fig. 2 is a schematic side view of the present embodiment 1.
Fig. 3 is a side structural sectional view of the present embodiment 1.
In the figure, 1, a lifting rope frame; 2. a lifting hook; 3. a feed opening; 4. hanging a frame; 5. a pressing plate; 6. a storage cavity; 7. a guide rod; 8. an adjustment assembly; 801. a threaded cylinder; 802. a threaded rod; 9. a buffer spring; 10. an abrasion-proof pad; 11. a chute; 12. a connecting rod; 13. a handle; 14. a guide hole; 15. a sliding plate; 16. a feeding port; 17. and a fixing plate.
Detailed Description
The technical scheme of the present utility model will be clearly and completely described in connection with specific embodiments. It will be apparent that the described embodiments are only some, but not all, embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to fall within the scope of the utility model.
Embodiment 1, a vehicle-mounted new forms of energy steel hoist device, as shown in fig. 1, fig. 2, including lifting hook 2 on lifting hook 1 and fixedly connected with lifting hook 1, fixedly connected with hangs frame 4 subassembly on lifting hook 1, it includes hanging frame 4 to hang frame 4 subassembly, top and two side fixedly connected with clamp plate 5 in the hanging frame 4, three clamp plate 5 keep away from hanging frame 4 inner wall one side and constitute and deposit chamber 6, clamp plate 5 keep away from and deposit chamber 6 one side and hang and be connected with guide bar 7 between the frame 4, it has the guiding hole 14 that supplies guide bar 7 to keep away from clamp plate 5 one end to stretch out to hang frame 4 frame wall, fixedly connected with buffer spring 9 between clamp plate 5 and the hanging frame 4, fixedly connected with wear pad 10 on clamp plate 5, be equipped with pay-off mouth 16 on hanging frame 4, clamp plate 5 is located the pay-off mouth 16 both sides and is equipped with the chamfer.
When transporting steel, put steel from pay-off mouth 16 through clamp plate 5 to hang in the chamber 6 of depositing on the frame 4, when steel was put to deposit in the chamber 6, three side clamp plate 5 extrudeed steel, and buffer spring 9 extrudeed to hanging frame 4 inner wall simultaneously and remove, and guide bar 7 removes to the flexible of clamp plate 5 and buffer spring 9 in to guiding hole 14 and carries out the direction, and it is transported to hang the frame 4 through lifting hook 2 and lifting rope frame 1 after placing to hang to steel steadily.
As shown in fig. 2 and 3, the bottom of the hanging frame 4 is provided with a feed opening 3, two sides of the feed opening 3 are provided with fixing plates 17 fixed at the bottom of the hanging frame 4, sliding grooves 11 are arranged in the fixing plates 17, sliding plates 15 are connected in the sliding grooves 11 in a sliding manner, one side, away from the feed opening 3, of the sliding plates 15 is fixedly connected with a connecting rod 12, and one end, away from the sliding plates 15, of the connecting rod 12 extends out of the outer wall surface of the hanging frame 4 and is hinged with a handle 13.
When the lifting hook 2 drives the rope hanging frame 1 and the lifting frame 4 to transport steel to a destination to discharge the steel, the handle 13 on the two side walls of the lifting frame 4 is rotated simultaneously, the connecting rod 12 is pulled, the connecting rod 12 drives the sliding plates 15 to slide in the sliding groove 11 when the connecting rod 12 is pulled, therefore, the two sliding plates 15 can move in opposite directions, the discharging opening 3 at the bottom of the lifting frame 4 is opened, and the steel falls out from the discharging opening 3.
As shown in fig. 1, two hanging frame 4 assemblies are provided, the two hanging frame 4 assemblies are located on the same horizontal line of the hanging rope frame 1, an adjusting assembly 8 is fixedly connected between the two hanging frames 4 in the two hanging frame 4 assemblies, the adjusting assembly 8 comprises a threaded cylinder 801 and threaded rods 802 in threaded connection with two ends of the threaded cylinder 801, and one end, far away from the threaded cylinder 801, of each threaded rod 802 is fixedly connected to the hanging frame 4.
According to the distance between two hanging frame 4 components of steel materials with different lengths, the threaded cylinder 801 is rotated, so that threaded rods 802 at two ends of the threaded cylinder 801 move inwards or outwards, the threaded rods 802 drive hanging frames 4 fixedly connected with the threaded rods to move, and the distance between the two hanging frames 4 is shortened or lengthened.
In summary, the threaded rod 802 at two ends of the threaded cylinder 801 is moved inwards or outwards according to the length of steel, after the distance between the two hanging frames 4 is adjusted, the steel is placed into the storage cavity 6 on the hanging frame 4 from the feeding port 16 through the pressing plate 5, when the steel is placed into the storage cavity 6, the three-side pressing plate 5 extrudes the steel, meanwhile, the buffer spring 9 extrudes and moves towards the inner wall of the hanging frame 4, the guide rod 7 moves towards the guide hole 14 to guide the expansion and contraction of the pressing plate 5 and the buffer spring 9, the hanging frame 4 is lifted through the lifting hook 2 and the lifting rope frame 1 after stable placement, when the steel is conveyed to a destination for discharging, the handle 13 on two side walls of the hanging frame 4 is rotated and the connecting rod 12 is pulled, the connecting rod 12 drives the sliding plate 15 to slide in the sliding groove 11 when the connecting rod 12 is pulled, therefore, the two sliding plates 15 can move towards opposite directions, the lower portion 3 of the hanging frame 4 is opened, and the steel falls from the lower portion 3.

Claims (7)

1. The utility model provides a vehicle-mounted new forms of energy steel hoist device, includes lifting rope frame (1) and fixed connection in lifting hook (2) on lifting rope frame (1), its characterized in that: the lifting rope frame is characterized in that a lifting frame (4) component is fixedly connected to the lifting rope frame (1), the lifting frame (4) component comprises a lifting frame (4), a pressing plate (5) is fixedly connected to the inner top and two sides of the lifting frame (4), the pressing plate (5) is far away from one side of the inner wall of the lifting frame (4) to form a storage cavity (6), the pressing plate (5) is far away from one side of the storage cavity (6) and a guide rod (7) is connected between the lifting frame (4), and a guide hole (14) for the guide rod (7) to extend out from one end of the pressing plate (5) is formed in the frame wall of the lifting frame (4), and a plurality of buffer springs (9) are fixedly connected between the pressing plate (5) and the lifting frame (4).
2. The vehicle-mounted new energy steel hoisting device according to claim 1, wherein: the automatic feeding device is characterized in that a blanking opening (3) is formed in the bottom of the hanging frame (4), fixing plates (17) fixed to the bottom of the hanging frame (4) are arranged on two sides of the blanking opening (3), sliding grooves (11) are formed in the fixing plates (17), and sliding plates (15) are connected in the sliding grooves (11) in a sliding mode.
3. The vehicle-mounted new energy steel hoisting device according to claim 2, wherein: one side of the sliding plate (15) away from the blanking opening (3) is fixedly connected with a connecting rod (12), and one end of the connecting rod (12) away from the sliding plate (15) extends out of the outer wall surface of the hanging frame (4) and is hinged with a handle (13).
4. The vehicle-mounted new energy steel hoisting device according to claim 1, wherein: and the pressing plate (5) is fixedly connected with an anti-abrasion pad (10).
5. The vehicle-mounted new energy steel hoisting device according to claim 1, wherein: the lifting frame (4) is provided with a feeding port (16), and the two sides of the pressing plate (5) located at the feeding port (16) are provided with chamfers.
6. The vehicle-mounted new energy steel hoisting device according to claim 1, wherein: the number of the hanging frame (4) components is two, and the two hanging frame (4) components are positioned on the same horizontal line of the hanging rope frame (1).
7. The vehicle-mounted new energy steel hoisting device according to claim 6, wherein: two in hanging frame (4) subassembly two hang fixedly connected with adjusting part (8) between frame (4), adjusting part (8) include screw thread barrel (801) with threaded rod (802) of screw thread barrel (801) both ends threaded connection, threaded rod (802) are kept away from screw thread barrel (801) one end fixed connection is in hang on frame (4).
CN202320489559.XU 2023-03-10 2023-03-10 Vehicle-mounted new energy steel hoisting device Active CN219546479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320489559.XU CN219546479U (en) 2023-03-10 2023-03-10 Vehicle-mounted new energy steel hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320489559.XU CN219546479U (en) 2023-03-10 2023-03-10 Vehicle-mounted new energy steel hoisting device

Publications (1)

Publication Number Publication Date
CN219546479U true CN219546479U (en) 2023-08-18

Family

ID=87730376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320489559.XU Active CN219546479U (en) 2023-03-10 2023-03-10 Vehicle-mounted new energy steel hoisting device

Country Status (1)

Country Link
CN (1) CN219546479U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118083794A (en) * 2024-04-28 2024-05-28 河南省第二建筑工程发展有限公司 Steel construction hoist device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118083794A (en) * 2024-04-28 2024-05-28 河南省第二建筑工程发展有限公司 Steel construction hoist device

Similar Documents

Publication Publication Date Title
CN219546479U (en) Vehicle-mounted new energy steel hoisting device
CN206779975U (en) A kind of lift centering clamping device
CN210213890U (en) Automatic workpiece differentiation feeding device
CN215326377U (en) High-rise building glass curtain wall lifting device
CN210340124U (en) Scroll handling equipment of convenient centre gripping
CN221191219U (en) Auxiliary lifting appliance for horizontally lifting long and straight parts
CN112573356A (en) Steel bar lifting appliance for crane
CN220906943U (en) Lifting appliance for prefabricated part cover plate
CN218520870U (en) Integral rigid square cabin lifting appliance
CN219791748U (en) Automatic discharging bin
CN217296965U (en) Crossbeam hoist
CN216420899U (en) Lifting feeding device
CN217890174U (en) Lifting type loading and unloading truss mechanism of duplex numerical control machine tool
CN220745175U (en) Mechanical climbing type steel transportation device
JPS60252526A (en) Electrode plate transfer device
CN216036657U (en) Loading and unloading machine for high-level intelligent storage shelf
CN220313174U (en) Horizontal holding structure for butt-joint installation of curved sliding rails
CN212953785U (en) Railway freight container lifting appliance
CN210709095U (en) Pipe receiving device
CN109333803B (en) Automatic pipe laying equipment for composite wallboard production line and composite wallboard production line
CN218410742U (en) Feeding device for coal gangue hollow brick sintering kiln
CN212051765U (en) Auxiliary mechanism for loading and unloading textile cylinder
CN215053857U (en) Bar planting structure is exempted from to aluminium mould biography material mouth entrance to a cave
CN221295874U (en) Lifting belt length adjusting device
CN116658095B (en) Automatic rod receiving and discharging device with hoisting function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant