CN219542899U - Spring linkage installation component - Google Patents

Spring linkage installation component Download PDF

Info

Publication number
CN219542899U
CN219542899U CN202320344782.5U CN202320344782U CN219542899U CN 219542899 U CN219542899 U CN 219542899U CN 202320344782 U CN202320344782 U CN 202320344782U CN 219542899 U CN219542899 U CN 219542899U
Authority
CN
China
Prior art keywords
base
connecting table
guide column
bases
guide post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320344782.5U
Other languages
Chinese (zh)
Inventor
张风会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Huierming Hardware Products Co ltd
Original Assignee
Changzhou Huierming Hardware Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Huierming Hardware Products Co ltd filed Critical Changzhou Huierming Hardware Products Co ltd
Priority to CN202320344782.5U priority Critical patent/CN219542899U/en
Application granted granted Critical
Publication of CN219542899U publication Critical patent/CN219542899U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model relates to a spring linkage installation assembly, which comprises a first base and a plurality of second bases connected to the first base, wherein a first guide column and a second guide column which are vertically arranged are respectively arranged on the first base and the second bases, and the first guide columns are rotationally connected to the first base; the first guide post and the second guide post are respectively and movably connected with a first connecting table and a second connecting table through springs, one end of the first connecting table is provided with a first installation platform, the lower end of the first installation platform is fixedly connected with a hollow pipe, and the bottom of the hollow pipe abuts against the inner bottom surface of a cavity of the second connecting table and is tightly propped and limited through bolts; the first guide post on the equidistance be provided with a plurality of spacing hole, push down first connecting bench and can realize high regulation to first connecting bench through inserting the bolt in corresponding spacing hole to need not the dismouting and can realize the synchronous altitude mixture control of linkage unit, it is very practical.

Description

Spring linkage installation component
Technical Field
The utility model relates to the technical field of spring linkage structures, in particular to a spring linkage installation assembly.
Background
The existing mechanical carrier mounting structure generally realizes linkage through a very complex connecting rod mechanism and a telescopic mechanism, and when the central active operation/execution unit performs height adjustment, the central active operation/execution unit needs to be disassembled and reinstalled together with surrounding linkage units, which is very troublesome, so that the mechanical carrier mounting structure needs to be improved by matching with a spring assembly, so that the mechanical carrier mounting structure is simplified in structure and convenient to adjust.
Disclosure of Invention
The utility model aims to solve the technical problems that: in order to solve the problems in the prior art, an improved spring linkage mounting assembly is provided.
The technical scheme adopted for solving the technical problems is as follows: the spring linkage installation assembly comprises a first base and a plurality of second bases connected to the first base, wherein a first guide column and a second guide column which are vertically arranged are respectively arranged on the first base and the second bases, and the first guide columns are rotatably connected to the first base;
the first guide post and the second guide post are respectively and movably connected with a first connecting table and a second connecting table through springs, one end of the first connecting table is provided with a first installation platform, the lower end of the first installation platform is fixedly connected with a hollow pipe, and the bottom of the hollow pipe abuts against the inner bottom surface of a cavity of the second connecting table and is tightly propped and limited through bolts;
the first guide post on the equidistance be provided with a plurality of spacing hole, push down first connection platform and can realize high regulation to first connection platform through inserting the bolt in corresponding spacing hole.
Further, a second installation platform is connected to the second connection platform to realize linkage.
Furthermore, the top ends of the first guide post and the second guide post are respectively provided with the anti-falling end blocks, so that the connection table is effectively prevented from accidentally jumping upwards.
Further, the first base is of a cylindrical structure, and four second bases are arranged on the first base at equal intervals according to the circumference;
through adopting above-mentioned technical scheme, can install the linkage unit on multidirectional second base, the direction of convenient according to actual need rotation first mounting platform, with hollow tube connection to the second that corresponds connect bench locking can.
The beneficial effects of the utility model are as follows: the defects in the background technology are overcome, complex connecting rods, telescopic structures and the like between the main execution mechanism and surrounding auxiliary linkage structures in the prior art are simplified, the main execution unit (the first connecting table and the first mounting platform) is more convenient in height adjustment, and the linkage unit (the second connecting table and the second mounting platform) can realize linkage adjustment without reinstallation; and the main execution unit can rotate by an angle to match with the corresponding linkage unit, so that multidirectional operation is realized, and the device is very practical.
Drawings
FIG. 1 is a schematic structural view of a preferred embodiment of the present utility model;
in the figure: 1. the anti-drop end block comprises a first base, a second base, a first guide post, a second guide post, a spring, a first connecting table, a second connecting table, a first mounting platform, a hollow pipe, a cavity, a bolt, a limiting hole, a bolt, a limiting pin, a second mounting platform and an anti-drop end block.
Detailed Description
The utility model will now be described in further detail with reference to the drawings and a preferred embodiment. The drawings are simplified schematic representations which merely illustrate the basic structure of the utility model and therefore show only the structures which are relevant to the utility model.
The spring linkage installation assembly shown in fig. 1 comprises a first base 1 and a plurality of second bases 2 connected to the first base 1, wherein a first guide post 3 and a second guide post 4 which are vertically arranged are respectively arranged on the first base 1 and the second bases 2, and the first guide post 3 is rotatably connected to the first base 1;
the first guide column 3 and the second guide column 4 are respectively and movably connected with a first connecting table 6 and a second connecting table 7 through springs 5, one end of the first connecting table 6 is provided with a first installation platform 8, the lower end of the first installation platform 8 is fixedly connected with a hollow pipe 9, and the bottom of the hollow pipe 9 abuts against the inner bottom surface of a cavity 10 of the second connecting table 7 and is tightly propped and limited through bolts 11;
a plurality of limiting holes 12 are equidistantly formed in the first guide column 3, the first connecting table 6 is pressed down, and the height of the first connecting table 6 can be adjusted by inserting bolts 13 into the corresponding limiting holes 12.
Wherein, the second connecting platform 7 is connected with a second mounting platform 14. The top ends of the first guide post 3 and the second guide post 4 are provided with an anti-drop end block 15. The first base 1 is of a cylindrical structure, and four second bases 2 are arranged on the first base 1 at equal intervals according to the circumference.
Working principle:
rotating the first connecting table and the first mounting platform, aligning and connecting the hollow pipe at the lower end of the first mounting platform to the corresponding second connecting table below, and locking by bolts; when the height is required to be adjusted, only the first connecting table is required to be pressed, after the proper height is adjusted, the bolt is inserted into the corresponding limiting hole, and at the moment, the second connecting table and the second mounting platform synchronously move under the action of the hollow pipe and the spring.
The foregoing description is merely illustrative of specific embodiments of the utility model, and the utility model is not limited to the details shown, since modifications and variations of the foregoing embodiments may be made by those skilled in the art without departing from the spirit and scope of the utility model.

Claims (4)

1. A spring linkage installation component, characterized in that: the device comprises a first base (1) and a plurality of second bases (2) connected to the first base (1), wherein a first guide column (3) and a second guide column (4) which are vertically arranged are respectively arranged on the first base (1) and the second bases (2), and the first guide column (3) is rotationally connected to the first base (1);
the first guide column (3) and the second guide column (4) are respectively and movably connected with a first connecting table (6) and a second connecting table (7) through springs (5), one end of the first connecting table (6) is provided with a first mounting platform (8), the lower end of the first mounting platform (8) is fixedly connected with a hollow pipe (9), and the bottom of the hollow pipe (9) abuts against the inner bottom surface of a cavity (10) of the second connecting table (7) and is tightly limited by pushing through bolts (11);
the first guide column (3) is provided with a plurality of limiting holes (12) at equal intervals, the first connecting table (6) is pressed down, and the height of the first connecting table (6) can be adjusted by inserting bolts (13) into the corresponding limiting holes (12).
2. A spring linkage mounting assembly as defined in claim 1, wherein: the second connecting platform (7) is connected with a second mounting platform (14).
3. A spring linkage mounting assembly as defined in claim 1, wherein: the top ends of the first guide column (3) and the second guide column (4) are respectively provided with an anti-falling end block (15).
4. A spring linkage mounting assembly as defined in claim 1, wherein: the first base (1) is of a cylindrical structure, and four second bases (2) are arranged on the first base (1) at equal intervals according to the circumference.
CN202320344782.5U 2023-02-28 2023-02-28 Spring linkage installation component Active CN219542899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320344782.5U CN219542899U (en) 2023-02-28 2023-02-28 Spring linkage installation component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320344782.5U CN219542899U (en) 2023-02-28 2023-02-28 Spring linkage installation component

Publications (1)

Publication Number Publication Date
CN219542899U true CN219542899U (en) 2023-08-18

Family

ID=87705084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320344782.5U Active CN219542899U (en) 2023-02-28 2023-02-28 Spring linkage installation component

Country Status (1)

Country Link
CN (1) CN219542899U (en)

Similar Documents

Publication Publication Date Title
CN219542899U (en) Spring linkage installation component
CN116336325A (en) Surveying and mapping device based on land space planning field investigation usefulness
CN215664930U (en) Adjustable steel structure supporting frame
CN215631305U (en) Assembled raised floor
CN210567317U (en) Height-adjustable electromechanical device mounting seat
CN218522334U (en) Net rack jacking support with adjustable umbelliform
CN219061201U (en) Safety guard rail for civil engineering construction
CN216699350U (en) Cable erection supporting device for electromechanical installation
CN219012063U (en) Supporting equipment convenient to adjust
CN218912395U (en) Combined stage
CN220162228U (en) High-verticality positioning upright post mechanism
CN221237306U (en) Concrete pump truck return bend supports fixing device
CN220790076U (en) Light steel mill house base structure that stability is high
CN219061139U (en) Quick assembly structure of beam column for tent
CN220994867U (en) Detachable stair model support frame
CN217811063U (en) Easy dismouting formula underground structure
CN219993043U (en) Scaffold frame bearing structure is detained to dish of adjustable pole setting length
CN218378779U (en) Leveling device for land surveying and mapping device
CN214785314U (en) Steel construction factory building roofing truss lower carriage mounting structure
CN219569185U (en) Quick connection structure of building structure wall post foot
CN221227953U (en) Integrated controller and emulsion pump station control system
CN220336923U (en) Anti-toppling supporting device
CN219066358U (en) Adjustable LCD spliced screen
CN218346962U (en) Design beam support structure
CN210668655U (en) Satellite television antenna easy to assemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant