CN219528348U - Novel hanging basket bracket fixed on silo wall - Google Patents

Novel hanging basket bracket fixed on silo wall Download PDF

Info

Publication number
CN219528348U
CN219528348U CN202223298793.9U CN202223298793U CN219528348U CN 219528348 U CN219528348 U CN 219528348U CN 202223298793 U CN202223298793 U CN 202223298793U CN 219528348 U CN219528348 U CN 219528348U
Authority
CN
China
Prior art keywords
connecting piece
fixed
clamping
fixing
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223298793.9U
Other languages
Chinese (zh)
Inventor
王建哲
张涛
王丽霄
张金栋
段兴恒
曲拾天
邢爱玲
孟子恒
李育航
王丽霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebeisijian Construction Engineering Co ltd
Original Assignee
Hebeisijian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebeisijian Construction Engineering Co ltd filed Critical Hebeisijian Construction Engineering Co ltd
Priority to CN202223298793.9U priority Critical patent/CN219528348U/en
Application granted granted Critical
Publication of CN219528348U publication Critical patent/CN219528348U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/51Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture specially adapted for storing agricultural or horticultural products

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a novel hanging basket support which is fixedly installed on a silo wall, and structurally comprises a connecting rod, wherein a first fixed connecting piece and a second fixed connecting piece are sleeved on the connecting rod, a first hoisting piece connecting piece and a second hoisting connecting piece are respectively arranged at two ends of the connecting rod, a clamping bolt is connected to the first fixed connecting piece in a threaded manner, a clamping top plate is arranged at the end part of the clamping bolt, a fixed top plate and angle irons are arranged on the second fixed connecting piece, and the clamping top plate, the fixed top plate and the angle irons are used for clamping the silo wall of the silo. A plurality of adjusting holes are formed in the connecting rod along the length direction, and through-connection bolts penetrate through the corresponding adjusting holes. The utility model has strong applicability, can be suitable for the warehouse walls with different thicknesses, is safe and firm, can be produced in batches, and is convenient to assemble and disassemble and convenient to use.

Description

Novel hanging basket bracket fixed on silo wall
Technical Field
The utility model relates to a bracket for installing and fixing a hanging basket, in particular to a novel hanging basket bracket for installing and fixing a hanging basket on a silo wall.
Background
In high altitude operations such as construction of high building outer wall, curtain wall installation, heat preservation construction and maintenance, the construction hanging basket can be used, and general hanging basket equipment mainly comprises hanging basket, support, counter weight triplex. The existing hanging basket support is placed on a building roof or fixed on a building by using a triangular diagonal bracing support or hooped on a concrete wall, a beam or a steel beam by using a U-shaped device, one end of the hanging basket support is directly provided with a counterweight or fixed on the building, and the other end of the hanging basket support is provided with a hanging basket.
In the concrete conjuncted storehouse engineering, need carry out the construction of the inboard steel pocket of storehouse wall after the storehouse wall finishes the construction, this process is the high altitude construction, need install construction hanging flower basket and accomplish the installation of steel pocket. The steel material bag is required to enter from the bin top. Under the influence of construction procedures, the warehouse roof can not be constructed at present as a material conveying channel. The hanging basket bracket of the type placed on the roof of the building and the hanging basket bracket of the type using the U-shaped device anchor ear on the concrete beam or the steel beam can not be used.
If the embedded part fixing triangular diagonal bracing bracket is arranged on the silo wall and used as a hanging basket bracket, the construction cost and working procedures of the concrete silo are increased, and the bracket is inconvenient to disassemble and assemble and inconvenient to move the hanging basket position.
If the U-shaped device hoops are used on the concrete bin wall, the common U-shaped device is generally shaped, cannot be suitable for bin walls with different thicknesses, and cannot be reused. And the structure is simple, the device is not adjustable, the device can not be propped up and dead with a building, and the stability is poor.
Because conjuncted storehouse engineering volume is big, in order to improve the rate of utilization of hanging flower basket, saving time limit for a project, need develop a novel hanging flower basket support of fixed at silo storehouse wall installation, can adjust the interval of support anchor clamps part according to the storehouse wall thickness, can die with the storehouse wall top, can improve the overall stability of hanging flower basket, and two supports of being connected the hanging flower basket can adjust according to hanging flower basket length, and the installation is dismantled conveniently, swiftly.
Disclosure of Invention
The utility model aims to provide a novel hanging basket support which is fixedly arranged on a silo wall, so as to solve the problems that the existing hanging basket mounting rack is inconvenient to assemble and disassemble, cannot adapt to the silo walls with different thicknesses and cannot be reused, and further improve the stability of hanging baskets.
The utility model is realized in the following way: the utility model provides a novel hanging flower basket support at silo wall installation fixed, includes the connecting rod first fixed connection spare and second fixed connection spare have been cup jointed on the connecting rod the both ends of connecting rod are provided with first hoist and mount connecting piece and second hoist and mount connecting piece respectively threaded connection has clamping bolt on the first fixed connection spare clamping bolt's tip is provided with the clamping roof be provided with fixed roof and angle bar on the second fixed connection spare, clamping roof with fixed roof and the angle bar is used for clamping silo's wall.
The connecting rod is provided with a plurality of adjusting holes along the length direction, the first fixed connecting piece and the second fixed connecting piece are connected with through bolts in a penetrating way, and the through bolts penetrate through the corresponding adjusting holes.
The top of first fixed connection spare is provided with the stand first hoist and mount connecting piece with be connected with the connecting rope between the second hoist and mount connecting piece, the connecting rope overlap joint is in the top of stand.
The first fixed connecting piece comprises a first sleeve and a first vertical rod perpendicular to the first sleeve, a first through hole is formed in the first sleeve, a fixing nut is arranged on the first vertical rod, and the clamping bolt is connected to the first vertical rod in a penetrating mode and is in threaded connection with the fixing nut.
The second fixed connecting piece comprises a second sleeve and a second vertical rod perpendicular to the second sleeve, the fixed top plate is fixedly installed on the second vertical rod, and a second through hole is formed in the second sleeve.
The first hoisting connecting piece comprises two fixing frames, each fixing frame comprises two first clamping plates, one ends of the two first clamping plates are bent inwards, the two first clamping plates are connected with each other through connecting plates, and the two fixing frames are in butt joint with each other and are connected with each other through a bolt penetrating through the connecting rods.
The second hoisting connecting piece comprises two second clamping plates, the upper ends of the second clamping plates are bent towards the inner side, the upper ends, the lower ends and the middle parts of the second clamping plates are respectively connected through bolts, and the bolts positioned in the middle parts are simultaneously connected to the connecting rod in a penetrating manner.
The connecting rod is a square tube. The square pipe is provided with regulating holes which can be penetrated at regular intervals, the square pipe penetrates through the first fixed connecting piece and the second fixed connecting piece, and the corresponding positions are fixedly connected by bolts with corresponding numbers.
An operation hole is arranged at the end part of the clamping bolt.
The hanging basket is fixedly arranged on the top of the silo wall, the first fixed connecting piece and the second fixed connecting piece penetrate through the connecting rod to be arranged before use, the first hoisting connecting piece and the second hoisting connecting piece are arranged at two ends of the connecting rod, the first hoisting connecting piece at one end is connected with the second hoisting connecting piece at the other end by using the rope, and meanwhile, the rope is lapped on the top of the upright post of the first fixed connecting piece to be in tensioning connection.
When in use, the present patent needs to ride on the concrete silo wall. The positions of the first fixed connecting piece and the second fixed connecting piece are adjusted firstly, the requirements of the wall thickness of the concrete warehouse can be met, then the first fixed connecting piece and the second fixed connecting piece are fixed on the connecting rod by using a cross-connection screw, and a rope is used for tensioning and connecting the first hoisting connecting piece at one end through the top of the upright post of the first fixed connecting piece and the second hoisting connecting piece at the other end, so that the assembly of the concrete warehouse is completed.
After the equipment is accomplished, this novel patent rides on the storehouse wall, one side of first fixed connection spare sets up the storehouse wall outside, one side of second fixed connection spare sets up in the storehouse wall is inboard, overlap joint the connecting rod at the top of storehouse wall, make fixed roof and clamp the roof be close to two sides of storehouse wall, then rotatory clamping bolt, make clamp roof and fixed roof clamp the storehouse wall, thereby fix the top at the storehouse wall with whole device, the built-in fitting of silo storehouse wall has been saved, and the both ends hanging flower basket support interval of hanging flower basket is being connected, can adjust according to hanging flower basket length. Through connecting the counter weight through the rope on first hoist and mount connecting piece, through rope hanging flower basket on the second hoist and mount connecting piece to realize the installation of hanging flower basket, this kind of structure easy dismounting, easy operation.
The broken line design and the steel sheet welded connection of first hoist and mount connecting piece and second hoist and mount connecting piece have increased the fastness of structure. Meanwhile, the two first hoisting connecting pieces are arranged, the direction of the first hoisting connecting pieces can be consistent with the direction of the connecting rope according to the adjusting direction of the rotating shaft, and the first hoisting connecting pieces form linear stress when being tensioned, so that the overall stability of the novel bracket is ensured.
Meanwhile, the armpit of the first fixed connecting piece and the armpit of the second fixed connecting piece are respectively ribbed to form a triangular structure, so that the structural strength is enhanced.
When the position of the hanging basket on the bin wall is required to be adjusted, the clamping bolts are rotated, the clamping top plate and the fixed top plate for clamping the bin wall are loosened, the hanging basket is moved to the corresponding positions along the bin wall, and then the clamping bolts are rotated to enable the clamping top plate and the fixed top plate to clamp the bin wall again. The utility model can conveniently adjust the position.
For the silo walls with different thicknesses, the silo wall structure can be stably installed by only adjusting the positions of the first fixed connecting piece and the second fixed connecting piece and rotating the clamping bolt, so that the silo wall structure can be repeatedly used in construction projects of different silos, and the use cost is greatly reduced.
The utility model has strong applicability, safety, firmness, mass production, convenient disassembly and use and repeated use.
Drawings
Fig. 1 is a structural diagram of the present utility model.
Fig. 2 is a structural view of a first fixing coupler according to the present utility model.
Fig. 3 is a structural view of a second fixing coupler according to the present utility model.
Fig. 4 is a structural view of the fixing frame in the first hoisting connector of the present utility model.
Fig. 5 is a structural view of a second hoisting connector according to the utility model.
1. A connecting rod; 2. a first fixed connection; 3. a second fixed connection; 4. a first hoisting connector; 5. a second hoisting connector; 6. a column; 7. a connecting rope; 8. an adjustment aperture; 9. threading a bolt; 2-1, a first sleeve; 2-2, a first vertical rod; 2-3, a first through hole; 2-4, clamping bolts; 2-5, clamping the top plate; 2-6, fixing the nut; 2-7 operation holes; 3-1, a second sleeve; 3-2, a second vertical rod; 3-3, a second through hole; 3-4, fixing the top plate; 3-5, angle iron; 4-1, a first clamping plate; 5-1, a second clamping plate.
Detailed Description
As shown in fig. 1, the utility model comprises a horizontal connecting rod 1, a first fixed connecting piece 2 and a second fixed connecting piece 3 are sleeved on the connecting rod 1, the first fixed connecting piece 2 and the second fixed connecting piece 3 can move along the connecting rod 1, the first fixed connecting piece 2 and the second fixed connecting piece 3 are fixed on the connecting rod 1 after the positions are determined, a first hoisting connecting piece 4 and a second hoisting connecting piece 5 are respectively arranged at two ends of the connecting rod 1, and the first hoisting connecting piece 4 and the second hoisting connecting piece 5 are used for connecting a hanging basket and a counterweight.
The first fixed connecting piece 2 is connected with a clamping bolt 2-4 in a threaded manner, the end part of the clamping bolt 2-4 is provided with a clamping top plate 2-5, the second fixed connecting piece 3 is fixedly connected with a fixed top plate 3-4 and an angle iron 3-5, and the clamping bolt 2-4 is rotated so as to adjust the position of the clamping top plate 2-5, so that the clamping top plate 2-5, the fixed top plate 3-4 and the angle iron 3-5 clamp the wall of the silo.
Wherein, the clamping top plate 2-5 and the fixed top plate 3-4 are both in a circular disk-mounted structure.
A plurality of adjusting holes 8 are formed in the connecting rod 1 along the length direction, and through bolts 9 are connected to the first fixed connecting piece 2 and the second fixed connecting piece 3 in a penetrating way, and the through bolts 9 penetrate through the corresponding adjusting holes 8 to fix the positions of the first fixed connecting piece 2 and the second fixed connecting piece 3.
The top of the first fixed connecting piece 2 is fixedly provided with a stand column 6, a connecting rope 7 is connected between the first hoisting connecting piece 4 and the second hoisting connecting piece 5, and the connecting rope 7 is lapped on the top of the stand column 6. A horizontal rod is fixedly arranged at the top of the upright post 6, and the connecting rope 7 is contacted with the horizontal rod.
Besides being born by the connecting rod 1, the gravity of the hanging basket is partially transmitted to the upright post 6 through the connecting rope 7, downward pressure is generated by the upright post 6, and meanwhile, the gravity of the hanging basket is partially transmitted to the counterweight through the connecting rope 7 and directly counteracted by the gravity of the counterweight, so that the stress of the connecting rod 1 is optimized, and the connecting rod 1 is prevented from bending deformation due to overlarge stress.
Wherein the connecting rope 7 is a steel wire rope with a screw.
The connecting rod 1 is square pipe, and square pipe has stronger rigidity and intensity, and the side of square pipe is level and smooth simultaneously, does benefit to and stably places on the top surface of storehouse wall, and square pipe can prevent that first fixed connection spare 2, second fixed connection spare 3, first hoist and mount connecting piece 4 and second hoist and mount connecting piece 5 from rotating around its central axis.
As shown in fig. 2, the first fixed connection member 2 comprises a first sleeve and a first vertical rod 2-2 perpendicular to the first sleeve, at least one first through hole 2-3 is formed in the first sleeve, a through bolt 9 is connected in the first through hole 2-3 in a penetrating manner, fixing nuts 2-6 are respectively and fixedly arranged on two sides of the first vertical rod 2-2, a clamping bolt 2-4 is connected on the first vertical rod 2-2 in a penetrating manner and is in threaded connection with the fixing nuts 2-6, a clamping top plate 2-5 is located at the inner end part of the clamping bolt 2-4, the clamping top plate 2-5 is located on a vertical plane, and the extending length of the clamping bolt 2-4 can be adjusted through rotation, so that the position of the clamping top plate 2-5 can be adjusted.
For convenience of operation, an operation hole 2-7 is provided at an end of the clamp bolt 2-4, and when the position of the clamp top plate 2-5 needs to be adjusted, an operation lever is inserted into the operation hole 2-7, so that the clamp bolt 2-4 can be rotated by the operation lever.
Wherein, first sleeve 2-1 and first montant 2-2 are square tube structure, and at the position that first sleeve 2-1 and first montant 2-2 connect installation angle bar etc. makes both structures more stable firm.
The upright 6 is fixedly mounted on the top surface of the first sleeve 2-1, and the upright 6 is located at the inner end of the first sleeve 2-1.
As shown in fig. 3, the second fixed connecting piece 3 comprises a second sleeve and a second vertical rod 3-2 perpendicular to the second sleeve, the fixed top plate 3-4 is fixedly arranged on the second vertical rod 3-2, an angle iron 3-5 is further arranged on the second vertical rod 3-2, the angle iron 3-5 is positioned at the upper end of the fixed top plate, one side plate is in contact with the connecting rod 1, the other side plate is in contact with the inner side surface of the second vertical rod 3-2, and when in use, the angle iron 3-5 is in contact with the edge of the top of the bin wall, so that the reliability of connection is improved. At least one second through hole 3-3 is formed in the second sleeve, and the through bolt 9 is connected in the second through hole 3-3 in a penetrating way.
Wherein, the second sleeve 3-1 and the second vertical rod 3-2 are square pipe structures, and reinforcing ribs and the like are arranged at the connection positions of the second sleeve 3-1 and the second vertical rod 3-2, so that the structures of the second sleeve 3-1 and the second vertical rod 3-2 are more stable and firm.
As shown in fig. 4, the first hoisting connecting piece 4 includes two fixing frames, each fixing frame includes two first clamping plates 4-1, one ends of the two first clamping plates 4-1 are bent inwards, and the two first clamping plates 4-1 are welded and fixed into a whole through a connecting plate. The end of the fixing frame, which is far away from the two first clamping plates 4-1, is overlapped with the end of the other fixing frame, which is far away from the two first clamping plates 4-1, and is fixedly connected through a bolt, and the bolt passes through the connecting rod 1 to fix the two fixing frames on the connecting rod 1. The smaller spacing ends of the first clamping plates 4-1 on the two connecting frames are connected by bolts, and for the bolts, the part between the two first clamping plates 4-1 is a polished rod as the connecting ropes 7 or the ropes for hoisting are required to be installed.
As shown in fig. 5, the second hoisting connection member 5 includes two second clamping plates 5-1, the upper ends of the second clamping plates 5-1 are bent inward, the upper and lower ends and the middle parts of the two second clamping plates 5-1 are respectively connected by bolts, and the bolts at the middle parts are simultaneously connected to the connection rod 1 in a penetrating manner, and the bolts at the upper and lower ends need to be connected with the connection rope 7 or the rope, so that the part between the two second clamping plates 5-1 is a polished rod.
The application method of the utility model is as follows:
first, the hanging basket bracket is assembled. The first fixed connecting piece 2 and the second fixed connecting piece 3 are installed through the connecting rod 1, the first hoisting connecting piece 4 and the second hoisting connecting piece 5 are installed at two ends of the connecting rod 1, the rope 7 is used for connecting the first hoisting connecting piece 4 at one end with the second hoisting connecting piece 5 at the other end, and meanwhile, the rope 7 is taken on the top of the upright post 6 of the first fixed connecting piece 4 for tensioning connection.
And secondly, installing a hanging basket bracket. The connecting rod 1 is lapped on the top of the bin wall, the positions of the first fixed connecting piece 2 and the second fixed connecting piece 3 are adjusted, the first fixed connecting piece 2 and the second fixed connecting piece 3 are fixed on the connecting rod 1, the fixed top plate 3-4 and the clamping top plate 2-5 are close to two side surfaces of the bin wall, then the clamping bolt 2-4 is rotated, the clamping top plate 2-5 and the fixed top plate 3-4 clamp the bin wall, and therefore the whole device is fixed on the top of the bin wall.
And thirdly, installing a hanging basket and a counterweight. The first hoisting connecting piece 4 and the second hoisting connecting piece 5 are respectively connected with a counterweight or a hanging basket through ropes.
And fourthly, when the position of the hanging basket on the bin wall needs to be adjusted, rotating the clamping bolts 2-4, loosening the clamping top plates 2-5 and the fixed top plates 3-4 for clamping the bin wall, enabling the whole to move to the corresponding positions along the bin wall, and then rotating the clamping bolts 2-4 to enable the clamping top plates 2-5 and the fixed top plates 3-4 to clamp the bin wall again.
For the silo walls with different thicknesses, the silo wall structure can be firmly installed by only adjusting the first fixed connecting piece 2, the second fixed connecting piece 3 and the rotary clamping bolt 2-4, so that the silo wall structure can be repeatedly used in construction projects of different silos, and the use cost is greatly reduced. The utility model can realize industrial batch production of each structural part, and each part is a replaceable standardized part, thereby reducing the production and use cost.

Claims (7)

1. The novel hanging basket support is characterized by comprising a connecting rod, wherein a first fixed connecting piece and a second fixed connecting piece are sleeved on the connecting rod, a first hoisting connecting piece and a second hoisting connecting piece are respectively arranged at two ends of the connecting rod, a clamping bolt is connected to the first fixed connecting piece in a threaded manner, a clamping top plate is arranged at the end part of the clamping bolt, a fixed top plate and angle irons are arranged on the second fixed connecting piece, and the clamping top plate, the fixed top plate and the angle irons are used for clamping the wall of a silo; the first hoisting connecting piece comprises two fixing frames, each fixing frame comprises two first clamping plates, one ends of the two first clamping plates are bent inwards, the two first clamping plates are connected with each other through connecting plates, and the two fixing frames are in butt joint with each other and are connected with each other through a bolt penetrating through the connecting rods; the second hoisting connecting piece comprises two second clamping plates, the upper ends of the second clamping plates are bent towards the inner side, the upper ends, the lower ends and the middle parts of the second clamping plates are respectively connected through bolts, and the bolts positioned in the middle parts are simultaneously connected to the connecting rod in a penetrating manner.
2. The novel hanging basket support for mounting and fixing the silo wall according to claim 1, wherein a plurality of adjusting holes are formed in the connecting rod along the length direction, and through-connection bolts penetrate through the corresponding adjusting holes and are connected to the first fixed connecting piece and the second fixed connecting piece in a penetrating mode.
3. The novel hanging basket support for mounting and fixing the silo wall according to claim 1, wherein a stand column is arranged at the top of the first fixed connecting piece, a connecting rope is connected between the first hoisting connecting piece and the second hoisting connecting piece, and the connecting rope is lapped at the top of the stand column.
4. The novel hanging basket support for mounting and fixing on the wall of a silo according to claim 1, wherein the first fixing connecting piece comprises a first sleeve and a first vertical rod perpendicular to the first sleeve, a first through hole is formed in the first sleeve, a fixing nut is arranged on the first vertical rod, and the clamping bolt is connected to the first vertical rod in a penetrating manner and is in threaded connection with the fixing nut.
5. The novel hanging basket support for mounting and fixing on the wall of a silo according to claim 1, wherein the second fixed connecting piece comprises a second sleeve and a second vertical rod perpendicular to the second sleeve, the fixed top plate is fixedly mounted on the second vertical rod, and a second through hole is formed in the second sleeve.
6. The novel hanging basket support for mounting and fixing on the wall of a silo according to claim 1, wherein the connecting rod is a square tube.
7. A novel basket support for mounting and fixing a silo wall according to claim 1, wherein an operation hole is provided at the end of the clamping bolt.
CN202223298793.9U 2022-12-09 2022-12-09 Novel hanging basket bracket fixed on silo wall Active CN219528348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223298793.9U CN219528348U (en) 2022-12-09 2022-12-09 Novel hanging basket bracket fixed on silo wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223298793.9U CN219528348U (en) 2022-12-09 2022-12-09 Novel hanging basket bracket fixed on silo wall

Publications (1)

Publication Number Publication Date
CN219528348U true CN219528348U (en) 2023-08-15

Family

ID=87631397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223298793.9U Active CN219528348U (en) 2022-12-09 2022-12-09 Novel hanging basket bracket fixed on silo wall

Country Status (1)

Country Link
CN (1) CN219528348U (en)

Similar Documents

Publication Publication Date Title
CN112411994A (en) Embrace arc roof beam and do not have counter weight hanging flower basket suspension mechanism
CN211171598U (en) Installation positioning device for bridge expansion joint steel reinforcement framework
CN207277817U (en) Falsework rack connecting structure
CN219528348U (en) Novel hanging basket bracket fixed on silo wall
CN209654736U (en) Drawing device in a kind of PCCP pipeline
CN220319071U (en) Suspension mechanism with adjustable distance of hanging basket
CN216690350U (en) Concrete circular silo slip form construction equipment
CN214834907U (en) Prefabricated assembled post hoist and mount counterpoint installing the system
CN113062348B (en) Concrete foundation structure of tower crane
CN215240464U (en) Quick and accurate mounting device for flange branch pipe
CN202000649U (en) Movable strengthening device for bottom of upright stenshion of construction cantilevered frame
CN219411771U (en) Split mounting type fixing device applicable to parapet part hanging basket bracket
CN220036233U (en) Be used for steel construction to support fixing device
CN215484888U (en) Civil engineering construction support
CN210530388U (en) Simple detachable safety flat net structure
CN210669424U (en) Bridge bidirectional anti-seismic supporting and hanging structure
CN215402720U (en) Double-rail hoisting system for curtain wall
CN216809584U (en) Easy-to-disassemble and assemble capping beam top edge-facing protective device
CN215787725U (en) Special welding rotating tire for aluminum structure
CN212931451U (en) Vertical line transfer device for directional measurement of vertical shaft
CN216109660U (en) Exempt from to weld adjustable pull rod nut fixing device
CN217128535U (en) Adjusting device is connected to stand
CN220014370U (en) Full scaffold using bailey frame as supporting platform
CN221186272U (en) Spray tower pipeline elbow mounting tool
CN216238149U (en) Tripod supporting device for pouring overhanging concrete panels on two sides of bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant