CN219510495U - Progress display device - Google Patents

Progress display device Download PDF

Info

Publication number
CN219510495U
CN219510495U CN202320808511.0U CN202320808511U CN219510495U CN 219510495 U CN219510495 U CN 219510495U CN 202320808511 U CN202320808511 U CN 202320808511U CN 219510495 U CN219510495 U CN 219510495U
Authority
CN
China
Prior art keywords
wall
gear
display
dust removal
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320808511.0U
Other languages
Chinese (zh)
Inventor
马强
陈仕江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320808511.0U priority Critical patent/CN219510495U/en
Application granted granted Critical
Publication of CN219510495U publication Critical patent/CN219510495U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Displays For Variable Information Using Movable Means (AREA)

Abstract

The utility model discloses a progress display, which comprises: the base, two sets of supporting ends are installed at the top of base, the show ware body is installed to the outer wall of supporting end, adjusting structure is installed to the inner wall of supporting end, dust removal structure is installed to the bottom of show ware body, the gag lever post is installed to dust removal structure's inner wall, and dust removal structure's inner wall movable mounting has the lead screw. According to the utility model, the height of the display can be adjusted after the installation of the display is completed by installing the adjusting structure, and the installation of the adjusting structure enables the display to complete lifting operation, so that the height of the display can be adjusted according to application requirements and different watching staff, the application of the display can be more flexible, the application range of the display is increased, and the practicability of the display is improved.

Description

Progress display device
Technical Field
The utility model relates to the technical field of displays, in particular to a progress display.
Background
The engineering management is also called building engineering management, and the building engineering is the engineering entity for planning, surveying, designing, constructing, completing and other technical works and completed engineering entities and matched lines, pipelines and equipment, and also refers to the building engineering of various houses and buildings, also called building workload, and the engineering management process needs to record and display the dynamic progress of projects, site progress report, process node management and personnel and equipment scheduling, so the engineering management system needs to be applied to a progress display.
The existing progress demonstrator has the defects that:
patent document CN216450314U discloses a progress display board for building engineering management, and the protection rights "comprises a display, wherein a clamping frame is arranged on the outer side of the display, a heat dissipation device is arranged on one side of the clamping frame, a dust removal device is arranged on the other side of the clamping frame, and the bottom of the clamping frame is connected with a base; glass board one side symmetry is provided with the slide rail, and slide rail inside card is equipped with the slider, and two sliders are in same horizontal position, and the slider can carry out vertically directional removal along the slide rail direction, is connected with the horizontal pole between the slider, and the horizontal pole plays the effect of installation clean sponge, when cleaning glass board surface dust, promotes the horizontal pole from top to bottom after being wet clean sponge, drives clean sponge through the horizontal pole and cleans the glass board, through above setting, has produced the progress show board for the building engineering management and has conveniently carried out the dust clearance, keeps the clean technical effect of show panel.
However, the progress show board for building engineering management of above-mentioned publication mainly considers the convenience to carry out the dust clearance, keeps the clean technical effect of show panel, does not consider traditional show ware and is mostly fixed mounting when the installation, then can make the show ware be difficult to adjust the use height of show ware according to actual need like this, inconvenient crowd of different heights watches and uses, and then causes the problem of influence to the use of show ware easily.
Therefore, it is necessary to develop a structure capable of conveniently adjusting the height of the display, and then the height of the display can be adjusted according to the application requirements and the difference of the watching staff, so that the application of the display can be more flexible, the application range of the display is increased, and the practicability of the display is improved.
Disclosure of Invention
The utility model aims to provide a progress display to solve the technical problem that the traditional display proposed in the background art is inconvenient to adjust the height after being installed.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a progress presenter comprising:
the display device comprises a base, wherein two groups of supporting ends are arranged at the top of the base, and a display body is arranged on the outer wall of each supporting end;
the inner wall of supporting terminal installs adjusting structure, adjusting structure's inner wall movable mounting has the threaded rod, first sprocket is installed to the bottom of threaded rod, two sets of installation ends are installed to the outer wall of show ware body, the installation end is located adjusting structure's inner wall, and the threaded rod runs through in the inner wall of installation end and meshes with it, adjusting component is installed to the inner wall of supporting terminal, and first gear is located adjusting component's inner wall, adjusting component's inner wall movable mounting has first bull stick, the outer wall of first bull stick encircles and installs the second gear, and the second gear meshes with first gear, the outer wall of first bull stick encircles and installs first sprocket, the outer wall of first sprocket encircles and installs the chain, adjusting mechanism's inner wall movable mounting has the second bull stick, the outer wall of second bull stick encircles and installs two sets of second sprockets, and the outer wall of second sprocket encircles and install the chain, the outer wall of second bull stick encircles and install a gear, the inner wall of adjusting mechanism installs first gear and the output number of first motor, and the second gear meshes with the first gear.
Preferably, the bottom of the display body is provided with a dust removing structure.
Preferably, the gag lever post is installed to dust removal structure's inner wall, and dust removal structure's inner wall movable mounting has the lead screw, and dust removal structure's outer wall is installed the second motor, and the output fixed mounting of second motor to the inner wall of lead screw.
Preferably, the inner wall of the dust removing structure is provided with a dust removing assembly, the limiting rod movably penetrates through the inner wall of the dust removing assembly, and the screw rod penetrates through the inner wall of the dust removing assembly and is meshed with the inner wall of the dust removing assembly.
Preferably, the third motor is installed to the inner wall of dust removal subassembly, and the gear No. one is installed to the output of installation component third motor is installed to the one end of dust removal subassembly, and the gear No. one is located the inner wall of installation component.
Preferably, the inner wall of the installation component is provided with a rod body in a penetrating way.
Preferably, the gear number two is installed to the bottom of the body of rod, and gear number two meshes with gear number one, and the outer wall of the body of rod encircles and installs the dust removal end, and the dust removal end is located dust removal structure's outer wall and laminates mutually with the outer wall of show ware body.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the height of the conventional display can be adjusted after the display is installed through the adjusting structure, most of the conventional display is fixedly installed when the display is installed, so that the use height of the display is difficult to adjust according to actual needs, people with different heights are inconvenient to watch and use, the use of the display is easy to be influenced, the first motor is started, the output end of the first motor drives the second rotating rod to rotate through the second gear and the first gear meshed with the second gear, the second rotating rod drives the chain to move through the second sprocket to drive the first rotating rod to rotate, the first rotating rod rotates to drive the threaded rod to rotate through the second gear and the first gear meshed with the second gear, the threaded rod rotates to enable the outer wall of the threaded rod to rotate around the installation end meshed with the second gear to drive the display body to move, the lifting operation of the display is finished, the application of the display can be more flexible according to the application requirements and the height of the display with different adjustment of viewers, the application range of the display is increased, and the practicability of the display is improved;
2. according to the utility model, dust adsorbed on the surface of the display can be cleaned through the dust removing structure, the conventional engineering management display is applied to outdoors, external dust is easy to adhere to the display after the display is used for a long time, the display effect and the watching effect of the display are influenced, the second motor is started, the output end of the second motor drives the screw rod to rotate, the screw rod rotates to enable the dust removing assembly meshed with the screw rod to move, the limit rod is used for limiting the dust removing assembly, the dust removing assembly is moved to drive the dust removing end to move through the mounting assembly, the third motor is started, the output end of the third motor drives the rod body to rotate through the first gear and the second gear meshed with the first gear, the rod body rotates to drive the dust removing end to rotate, and the dust removing end is rotated along with the rotation and the movement of the dust removing end to clean the dust adsorbed on the outer wall of the display, so that the display is tidy, and the display is prevented from being influenced by a large amount of dust adsorption.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic diagram of an adjustment structure of the present utility model;
FIG. 3 is a schematic view of an adjusting mechanism according to the present utility model;
FIG. 4 is a schematic view of a dust removing assembly according to the present utility model;
fig. 5 is a schematic view of a dust removing structure of the present utility model.
In the figure: 1. a base; 101. a support end; 102. a display body; 2. an adjustment structure; 201. a threaded rod; 202. a first gear; 203. a mounting end; 3. an adjustment assembly; 301. a first rotating lever; 302. a second gear; 303. a first sprocket; 304. a chain; 4. an adjusting mechanism; 401. a second rotating rod; 402. a second sprocket; 403. a first gear; 404. a first motor; 405. a second gear; 5. a dust removal structure; 501. a limit rod; 502. a screw rod; 503. a second motor; 6. a dust removal assembly; 601. a third motor; 602. a mounting assembly; 603. gear number one; 7. a rod body; 701. a dust removing end; 702. gear number two.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1, a progress presenter includes: the base 1, two sets of supporting ends 101 are installed at the top of base 1, and show ware body 102 is installed to the outer wall of supporting ends 101, and show ware body 102 is the progress show ware for engineering management, and it is mainly used to demonstrate the engineering progress, and supporting ends 101 and base 1 are used for providing the support fixed action for show ware body 102.
Referring to fig. 1, 2 and 3, the adjusting structure 2 is installed on the inner wall of the supporting end 101, the adjusting structure 2 is movably installed on the inner wall of the adjusting structure 2, the threaded rod 201 is movably installed on the inner wall of the adjusting structure 2, the first gear 202 is installed at the bottom end of the threaded rod 201, two groups of installation ends 203 are installed on the outer wall of the display body 102, the installation ends 203 are located on the inner wall of the adjusting structure 2, the threaded rod 201 penetrates through the inner wall of the installation ends 203 and is meshed with the installation ends, the adjusting component 3 is installed on the inner wall of the supporting end 101, the first gear 202 is located on the inner wall of the adjusting component 3, the first rotating rod 301 is movably installed on the inner wall of the adjusting component 3, the second gear 302 is installed around the outer wall of the first rotating rod 301, the second gear 302 is meshed with the first gear 202, the first sprocket 303 is installed around the outer wall of the first sprocket 303, the adjusting mechanism 4 is installed on the inner wall of the base 1, the inner wall of the adjusting mechanism 4 is movably provided with a second rotating rod 401, the outer wall of the second rotating rod 401 is provided with two groups of second chain wheels 402 in a surrounding manner, the outer wall of the second chain wheel 402 is provided with a chain 304 in a surrounding manner, the outer wall of the second rotating rod 401 is provided with a first gear 403 in a surrounding manner, the inner wall of the adjusting mechanism 4 is provided with a first motor 404, the output end of the first motor 404 is provided with a second gear 405, the second gear 405 is meshed with the first gear 403, the conventional display is mainly fixedly arranged during installation, thus the use height of the display is difficult to adjust according to actual needs, people with different heights are inconvenient to watch and use, the use of the display is easy to be influenced, the first motor 404 is started, the output end of the first motor 404 drives the second rotating rod 401 to rotate through the second gear 405 and the first gear 403 meshed with the first gear 403, the second bull stick 401 rotates and drives chain 304 through second sprocket 402 and move chain 304 and remove and drive first bull stick 301 rotation through first sprocket 303, first bull stick 301 rotates and drives threaded rod 201 rotation through second gear 302 and the first gear 202 that meshes with it, threaded rod 201 rotates and makes its outer wall around the installation end 203 of meshing installation drive the show ware body 102 and remove, thereby make the show ware accomplish the lift operation, and then make the show ware can be according to the different adjustment show ware's of application demand and watching personnel height, make the application of show ware can be more nimble, increase its application scope, the practicality of show ware has been improved.
Referring to fig. 1, 4 and 5, a dust removing structure 5 is installed at the bottom of a display body 102, a limit rod 501 is installed on the inner wall of the dust removing structure 5, a screw rod 502 is movably installed on the inner wall of the dust removing structure 5, a second motor 503 is installed on the outer wall of the dust removing structure 5, the output end of the second motor 503 is fixedly installed on the inner wall of the screw rod 502, a dust removing component 6 is installed on the inner wall of the dust removing structure 5, the limit rod 501 movably penetrates through the inner wall of the dust removing component 6, the screw rod 502 penetrates through the inner wall of the dust removing component 6 and is meshed with the inner wall of the dust removing component 6, a third motor 601 is installed on the inner wall of the dust removing component 6, a first gear 603 is installed on the output end of the third motor 601 of the installation component 602, the first gear 603 is located on the inner wall of the installation component 602, a rod body 7 is installed on the inner wall of the installation component 602, a second gear 702 is installed on the bottom end of the rod body 7, the gear number two 702 is meshed with the gear number one 603, the outer wall of the rod body 7 is provided with a dust removing end 701 in a surrounding manner, the dust removing end 701 is positioned on the outer wall of the dust removing structure 5 and is attached to the outer wall of the display body 102, the conventional engineering management display is mostly applied outdoors, when the display is used for a long time, external dust is easy to adhere to the display, the display effect and the watching effect of the display are influenced, the second motor 503 is started, the output end of the second motor 503 drives the screw rod 502 to rotate, the screw rod 502 rotates to enable the dust removing assembly 6 meshed with the screw rod 502 to move, the limiting rod 501 is arranged to limit the dust removing assembly 6, the dust removing assembly 6 moves to drive the dust removing end 701 through the mounting assembly 602, the third motor 601 is started, the output end of the third motor drives the rod body 7 to rotate through the gear number one 603 and the gear number two 702 meshed with the screw rod body 7 to drive the dust removing end 701 to rotate, along with the rotation and removal of the dust removing end 701, dust adsorbed on the outer wall of the display is cleaned, so that the display is kept clean, and the display effect and the watching effect of the display are prevented from being influenced by massive adsorption of the dust.
The working principle is that the display body 102 is a progress display for engineering management, which is mainly used for displaying engineering progress, the supporting end 101 and the base 1 are used for providing supporting and fixing functions for the display body 102, the traditional display is mainly fixedly installed during installation, so that the use height of the display is difficult to adjust according to actual needs, people with different heights are inconvenient to watch and use, the use of the display is easy to be influenced, the first motor 404 is started, the output end of the first motor 404 drives the second rotating rod 401 to rotate through the second gear 405 and the first gear 403 meshed with the second gear 405, the second rotating rod 401 drives the chain 304 to move through the second sprocket 402 to drive the first rotating rod 301 to rotate through the first sprocket 303, the first rotating rod 301 rotates through the second gear 302 and the first gear 202 meshed with the first gear 202 to drive the threaded rod 201 to rotate, the threaded rod 201 rotates to enable the outer wall of the threaded rod 201 to rotate around the installation end 203 which is meshed with the threaded rod to drive the display body 102 to move, so that the display can be lifted, the height of the display can be adjusted according to different application requirements and different observers, the application range of the display can be more flexible, the practicability of the display is improved, the conventional engineering management display is mostly applied outdoors, when the display is used for a long time, external dust is easily attached to the display, the display effect and the watching effect of the display are influenced, the second motor 503 is started, the output end of the second motor drives the screw rod 502 to rotate, the screw rod 502 rotates to enable the dust removing assembly 6 meshed with the screw rod 502 to move, the limit rod 501 is installed to limit the dust removing assembly 6, the dust removing assembly 6 moves through the installation assembly 602 to drive the dust removing end 701 to move, the third motor 601 starts, and the output end drives the rod body 7 to rotate through the first gear 603 and the second gear 702 meshed with the first gear, and the rod body 7 rotates to drive the dust removing end 701 to rotate, so that dust absorbed by the outer wall of the display can be cleaned along with the rotation and movement of the dust removing end 701, the display is kept clean, and the display effect and the watching effect of the display are prevented from being influenced by a large amount of dust absorption.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. A progress display, comprising:
the display device comprises a base (1), wherein two groups of supporting ends (101) are arranged at the top of the base (1), and a display body (102) is arranged on the outer wall of each supporting end (101);
the adjusting structure (2), adjusting structure (2) is installed to the inner wall of supporting end (101), threaded rod (201) is installed to the inner wall movable mounting of adjusting structure (2), first gear (202) are installed to the bottom of threaded rod (201), two sets of installing ends (203) are installed to the outer wall of show ware body (102), installing ends (203) are located the inner wall of adjusting structure (2), and threaded rod (201) run through in installing ends (203) the inner wall and mesh with it, adjusting component (3) is installed to the inner wall of supporting end (101), and first gear (202) are located the inner wall of adjusting component (3), first rotating rod (301) is installed to the inner wall movable mounting of adjusting component (3), second gear (302) are installed around the outer wall of first rotating rod (301), and second gear (302) meshes with first gear (202), the outer wall of first rotating rod (301) is around having first sprocket (303), the outer wall of first sprocket (304) is installed around chain (1), the second sprocket (401) are installed around adjusting mechanism (401) are installed to the outer wall of second rotating rod (4), and chain (304) are installed around the outer wall of second sprocket (402), no. one gear (403) is installed around the outer wall of second bull stick (401), first motor (404) are installed to the inner wall of adjustment mechanism (4), no. two gear (405) are installed to the output of first motor (404), and No. two gear (405) mesh with No. one gear (403).
2. A schedule display as claimed in claim 1, wherein: the bottom of the display body (102) is provided with a dust removing structure (5).
3. A schedule presenter according to claim 2 wherein: the utility model discloses a dust removal structure, including dust removal structure (5), gag lever post (501) is installed to the inner wall of dust removal structure (5), and inner wall movable mounting of dust removal structure (5) has lead screw (502), and second motor (503) is installed to the outer wall of dust removal structure (5), and the output fixed mounting of second motor (503) is to the inner wall of lead screw (502).
4. A schedule presenter according to claim 2 wherein: the inner wall of the dust removing structure (5) is provided with a dust removing assembly (6), a limiting rod (501) movably penetrates through the inner wall of the dust removing assembly (6), and a screw rod (502) penetrates through the inner wall of the dust removing assembly (6) and is meshed with the inner wall of the dust removing assembly.
5. A schedule display as defined in claim 4, wherein: the inner wall of dust removal subassembly (6) is installed third motor (601), and installation component (602) is installed to the one end of dust removal subassembly (6) third motor (601) output is installed gear number one (603), and gear number one (603) is located the inner wall of installation component (602).
6. A schedule display as defined in claim 5, wherein: the inner wall of the mounting assembly (602) is provided with a rod body (7) in a penetrating way.
7. A schedule display as defined in claim 6, wherein: the bottom of body of rod (7) is installed gear No. two (702), and gear No. two (702) and gear No. one (603) mesh, and outer wall of body of rod (7) is encircled and is installed dust removal end (701), and dust removal end (701) are located the outer wall of dust removal structure (5) and laminate mutually with the outer wall of show ware body (102).
CN202320808511.0U 2023-04-13 2023-04-13 Progress display device Active CN219510495U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320808511.0U CN219510495U (en) 2023-04-13 2023-04-13 Progress display device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320808511.0U CN219510495U (en) 2023-04-13 2023-04-13 Progress display device

Publications (1)

Publication Number Publication Date
CN219510495U true CN219510495U (en) 2023-08-11

Family

ID=87530456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320808511.0U Active CN219510495U (en) 2023-04-13 2023-04-13 Progress display device

Country Status (1)

Country Link
CN (1) CN219510495U (en)

Similar Documents

Publication Publication Date Title
CN219510495U (en) Progress display device
CN112609540B (en) Road surface tamping device for municipal road construction
CN210300390U (en) Model bears frame for architectural structure design
CN215006477U (en) Artificial intelligence data storage device
CN216133614U (en) Internet of things controlled outdoor LED display screen
CN214008614U (en) Double-sided liquid crystal display screen
CN212156552U (en) Over-and-under type projecting apparatus convenient to installation
CN211237429U (en) Geometric model display device for mathematical teaching
CN209743939U (en) Computer network teaching experimental device
CN214332223U (en) Multi-person dance teaching interactive projection device
CN217534304U (en) Hidden mounting structure of slide rail screen rail
CN216728736U (en) Video conference terminal with dustproof function
CN217951704U (en) Display device for planning path of monorail crane
CN220187753U (en) Environment real-time monitoring device for green construction
CN215495797U (en) Outdoor bus stop display screen with temperature control system
CN215978822U (en) Municipal works construction safety control rail
CN210777489U (en) Sand table for environmental art design
CN216952423U (en) Electronic information signboard of convenient adjustment
CN221668457U (en) Report form display column for engineering cost
CN211201209U (en) Partition plate device of taking one's place
CN220160623U (en) Display screen for video monitoring
CN217276503U (en) Noise pollution source monitoring and early warning device for construction site
CN221424482U (en) Security protection monitoring support of security protection facility
CN214253643U (en) Guide device for territorial space planning model
CN214098917U (en) Sand table for architectural design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant