CN219507477U - Construction handling equipment - Google Patents

Construction handling equipment Download PDF

Info

Publication number
CN219507477U
CN219507477U CN202320401649.9U CN202320401649U CN219507477U CN 219507477 U CN219507477 U CN 219507477U CN 202320401649 U CN202320401649 U CN 202320401649U CN 219507477 U CN219507477 U CN 219507477U
Authority
CN
China
Prior art keywords
fixedly connected
rack
winding
plate
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320401649.9U
Other languages
Chinese (zh)
Inventor
白东轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Water Conservancy Engineering Geological Construction Co ltd
Original Assignee
Gansu Water Conservancy Engineering Geological Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Water Conservancy Engineering Geological Construction Co ltd filed Critical Gansu Water Conservancy Engineering Geological Construction Co ltd
Priority to CN202320401649.9U priority Critical patent/CN219507477U/en
Application granted granted Critical
Publication of CN219507477U publication Critical patent/CN219507477U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to the technical field of pipeline lifting and discloses construction lifting equipment, which comprises two bottom plates, wherein the top of the bottom plates is fixedly connected with supporting rods, the top of each supporting rod is fixedly connected with a supporting plate, and the top of each supporting plate is fixedly connected with a winding mechanism; the winding mechanism comprises two fixing plates, a winding shaft is rotatably connected between one opposite sides of the two fixing plates, winding ropes are fixedly connected with the surface of the winding shaft, the number of the winding ropes is two, and one end of each winding rope is fixedly connected with a placing frame. This construction handling equipment through setting up winding mechanism, places the pipeline behind the rack on, rotates the winding axle for the winding axle carries out the rolling to the winding rope, thereby reaches the effect that drives the rack and remove, and when removing the rack, the telescopic link contracts, leads the rack, thereby increases the stability of rack.

Description

Construction handling equipment
Technical Field
The utility model relates to the technical field of pipeline lifting, in particular to construction lifting equipment.
Background
The hydraulic engineering mainly researches basic knowledge and skills in aspects of engineering hydrology, hydraulic engineering measurement, hydraulic reinforced concrete, hydraulic buildings, engineering drawing and the like, and is used for engineering planning and design, engineering site construction, engineering budget and maintenance of hydraulic equipment in the field of hydraulic engineering, and pipelines are usually required to be transported.
In the application document of the cement pipeline lifting device with the application number of 202120413543.1, the cement pipeline lifting device is provided with the storage battery inside the protection box, so that the use scene is increased, the use of a product difference point is avoided, the control panel is arranged on one side of the first vertical rod, the equipment is controllable, and the use convenience of the product is improved; the lifting device is simple and reasonable in structure, novel in design and simple and convenient to operate, can effectively reduce the arrangement of the lifting rings during manufacturing of cement pipelines, can adapt to cement pipelines with different sizes, has higher practical value, but only depends on one steel wire rope to lift the pipelines, and when the lifting device moves, the pipelines can shake, if the pipelines collide with foreign objects, damage can be caused, and the operation difficulty of a user is increased.
Disclosure of Invention
The utility model aims to provide construction lifting equipment for solving the problems in the background technology.
In order to solve the technical problems, the utility model provides the following technical scheme: the construction lifting equipment comprises two bottom plates, wherein the top of the bottom plates is fixedly connected with supporting rods, the top of each supporting rod is fixedly connected with a supporting plate, and the top of each supporting plate is fixedly connected with a winding mechanism;
the winding mechanism comprises two fixing plates, a winding shaft is rotatably connected between one opposite sides of the two fixing plates, a winding rope is fixedly connected to the surface of the winding shaft, the number of the winding ropes is two, one end of the winding rope is fixedly connected with a placement frame, the top of the placement frame is fixedly connected with a telescopic rod, and the telescopic end of the telescopic rod is fixedly connected with the bottom of the supporting plate.
Through setting up winding mechanism, place the pipeline behind the rack on, rotate the winding axle for the winding axle carries out the rolling to the winding rope, thereby reaches the effect that drives the rack and removes, and when removing the rack, the telescopic link contracts, leads the rack, thereby increases the stability of rack.
Preferably, the surface fixing sleeve of the winding shaft is provided with a bearing, and the outer side of the outer ring of the bearing is fixedly connected with the inner wall of the fixing plate.
Preferably, the top of rack has seted up and has been placed the hole, the bottom of bottom plate is provided with the universal wheel.
Preferably, a motor is fixedly connected to one side of the fixing plate, and the output end of the motor penetrates through the fixing plate and is fixedly connected with the winding shaft.
Preferably, both sides of the placing frame are both connected with positioning rods in a sliding way, and a through hole matched with the positioning rods is formed in one side of the placing frame.
Preferably, the top threaded connection of rack has the gag lever post, the spacing groove that uses with the gag lever post cooperation is seted up at the top of locating lever, the quantity of spacing groove is a plurality of.
Compared with the prior art, the utility model has the following beneficial effects:
firstly, the utility model sets up winding mechanism, after placing the pipeline on the rack, rotates the winding shaft, makes the winding shaft wind the winding rope, thereby achieves the effect of driving the rack to move, and when moving the rack, the telescopic rod contracts, guides the rack, and increases the stability of the rack.
Secondly, the bearing is arranged, and when the winding shaft rotates, the inner ring of the bearing is driven to rotate, so that the effect of conveniently rotating the winding shaft is achieved, and friction is reduced.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a first perspective view of a partial structure of the present utility model;
FIG. 3 is an enlarged view of a portion of the utility model at A in FIG. 2;
fig. 4 is a second perspective view of a partial structure of the present utility model.
Wherein: 1. a bottom plate; 2. a support rod; 3. a support plate; 4. a winding mechanism; 401. a fixing plate; 402. a winding shaft; 403. winding the rope; 404. a placing rack; 405. a telescopic rod; 5. a bearing; 6. placing the hole; 7. a universal wheel; 8. a motor; 9. a positioning rod; 10. a through hole; 11. a limit rod; 12. and a limit groove.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, a construction lifting device comprises a bottom plate 1, wherein the number of the bottom plates 1 is two, a supporting rod 2 is fixedly connected to the top of the bottom plate 1, a supporting plate 3 is fixedly connected to the top of the supporting rod 2, and a winding mechanism 4 is fixedly connected to the top of the supporting plate 3;
the winding mechanism 4 comprises two fixing plates 401, a winding shaft 402 is rotatably connected between one sides of the two fixing plates 401, winding ropes 403 are fixedly connected to the surface of the winding shaft 402, the number of the winding ropes 403 is two, one ends of the winding ropes 403 are fixedly connected with a placing frame 404, the top of the placing frame 404 is fixedly connected with a telescopic rod 405, and the telescopic end of the telescopic rod 405 is fixedly connected with the bottom of the supporting plate 3.
Through above-mentioned technical scheme, through setting up winding mechanism 4, place the pipeline behind on rack 404, rotate winding shaft 402 for winding shaft 402 carries out the rolling to rolling rope 403, thereby reaches the effect that drives rack 404 and removes, and when removing rack 404, telescopic link 405 contracts, leads rack 404, thereby increases rack 404's stability.
Specifically, the surface fixing sleeve of the winding shaft 402 is provided with a bearing 5, and the outer side of the outer ring of the bearing 5 is fixedly connected with the inner wall of the fixing plate 401.
Through above-mentioned technical scheme, through setting up bearing 5, when rotatory to take-up shaft 402, can drive the inner circle of bearing 5 and rotate to reach the effect of being convenient for rotate take-up shaft 402, reduce the friction.
Specifically, the top of the placement frame 404 is provided with a placement hole 6, and the bottom of the bottom plate 1 is provided with a universal wheel 7.
Through above-mentioned technical scheme, place hole 6 through setting up, place the pipeline in the inner chamber of placing hole 6, reach the effect of placing the pipeline.
Specifically, a motor 8 is fixedly connected to one side of the fixing plate 401, and an output end of the motor 8 penetrates through the fixing plate 401 and is fixedly connected with the winding shaft 402.
Through above-mentioned technical scheme, through setting up motor 8, utilize external control switch start motor 8, reach through motor 8 and drive the effect that take-up spool 402 rotated.
Specifically, the positioning rods 9 are slidably connected to two sides of the placement frame 404, and the through holes 10 matched with the positioning rods 9 are formed in one side of the placement frame 404.
Through above-mentioned technical scheme, through setting up the cooperation use of locating lever 9 and through-hole 10, place the pipeline behind the inner chamber of placing hole 6, with locating lever 9 through the inner chamber of through-hole 10 card at the pipeline to reach the effect that carries out spacing to the pipeline.
Specifically, the top threaded connection of rack 404 has gag lever post 11, the spacing groove 12 that cooperates with gag lever post 11 to use is seted up at the top of locating lever 9, the quantity of spacing groove 12 is a plurality of.
Through above-mentioned technical scheme, through setting up the cooperation use of gag lever post 11 and spacing groove 12, use the cooperation of gag lever post 11 and spacing groove 12, remove to the back to the certain position to locating lever 9, with gag lever post 11 card in the inner chamber of spacing groove 12 to reach the effect that carries out spacingly to locating lever 9.
When the device is used, after the pipeline is placed in the inner cavity of the placement hole 6, the positioning rod 9 is clamped in the inner cavity of the pipeline through the through hole 10, so that the effect of limiting the pipeline is achieved, the positioning rod 11 and the limiting groove 12 are matched for use, after the positioning rod 9 is moved to a certain position, the positioning rod 11 is clamped in the inner cavity of the limiting groove 12, the effect of limiting the positioning rod 9 is achieved, after the pipeline is placed on the placement frame 404, the motor 8 is started by utilizing the external control switch, the effect of driving the winding shaft 402 to rotate is achieved through the motor 8, the winding shaft 402 winds the winding rope 403, the effect of driving the placement frame 404 to move is achieved, and when the placement frame 404 is moved, the telescopic rod 405 contracts, the placement frame 404 is guided, and therefore the stability of the placement frame 404 is improved.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. Construction handling equipment, including bottom plate (1), its characterized in that: the number of the bottom plates (1) is two, the top of the bottom plate (1) is fixedly connected with a supporting rod (2), the top of the supporting rod (2) is fixedly connected with a supporting plate (3), and the top of the supporting plate (3) is fixedly connected with a winding mechanism (4);
winding mechanism (4) are including fixed plate (401), the quantity of fixed plate (401) is two, rotates between the one side that two fixed plates (401) are relative and is connected with rolling axle (402), the fixed surface of rolling axle (402) is connected with rolling rope (403), the quantity of rolling rope (403) is two, the one end fixedly connected with rack (404) of rolling rope (403), the top fixedly connected with telescopic link (405) of rack (404), the flexible end of telescopic link (405) and the bottom fixed connection of backup pad (3).
2. A construction hoist as claimed in claim 1, wherein: the surface fixing sleeve of the winding shaft (402) is provided with a bearing (5), and the outer side of the outer ring of the bearing (5) is fixedly connected with the inner wall of the fixing plate (401).
3. A construction hoist as claimed in claim 1, wherein: the top of rack (404) has seted up and has placed hole (6), the bottom of bottom plate (1) is provided with universal wheel (7).
4. A construction hoist as claimed in claim 1, wherein: one side of the fixed plate (401) is fixedly connected with a motor (8), and the output end of the motor (8) penetrates through the fixed plate (401) and is fixedly connected with the winding shaft (402).
5. A construction hoist as claimed in claim 1, wherein: both sides of rack (404) all sliding connection has locating lever (9), through-hole (10) with locating lever (9) cooperation use are seted up to one side of rack (404).
6. A construction hoist as claimed in claim 5, wherein: the top threaded connection of rack (404) has gag lever post (11), limit groove (12) that use with gag lever post (11) cooperation are seted up at the top of locating lever (9), the quantity of limit groove (12) is a plurality of.
CN202320401649.9U 2023-03-07 2023-03-07 Construction handling equipment Active CN219507477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320401649.9U CN219507477U (en) 2023-03-07 2023-03-07 Construction handling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320401649.9U CN219507477U (en) 2023-03-07 2023-03-07 Construction handling equipment

Publications (1)

Publication Number Publication Date
CN219507477U true CN219507477U (en) 2023-08-11

Family

ID=87547181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320401649.9U Active CN219507477U (en) 2023-03-07 2023-03-07 Construction handling equipment

Country Status (1)

Country Link
CN (1) CN219507477U (en)

Similar Documents

Publication Publication Date Title
CN203729592U (en) Vertical bush hammering equipment
CN105460826A (en) Lifting device for electric power maintenance
CN219507477U (en) Construction handling equipment
CN113006240B (en) Municipal road sewer pipeline construction equipment and method
CN211226168U (en) A safe lift for housing construction
CN212503740U (en) Cable trench cover lifts by crane instrument
CN211998553U (en) Small-size machine of lifting in civil engineering
CN206395761U (en) A kind of jack lift for small building
CN217708723U (en) Lifting mechanism for stacker
CN217148283U (en) Material transfer device is used in architectural decoration construction
CN214360009U (en) Material lifting device for building decoration
CN211004272U (en) Electromechanical lifting device
CN212982348U (en) Building materials elevating gear convenient to unload for building
CN208648628U (en) A kind of movable tube lifting device
CN114059780A (en) Movable ALC light partition plate installation device
CN112811346A (en) Totally closed installation device for sound barrier
CN112772243A (en) Landscape architecture engineering is with trees rope woolding device
CN210029833U (en) Lifting equipment for building construction
CN218025093U (en) Material lifting device for civil construction
CN216764177U (en) Reinforcing bar lifting device for building engineering
CN221057942U (en) Electric power engineering electromechanical device overhauls device
CN219507508U (en) Municipal administration concrete apron hoist device
CN219991029U (en) Auxiliary stand for building electromechanical installation engineering
CN211871269U (en) Small-size jacking equipment is used in construction
CN215798061U (en) Portable construction lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant