CN219493271U - Pipe jacking construction device - Google Patents

Pipe jacking construction device Download PDF

Info

Publication number
CN219493271U
CN219493271U CN202320920599.5U CN202320920599U CN219493271U CN 219493271 U CN219493271 U CN 219493271U CN 202320920599 U CN202320920599 U CN 202320920599U CN 219493271 U CN219493271 U CN 219493271U
Authority
CN
China
Prior art keywords
threaded
construction
block
placing
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320920599.5U
Other languages
Chinese (zh)
Inventor
赵高鹏
郑光灿
陈慧之
夏旭东
彭浩
方明立
陈巍
陶帅
陈诗华
邬俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Group Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Group Co Ltd filed Critical Anhui Road and Bridge Engineering Group Co Ltd
Priority to CN202320920599.5U priority Critical patent/CN219493271U/en
Application granted granted Critical
Publication of CN219493271U publication Critical patent/CN219493271U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a pipe jacking construction device which comprises a placing construction plate, wherein a motor is arranged on the placing construction plate, the output end of the motor is connected with a guide rod, the outer side wall of the guide rod is provided with a threaded guide groove, a sliding threaded guide pillar is arranged in the threaded guide groove, a movable block is fixedly connected to the threaded guide pillar, a movable groove is arranged on the placing construction plate, a movable fixed placing block is arranged in the movable groove, a placing hole is arranged on the fixed placing block, a pipeline is arranged in the placing hole, a plurality of discharging holes are formed in a top, a large amount of broken stone and broken sand generated in construction fall into a conveying pipe through the discharging holes, and are transported and discharged under the action of a threaded conveying rod, so that the construction efficiency caused by manual transportation is effectively avoided.

Description

Pipe jacking construction device
Technical Field
The utility model relates to the technical field of pipe jacking construction, in particular to a pipe jacking construction device.
Background
The pipe jacking construction is a non-excavation construction method, which is a pipeline buried construction technology without excavation or with less excavation;
according to the jacking pipe construction device with the reference of application number of CN202010653691.0, a motor of the device rotates to drive a shield cutter head and a connecting block to synchronously rotate, a cam part extrudes a piston plate when the connecting block rotates, the piston plate resets under the action of the elasticity of a spring, so that reciprocating motion of the piston plate is realized, pumping water and squeezing water are continuously completed, water is conveyed into a spray head through a first water pipe in a penetrating manner, a soil layer contacted with the shield cutter head is sprayed, the shield cutter head is flushed, the excavating efficiency is improved, meanwhile, the piston plate and the shield cutter head synchronously work, when the shield cutter head works, the piston plate pumps water and supplies water, when the shield cutter head stops working, the piston plate also stops supplying water, water resources are saved, meanwhile, the phenomenon that the internal soil layer structure is influenced, the ground collapse is caused, and the construction quality and safety are ensured;
when the pipeline is jacked in, a large amount of broken stone and powder sand can be generated in construction by the existing construction device, and most of broken stone and powder sand are required to be manually transported out, so that the construction efficiency is low, and meanwhile, the pipeline cannot be fixed by the existing construction device, so that the pipeline can be moved when laid, and the construction quality is affected.
Therefore, we design a pipe-jacking construction device.
Disclosure of Invention
The utility model aims to solve the problems that crushed stone and silt manual transportation efficiency is low and a construction device cannot fix a pipeline in the prior art, and provides a pipe jacking construction device.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a push pipe construction device, is including placing the construction board, be equipped with the motor on placing the construction board, and the output of motor is connected with the guide arm, the screw thread guide slot has been seted up to the guide arm lateral wall, and is equipped with gliding screw thread guide pillar in the screw thread guide slot, fixedly connected with movable block on the screw thread guide pillar, the fixed piece of placing that has seted up the movable groove on placing the construction board, and be equipped with the removal in the movable groove, be equipped with fixing device on the fixed piece of placing, set up on the fixed piece of placing and placed the hole, and be equipped with the pipeline in the hole of placing, be equipped with construction conveyor on the fixed piece of placing.
Preferably, the fixing device comprises a threaded rod which is fixedly connected with the fixing device through rotation of the placing block, and the threaded rod is connected with an internal thread lifting plate in a threaded manner, and the internal thread lifting plate is lifted through rotation of the threaded rod.
Preferably, the construction conveying device comprises a conveying pipe sleeved in a pipeline, a peripheral motor is fixedly arranged on the placement block, the output end of the peripheral motor is connected with a threaded conveying rod, a plug is fixedly connected to the threaded conveying rod, a plurality of accelerating jacks are fixedly connected to the push bench, a plurality of row holes are formed in the push bench, the peripheral motor provides power for the threaded conveying rod, the threaded conveying rod rotates through the peripheral motor, and the size of the push bench is matched with the diameter of the inner wall of the conveying pipe.
Preferably, the motor powers the guide bar and the guide bar is rotated by the motor.
Preferably, the moving block slides on the threaded guide groove through a threaded guide post.
Preferably, the moving block is fixedly connected with the fixed placement block, and the fixed placement block moves in the moving groove through the moving block.
The beneficial effects of the utility model are as follows:
1. according to the utility model, the plurality of row holes are formed in the top, a large amount of broken stones and broken sand generated in construction fall into the conveying pipe through the row holes, and are transported and discharged under the action of the threaded conveying rod, so that the construction efficiency caused by manual transportation is effectively avoided, and meanwhile, the top is provided with the plurality of accelerating tops, so that the contact area with the land can be increased through the arrangement of the accelerating tops, and the construction efficiency is effectively improved.
2. According to the utility model, the threaded rod is arranged on the fixed placing block, and the internal thread lifting plate is lifted by rotating the threaded rod, so that the pipeline is closed and fixed with the fixed placing block, the construction quality is not affected by movement caused by the fact that the pipeline cannot be fixed, and meanwhile, the pipeline is convenient to fix and lay, so that the working efficiency is effectively improved.
Drawings
Fig. 1 is a schematic structural diagram of a pipe jacking construction device according to the present utility model;
fig. 2 is a sectional view of a pipe jacking construction device according to the present utility model;
FIG. 3 is a schematic view of a moving apparatus in a pipe-jacking construction apparatus;
fig. 4 is a schematic structural view of a construction conveying device in the pipe-jacking construction device.
In the figure: the construction method comprises the steps of 1 placing a construction plate, 2 motors, 3 guide rods, 4 thread guide grooves, 5 thread guide columns, 6 moving blocks, 7 fixing and placing blocks, 8 threaded rods, 9 internal thread lifting plates, 10 pipelines, 11 conveying pipes, 12 peripheral motors, 13 thread conveying rods, 14 top heads, 15 accelerating tops and 16 rows of holes.
Detailed Description
Referring to fig. 1-4, a pipe jacking construction device comprises a placing construction plate 1, wherein a motor 2 is arranged on the placing construction plate 1, the output end of the motor 2 is connected with a guide rod 3, the motor 2 provides power for the guide rod 3, and the guide rod 3 rotates through the motor 2;
the outer side wall of the guide rod 3 is provided with a threaded guide groove 4, a sliding threaded guide post 5 is arranged in the threaded guide groove 4, a moving block 6 is fixedly connected to the threaded guide post 5, the moving block 6 slides on the threaded guide groove 4 through the threaded guide post 5, a moving groove is formed in the placement construction plate 1, a moving fixed placement block 7 is arranged in the moving groove, the moving block 6 is fixedly connected with the fixed placement block 7, the fixed placement block 7 moves in the moving groove through the moving block 6, a fixing device is arranged on the fixed placement block 7, a placement hole is formed in the fixed placement block 7, a pipeline 10 is arranged in the placement hole, a construction conveying device is arranged on the fixed placement block 7, the threaded guide post 5 slides in the threaded guide groove 4 due to rotation of the guide rod 3, the moving block 6 fixedly connected with the threaded guide post 5 moves due to rotation of the threaded guide post 5, the fixed placement block 7 fixedly connected with the moving block 6 moves in the moving groove, the pipeline 10 can be quickly moved by the setting of the guide rod 3, and the pipeline 10 can be paved conveniently, so that the working efficiency is effectively improved;
the fixing device comprises a threaded rod 8 which is fixedly connected with the placing block 7 in a rotating manner, the threaded rod 8 is connected with an internal thread lifting plate 9 in a threaded manner, the internal thread lifting plate 9 is lifted through the rotation of the threaded rod 8, a pipeline 10 is sleeved outside a conveying pipe 11 and moves into a placing hole, the threaded rod 8 is rotated, the rotation of the threaded rod 8 enables the internal thread lifting plate 9 which is in threaded connection with the threaded rod 8 to move, and the internal thread lifting plate 9 moves and the fixing placing block 7 are used for fixing the pipeline 10 in a closing manner, so that the construction quality is not affected due to the fact that the pipeline 10 cannot be fixed, meanwhile, the pipeline 10 is convenient to lay due to the fact that the pipeline 10 is fixed, and therefore the working efficiency is effectively improved;
referring to fig. 4, construction conveyor includes conveyer pipe 11 that the pipeline 10 endotheca was established, the peripheral hardware motor 12 of setting on the fixed piece of placing 7, and the output of peripheral hardware motor 12 is connected with screw conveyer pole 13, fixedly connected with top 14 on the screw conveyer pole 13, fixedly connected with is a plurality of acceleration tops 15 on the top 14, a plurality of row's holes 16 of seting up on the top 14, peripheral hardware motor 12 provides power for screw conveyer pole 13, and screw conveyer pole 13 rotates through peripheral hardware motor 12, top 14 size and conveyer pipe 11 inner wall diameter looks adaptation, the discharge hole has been seted up to the one end that the conveyer pipe 11 is close to peripheral hardware motor 12, screw conveyer pole 13 rotates through peripheral hardware motor 12, screw conveyer pole 13's rotation makes the top 14 rotation with screw conveyer pole 13 fixed connection, top 14's rotation makes the acceleration top 15 rotation with top 14 fixed connection, can increase the area of contact with the soil through the setting up of acceleration top 15, thereby the construction efficiency is improved, a large amount of broken sand that the construction falls into conveyer pipe 11 through row's holes 16, a large amount of broken sand is in conveyer pipe 11, a large amount of broken sand has been offered at the screw conveyer pole 13 and has been improved the broken sand and has been carried the broken sand to the effective broken stone and has been put into the broken stone and has been improved the broken stone and has been put into the work efficiency.
The working principle of the utility model is as follows: firstly, a pipeline 10 is sleeved outside a conveying pipe 11 and moves into a placing hole, a threaded rod 8 is rotated, the threaded rod 8 rotates to enable the threaded rod 8 to move with an internal thread lifting plate 9, and the internal thread lifting plate 9 moves and a fixed placing block 7 closes and fixes the pipeline 10, so that the pipeline 10 cannot influence the construction quality due to the fact that the pipeline 10 cannot be fixed, and meanwhile, the pipeline 10 is convenient to fix and lay, so that the working efficiency is effectively improved;
further, the screw conveying rod 13 rotates through the external motor 12, the plug 14 rotates due to the rotation of the screw conveying rod 13, the accelerating roof 15 rotates due to the rotation of the plug 14, the contact area between the accelerating roof 15 and the land can be increased through the arrangement of the accelerating roof 15, so that the construction efficiency is effectively improved, a large amount of broken stones and broken sand generated in construction fall into the conveying pipe 11 through the row holes 16, and the broken stones and the broken sand are conveyed to the discharge holes through the screw conveying rod 13, so that the conveying speed is effectively improved, and the working efficiency is improved;
further, the guide rod 3 rotates through the motor 2, the rotation of the guide rod 3 enables the threaded guide post 5 to slide in the threaded guide groove 4, the rotation of the threaded guide post 5 enables the moving block 6 to move, the moving block 6 enables the fixed placing block 7 to move in the moving groove, the moving of the fixed placing block 7 enables the pipeline to move, the arrangement of the guide rod 3 can quickly move the pipeline 10, so that the pipeline 10 is paved, and the working efficiency is effectively improved.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (6)

1. The utility model provides a push pipe construction device, includes places construction board (1), its characterized in that, be equipped with motor (2) on placing construction board (1), and the output of motor (2) is connected with guide arm (3), screw thread guide groove (4) have been seted up to guide arm (3) lateral wall, and are equipped with gliding screw thread guide pillar (5) in screw thread guide groove (4), fixedly connected with movable block (6) on screw thread guide pillar (5), set up the movable groove on placing construction board (1), and be equipped with fixed placing block (7) of removal in the movable groove, be equipped with fixing device on the fixed placing block (7), set up on the fixed placing block (7) and placed the downthehole pipeline (10) that is equipped with, be equipped with construction conveyor on the fixed placing block (7).
2. The pipe jacking construction device according to claim 1, wherein the fixing device comprises a threaded rod (8) which is fixedly connected with the placement block (7) in a rotating mode, the threaded rod (8) is connected with an internal thread lifting plate (9) in a threaded mode, and the internal thread lifting plate (9) is lifted through the threaded rod (8) in a rotating mode.
3. The pipe jacking construction device according to claim 2, characterized in that the construction conveying device comprises a conveying pipe (11) sleeved in a pipeline (10), a peripheral motor (12) arranged on the fixed placement block (7) is connected with a threaded conveying rod (13) at the output end of the peripheral motor (12), a jacking head (14) is fixedly connected to the threaded conveying rod (13), a plurality of accelerating jacks (15) are fixedly connected to the jacking head (14), a plurality of row holes (16) are formed in the jacking head (14), the peripheral motor (12) provides power for the threaded conveying rod (13), the threaded conveying rod (13) rotates through the peripheral motor (12), and the size of the jacking head (14) is matched with the diameter of the inner wall of the conveying pipe (11).
4. A pipe jacking construction device according to claim 1, characterized in that the motor (2) powers the guide bar (3), and that the guide bar (3) is rotated by the motor (2).
5. A pipe jacking construction device according to claim 1, characterized in that the moving block (6) slides on the threaded guide groove (4) through the threaded guide post (5).
6. The pipe jacking construction device according to claim 1, wherein the moving block (6) is fixedly connected with the fixed placement block (7), and the fixed placement block (7) moves in the moving groove through the moving block (6).
CN202320920599.5U 2023-04-20 2023-04-20 Pipe jacking construction device Active CN219493271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320920599.5U CN219493271U (en) 2023-04-20 2023-04-20 Pipe jacking construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320920599.5U CN219493271U (en) 2023-04-20 2023-04-20 Pipe jacking construction device

Publications (1)

Publication Number Publication Date
CN219493271U true CN219493271U (en) 2023-08-08

Family

ID=87513517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320920599.5U Active CN219493271U (en) 2023-04-20 2023-04-20 Pipe jacking construction device

Country Status (1)

Country Link
CN (1) CN219493271U (en)

Similar Documents

Publication Publication Date Title
CN107926217A (en) A kind of forestry plant digging apparatus
CN207612589U (en) Forestry plant digging apparatus
CN212359850U (en) Spraying dust-settling device for coal mining
CN219493271U (en) Pipe jacking construction device
CN102182180A (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN110924861A (en) Walking type omnibearing rotary hydraulic pile foundation drilling machine
CN108532656B (en) A kind of information-based inclination correction method of building automatic dynamic forced landing jacking
CN108526215B (en) Portable normal position soil prosthetic devices
CN108104108B (en) Construction equipment and method for shallow in-situ solidification of waste sludge
CN113846664B (en) Continuous soil-taking and sinking machine for non-drainage open caisson
CN206888053U (en) Remove mud device in a kind of river course
CN207290549U (en) Barrette linear cutting equipment
CN213508317U (en) Hydraulic engineering construction supports protector
CN106088195A (en) A kind of small-sized solar water conservancy row's silt device
CN112177564B (en) High-pressure jet grouting system for building underground concealed reservoir and building method
CN108589715B (en) Construction method for taking soil, spraying and stirring cement soil pile
CN109630114B (en) Double-lane chain type filling and stoping arrangement structure
CN213077894U (en) Earth dust suppression device
CN109184724B (en) Construction device and method for pushing open cut method
CN214886823U (en) Drilling equipment for injection type reservoir seepage-proofing body construction in northwest high and cold regions
CN209891534U (en) Building block
CN216043715U (en) Main jacking device for pipe jacking construction by pipe curtain underground excavation method
CN217915936U (en) Spray set is used in roof beam board maintenance
CN210658500U (en) Breaking hammer convenient to hoist and mount
CN219176349U (en) Wet spraying equipment for tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant