CN219490963U - Tubular pile top repairing support - Google Patents

Tubular pile top repairing support Download PDF

Info

Publication number
CN219490963U
CN219490963U CN202320802251.6U CN202320802251U CN219490963U CN 219490963 U CN219490963 U CN 219490963U CN 202320802251 U CN202320802251 U CN 202320802251U CN 219490963 U CN219490963 U CN 219490963U
Authority
CN
China
Prior art keywords
pile
hack lever
repair
replacement
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320802251.6U
Other languages
Chinese (zh)
Inventor
黄瑞华
张敬伟
张凯
张宜兵
周郁兵
徐冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Original Assignee
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd, CCCC Third Harbor Engineering Co Ltd filed Critical No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
Priority to CN202320802251.6U priority Critical patent/CN219490963U/en
Application granted granted Critical
Publication of CN219490963U publication Critical patent/CN219490963U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of pile top repair brackets, and discloses a pile top repair bracket of a tubular pile, which comprises the following components: repair pile cap and two hack levers, two be provided with fixed subassembly between the hack lever, two the opposite face of hack lever all is provided with the clamp splice, two the opposite face of clamp splice all is connected with the slipmat, two the top of hack lever all is provided with the replacement layer board spare, the replacement layer board spare is located the top of clamp splice. This support is repaired at tubular pile bolck is through setting up two hack levers, fixed subassembly, coupling assembling and replacement bracket piece, and two hack levers are fixed to the pile body through fixed subassembly on, carry out the centre gripping to the pile body through the clamp splice, select replacement bracket piece according to the diameter size of pile body, the replacement bracket piece is installed to on the hack lever, and the replacement bracket piece can hold and repair the pile cap, makes it can not slide at the surface of pile body, conveniently carries out spacing to the position of drum steel hoop.

Description

Tubular pile top repairing support
Technical Field
The utility model relates to the technical field of pile top repair brackets, in particular to a pile top repair bracket for a tubular pile.
Background
In pile body installation, the pile bolck is usually hoist and mount or hammering stress point, consequently need repair the pile bolck after the installation, disclose a pile cap for pile head repair in the patent document of CN201567571U, include: the annular end plate is sleeved with a cylindrical steel hoop, the surface of the annular end plate is coplanar with the end face of the cylindrical steel hoop, the annular end plate is connected with the cylindrical steel hoop, and a kidney-shaped connecting hole is formed in the annular end plate. Compared with the prior art, the method has the following advantages: the special pile cap is sleeved on the damaged pile head, and the pile cap is adjusted to be horizontal, so that epoxy resin concrete filled in the damaged position of the pile head is integrated, the holding force from outside to inside is achieved, the strength of the whole pile head is increased, and the repair quality of the damaged pile head is improved and ensured; the outer diameter of the cylindrical steel hoop is slightly larger than that of the annular end plate, and the welding seam can be full by using the annular ribs for welding, so that no air holes are generated.
The outer diameter of the cylindrical steel hoop of the device is slightly larger than the outer diameter of the pile body, the cylindrical steel hoop is easy to slide on the surface of the pile body when sleeved on the pile body, and the position of the cylindrical steel hoop is inconvenient to limit.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a tubular pile top repairing support, which solves the problems mentioned in the background.
The utility model provides the following technical scheme: a tubular pile top repair stent comprising: repair pile cap and two hack levers, two be provided with fixed subassembly between the hack lever, two the opposite face of hack lever all is provided with the clamp splice, two the opposite face of clamp splice all is connected with the slipmat, two the top of hack lever all is provided with the replacement pallet piece, the replacement pallet piece is located the top of clamp splice, and is provided with coupling assembling between replacement pallet piece and the hack lever, repair pile cap is located the top of replacement pallet piece.
Preferably, the radius of the inner wall of the replacement pallet element is smaller than or equal to the radius of the pile cap.
Preferably, the connecting assembly comprises a connecting plate and a connecting seat, a movable groove is formed in the surface of the connecting plate, a limiting elastic piece is arranged on the inner wall of the movable groove, the connecting seat is connected to the surface of the hack lever, a through groove is formed in the surface of the connecting seat, and the limiting elastic piece is clamped on the inner wall of the through groove.
Preferably, the number of the fixing components is two, and the two fixing components are symmetrically arranged by taking a central vertical plane passing through the hack lever as a symmetrical plane.
Preferably, the fixing component comprises a fixing screw, a through hole is formed in the surface of the hack lever, the inner wall of the through hole is movably connected with the surface of the fixing screw, nuts are connected with the two ends of the fixing screw in a threaded mode, a gasket is arranged between the nuts and the fixing screw, and the gasket is sleeved on the surface of the fixing screw.
Preferably, the inner wall of the through hole is provided with a limit groove, the inner wall of the limit groove is provided with a spring, the spring is sleeved on the surface of the fixing screw, and one end of the spring is movably connected with the surface of the gasket.
Preferably, the frame bar is internally provided with a reinforced steel plate.
Compared with the prior art, the utility model has the following beneficial effects:
1. this support is repaired at tubular pile bolck is through setting up two hack levers, fixed subassembly, coupling assembling and replacement bracket piece, and two hack levers are fixed to the pile body through fixed subassembly on, carry out the centre gripping to the pile body through the clamp splice, select replacement bracket piece according to the diameter size of pile body, the replacement bracket piece is installed to on the hack lever, and the replacement bracket piece can hold and repair the pile cap, makes it can not slide at the surface of pile body, conveniently carries out spacing to the position of drum steel hoop.
2. This support is repaired at tubular pile bolck through setting up the reinforcing steel plate, and fixed subassembly can be bent the both ends of hack lever when fastening the hack lever, avoids the hack lever to be broken through setting up the reinforcing steel plate, improves the security of use.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic view of a fixing assembly of the present utility model in a top-down view;
FIG. 3 is an enlarged schematic view of the structure of FIG. 2A according to the present utility model;
FIG. 4 is a schematic side sectional view of the connection assembly of the present utility model;
FIG. 5 is an enlarged schematic view of the structure of FIG. 4B according to the present utility model;
fig. 6 is a schematic side sectional view of the hack lever of the present utility model.
In the figure: 1. repairing the pile cap; 2. a hack lever; 3. a fixing assembly; 31. a fixed screw; 32. a nut; 33. a gasket; 34. a limit groove; 35. a spring; 4. clamping blocks; 5. an anti-slip pad; 6. replacing the pallet element; 7. a connection assembly; 71. a connecting plate; 72. a connecting seat; 73. a movable groove; 74. a limiting spring plate; 75. a through groove; 8. reinforcing the steel plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, a tubular pile top repair stand, comprising: repair pile cap 1 and two hack levers 2, the inside of hack lever 2 is provided with strengthening steel plate 8, be provided with fixed subassembly 3 between two hack levers 2, the opposite face of two hack levers 2 all is provided with clamp splice 4, the opposite face of two clamp splice 4 all is connected with slipmat 5, the top of two hack levers 2 all is provided with replacement pallet piece 6, replacement pallet piece 6 is located the top of clamp splice 4, and be provided with coupling assembling 7 between replacement pallet piece 6 and the hack lever 2, repair pile cap 1 is located the top of replacement pallet piece 6, the inner wall radius of replacement pallet piece 6 is less than or equal to the radius of pile cap.
The connecting assembly 7 comprises a connecting plate 71 and a connecting seat 72, wherein a movable groove 73 is formed in the surface of the connecting plate 71, a limiting elastic piece 74 is arranged on the inner wall of the movable groove 73, the connecting seat 72 is connected to the surface of the hack lever 2, a through groove 75 is formed in the surface of the connecting seat 72, and the limiting elastic piece 74 is clamped on the inner wall of the through groove 75.
Wherein; the quantity of fixed subassembly 3 is two, two fixed subassemblies 3 are the symmetry setting of plane of symmetry with the center vertical face through hack lever 2, fixed subassembly 3 includes fixing screw 31, the through-hole has been seted up on the surface of hack lever 2, and the inner wall of through-hole and the surface swing joint of fixing screw 31, the equal threaded connection in both ends of fixing screw 31 has nut 32, be provided with gasket 33 between nut 32 and the fixing screw 31, the surface at fixing screw 31 is cup jointed to gasket 33, spacing groove 34 has been seted up to the inner wall of through-hole, the inner wall of spacing groove 34 is provided with spring 35, spring 35 cup joints the surface at fixing screw 31, and the one end and the surface swing joint of gasket 33, pass the through-hole on hack lever 2 in proper order through fixing screw 31, install gasket 33 and nut 32 in proper order on the fixing screw 31, after tightening nut 32, spring 35 is compressed to the inside of spacing groove 34 by gasket 33, spring 35 tends to stretch back to push away hack lever 2, make two hack levers 2 promote clamp block 4 and slipmat 5 more inseparable and the surface of tubular pile.
During the use, select replacement bracket piece 6 to piece replacement bracket piece 6 has gone up, the connecting plate 71 pegs graft to the inner wall of connecting seat 72, spacing shell fragment 74 joint on the connecting plate 71 is to the inner wall of logical groove 75, and then fixed replacement bracket piece 6, the slipmat 5 with splint inner wall and the surface contact of tubular pile, pass the through-hole on hack lever 2 in proper order through fixing screw 31, install gasket 33 and nut 32 in proper order on the fixing screw 31, fix hack lever 2, screw up nut 32, and then fix two hack levers 2, spring 35 is compressed to the inside of spacing groove 34 by gasket 33, spring 35 tends to stretch back and pushes away tight hack lever 2, make two hack levers 2 promote clamp splice 4 and antiskid piece more inseparable and the surface of tubular pile.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a support is repaired to tubular pile stake, which is characterized in that includes: repair pile cap (1) and two hack lever (2), two be provided with fixed subassembly (3) between hack lever (2), two the opposite face of hack lever (2) all is provided with clamp splice (4), two the opposite face of clamp splice (4) all is connected with slipmat (5), two the top of hack lever (2) all is provided with replacement bracket piece (6), replacement bracket piece (6) are located the top of clamp splice (4), and are provided with coupling assembling (7) between replacement bracket piece (6) and hack lever (2), repair pile cap (1) are located the top of replacement bracket piece (6).
2. A tubular pile top repair stent according to claim 1, characterised in that the radius of the inner wall of the replacement pallet element (6) is less than or equal to the radius of the pile cap.
3. The pipe pile top repairing support according to claim 1, wherein the connecting assembly (7) comprises a connecting plate (71) and a connecting seat (72), a movable groove (73) is formed in the surface of the connecting plate (71), a limiting elastic piece (74) is arranged on the inner wall of the movable groove (73), the connecting seat (72) is connected to the surface of the support rod (2), a through groove (75) is formed in the surface of the connecting seat (72), and the limiting elastic piece (74) is clamped on the inner wall of the through groove (75).
4. A tubular pile top repair stand according to claim 1, characterized in that the number of the fixing assemblies (3) is two, and the two fixing assemblies (3) are symmetrically arranged with a central vertical plane passing through the frame rod (2) as a symmetry plane.
5. The pipe pile top repairing support according to claim 4, wherein the fixing assembly (3) comprises a fixing screw (31), a through hole is formed in the surface of the support rod (2), the inner wall of the through hole is movably connected with the surface of the fixing screw (31), nuts (32) are connected with two ends of the fixing screw (31) in a threaded mode, a gasket (33) is arranged between the nuts (32) and the fixing screw (31), and the gasket (33) is sleeved on the surface of the fixing screw (31).
6. The pipe pile top repair support according to claim 5, wherein a limit groove (34) is formed in the inner wall of the through hole, a spring (35) is arranged on the inner wall of the limit groove (34), the spring (35) is sleeved on the surface of the fixing screw (31), and one end of the spring (35) is movably connected with the surface of the gasket (33).
7. A tubular pile top repair stent according to claim 1, characterized in that the interior of the hack lever (2) is provided with a reinforcing steel plate (8).
CN202320802251.6U 2023-04-12 2023-04-12 Tubular pile top repairing support Active CN219490963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320802251.6U CN219490963U (en) 2023-04-12 2023-04-12 Tubular pile top repairing support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320802251.6U CN219490963U (en) 2023-04-12 2023-04-12 Tubular pile top repairing support

Publications (1)

Publication Number Publication Date
CN219490963U true CN219490963U (en) 2023-08-08

Family

ID=87507534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320802251.6U Active CN219490963U (en) 2023-04-12 2023-04-12 Tubular pile top repairing support

Country Status (1)

Country Link
CN (1) CN219490963U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118461592A (en) * 2024-07-11 2024-08-09 安徽金美亚新型建材集团有限公司 Quick patching device of precast pile head

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118461592A (en) * 2024-07-11 2024-08-09 安徽金美亚新型建材集团有限公司 Quick patching device of precast pile head
CN118461592B (en) * 2024-07-11 2024-11-08 安徽金美亚新型建材集团有限公司 Quick patching device of precast pile head

Similar Documents

Publication Publication Date Title
CN219490963U (en) Tubular pile top repairing support
CN210978085U (en) Shock absorber tensioning connecting device
CN116393605A (en) Appearance correcting device for iron mold sand-lined castings
CN220354814U (en) Supporting device for repairing lamp bracket by ultraviolet light curing of pipeline
CN212361343U (en) Installing support and LED display device
CN211437623U (en) Fastening tool for aluminum bar handle
CN219138470U (en) Wall reinforcing device of industrial building structure
CN207106090U (en) Front plate spring support
CN221171305U (en) Pipeline fixing device
CN210661679U (en) Effectual auto oil pipe support of shock attenuation
CN220286773U (en) Pipe hoop for pipeline installation
CN213689179U (en) Clamp for fatigue test of glass fiber reinforced plastic sand inclusion pipe
CN214868373U (en) Car seat welding jig
CN220662212U (en) Novel rear transverse thrust rod mounting bracket structure of new energy automobile
CN221348205U (en) Building construction drainage pipeline clamp
CN105752168B (en) A kind of manufacture method of fender branch seat assembly
CN220622982U (en) Fixing frame with multi-size installation function
CN206668376U (en) Automobile exhaust pipe and applied to the connector on the blast pipe
CN109794881A (en) A kind of novel oil damper protective cover and piston rod device for screwing up
CN210288087U (en) Easy-to-detach Bailey sheet
CN116123379A (en) Pneumatic high-pressure-difference multistage regulating valve with anti-vibration and anti-shake effects
CN221763423U (en) Ceiling lamp conversion frame
CN111335996B (en) Anti-deformation automobile corrugated pipe with supporting structure
CN220792301U (en) Pipeline auxiliary connection assembly
CN212353608U (en) Side gas cylinder support assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant