CN219472952U - Supporting structure for chemical engineering pipeline erection - Google Patents

Supporting structure for chemical engineering pipeline erection Download PDF

Info

Publication number
CN219472952U
CN219472952U CN202320296639.3U CN202320296639U CN219472952U CN 219472952 U CN219472952 U CN 219472952U CN 202320296639 U CN202320296639 U CN 202320296639U CN 219472952 U CN219472952 U CN 219472952U
Authority
CN
China
Prior art keywords
backup pad
supporting plate
pipeline
chemical engineering
electric telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320296639.3U
Other languages
Chinese (zh)
Inventor
王吉科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou East China Engineering Co ltd
Original Assignee
Guizhou East China Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou East China Engineering Co ltd filed Critical Guizhou East China Engineering Co ltd
Priority to CN202320296639.3U priority Critical patent/CN219472952U/en
Application granted granted Critical
Publication of CN219472952U publication Critical patent/CN219472952U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a chemical engineering pipeline erection supporting structure in the technical field of pipeline erection, which comprises a supporting plate, wherein the supporting plate comprises a first supporting plate, a second supporting plate is arranged on the rear end face of the first supporting plate, electric telescopic rods are arranged at the tops of the first supporting plate and the second supporting plate, arc-shaped pipeline supporting frames are arranged at the tops of the electric telescopic rods, and storage batteries are arranged at the bottoms of the first supporting plate and the second supporting plate; the backup pad divide into backup pad one and backup pad two, can dismantle movably between the two, and when the connecting block was in the recess, semicircular fixture block can insert in the connecting hole, and backup pad one and backup pad two are in the same place this moment, when need support pipeline with its split according to actual user demand, can lift up backup pad two and be close to backup pad one's one end, make semicircular fixture block break away from in the connecting hole, can carry out the split with backup pad one with backup pad two like this.

Description

Supporting structure for chemical engineering pipeline erection
Technical Field
The utility model relates to the technical field of pipeline erection, in particular to a supporting structure for chemical engineering pipeline erection.
Background
The chemical engineering is because need use the pipeline when constructing, so in order to cooperate the installation and the stability of pipeline, the pipeline support is used to the use that can all form a complete set generally, not only can be convenient install and connect the pipeline through the pipeline support that sets up, also can play the effect of pipeline reinforcement simultaneously, but current pipeline support is inconvenient removal, most all is the manual handling, and some pipeline supports that conveniently remove, stability is not good again, current pipeline support does not possess the function of split simultaneously, can not support the pipeline from two positions according to actual service conditions, thereby lead to the supporting effect not good, for this reason, we propose a chemical engineering pipeline to erect bearing structure.
Disclosure of Invention
The utility model aims to provide a supporting structure for erecting a chemical engineering pipeline, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a bearing structure is erect to chemical engineering pipeline, including the backup pad, the backup pad includes backup pad one, backup pad one's rear end face is provided with backup pad two, backup pad one all is provided with electric telescopic handle with backup pad two's top, electric telescopic handle's top all is provided with arc pipeline support frame, backup pad one all is provided with the battery with backup pad two's bottom, and battery and electric telescopic handle electric connection in same position, backup pad one all is provided with the fixed plate with backup pad two's left and right sides, all vertical the running through is provided with ground on the fixed plate is inserted, backup pad one all is provided with the montant around the bottom of backup pad two, the bottom of montant all is provided with the universal wheel, backup pad one's top rear end face left and right sides all is provided with the recess, backup pad two's preceding terminal surface left and right sides all is provided with the connecting block with recess assorted, the inner chamber bottom of recess all is provided with semi-circular fixture block, all vertical run through on the connecting block be provided with semi-circular fixture block assorted connecting hole.
Further: the arc pipeline support frame is provided with screw holes in the center of the bottom, the top of the electric telescopic rod is provided with an external thread connecting rod matched with the screw holes, and the arc pipeline support frame is movably connected with the electric telescopic rod through the matched screw holes and the external thread connecting rod.
Further: the thickness of connecting block is the half of backup pad two thicknesses, and the preceding terminal surface bottom of connecting block all is provided with the arc contact surface.
Further: the top that inserts all is provided with the rectangular plate, and the rectangular plate inserts fixedly welding with the ground between.
Further: the length, width and thickness of the first support plate and the second support plate are the same, and the front end face and the rear end face of the left side and the right side of the second support plate are provided with handles.
Further: the inner wall of the arc-shaped pipeline supporting frame is adhered with a rubber protection layer, and the thickness of the rubber protection layer is set to be three centimeters.
Compared with the prior art, the utility model has the beneficial effects that:
according to the chemical engineering pipeline erection supporting structure, the universal wheels are arranged on the periphery of the bottom of the supporting plate through the vertical rods, the whole supporting structure can be conveniently, quickly and laborsaving moved through the universal wheels, the universal wheels are provided with the locking structures, a primary stabilizing effect can be achieved, and then the effect of secondary reinforcement can be achieved by inserting the universal wheels into the ground, so that the pipeline erection supporting structure is stably fixed at a proper position; the backup pad divide into backup pad one and backup pad two, can dismantle movably between the two, and when the connecting block was in the recess, semicircular fixture block can insert in the connecting hole, and backup pad one and backup pad two are in the same place this moment, when need support pipeline with its split according to actual user demand, can lift up backup pad two and be close to backup pad one's one end, make semicircular fixture block break away from in the connecting hole, can carry out the split with backup pad one with backup pad two like this.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a right side view of the present utility model;
FIG. 3 is a schematic top view of a first support plate and a second support plate.
In the figure: 1. a support plate; 101. a first supporting plate; 102. a second supporting plate; 2. an electric telescopic rod; 3. arc-shaped pipeline supporting frames; 4. a storage battery; 5. a fixing plate; 6. performing ground insertion; 7. a vertical rod; 8. a universal wheel; 9. a handle; 10. a groove; 11. a connecting block; 12. a semicircular clamping block; 13. and a connection hole.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1:
referring to fig. 1-3, the present utility model provides a technical solution: the utility model provides a chemical engineering pipeline erects bearing structure, including backup pad 1, backup pad 1 includes backup pad one 101, the rear end face of backup pad one 101 is provided with backup pad two 102, the top of backup pad one 101 and backup pad two 102 all is provided with electric telescopic handle 2, electric telescopic handle 2's top all is provided with arc pipeline support frame 3, electric telescopic handle 2 can drive arc pipeline support frame 3 through the flexible and reciprocate, thereby conveniently support the pipeline from different heights, backup pad one 101 and backup pad two 102's bottom all is provided with battery 4, and battery 4 and electric telescopic handle 2 electric connection of co-location, battery 4 can provide electric power for electric telescopic handle 2's work, backup pad one 101 and backup pad two 102's left and right sides all are provided with fixed plate 5, all vertically run through on the fixed plate 5 and be provided with ground and insert 6, the ground plug 6 can increase the stability of the whole structure when being placed, the bottoms of the first supporting plate 101 and the second supporting plate 102 are all provided with the vertical rods 7, the bottoms of the vertical rods 7 are all provided with the universal wheels 8, the universal wheels 8 are all provided with locking structures, the locking structures arranged on the universal wheels 8 are not described in detail in the prior art, the preliminary stabilizing effect can be achieved, the use of the ground plug 6 is convenient, the ground plug 6 can be inserted into the ground after the whole structure is stabilized, the secondary reinforcing effect is achieved, the whole structure can be stably fixed at a proper position, the left side and the right side of the rear end face of the top of the first supporting plate 101 are both provided with grooves 10, the left side and the right side of the front end face of the second supporting plate 102 are both provided with connecting blocks 11 matched with the grooves 10, the bottoms of inner cavities of the grooves 10 are both provided with semicircular clamping blocks 12, all vertically run through on the connecting block 11 be provided with semicircular fixture block 12 assorted connecting hole 13, when need dismantle backup pad two 102 from backup pad one 101, lift up the one end that backup pad two 102 is close to backup pad one 101 (note that the pipeline is not connected and is supported at this moment), semicircular fixture block 12 can break away from in connecting hole 13 this moment, then to keeping away from backup pad one 101 one end removal, make connecting block 11 break away from in the recess 10, so can with backup pad two 102 and backup pad one 101 split to support the pipeline from different positions.
Wherein, preferably, arc pipeline support frame 3's bottom center department all is provided with the screw hole, and electric telescopic handle 2's top all is provided with the external screw thread connecting rod with screw hole assorted, and arc pipeline support frame 3 all passes through assorted screw hole and external screw thread connecting rod swing joint electric telescopic handle 2, sets up like this and can conveniently dismantle arc pipeline support frame 3 to change suitable arc pipeline support frame 3 according to the difference of pipeline size.
Preferably, the thickness of the connecting block 11 is half of the thickness of the second supporting plate 102, the bottom of the front end surface of the connecting block 11 is provided with an arc contact surface, and the arc contact surface can facilitate the connecting block 11 to pass through the top of the semicircular clamping block 12, so that the semicircular clamping block 12 is inserted into the connecting hole 13.
Preferably, the top of inserting 6 all is provided with the rectangular plate, and the rectangular plate and insert between 6 fixed welding, the rectangular plate that sets up can make things convenient for the staff to press and insert 6 to insert 6 quick inserting ground.
Example 2:
referring to fig. 1-2, this embodiment differs from the first embodiment in that: the length, the width and the thickness of the first supporting plate 101 and the second supporting plate 102 are the same, the front end face and the rear end face of the left side and the right side of the second supporting plate 102 are provided with handles 9, and the handles 9 can facilitate workers to lift the second supporting plate 102, so that the second supporting plate 102 and the first supporting plate 101 are conveniently detached; the inner wall bonding of arc pipeline support frame 3 is provided with the rubber protection layer, and the thickness of rubber protection layer sets up to three centimetres, and the rubber protection layer of setting can play the function of protection pipeline, can play skid-proof effect simultaneously again.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a supporting structure is erect to chemical engineering pipeline, includes backup pad (1), its characterized in that: the utility model discloses a semi-circular connecting block, including backup pad (1), backup pad (1) including backup pad one (101), the rear end face of backup pad one (101) is provided with backup pad two (102), the top of backup pad one (101) and backup pad two (102) all is provided with electric telescopic handle (2), the top of electric telescopic handle (2) all is provided with arc pipeline support frame (3), the bottom of backup pad one (101) and backup pad two (102) all is provided with battery (4), and the battery (4) and the electric telescopic handle (2) electric connection of same position, the left and right sides of backup pad one (101) and backup pad two (102) all are provided with fixed plate (5), all vertically run through on the fixed plate (5) and are provided with ground and insert (6), the bottom all around of backup pad one (101) and backup pad two (102) all is provided with montant (7), the bottom of montant (7) all is provided with universal wheel (8), the top rear end face left and right sides of backup pad one (101) all is provided with recess (10), the front end face left and right sides of backup pad two (102) all is provided with recess (10), semi-circular connecting block (10), and connecting holes (13) matched with the semicircular clamping blocks (12) are vertically and penetratingly formed in the connecting blocks (11).
2. A chemical engineering pipeline erection support structure according to claim 1, wherein: the arc pipeline support frame is characterized in that screw holes are formed in the center of the bottom of the arc pipeline support frame (3), external screw thread connecting rods matched with the screw holes are arranged at the tops of the electric telescopic rods (2), and the arc pipeline support frame (3) is movably connected with the electric telescopic rods (2) through the matched screw holes and the external screw thread connecting rods.
3. A chemical engineering pipeline erection support structure according to claim 1, wherein: the thickness of the connecting block (11) is one half of the thickness of the second supporting plate (102), and arc-shaped contact surfaces are arranged at the bottoms of the front end faces of the connecting block (11).
4. A chemical engineering pipeline erection support structure according to claim 1, wherein: the top of ground is inserted (6) and is all provided with the rectangular plate, and fixed welding between rectangular plate and the ground is inserted (6).
5. A chemical engineering pipeline erection support structure according to claim 1, wherein: the length, the width and the thickness of the first supporting plate (101) and the second supporting plate (102) are the same, and handles (9) are arranged on the front end face and the rear end face of the left side and the right side of the second supporting plate (102).
6. A chemical engineering pipeline erection support structure according to claim 1, wherein: the inner wall of the arc-shaped pipeline supporting frame (3) is adhered with a rubber protection layer, and the thickness of the rubber protection layer is set to be three centimeters.
CN202320296639.3U 2023-02-23 2023-02-23 Supporting structure for chemical engineering pipeline erection Active CN219472952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320296639.3U CN219472952U (en) 2023-02-23 2023-02-23 Supporting structure for chemical engineering pipeline erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320296639.3U CN219472952U (en) 2023-02-23 2023-02-23 Supporting structure for chemical engineering pipeline erection

Publications (1)

Publication Number Publication Date
CN219472952U true CN219472952U (en) 2023-08-04

Family

ID=87460151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320296639.3U Active CN219472952U (en) 2023-02-23 2023-02-23 Supporting structure for chemical engineering pipeline erection

Country Status (1)

Country Link
CN (1) CN219472952U (en)

Similar Documents

Publication Publication Date Title
CN213174316U (en) Steel construction assembly type fast-assembling wallboard for building
CN214834701U (en) Assembled aluminum mould plate device for building
CN219472952U (en) Supporting structure for chemical engineering pipeline erection
CN211408046U (en) Portable graphic board frame for architectural design
CN113833124B (en) Spliced steel structure building house
CN206360335U (en) Aluminum alloy pattern plate arrangement for adjusting height
CN217859672U (en) Construction steel bar welding device
CN207217709U (en) A kind of photo frame type soft-package battery module basic structural unit
CN216462766U (en) Ultrasonic welding clamp for double-core lithium battery
CN215643606U (en) Information disclosing equipment for engineering service
CN214941013U (en) Combined steel structure with connecting structure
CN214411853U (en) Ring main unit convenient to splice
CN219247304U (en) Detachable structure and distribution box
CN216974024U (en) A multi-functional wallboard for indoor decoration
CN218843487U (en) Spliced combined floor bearing plate
CN220647040U (en) Pipeline erection frame for assembled wall body
CN216007798U (en) Novel formwork support device for building construction
CN218708882U (en) Fan blade installation auxiliary structure
CN211396611U (en) Concrete construction formwork
CN204541523U (en) A kind of aluminum alloy frame assembling regular polygon
CN215955425U (en) Battery case cavity battery core fixing structure for automobile
CN216698499U (en) Lithium battery liquid cooling plate
CN213245433U (en) Folding three-dimensional laser scanner
CN216304956U (en) Energy-concerving and environment-protective type house is built and is used steel construction node component
CN219672114U (en) Aluminum film plate joint stubble processing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant