CN219434048U - Integral settlement observation nail capable of being connected secondarily - Google Patents

Integral settlement observation nail capable of being connected secondarily Download PDF

Info

Publication number
CN219434048U
CN219434048U CN202320105487.4U CN202320105487U CN219434048U CN 219434048 U CN219434048 U CN 219434048U CN 202320105487 U CN202320105487 U CN 202320105487U CN 219434048 U CN219434048 U CN 219434048U
Authority
CN
China
Prior art keywords
observation
nut
thread
external
nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320105487.4U
Other languages
Chinese (zh)
Inventor
白明瑞
黄浩
樊清禄
纪海军
赵幸幸
王利川
张�浩
郭媛媛
郝志鹏
王慧媛
王世聪
黄志斌
郝红军
张志江
洪泽仁
梁大伟
杨志忠
史恒军
郑洁平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Academy Of Building Sciences Testing Center Co ltd
Original Assignee
Shanxi Academy Of Building Sciences Testing Center Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Academy Of Building Sciences Testing Center Co ltd filed Critical Shanxi Academy Of Building Sciences Testing Center Co ltd
Priority to CN202320105487.4U priority Critical patent/CN219434048U/en
Application granted granted Critical
Publication of CN219434048U publication Critical patent/CN219434048U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Spectrometry And Color Measurement (AREA)

Abstract

The utility model relates to the technical field of observation nails, in particular to an integral sedimentation observation nail capable of being connected secondarily. The technical proposal comprises: the novel nail comprises an observation nail main rod, wherein a locking nut and an expansion pipe are connected to the periphery of the observation nail main rod in a threaded manner, the locking nut is located at the head end of the observation nail main rod, a special-shaped nut is sleeved on the periphery of the tail end of the observation nail main rod in a threaded manner, a metal gasket, a spring gasket and a warning board are sequentially arranged between the locking nut and the expansion pipe, and the periphery of the observation nail main rod is movably sleeved with the metal gasket, the spring gasket and the warning board. The utility model solves the problems that the observation nails and the protection sleeve are separately installed, the length is fixed, and the volume of the protection sleeve is too large, and can be connected with a new sedimentation observation nail for a second time according to the actual length, thereby solving the problem that the sedimentation observation nail is destroyed during the use of the building after the outer layer heat preservation or decoration is installed on the building.

Description

Integral settlement observation nail capable of being connected secondarily
Technical Field
The utility model relates to the technical field of observation nails, in particular to an integral sedimentation observation nail capable of being connected secondarily.
Background
Sedimentation, particularly uneven sedimentation, of the construction works will lead to tilting, cracking, and even collapse of the building. Therefore, the settlement observation of the building engineering is an important deformation measurement work in the building construction and use process. National and industry related standard standards specify that settlement observation buildings should be subjected to settlement deformation observation during construction and use. At present, the settlement observation points are generally arranged on a bearing wall or a column of a building, one end of each settlement observation point is usually stuck by colloid or expansion nails to penetrate into and be fixed in the wall or the column, and the other end of each settlement observation point is exposed out of the wall surface and is used for a vertical ruler for settlement observation. The outside of the settlement observation nail adopts a protection box to protect and avoid damage.
Because settlement observation is performed through the whole construction stage and the use stage for a period of time in the future, the current common observation nails and protection boxes have the following defects:
many sedimentation observation nails are of fixed length, and the length cannot be changed during observation. The settlement observation point is generally installed immediately after the construction of a layer of bearing wall or column is finished, if the pre-buried observation nails are too long, the construction period is easy to touch and damage, and the observation cannot be continued; if the embedded observation nails are too short, after the outer wall heat insulation layer and the decoration surface layer are constructed in the later period, the sedimentation nails are wrapped in the heat insulation layer or the decoration layer, and the observation cannot be continued during the use period. Even if the individual length-adjustable settlement observation nails are connected by the screw-bearing parts of which the extension parts and the embedded wall parts are tightly abutted against 1cm-2cm, the deformation of the observation nail parts extending out of the wall is large, and the accuracy is difficult to ensure in the measurement work. In addition, protection box on the existing market is mostly fixed size, and the volume is great, and on the one hand damages easily, and on the other hand can't form effective connection with subside nail, unable normal play guard action.
Disclosure of Invention
The utility model aims to solve the problems in the background art and provides an integral sedimentation observation nail capable of being connected secondarily.
The technical scheme of the utility model is as follows: the utility model provides an integral subsidence of secondary connection surveys nail, is including observing the nail mobile jib, the peripheral threaded connection who observes the nail mobile jib has lock nut and expansion pipe, and lock nut is located the head end of observing the nail mobile jib, the peripheral thread bush of tail end of observing the nail mobile jib is equipped with special-shaped nut, set gradually metal gasket, spring gasket and warning sign between lock nut and the expansion pipe, and metal gasket, spring gasket and the equal movable sleeve of warning sign establish in the periphery of observing the nail mobile jib, lock nut's peripheral thread bush is equipped with protective sleeve, protective sleeve's the other end internal thread connection has concatenation to observe nail or screw cap.
Preferably, the main rod of the observation nail comprises a head end observation round head, a middle external threaded rod and a tail end threaded head which are integrally connected.
Preferably, the inside processing of dysmorphism nut has the internal thread, and internal thread and the first external screw thread phase-match of screw thread, dysmorphism nut and the external diameter of screw thread head locking part are the same with the expansion pipe external diameter, and the tail end external diameter increases gradually.
Preferably, the lock nut comprises a hexagonal nut and an external thread nut which are integrally connected, the hexagonal nut is a hexagonal flange face lock nut, a spanner can be used for screwing, threads are machined on the outer surface of the external thread nut, the inner diameters of the hexagonal nut and the external thread nut are the same, and internal threads matched with the external threads of the external threaded rod are machined on the inner diameters of the hexagonal nut and the external thread nut.
Preferably, eight rows of barbs are respectively arranged at two ends of the expansion pipe, and six incisions are evenly distributed at two ends of the expansion pipe.
Preferably, the screw cap comprises a cover plate and a first external screw thread cylinder which are integrally connected, and the external screw thread of the first external screw thread cylinder is matched with the internal screw thread of the protection sleeve.
Preferably, the spliced observation nail comprises a splice plate, a second external thread cylinder and a secondary connection round head which are integrally connected, and the external thread of the second external thread cylinder is matched with the internal thread of the protection sleeve.
Compared with the prior art, the utility model has the following beneficial technical effects:
the utility model discloses but the integral subsidence observation nail of secondary connection will subside and observe nail and protection sleeve and close as an organic wholely, and protection sleeve can the secondary connection subside observe nail. The problem that the observation nails are installed separately from the protection sleeve, the length is fixed, and the volume of the protection sleeve is too large is well solved. Meanwhile, the protection sleeve of the settlement observation nail can be connected with a new settlement observation nail for a second time according to the actual length, and the problem that the settlement observation nail is damaged during the use period of the building after the outer layer is installed for heat preservation or decoration is solved.
Drawings
FIG. 1 is an exploded view of a secondary attachable integral settlement observation spike of the present utility model;
FIG. 2 is a schematic elevational view of a secondary connectable integral settlement observation spike of the present utility model;
FIG. 3 is a schematic diagram of a front view structure of a secondary connection integral settlement observation nail of the present utility model;
fig. 4 is a schematic diagram of the structure of a protective sleeve, a threaded cover and a spliced observation nail of the integrated settlement observation nail capable of being connected secondarily.
Reference numerals: 1. observing the main rod of the nail; 101. observing the round head; 102. an external threaded rod; 103. a thread head; 2. a lock nut; 201. a hexagonal nut; 202. an external threaded nut; 3. a metal gasket; 4. a spring washer; 5. a warning board; 6. an expansion tube; 7. a special-shaped nut; 8. a protective sleeve; 9. a screw cap; 901. a cover plate; 902. a first external thread cylinder; 10. splicing the observation nails; 1001. splice plates; 1002. a second external thread cylinder; 1003. and (5) connecting the round heads for the second time.
Detailed Description
The technical scheme of the utility model is further described below with reference to the attached drawings and specific embodiments.
Example 1
As shown in fig. 1-4, the integrated settlement observation nail capable of being connected secondarily provided by the utility model comprises an observation nail main rod 1, wherein a lock nut 2 and an expansion pipe 6 are connected to the periphery of the observation nail main rod 1 in a threaded manner, the lock nut 2 is positioned at the head end of the observation nail main rod 1, a special-shaped nut 7 is sleeved on the periphery of the tail end of the observation nail main rod 1 in a threaded manner, a metal gasket 3, a spring gasket 4 and a warning board 5 are sequentially arranged between the lock nut 2 and the expansion pipe 6, the metal gasket 3, the spring gasket 4 and the warning board 5 are movably sleeved on the periphery of the observation nail main rod 1, a protective sleeve 8 is sleeved on the periphery of the lock nut 2 in a threaded manner, and a threaded cover 9 is connected to the inner thread of the other end of the protective sleeve 8.
In this embodiment: the main observation pin rod 1 comprises a head end observation round head 101, a middle external threaded rod 102 and a tail end threaded head 103 which are connected integrally; the inside of the special-shaped nut 7 is provided with an internal thread which is matched with the external thread of the thread head 103, the outer diameter of the locking part of the special-shaped nut 7 and the thread head 103 is the same as the outer diameter of the expansion pipe 6, and the outer diameter of the tail end is gradually increased; the locking nut 2 comprises a hexagonal nut 201 and an external thread nut 202 which are integrally connected, wherein the hexagonal nut 201 is a hexagonal flange surface locking nut which can be screwed by a wrench, threads are processed on the outer surface of the external thread nut 202, the inner diameters of the hexagonal nut 201 and the external thread nut 202 are the same, and internal threads matched with the external threads of the external threaded rod 102 are processed on the inner diameters; the screw cap 9 comprises a cover plate 901 and a first external screw thread cylinder 902 which are connected integrally, and the external screw thread of the first external screw thread cylinder 902 is matched with the internal screw thread of the protection sleeve 8; eight rows of barbs are respectively arranged at two ends of the expansion pipe 6, and six notches are evenly distributed at two ends.
Working principle: firstly, the main rod 1 of the observation nail, the lock nut 2, the metal gasket 3, the spring gasket 4, the warning sign 5, the expansion pipe 6 and the special-shaped nut 7 are installed in sequence as shown in figure 2. After the installation, the expansion part of the expansion pipe 6 and the rear half part of the main rod 1 of the observation nail are embedded into the wall body according to the required length, and the adjustment of the lock nut 2 to the proper position means that the side, close to the wall surface, of the warning sign 5 is propped against the wall surface and then is screwed by a wrench, so that the purpose of expansion fixation is achieved; at this time, the observation round head 101 is provided with a round head part which is positioned outside the wall body, and a ruler is arranged on the round head for settlement observation; the protection sleeve 8 is a sleeve, threads are arranged on the inner sides of two ends of the protection sleeve, one end of the protection sleeve is connected to the periphery of the external threaded nut 202, the other end of the protection sleeve is connected to the threaded cover 9, one end of the protection sleeve is connected to the external threaded nut 202, the external surface of the external threaded nut 202 is in threaded locking, one end of the protection sleeve is connected to the external surface of the first external threaded cylinder 902, when the settlement observation nail is used for observation, the protection sleeve 8 is taken down, the settlement observation can be carried out on the round head upper ruler of the main rod 1 of the observation nail, after the settlement observation operation is finished, the protection sleeve 8 is screwed to the external threaded nut 202, and the threaded cover 9 is screwed on, so that the purpose of protecting the settlement observation point is achieved.
Example two
As shown in fig. 1-4, compared with the first embodiment, the embodiment of the utility model further comprises a protection sleeve 8, wherein the other end of the protection sleeve 8 is internally connected with a splicing observation nail 10 in a threaded manner; the splice observation pin 10 comprises a splice plate 1001, a second external thread cylinder 1002 and a secondary connection round head 1003 which are integrally connected, and the external thread of the second external thread cylinder 1002 is matched with the internal thread of the protection sleeve 8.
After the screw cap 9 is taken down from the protective sleeve 8, the spliced observation nail 10 with proper length is screwed into the protective sleeve 8 according to the required length, so that the lengthening of the settlement observation nail can be completed, and the settlement observation point is damaged due to the fact that marble or mushroom stone is used for decoration of a later engineering outer wall, so that an important improvement effect is achieved.
The above-described embodiments are merely a few preferred embodiments of the present utility model, and many alternative modifications and combinations of the above-described embodiments will be apparent to those skilled in the art based on the technical solutions of the present utility model and the related teachings of the above-described embodiments.

Claims (7)

1. The utility model provides a but integral subsides of secondary connection surveys nail, includes survey nail mobile jib (1), its characterized in that: the novel screw comprises a main observation screw rod (1), wherein a locking nut (2) and an expansion pipe (6) are connected to the periphery of the main observation screw rod (1) through threads, the locking nut (2) is located at the head end of the main observation screw rod (1), a special-shaped nut (7) is sleeved on the periphery of the tail end of the main observation screw rod (1) through threads, a metal gasket (3), a spring gasket (4) and a warning board (5) are sequentially arranged between the locking nut (2) and the expansion pipe (6), the metal gasket (3), the spring gasket (4) and the warning board (5) are movably sleeved on the periphery of the main observation screw rod (1), a protective sleeve (8) is arranged on the periphery of the locking nut (2) through threads, and a splicing observation screw (10) or a screw cap (9) is connected to the inner threads of the other end of the protective sleeve (8).
2. The secondarily connectable integral settlement observation spike according to claim 1, wherein the observation spike main rod (1) comprises a head end observation round head (101), a middle external threaded rod (102) and a tail end threaded head (103) which are integrally connected.
3. The integral settlement observation nail capable of being connected secondarily according to claim 2, wherein the inside of the special-shaped nut (7) is provided with an internal thread, the internal thread is matched with the external thread of the thread head (103), the outer diameter of the locking part of the special-shaped nut (7) and the thread head (103) is the same as the outer diameter of the expansion pipe (6), and the outer diameter of the tail end is gradually increased.
4. The secondary connection integrated settlement observation screw as claimed in claim 2, wherein the locking nut (2) comprises a hexagonal nut (201) and an external thread nut (202) which are integrally connected, the hexagonal nut (201) is a hexagonal flange locking nut which can be screwed by a wrench, threads are processed on the outer surface of the external thread nut (202), the inner diameters of the hexagonal nut (201) and the external thread nut (202) are the same, and an internal thread matched with the external thread of the external threaded rod (102) is processed on the inner diameter.
5. A secondary connectable integral settlement observation spike according to claim 1, wherein the expansion tube (6) has eight rows of barbs at each end and six cuts are evenly distributed at each end.
6. A secondarily connectable integral settlement observation spike according to claim 1, wherein the screw cap (9) comprises a cap plate (901) and a first external screw barrel (902) integrally connected, and the external screw thread of the first external screw barrel (902) is matched with the internal screw thread of the protection sleeve (8).
7. The secondary connectable integral settlement observation spike according to claim 1, wherein the spliced observation spike (10) comprises an integrally connected splice plate (1001), a second external thread cylinder (1002) and a secondary connection round head (1003), and the external thread of the second external thread cylinder (1002) is matched with the internal thread of the protection sleeve (8).
CN202320105487.4U 2023-02-03 2023-02-03 Integral settlement observation nail capable of being connected secondarily Active CN219434048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320105487.4U CN219434048U (en) 2023-02-03 2023-02-03 Integral settlement observation nail capable of being connected secondarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320105487.4U CN219434048U (en) 2023-02-03 2023-02-03 Integral settlement observation nail capable of being connected secondarily

Publications (1)

Publication Number Publication Date
CN219434048U true CN219434048U (en) 2023-07-28

Family

ID=87345133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320105487.4U Active CN219434048U (en) 2023-02-03 2023-02-03 Integral settlement observation nail capable of being connected secondarily

Country Status (1)

Country Link
CN (1) CN219434048U (en)

Similar Documents

Publication Publication Date Title
CN219434048U (en) Integral settlement observation nail capable of being connected secondarily
CN211421612U (en) Butt joint connection structure of reinforcement cage
CN110016904B (en) Protection fixing device for rock-soil body pressure test pressure box
CN218628348U (en) Detachable building settlement mark
CN210269452U (en) In-situ detection device for compressive strength clamping and twisting method of sintered common bricks
CN205588200U (en) Sleeve hexagonal spanner
CN210633562U (en) Screw wrench suitable for narrow space
CN211341758U (en) Column hoop of concrete column template
CN204284108U (en) Be applied to the positioning and locking device of shutter machine
CN202895113U (en) Pick-out device for locking ring assembly of well logging during drilling instrument
CN206019656U (en) For monitoring the mark instrument in tunnel
CN201666302U (en) Passive theftproof bolt and nut
CN214490442U (en) Novel hardware hammer
CN206709824U (en) A kind of building subsidence observation point device assembly
CN206113940U (en) Detection hammer for civil engineering
CN213290150U (en) Novel multifunctional wrench
CN210090691U (en) Switching device of microseism probe and stock
CN2482678Y (en) Submerged settlement observation point marker
CN2661829Y (en) Constructional combined type template with improved structure
CN219075563U (en) Engineering hammer for building site
CN220414825U (en) Installation interfacing apparatus for steel construction engineering
CN214614615U (en) Pre-buried formula concrete member connecting device
CN215631089U (en) Quick tightening device for steel bar sleeve
CN207223833U (en) Cylinder piston rod nut wrench for dismounting
CN210397392U (en) Easy split type torque nut

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant