CN219411956U - Building crack repair structure - Google Patents
Building crack repair structure Download PDFInfo
- Publication number
- CN219411956U CN219411956U CN202320582738.8U CN202320582738U CN219411956U CN 219411956 U CN219411956 U CN 219411956U CN 202320582738 U CN202320582738 U CN 202320582738U CN 219411956 U CN219411956 U CN 219411956U
- Authority
- CN
- China
- Prior art keywords
- crack repairing
- agent storage
- building
- repairing agent
- storage tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a building crack repairing structure, and relates to the technical field of building crack repairing. The utility model comprises a building crack repairing agent storage tube: one side of the building crack repairing agent storage pipe is fixedly provided with a first installation shell, the other side of the building crack repairing agent storage pipe is provided with a second installation shell, and one side of the second installation shell is provided with a transmission pipe. According to the utility model, through the arranged external thread connecting block, the external thread connecting block can be rotated after the construction crack repairing agent is sprayed, so that the flaring cover is arranged at the crack, and then the curing fan is started to perform quick curing through the control button, thus the curing time of the construction crack repairing agent can be reduced, the problem that the repairing time is long due to the fact that the working efficiency is reduced in the use process if the curing time is long is avoided, and the practicability and convenience of the device are improved.
Description
Technical Field
The utility model belongs to the field of building crack repair, and particularly relates to a building crack repair structure.
Background
The building refers to an asset formed by artificial building, belongs to the category of fixed assets, and comprises a house and a structure, and the building is easy to generate cracks at indoor walls in long-term use, so that leakage occurs, and a building crack repairing structure is needed.
In the prior art, a crack repairing agent is used for repairing a crack of a building, but the crack repairing agent has a certain setting time, and if the setting time is longer, the working efficiency is reduced in the using process, so that the repairing time is longer.
The publication number is: the utility model discloses a building crack repairing structure, which relates to the technical field of building crack repairing structures, and discloses a building crack repairing structure, and comprises a lower supporting plate, wherein fixed telescopic columns are fixedly connected to the periphery of the upper surface of the lower supporting plate, and an upper supporting plate is fixedly connected to the upper surface of the fixed telescopic columns. This building crack repair structure through setting up fixed telescopic column, lower backup pad and last backup pad to make the extension through pressing from both sides tight electric putter rise and contact with the ceiling and extrude, and the lower backup pad then descends the back and contacts and extrude ground and make the whole fixed of device, make the repair board remove to the right side and hug closely with the wall along pasting tight telescopic column through pasting tight electric putter extension, make the repair board need not use the screw to go into the wall just can fix on needing prosthetic wall, thereby solved current building crack repair structure and easily cause the problem of secondary injury to the wall that needs to repair when using.
The problem that the existing building crack repairing structure is easy to cause secondary damage to the wall body needing repairing when in use can be solved, but the problem that the existing building crack repairing structure can only repair cracks at the ceiling and cannot repair the ground wall body has certain limitation is solved.
The present utility model has been made in view of this.
Disclosure of Invention
The utility model aims to solve the technical problem of overcoming the defects of the prior art and providing a building crack repairing structure.
In order to solve the technical problems, the utility model adopts the basic conception of the technical scheme that:
a construction crack repair structure comprising a construction crack repair agent storage tube: one side fixed mounting of building crack repairing agent storage tube has first installation casing, the second installation casing is installed to the opposite side of building crack repairing agent storage tube, one side of second installation casing is provided with the transmission pipe, one side of transmission pipe is provided with the discharge gate, the lateral wall threaded connection of transmission pipe has the external screw thread connecting block, one side of external screw thread connecting block is provided with the expanding mask, the inside equidistant curing fan that is provided with of expanding mask, curing fan and control button and battery electric connection, control button installs the lateral wall at the expanding mask, the lateral wall at the external screw thread connecting block is installed to the battery.
Optionally, internally mounted of first installation casing has the mounting box, the internally mounted of mounting box has the motor, the output of motor runs through in one side of building crack repairing agent storage tube to be connected with the puddler, the equidistant stirring flabellum of installing of lateral wall of puddler.
Optionally, the one end and the movable block of puddler are connected, movable block swing joint is in the inside of movable groove, the inside at the connecting block body is seted up to the movable groove, connecting block body fixed mounting is in one side of fixed plate, the inside at building crack repairing agent storage tube is installed to the fixed plate.
Optionally, a transmission pump is installed in the second installation shell, one end of the transmission pump is connected with one side of the building crack repairing agent storage pipe, and the other end of the transmission pump is connected with the transmission pipe.
Optionally, the inside wall threaded connection of transmission pipe has the internal thread connecting pipe, the one end and the discharge gate of internal thread connecting pipe are connected, the lateral wall of discharge gate is provided with sealed pad, sealed pad is inconsistent with one side of discharge gate.
Optionally, the handle is installed on the top of building crack repairing agent storage tube, building crack repairing agent storage tube's bottom outer wall bonds there is the slipmat, the bottom of second installation casing is provided with the go-between, the internally connected of go-between has the linking to hang and detains, the bottom that links up to hang and detains is connected with the looks piece through the connecting band, the bottom of looks piece is connected with crushing spike through the pole setting.
After the technical scheme is adopted, compared with the prior art, the utility model has the following beneficial effects, and of course, any product for implementing the utility model does not necessarily need to achieve all the following advantages at the same time:
1. through the external screw thread connecting block that sets up, can rotate the external screw thread connecting block after spraying building crack repairing agent like this, make the flaring cover establish and carry out quick solidification through control button start solidification fan in crack department again, like this reducible building crack repairing agent's setting time to avoided crack repairing agent to have certain setting time, if setting time is longer then lead to the decline of work efficiency in the use leads to the longer problem of repairing time, improved practicality and the convenience of device like this.
2. Through the motor that sets up, can drive puddler and stirring flabellum like this in the use to the inside storage of building crack repairing agent storage tube's of building crack repairing agent stirs, not only can fully stir building crack repairing agent like this in the use to can also avoid building crack repairing agent to solidify in the inside of building crack repairing agent storage tube and lead to being difficult to the clearance, improved practicality and the convenience of device like this.
The following describes the embodiments of the present utility model in further detail with reference to the accompanying drawings.
Drawings
The drawings in the following description are only examples of embodiments from which other drawings may be derived by those skilled in the art without the exercise of inventive faculty. In the drawings:
FIG. 1 is a schematic diagram of a front view of the present utility model;
FIG. 2 is a schematic view of the internal components of the present utility model including a crack sealer storage tube, a first mounting housing, a second mounting housing, and a transfer tube;
FIG. 3 is a schematic view of the combined parts of the external thread connection block, the diffuser cap, the curing fan and the control button in the utility model;
FIG. 4 is a schematic view of the structure of the combined parts of the connecting buckle, the connecting belt, the connecting block, the vertical rod and the crushing spike;
FIG. 5 is a schematic view of the enlarged part of the portion A in FIG. 2;
in the drawings, the list of components represented by the various numbers is as follows:
1. building crack repairing agent storage tube; 2. a first mounting housing; 3. a second mounting housing; 4. a transmission tube; 5. a discharge port; 6. an external thread connecting block; 7. a mask expanding cover; 8. a curing fan; 9. a control button; 10. a battery; 11. a mounting box; 12. a motor; 13. a stirring rod; 14. stirring fan blades; 15. a movable block; 16. a movable groove; 17. a connecting block; 18. a transfer pump; 19. an internal thread connecting pipe; 20. a sealing gasket; 21. a grip; 22. an anti-slip pad; 23. a connecting ring; 24. connecting a hanging buckle; 25. a connecting belt; 26. a connecting block; 27. a vertical rod; 28. pulverizing the spike.
It should be noted that these drawings and the written description are not intended to limit the scope of the inventive concept in any way, but to illustrate the inventive concept to those skilled in the art by referring to the specific embodiments.
Detailed Description
The utility model will now be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 to 5, the present utility model provides a construction crack repairing structure, comprising a construction crack repairing agent storage tube 1: the first installation casing 2 is fixedly installed on one side of the building crack repairing agent storage pipe 1, the second installation casing 3 is installed on the other side of the building crack repairing agent storage pipe 1, one side of the second installation casing 3 is provided with the transmission pipe 4, one side of the transmission pipe 4 is provided with the discharge port 5, the outer side wall threaded connection of the transmission pipe 4 is provided with the external thread connecting block 6, one side of the external thread connecting block 6 is provided with the expanding cover 7, the inside of the expanding cover 7 is provided with the curing fan 8 at equal intervals, the curing fan 8 is electrically connected with the control button 9 and the battery 10, the control button 9 is installed on the outer side wall of the expanding cover 7, the battery 10 is installed on the outer side wall of the external thread connecting block 6, through the discharge port 5, the building crack repairing agent can be sprayed to repair the crack through the external thread connecting block 6, the external thread connecting block 6 can be rotated after the building crack repairing agent is sprayed, the expanding cover 7 is arranged at the crack, and the curing fan 8 is started through the control button 9 to quickly cure.
In this embodiment, preferably, the first installation housing 2 has an installation box 11 internally installed, the installation box 11 has a motor 12 internally installed, the output end of the motor 12 penetrates through one side of the building crack repairing agent storage tube 1 and is connected with a stirring rod 13, stirring blades 14 are installed on the outer side wall of the stirring rod 13 at equal intervals, and through the set motor 12, the stirring rod 13 and the stirring blades 14 can be driven to stir the building crack repairing agent stored in the building crack repairing agent storage tube 1 in the use process.
In this embodiment, preferably, one end of the stirring rod 13 is connected with the movable block 15, the movable block 15 is movably connected in the movable groove 16, the movable groove 16 is formed in the connecting block body 17, the connecting block body 17 is fixedly mounted on one side of the fixing plate, the fixing plate is mounted in the building crack repairing agent storage tube 1, and through the movable block 15, the stirring rod 13 and the stirring fan blade 14 can synchronously move in the movable groove 16 in a matched manner when stirring, so that the stirring rod 13 and the stirring fan blade 14 are more stable when stirring.
In this embodiment, preferably, the second installation housing 3 is internally provided with a transmission pump 18, one end of the transmission pump 18 is connected with one side of the building crack repairing agent storage tube 1, and the other end of the transmission pump 18 is connected with the transmission tube 4, so that the building crack repairing agent storage tube 1 can be transmitted through the transmission pump 18 in the use process through the transmission pump 18, which is more convenient and labor-saving than the traditional manual extrusion method.
In this embodiment, preferably, the inside wall threaded connection of transmission pipe 4 has internal thread connecting pipe 19, and the one end of internal thread connecting pipe 19 is connected with discharge gate 5, and the lateral wall of discharge gate 5 is provided with sealed pad 20, and sealed pad 20 is inconsistent with one side of discharge gate 5, through the internal thread connecting pipe 19 of setting up, can dismantle transmission pipe 4 in a flexible way and change according to factors such as cracked degree of depth like this in the use.
In this embodiment, preferably, the grip 21 is installed on the top of the building crack repairing agent storage tube 1, the anti-slip pad 22 is adhered to the outer wall of the bottom end of the building crack repairing agent storage tube 1, the connecting ring 23 is arranged at the bottom of the second installation shell 3, the connecting ring 23 is connected with the connecting buckle 24, the bottom of the connecting buckle 24 is connected with the connecting block 26 through the connecting belt 25, the bottom of the connecting block 26 is connected with the crushing spike 28 through the upright rod 27, and the grip 21 and the anti-slip pad 22 are arranged, so that the stability of the device is higher and the device is more convenient to operate when the device is operated, and the crack repairing agent solidified by the conveying tube 4 and the discharge hole 5 can be effectively crushed through the upright rod 27 and the crushing spike 28 when the interiors of the conveying tube 4 and the discharge hole 5 are blocked.
The working principle and the using flow of the utility model are as follows: when the device is used, firstly, the transmission pump 18 is arranged, the transmission pump 18 can be used for transmitting the building crack repairing agent storage tube 1 in the use process, and the building crack repairing agent storage tube 1 can be inserted into the building crack to be sprayed through the arranged discharge port 5, so that the crack is repaired, secondly, the external thread connecting block 6 is arranged, the external thread connecting block 6 can be rotated after the building crack repairing agent is sprayed, the flaring cover 7 is covered at the crack, the curing fan 8 is started through the control button 9 to be quickly cured, afterwards, the motor 12 which is arranged in the use process can be used for driving the stirring rod 13 and the stirring fan blade 14 to stir the building crack repairing agent stored in the building crack repairing agent storage tube 1, finally, the transmission tube 4 can be flexibly disassembled and replaced according to factors such as the depth of the crack in the use process, and the crack repairing agent can be effectively cured through the grinding tip 28 matched with the grinding tip 27 when the inside of the transmission tube 4 and the discharge port 5 is blocked, and the concrete circuit is connected in a finished mode, and the concrete circuit is finished in a finished mode of the connection mode of the traditional pump 18.
The present utility model is not limited to the above embodiments, and any person who can learn the structural changes made under the teaching of the present utility model can fall within the scope of the present utility model if the present utility model has the same or similar technical solutions. The technology, shape, and construction parts of the present utility model, which are not described in detail, are known in the art.
Claims (6)
1. The construction crack repair structure is characterized by comprising a construction crack repair agent storage tube (1): one side fixed mounting of building crack repairing agent storage tube (1) has first installation casing (2), second installation casing (3) are installed to the opposite side of building crack repairing agent storage tube (1), one side of second installation casing (3) is provided with transmission pipe (4), one side of transmission pipe (4) is provided with discharge gate (5), the lateral wall threaded connection of transmission pipe (4) has external screw thread connecting block (6), one side of external screw thread connecting block (6) is provided with flaring cover (7), the inside equidistant curing fan (8) that are provided with of flaring cover (7), curing fan (8) and control button (9) and battery (10) electric connection, the lateral wall at flaring cover (7) is installed to control button (9), the lateral wall at external screw thread connecting block (6) is installed to battery (10).
2. The building crack repairing structure according to claim 1, wherein an installation box (11) is installed in the first installation shell (2), a motor (12) is installed in the installation box (11), an output end of the motor (12) penetrates through one side of the building crack repairing agent storage tube (1) and is connected with a stirring rod (13), and stirring blades (14) are installed on the outer side wall of the stirring rod (13) at equal intervals.
3. The construction crack repairing structure according to claim 2, wherein one end of the stirring rod (13) is connected with a movable block (15), the movable block (15) is movably connected in the movable groove (16), the movable groove (16) is formed in the connecting block body (17), the connecting block body (17) is fixedly arranged on one side of a fixing plate, and the fixing plate is arranged in the construction crack repairing agent storage tube (1).
4. A construction crack repairing structure according to claim 1, characterized in that the second mounting housing (3) is internally provided with a transfer pump (18), one end of the transfer pump (18) is connected with one side of the construction crack repairing agent storage tube (1), and the other end of the transfer pump (18) is connected with the transfer tube (4).
5. The building crack repairing structure according to claim 1, wherein an inner side wall of the transmission pipe (4) is in threaded connection with an inner threaded connecting pipe (19), one end of the inner threaded connecting pipe (19) is connected with the discharge port (5), a sealing gasket (20) is arranged on the outer side wall of the discharge port (5), and the sealing gasket (20) is in contact with one side of the discharge port (5).
6. The building crack repairing structure according to claim 1, wherein a grip (21) is mounted at the top end of the building crack repairing agent storage tube (1), an anti-slip pad (22) is bonded to the outer wall of the bottom end of the building crack repairing agent storage tube (1), a connecting ring (23) is arranged at the bottom end of the second mounting shell (3), a connecting hanging buckle (24) is connected to the inner part of the connecting ring (23), a connecting block (26) is connected to the bottom end of the connecting hanging buckle (24) through a connecting belt (25), and a crushing spike (28) is connected to the bottom end of the connecting block (26) through a vertical rod (27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320582738.8U CN219411956U (en) | 2023-03-23 | 2023-03-23 | Building crack repair structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320582738.8U CN219411956U (en) | 2023-03-23 | 2023-03-23 | Building crack repair structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219411956U true CN219411956U (en) | 2023-07-25 |
Family
ID=87232894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320582738.8U Active CN219411956U (en) | 2023-03-23 | 2023-03-23 | Building crack repair structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219411956U (en) |
-
2023
- 2023-03-23 CN CN202320582738.8U patent/CN219411956U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219411956U (en) | Building crack repair structure | |
CN211872549U (en) | Crack pouring device for highway bridge construction | |
CN204566331U (en) | A kind of sleeve barrel fixing device for building, syndeton, prefabricated board die structure and prefabricated board | |
CN114825239A (en) | Cable conduit sealing plug | |
CN201998324U (en) | Foam concrete preparation machine | |
CN110394937B (en) | Production die and production process for special-shaped prefabricated heat-insulating pipe fitting | |
CN205205862U (en) | Can compatible plastic check well and connection structure with pipeline thereof | |
CN211616043U (en) | Concrete maintenance sprinkler | |
CN107882203A (en) | A kind of fast-assembling partition wall and its installation method | |
CN215111293U (en) | Temporary plugging device for pipeline | |
CN111411680A (en) | Pipe well blowout repair method | |
CN218862660U (en) | Underground water spraying and pressurizing device for coal mine | |
CN220036221U (en) | Anti-blocking high-pressure grouting machine | |
CN111622226A (en) | Concrete placement device for building site ground hole | |
CN211036652U (en) | Road device of caulking for municipal works | |
CN212080484U (en) | Modified high-strength pipe joint | |
CN220172517U (en) | Fastening assembly type electric connector | |
CN112792988B (en) | Concrete stirring device for hydraulic engineering and working method thereof | |
CN116356962B (en) | Integrated screw eye plugging device for concrete wall and use method | |
CN215027238U (en) | Fixed type climbing frame spraying device for house construction | |
CN217630248U (en) | Green water saving fixtures that job site used | |
CN219583189U (en) | Construction mould easy to dismantle | |
CN218659780U (en) | Concrete mixer for municipal works | |
CN211121684U (en) | Novel building indoor environment detects all-in-one | |
CN221703256U (en) | Leakage maintenance device and leakage maintenance equipment for opposite-pull bolt holes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230919 Address after: 620500 unit 1, building 3, Tianfu Yuncheng district a, south of the fast track around Tianfu new area, Shigao street, Renshou County, Meishan City, Sichuan Province Patentee after: Sichuan Boruijia Smart City Construction Co.,Ltd. Address before: 071051 Business in Yuanqilidian Village, Fuchang Township, Jingxiu District, Baoding, Hebei Province Patentee before: Hebei Zhonglu Engineering Technology Consulting Co.,Ltd. |