CN219411736U - Protection device for construction - Google Patents

Protection device for construction Download PDF

Info

Publication number
CN219411736U
CN219411736U CN202223307156.3U CN202223307156U CN219411736U CN 219411736 U CN219411736 U CN 219411736U CN 202223307156 U CN202223307156 U CN 202223307156U CN 219411736 U CN219411736 U CN 219411736U
Authority
CN
China
Prior art keywords
lifting
protection device
protection
working bin
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223307156.3U
Other languages
Chinese (zh)
Inventor
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223307156.3U priority Critical patent/CN219411736U/en
Application granted granted Critical
Publication of CN219411736U publication Critical patent/CN219411736U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model relates to the technical field of building construction protection equipment and discloses a protection device for construction, which comprises a protection device base, wherein the top end of the protection device base is provided with a lifting device, one side of the lifting device is provided with a working bin, the inner side of the lifting device is provided with a limiting rod, one side of the limiting rod is provided with a lifting threaded rod, the top end of the lifting threaded rod is provided with a fixing device, the inner side of the working bin is provided with a first mounting block, the bottom end of the first mounting block is provided with a second mounting block, the top end of the protection device base is provided with a mounting hole, the outer side of the protection device base is provided with a pedal, one side of the pedal is provided with a movable device, the inner side of the lifting device is provided with a lifting block, the inner side of the working bin is provided with a working platform, and the inner side of the bottom end of the working bin is provided with a damping layer.

Description

Protection device for construction
Technical Field
The utility model relates to the technical field of building construction protection equipment, in particular to a protection device for construction.
Background
The construction is a production activity carried out by people for constructing various building products in a certain space and time according to a specific design blueprint by utilizing various building materials and mechanical equipment, and comprises the whole production process from construction preparation, earth breaking work to project completion acceptance, wherein the process is about to carry out construction preparation, construction organization design and management, earthwork, blasting engineering, foundation engineering, reinforcing steel bar engineering, template engineering, scaffold engineering, concrete engineering, prestressed concrete engineering, masonry engineering, steel structure engineering, wood structure engineering, structure installation engineering and the like.
Therefore, the utility model provides a protection device for construction, which aims to solve the problems that the protection effect is poor due to the design structure, the stability in operation is poor and the danger is easy to cause.
Disclosure of Invention
In order to overcome the above-mentioned drawbacks of the prior art, the present utility model provides a protection device for construction, so as to solve the above-mentioned problems in the prior art.
The utility model provides the following technical scheme: the utility model provides a protection device that construction was used, includes the protection device base, the top of protection device base is equipped with elevating gear, one side of elevating gear is equipped with the work bin, the inboard of elevating gear is equipped with the gag lever post, one side of gag lever post is equipped with the lift threaded rod, the top of lift threaded rod is equipped with fixing device, the inboard of work bin is equipped with first installation piece, the bottom of first installation piece is equipped with the second installation piece, the connecting hole has been seted up on the top of protection device base, the outside of protection device base is equipped with the footboard, one side of footboard is equipped with movable device, the inboard of elevating gear is equipped with the lifter, work platform has been seted up to the inboard of work bin, the bottom inboard of work bin is equipped with the buffer layer.
Further, the connecting hole is located at the top end of the base of the protection device, the pedal is located at the outer side of the base of the protection device, the movable device is located at one side of the pedal, the pedal is fixedly connected with the movable device, and the movable device is movably connected with the base of the protection device.
Further, the lifting block is located on the inner side of the lifting device, the lifting device is located on the top end of the base of the protecting device, the lifting block is movably connected with the lifting device, the lifting device is fixedly connected with the base of the protecting device, two lifting devices are arranged, and the two lifting devices are located on two sides of the top end of the base of the protecting device and close to the edge portions.
Further, the working platform is arranged on the inner side of the working bin, the shock absorption layer is arranged on the inner side of the bottom end of the working bin, the shock absorption layer is fixedly connected with the working bin, and the shock absorption layer is made of soft rubber materials.
Further, the gag lever post is located elevating gear's inboard, one side of gag lever post is equipped with the lift threaded rod, the top of lift threaded rod is equipped with fixing device, gag lever post and lifter piece swing joint, lift threaded rod and lifter piece swing joint, fixing device and elevating gear fixed connection.
Further, the first installation piece is located the inboard of work bin, first mounting hole has all been seted up to one side both sides of first installation piece, first mounting hole inboard is equipped with the protection pole, first installation piece and work bin fixed connection, protection pole and first installation piece fixed connection.
Further, the second installation piece is located the inboard of work bin, the second installation piece is located the bottom of first installation piece, the second mounting hole has all been seted up to the both sides of second installation piece, the inboard instrument of being equipped with of second mounting hole is placed the pole, second installation piece and work bin fixed connection, instrument is placed pole and second installation piece fixed connection.
The utility model has the technical effects and advantages that:
1. the lifting device and the working bin are arranged, so that the lifting threaded rod on the inner side of the lifting device can start to work through the motor arranged on the outer portion of the base of the protection device, when the lifting threaded rod starts to rotate, the lifting block can lift upwards, at the moment, the working bin is driven by the lifting block to lift at the same time, when the lifting threaded rod rises to the height capable of carrying out building construction, the lifting threaded rod can stop working, and the lifting process is more stable.
2. The protection rods and the tool placing rods are arranged, so that workers on the inner side of the working bin can hold the protection rods arranged on the two sides of the first installation block by hand to wait for the working bin to be stopped, and then tools required for building construction can be taken from the tool placing rods arranged on the two sides of the second installation block, and then the construction is performed outwards.
Drawings
Fig. 1 is a schematic diagram of the overall structure of the present utility model.
Fig. 2 is a schematic view of a base structure of the protection device of the present utility model.
FIG. 3 is a schematic cross-sectional view of a working chamber according to the present utility model.
Fig. 4 is a schematic view of the inner side structure of the working chamber of the present utility model.
Fig. 5 is a schematic view of the structure of the first and second mounting blocks of the present utility model.
The reference numerals are: 1. a protective device base; 101. a connection hole; 102. a pedal; 103. a movable device; 2. a lifting device; 201. a lifting block; 3. a working bin; 301. a working platform; 302. a shock absorbing layer; 4. a limit rod; 5. lifting the threaded rod; 6. a fixing device; 7. a first mounting block; 701. a protection rod; 8. a second mounting block; 801. the tool places the rod.
Detailed Description
The embodiments of the present utility model will be described more fully with reference to the accompanying drawings, and the configuration of each structure described in the following embodiments is merely illustrative, and the protection device for construction according to the present utility model is not limited to each structure described in the following embodiments, and all other embodiments obtained by a person skilled in the art without any inventive effort are within the scope of the present utility model.
Referring to fig. 1 to 5, the utility model provides a protection device for construction, which comprises a protection device base 1, wherein a lifting device 2 is arranged at the top end of the protection device base 1, a working bin 3 is arranged on one side of the lifting device 2, a limiting rod 4 is arranged on the inner side of the lifting device 2, a lifting threaded rod 5 is arranged on one side of the limiting rod 4, a fixing device 6 is arranged at the top end of the lifting threaded rod 5, a first installation block 7 is arranged on the inner side of the working bin 3, a second installation block 8 is arranged at the bottom end of the first installation block 7, a connecting hole 101 is formed in the top end of the protection device base 1, a pedal 102 is arranged on the outer side of the protection device base 1, a movable device 103 is arranged on one side of the pedal 102, a lifting block 201 is arranged on the inner side of the lifting device 2, a working platform 301 is arranged on the inner side of the working bin 3, and a damping layer 302 is arranged on the inner side of the bottom end of the working bin 3.
Referring to fig. 2, the connection hole 101 is located at the top end of the protector base 1, the pedal 102 is located at the outer side of the protector base 1, the movable device 103 is located at one side of the pedal 102, the pedal 102 is fixedly connected with the movable device 103, and the movable device 103 is movably connected with the protector base 1.
Referring to fig. 2, a lifting block 201 is located at the inner side of a lifting device 2, the lifting device 2 is located at the top end of a base 1 of the protecting device, the lifting block 201 is movably connected with the lifting device 2, the lifting device 2 is fixedly connected with the base 1 of the protecting device, two lifting devices 2 are arranged, and two lifting devices 2 are located at two sides of the top end of the base 1 of the protecting device and close to edge portions.
Referring to fig. 3, a working platform 301 is provided on the inner side of the working bin 3, a shock-absorbing layer 302 is provided on the inner side of the bottom end of the working bin 3, the shock-absorbing layer 302 is fixedly connected with the working bin 3, and the shock-absorbing layer 302 is made of soft rubber material.
Referring to fig. 1, a limit rod 4 is located at the inner side of a lifting device 2, a lifting threaded rod 5 is arranged at one side of the limit rod 4, a fixing device 6 is arranged at the top end of the lifting threaded rod 5, the limit rod 4 is movably connected with a lifting block 201, the lifting threaded rod 5 is movably connected with the lifting block 201, and the fixing device 6 is fixedly connected with the lifting device 2.
Referring to fig. 4, the first installation block 7 is located at the inner side of the working bin 3, the first installation holes are formed in two sides of one side of the first installation block 7, the protection rod 701 is arranged at the inner side of the first installation hole, the first installation block 7 is fixedly connected with the working bin 3, and the protection rod 701 is fixedly connected with the first installation block 7.
Referring to fig. 5, the second mounting block 8 is located at the inner side of the working bin 3, the second mounting block 8 is located at the bottom end of the first mounting block 7, second mounting holes are formed in two sides of the second mounting block 8, a tool placement rod 801 is arranged at the inner side of the second mounting holes, the second mounting block 8 is fixedly connected with the working bin 3, and the tool placement rod 801 is fixedly connected with the second mounting block 8.
The working principle of the utility model is as follows: in the working process, the device is checked first to ensure that the device can normally operate. Then switch on external power supply, make the device switch on, firstly let the staff enter into on the inboard work platform 301 of work storehouse 3 through the footboard 102 that protection device base 1 outside was equipped with, then make the inboard lift threaded rod 5 of elevating gear 2 start working through the motor that protection device base 1 outside was equipped with, when lift threaded rod 5 starts to rotate, lift piece 201 can rise upwards, at this moment make work storehouse 3 rise simultaneously by the drive of lift piece 201, when rising to the height that can carry out construction, lift threaded rod 5 can stop working, at this moment, the staff of work storehouse 3 inboard can hold the protection rod 701 that first installation piece 7 both sides all were equipped with hand, then can take the instrument that needs to be used when constructing on the instrument placing rod 801 that all was equipped with in second installation piece 8 both sides, then construct outside, the staff grasps protection rod 701 after the construction is accomplished, wait that work storehouse 3 descends at this moment, the buffer layer 302 that is located the inboard bottom of work storehouse 3 can reduce vibrations when work storehouse 3, the steady in the time of work storehouse 3, accessible movable device 103 bumps 102 and is equipped with, the protection rod 3 is stopped at the time, the unexpected situation is avoided being used for the protection device is that the protection device is located the top end 1 is equipped with when lifting device is equipped with the protection device, the top end 1 is stopped 5, the unexpected is avoided being used for connecting the device is 5, the top is stopped to be used for the safety device is avoided to be 1 to be used for the lifting device to be the top to be mounted to the top end of the device is to be a stop device is 5.
Finally: the foregoing description of the preferred embodiments of the utility model is not intended to limit the utility model to the precise form disclosed, and any such modifications, equivalents, and alternatives falling within the spirit and principles of the utility model are intended to be included within the scope of the utility model.

Claims (7)

1. The utility model provides a protection device that construction was used, includes protection device base (1), its characterized in that: the protection device is characterized in that the top of the protection device base (1) is provided with a lifting device (2), one side of the lifting device (2) is provided with a working bin (3), the inner side of the lifting device (2) is provided with a limiting rod (4), one side of the limiting rod (4) is provided with a lifting threaded rod (5), the top of the lifting threaded rod (5) is provided with a fixing device (6), the inner side of the working bin (3) is provided with a first mounting block (7), the bottom of the first mounting block (7) is provided with a second mounting block (8), the top of the protection device base (1) is provided with a connecting hole (101), the outer side of the protection device base (1) is provided with a pedal (102), one side of the pedal (102) is provided with a movable device (103), the inner side of the lifting device (2) is provided with a lifting block (201), the inner side of the working bin (3) is provided with a working platform (301), and the inner side of the bottom of the working bin (3) is provided with a shock-absorbing layer (302).
2. A protective device for construction according to claim 1, wherein: the connecting hole (101) is located at the top end of the protection device base (1), the pedal (102) is located at the outer side of the protection device base (1), the movable device (103) is located at one side of the pedal (102), the pedal (102) is fixedly connected with the movable device (103), and the movable device (103) is movably connected with the protection device base (1).
3. A protective device for construction according to claim 1, wherein: lifting block (201) is located the inboard of elevating gear (2), elevating gear (2) are located the top of protection device base (1), elevating gear (201) and elevating gear (2) swing joint, elevating gear (2) and protection device base (1) fixed connection, elevating gear (2) have two, two elevating gear (2) are located protection device base (1) top both sides and are close to the marginal portion.
4. A protective device for construction according to claim 1, wherein: the novel hydraulic shock absorber is characterized in that a working platform (301) is arranged on the inner side of the working bin (3), a shock absorption layer (302) is arranged on the inner side of the bottom end of the working bin (3), the shock absorption layer (302) is fixedly connected with the working bin (3), and the shock absorption layer (302) is made of soft rubber materials.
5. A protective device for construction according to claim 1, wherein: the utility model discloses a lifting device, including lifting device (2), stop lever (4), fixing device (6), lifting device (2) and lifting block (201), stop lever (4) are located the inboard of lifting device (2), one side of stop lever (4) is equipped with lifting threaded rod (5), the top of lifting threaded rod (5) is equipped with fixing device (6), lifting threaded rod (5) and lifting block (201) swing joint, fixing device (6) and lifting device (2) fixed connection.
6. A protective device for construction according to claim 1, wherein: the novel automatic mounting device is characterized in that the first mounting block (7) is located on the inner side of the working bin (3), first mounting holes are formed in two sides of one side of the first mounting block (7), a protection rod (701) is arranged on the inner side of each first mounting hole, the first mounting block (7) is fixedly connected with the working bin (3), and the protection rod (701) is fixedly connected with the first mounting block (7).
7. A protective device for construction according to claim 1, wherein: the second installation piece (8) is located the inboard of work bin (3), second installation piece (8) are located the bottom of first installation piece (7), the second mounting hole has all been seted up to the both sides of second installation piece (8), second mounting hole inboard is equipped with instrument and places pole (801), second installation piece (8) and work bin (3) fixed connection, instrument is placed pole (801) and second installation piece (8) fixed connection.
CN202223307156.3U 2022-12-09 2022-12-09 Protection device for construction Active CN219411736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223307156.3U CN219411736U (en) 2022-12-09 2022-12-09 Protection device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223307156.3U CN219411736U (en) 2022-12-09 2022-12-09 Protection device for construction

Publications (1)

Publication Number Publication Date
CN219411736U true CN219411736U (en) 2023-07-25

Family

ID=87205108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223307156.3U Active CN219411736U (en) 2022-12-09 2022-12-09 Protection device for construction

Country Status (1)

Country Link
CN (1) CN219411736U (en)

Similar Documents

Publication Publication Date Title
WO2022160732A1 (en) Intelligent anti-seismic device for shallow foundation ancient buildings, and construction method therefor
CN211397627U (en) Supporting device for tunnel construction
CN219411736U (en) Protection device for construction
CN215926087U (en) Prefabricated building foundation pile with buffering and damping effects
CN212101729U (en) Open caisson foundation for building engineering
CN216105896U (en) Lifting device for engineering machinery maintenance
CN212336023U (en) Civil engineering is with small-size building pile driver
CN213329928U (en) Noise reduction type building construction platform
CN214141391U (en) Guide tracked lift platform balance adjustment device
CN212176672U (en) Building site is with knocking wall device
CN210500860U (en) Secondary structure constructional column top bar planting assistor
CN111155754B (en) Automatic elevator shaft jacking platform and using method thereof
CN210217076U (en) Civil engineering safety scaffold
CN209179478U (en) Jumping formwork truss
CN207030676U (en) A kind of construction construction elevator
CN110844829A (en) Small-size equipment lifting machine in building site
CN218493033U (en) Steel constructs hanging flower basket hoisting device for construction
CN211421777U (en) Movable operation frame for construction engineering
CN212105140U (en) Building construction form removal device
CN211775572U (en) Climbing scaffold with unloading platform
CN220566084U (en) Tunnel construction operation platform
CN217482442U (en) Building construction device capable of reducing ground surface damage degree
CN213269281U (en) Energy-concerving and environment-protective construction encloses fender convenient to equipment
CN214246536U (en) Scaffold convenient to move
CN219568837U (en) Foundation pit prefabricated enclosure damping pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant