CN219411713U - Construction frame for building decoration - Google Patents

Construction frame for building decoration Download PDF

Info

Publication number
CN219411713U
CN219411713U CN202222052585.4U CN202222052585U CN219411713U CN 219411713 U CN219411713 U CN 219411713U CN 202222052585 U CN202222052585 U CN 202222052585U CN 219411713 U CN219411713 U CN 219411713U
Authority
CN
China
Prior art keywords
support plate
plate
fixed column
construction frame
architectural decoration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222052585.4U
Other languages
Chinese (zh)
Inventor
王永威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222052585.4U priority Critical patent/CN219411713U/en
Application granted granted Critical
Publication of CN219411713U publication Critical patent/CN219411713U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Ladders (AREA)

Abstract

本实用新型公开了一种建筑装饰用的施工架,属于建筑装饰装修技术领域,包括支撑板,支撑板开设有多个均匀分布的放置孔,支撑板连接有多个均匀分布的提拉机构,提拉机构对应放置孔设置,支撑板连接有升降机构,升降机构包括连接在支撑板上的多个固定柱A和固定柱B,固定柱A滑动连接有站立板,固定柱B螺纹连接有螺杆B且螺杆B螺纹连接站立板,螺杆B远离站立板一端连接有转动把手,固定柱A远离支撑板一端连接有阻挡板,支撑板连接有高度提升机构,高度提升机构设置在提拉机构一侧,固定柱A与固定柱B外端均连接有稳定支撑机构。该实用新型实现了对施工架在进行施工过程中进行稳定支撑的动作,提高了施工架施工时的稳定性。

The utility model discloses a construction frame for architectural decoration, which belongs to the technical field of architectural decoration, and comprises a support plate. The support plate is provided with a plurality of uniformly distributed placement holes. The support plate is connected with a plurality of evenly distributed lifting mechanisms. The end of the fixed column A away from the support plate is connected with a blocking plate, the support plate is connected with a height raising mechanism, and the height raising mechanism is arranged on one side of the lifting mechanism, and the outer ends of the fixed column A and the fixed column B are connected with a stable supporting mechanism. The utility model realizes the action of stably supporting the construction frame during construction, and improves the stability of the construction frame during construction.

Description

一种建筑装饰用的施工架A construction frame for architectural decoration

技术领域technical field

本实用新型涉及建筑装饰装修技术领域,具体为一种建筑装饰用的施工架。The utility model relates to the technical field of architectural decoration, in particular to a construction frame for architectural decoration.

背景技术Background technique

建筑装饰是建筑装饰装修工程的简称,建筑装饰是为保护建筑物的主体结构、完善建筑物的物理性能、使用功能和美化建筑物,采用装饰装修材料或饰物对建筑物的内外表面及空间进行的各种处理过程,建筑装饰是人们生活中不可缺少的一部分。Architectural decoration is the abbreviation of architectural decoration engineering. Architectural decoration is to protect the main structure of the building, improve the physical performance of the building, use the function and beautify the building. Various processing processes are carried out on the inner and outer surfaces and spaces of the building with decorative materials or accessories. Architectural decoration is an indispensable part of people's lives.

现有的技术中存在施工架底部有锁止万向轮进行导向移动作用,但是在施工架进行施工过程中,由于工人在施工架上进行走动会造成锁止万向轮产生转动以及脱扣的现象,最后导致施工架在施工过程中会时常移动,直接导致不能确保工人安全的结果,为此,我们提出一种建筑装饰用的施工架。In the existing technology, there are locking universal wheels at the bottom of the construction frame for guiding movement. However, during the construction process of the construction frame, the locking universal wheels will rotate and trip due to workers walking on the construction frame. Finally, the construction frame will often move during the construction process, which directly leads to the result that the safety of workers cannot be guaranteed. Therefore, we propose a construction frame for architectural decoration.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑装饰用的施工架,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a construction frame for architectural decoration to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种建筑装饰用的施工架,包括支撑板,所述支撑板开设有多个均匀分布的放置孔,所述支撑板连接有多个均匀分布的提拉机构,所述提拉机构对应放置孔设置,所述支撑板连接有升降机构,所述升降机构包括连接在支撑板上的多个固定柱A和固定柱B,所述固定柱A滑动连接有站立板,所述固定柱B螺纹连接有螺杆B且螺杆B螺纹连接站立板,所述螺杆B远离站立板一端连接有转动把手,所述固定柱A远离支撑板一端连接有阻挡板,所述支撑板连接有高度提升机构,所述高度提升机构设置在提拉机构一侧,所述固定柱A与固定柱B外端均连接有稳定支撑机构,所述稳定支撑机构包括连接在固定柱A以及固定柱B外端的安装板,所述安装板靠近支撑板一端连接有转动螺杆,所述转动螺杆螺纹连接有转动螺套,所述转动螺套连接有支撑柱。In order to achieve the above object, the utility model provides the following technical solutions: a construction frame for architectural decoration, including a support plate, the support plate is provided with a plurality of uniformly distributed placement holes, the support plate is connected with a plurality of evenly distributed lifting mechanisms, the lifting mechanism is set corresponding to the placement holes, the support plate is connected with a lifting mechanism, the lifting mechanism includes a plurality of fixed columns A and B connected to the support plate, the fixed column A is slidably connected to the standing plate, and the fixed column B is threaded. One end of the standing plate is connected with a rotating handle, and the end of the fixed column A away from the support plate is connected with a blocking plate.

优选的,所述提拉机构包括连接在支撑板上的L形板,所述L形板靠近支撑板一端连接有液压装置,所述液压装置输出端连接有锁止万向轮,所述锁止万向轮靠近支撑板一端连接有接触弹簧。Preferably, the pulling mechanism includes an L-shaped plate connected to the support plate, a hydraulic device is connected to an end of the L-shaped plate close to the support plate, a locking universal wheel is connected to an output end of the hydraulic device, and a contact spring is connected to an end of the locking universal wheel close to the support plate.

通过上述方案,可达到如下技术效果:设置有提拉机构可实现方便对锁止万向轮进行向上提拉动作。Through the above solution, the following technical effects can be achieved: the lifting mechanism is provided to facilitate the upward lifting action of the locking universal wheel.

优选的,所述高度提升机构包括连接在支撑板上两个对称的固定板,两个所述固定板相互靠近的两端面均开设有滑槽,每个所述滑槽均滑动连接有滑块,所述滑块之间连接有接触块,所述接触块连接有升降螺柱,所述升降螺柱远离支撑板一端连接有承托板,所述升降螺柱螺纹连接有螺杆A,所述螺杆A连接有电机。Preferably, the height raising mechanism includes two symmetrical fixed plates connected to the support plate, and two fixed plates close to each other are provided with chute, each of the chute is slidably connected with a slider, a contact block is connected between the sliders, the contact block is connected with a lifting stud, the end of the lifting stud far away from the support plate is connected with a supporting plate, the lifting stud is threadedly connected with a screw A, and the screw A is connected with a motor.

通过上述方案,可达到如下技术效果:设置有高度提升机构可实现对物料提升到站立板上。Through the above scheme, the following technical effects can be achieved: a height raising mechanism is provided to realize lifting materials to the standing board.

优选的,所述站立板远离支撑板一端连接有护栏,所述护栏呈C形形状设置。Preferably, the end of the standing board away from the supporting board is connected with a guardrail, and the guardrail is arranged in a C shape.

通过上述方案,可达到如下技术效果:设置有护栏可实现对施工人员进行防护的效果。Through the above scheme, the following technical effect can be achieved: the effect of protecting the construction personnel can be realized by setting the guardrail.

优选的,所述支撑板远离护栏一端连接有爬梯,所述爬梯倾斜设置。Preferably, a ladder is connected to the end of the support plate away from the guardrail, and the ladder is arranged obliquely.

通过上述方案,可达到如下技术效果:设置有爬梯可实现方便施工人员上下站立板。Through the above scheme, the following technical effect can be achieved: the ladder is provided to facilitate the construction personnel to stand up and down the board.

优选的,所述滑块的尺寸与滑槽的尺寸匹配设置。Preferably, the size of the slider is matched with the size of the chute.

通过上述方案,可达到如下技术效果:确保滑块在滑槽内不会发生干涉现象。Through the above solution, the following technical effect can be achieved: ensuring that the slider does not interfere in the chute.

与现有技术相比,本实用新型的有益效果是:通过支撑板、提拉机构、放置孔、稳定支撑机构、高度提升机构、升降机构、护栏以及爬梯,该实用新型实现了对施工架在进行施工过程中进行稳定支撑的动作,提高了施工架施工时的稳定性。Compared with the prior art, the utility model has the beneficial effects that: through the support plate, the lifting mechanism, the placement hole, the stable support mechanism, the height raising mechanism, the lifting mechanism, the guardrail and the climbing ladder, the utility model realizes the action of stably supporting the construction frame during the construction process, and improves the stability of the construction frame during construction.

附图说明Description of drawings

图1为本实用新型整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the utility model;

图2为本实用新型升降机构结构示意图;Fig. 2 is a structural schematic diagram of the utility model lifting mechanism;

图3为本实用新型提拉机构结构示意图;Fig. 3 is a structural schematic diagram of the lifting mechanism of the utility model;

图4为本实用新型高度提升机构结构示意图;Fig. 4 is a structural schematic diagram of the height lifting mechanism of the utility model;

图5为本实用新型稳定支撑机构结构示意图。Fig. 5 is a structural schematic diagram of the stable support mechanism of the utility model.

图中:1、支撑板;2、提拉机构;201、L形板;202、液压装置;203、接触弹簧;204、锁止万向轮;3、放置孔;4、稳定支撑机构;401、安装板;402、转动螺杆;403、转动螺套;404、支撑柱;5、高度提升机构;501、固定板;502、滑槽;503、滑块;504、接触块;505、承托板;506、升降螺柱;507、螺杆A;508、电机;6、升降机构;601、固定柱A;602、站立板;603、固定柱B;604、螺杆B;605、转动把手;606、阻挡板;7、护栏;8、爬梯。Among the figure: 1, support plate; 2, lifting mechanism; 201, L-shaped plate; 202, hydraulic device; 203, contact spring; 204, locking universal wheel; 3, placement hole; 4, stable support mechanism; 401, mounting plate; 402, rotating screw rod; 05, supporting plate; 506, lifting stud; 507, screw rod A; 508, motor; 6, lifting mechanism; 601, fixed column A; 602, standing plate; 603, fixed column B; 604, screw rod B;

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-5,本实用新型提供一种技术方案:一种建筑装饰用的施工架,包括支撑板1,支撑板1开设有多个均匀分布的放置孔3,支撑板1连接有多个均匀分布的提拉机构2,提拉机构2对应放置孔3设置,支撑板1连接有升降机构6,升降机构6包括连接在支撑板1上的多个固定柱A601和固定柱B603,固定柱A601滑动连接有站立板602,固定柱B603螺纹连接有螺杆B604且螺杆B604螺纹连接站立板602,螺杆B604远离站立板602一端连接有转动把手605,固定柱A601远离支撑板1一端连接有阻挡板606,支撑板1连接有高度提升机构5,高度提升机构5设置在提拉机构2一侧,固定柱A601与固定柱B603外端均连接有稳定支撑机构4,稳定支撑机构4包括连接在固定柱A601以及固定柱B603外端的安装板401,安装板401靠近支撑板1一端连接有转动螺杆402,转动螺杆402螺纹连接有转动螺套403,转动螺套403连接有支撑柱404。Please refer to Figures 1-5, the utility model provides a technical solution: a construction frame for architectural decoration, including a support plate 1, which is provided with a plurality of evenly distributed placement holes 3, connected to the support plate 1 with a plurality of evenly distributed lifting mechanisms 2, the lifting mechanism 2 is set corresponding to the placement holes 3, the support plate 1 is connected with a lifting mechanism 6, and the lifting mechanism 6 includes a plurality of fixed columns A601 and B603 connected to the support plate 1. The fixed column A601 is slidably connected to a standing plate 602 and a fixed column B603 Screw rod B604 is threaded and screw rod B604 is threadedly connected to the standing board 602. The end of the screw rod B604 away from the standing board 602 is connected with a rotating handle 605, and the end of the fixed column A601 away from the support plate 1 is connected with a blocking plate 606. 601 and the mounting plate 401 at the outer end of the fixed column B603, the mounting plate 401 is connected with a rotating screw 402 near the end of the support plate 1, the rotating screw 402 is threaded with a rotating nut 403, and the rotating nut 403 is connected with a supporting column 404.

具体的,提拉机构2包括连接在支撑板1上的L形板201,L形板201靠近支撑板1一端连接有液压装置202,液压装置202输出端连接有锁止万向轮204,锁止万向轮204靠近支撑板1一端连接有接触弹簧203;高度提升机构5包括连接在支撑板1上两个对称的固定板501,两个固定板501相互靠近的两端面均开设有滑槽502,每个滑槽502均滑动连接有滑块503,滑块503之间连接有接触块504,接触块504连接有升降螺柱506,升降螺柱506远离支撑板1一端连接有承托板505,升降螺柱506螺纹连接有螺杆A507,螺杆A507连接有电机508;站立板602远离支撑板1一端连接有护栏7,护栏7呈C形形状设置;支撑板1远离护栏7一端连接有爬梯8,爬梯8倾斜设置;滑块503的尺寸与滑槽502的尺寸匹配设置。Specifically, the lifting mechanism 2 includes an L-shaped plate 201 connected to the support plate 1, the end of the L-shaped plate 201 close to the support plate 1 is connected with a hydraulic device 202, the output end of the hydraulic device 202 is connected with a locking universal wheel 204, and the end of the locking universal wheel 204 is connected with a contact spring 203 near the support plate 1; Each chute 502 is slidably connected with a slider 503, the sliders 503 are connected with a contact block 504, the contact block 504 is connected with a lifting stud 506, the lifting stud 506 is connected with a supporting plate 505 at one end away from the support plate 1, the lifting stud 506 is threaded with a screw rod A507, and the screw rod A507 is connected with a motor 508; the end of the standing plate 602 away from the support plate 1 is connected with a guardrail 7, and the guardrail 7 is arranged in a C shape; 1 A ladder 8 is connected to the end far away from the guardrail 7, and the ladder 8 is arranged obliquely; the size of the slider 503 matches the size of the chute 502 and is set.

工作原理:在使用施工架时,施工人员通过对固定柱A601进行推动动作使得将装置移动到既定位置,接下来通过稳定支撑机构4对装置进行稳定支撑,此时可对支撑柱404进行转动动作,此时的支撑柱404带动转动螺套403进行转动动作,转动螺套403进行向下方向运动,当支撑柱404与地面进行接触后即可,接下来对每个液压装置202进行动力提供,此时的液压装置202输出端带动锁止万向轮204进行向上方向运动,此时的锁止万向轮204对接触弹簧203进行压缩动作,此时的锁止万向轮204不再与地面产生接触动作,接下来施工人员通过爬梯8爬到站立板602上,接下来另外一个施工人员将物料放到承托板505,再接通电机508的电源,电机508带动螺杆A507进行转动进而带动升降螺柱506进行向上方向运动,此时的滑块503在滑槽502内进行滑动动作,当承托板505上升带与站立板602同一高度位置处即可断开电机508电源,当需要对站立板602高度进行调整时,施工人员可对转动把手605进行转动,此时的站立板602进行向上方向运动,该实用新型实现了对施工架在进行施工过程中进行稳定支撑的动作,提高了施工架施工时的稳定性。Working principle: When using the construction frame, the construction personnel move the device to the predetermined position by pushing the fixed column A601, and then stabilize the device through the stable support mechanism 4. At this time, the support column 404 can be rotated. At this time, the support column 404 drives the rotation nut 403 to rotate, and the rotation nut 403 moves downward. When the support column 404 is in contact with the ground, power is provided for each hydraulic device 202. At this time, the output end of the hydraulic device 202 drives the lock. The universal wheel 204 moves upwards. At this time, the locking universal wheel 204 compresses the contact spring 203. At this time, the locking universal wheel 204 is no longer in contact with the ground. Next, the construction worker climbs onto the standing plate 602 through the ladder 8. Next, another construction worker puts the material on the support plate 505, and then turns on the power of the motor 508. The motor 508 drives the screw rod A507 to rotate and then drives the lifting stud 506 to move upward. Sliding action is carried out in the chute 502. When the supporting plate 505 rises with the same height position as the standing plate 602, the power supply of the motor 508 can be disconnected. When the height of the standing plate 602 needs to be adjusted, the construction personnel can rotate the handle 605. At this time, the standing plate 602 moves upward.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, replacements and modifications can be made to these embodiments without departing from the principle and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1.一种建筑装饰用的施工架,包括支撑板(1),其特征在于:所述支撑板(1)开设有多个均匀分布的放置孔(3),所述支撑板(1)连接有多个均匀分布的提拉机构(2),所述提拉机构(2)对应放置孔(3)设置,所述支撑板(1)连接有升降机构(6),所述升降机构(6)包括连接在支撑板(1)上的多个固定柱A(601)和固定柱B(603),所述固定柱A(601)滑动连接有站立板(602),所述固定柱B(603)螺纹连接有螺杆B(604)且螺杆B(604)螺纹连接站立板(602),所述螺杆B(604)远离站立板(602)一端连接有转动把手(605),所述固定柱A(601)远离支撑板(1)一端连接有阻挡板(606),所述支撑板(1)连接有高度提升机构(5),所述高度提升机构(5)设置在提拉机构(2)一侧,所述固定柱A(601)与固定柱B(603)外端均连接有稳定支撑机构(4),所述稳定支撑机构(4)包括连接在固定柱A(601)以及固定柱B(603)外端的安装板(401),所述安装板(401)靠近支撑板(1)一端连接有转动螺杆(402),所述转动螺杆(402)螺纹连接有转动螺套(403),所述转动螺套(403)连接有支撑柱(404)。1. A construction frame for architectural decoration, comprising a support plate (1), characterized in that: the support plate (1) is provided with a plurality of uniformly distributed placement holes (3), the support plate (1) is connected with a plurality of evenly distributed lifting mechanisms (2), the lifting mechanism (2) is set corresponding to the placement hole (3), the support plate (1) is connected with a lifting mechanism (6), and the lifting mechanism (6) includes a plurality of fixed columns A (601) and fixed columns B (603) connected to the support plate (1) , the fixed column A (601) is slidably connected with a standing plate (602), the fixed column B (603) is threaded with a screw B (604) and the screw B (604) is threaded with the standing plate (602), the end of the screw B (604) away from the standing plate (602) is connected with a turning handle (605), the end of the fixed column A (601) away from the support plate (1) is connected with a blocking plate (606), and the support plate ( 1) a height lifting mechanism (5) is connected, the height lifting mechanism (5) is arranged on one side of the lifting mechanism (2), the outer ends of the fixed column A (601) and the fixed column B (603) are connected with a stable support mechanism (4), the stable support mechanism (4) includes a mounting plate (401) connected to the outer ends of the fixed column A (601) and the fixed column B (603), and the mounting plate (401) is connected with a rotating screw (402) near the end of the support plate (1), The rotating screw rod (402) is threadedly connected with a rotating nut (403), and the rotating nut (403) is connected with a support column (404). 2.根据权利要求1所述的一种建筑装饰用的施工架,其特征在于:所述提拉机构(2)包括连接在支撑板(1)上的L形板(201),所述L形板(201)靠近支撑板(1)一端连接有液压装置(202),所述液压装置(202)输出端连接有锁止万向轮(204),所述锁止万向轮(204)靠近支撑板(1)一端连接有接触弹簧(203)。2. A construction frame for architectural decoration according to claim 1, characterized in that: the lifting mechanism (2) includes an L-shaped plate (201) connected to the support plate (1), the end of the L-shaped plate (201) close to the support plate (1) is connected to a hydraulic device (202), the output end of the hydraulic device (202) is connected to a locking universal wheel (204), and the locking universal wheel (204) is connected to a contact spring (2) at an end close to the support plate (1) 03). 3.根据权利要求1所述的一种建筑装饰用的施工架,其特征在于:所述高度提升机构(5)包括连接在支撑板(1)上两个对称的固定板(501),两个所述固定板(501)相互靠近的两端面均开设有滑槽(502),每个所述滑槽(502)均滑动连接有滑块(503),所述滑块(503)之间连接有接触块(504),所述接触块(504)连接有升降螺柱(506),所述升降螺柱(506)远离支撑板(1)一端连接有承托板(505),所述升降螺柱(506)螺纹连接有螺杆A(507),所述螺杆A(507)连接有电机(508)。3. A construction frame for architectural decoration according to claim 1, characterized in that: said height raising mechanism (5) comprises two symmetrical fixed plates (501) connected to the supporting plate (1), two said fixed plates (501) are provided with chute (502) on both ends close to each other; There is a lifting stud (506), and the end of the lifting stud (506) away from the support plate (1) is connected with a support plate (505), and the lifting stud (506) is threaded with a screw A (507), and the screw A (507) is connected with a motor (508). 4.根据权利要求1所述的一种建筑装饰用的施工架,其特征在于:所述站立板(602)远离支撑板(1)一端连接有护栏(7),所述护栏(7)呈C形形状设置。4. A construction frame for architectural decoration according to claim 1, characterized in that: the end of the standing board (602) away from the supporting board (1) is connected with a guardrail (7), and the guardrail (7) is arranged in a C shape. 5.根据权利要求1所述的一种建筑装饰用的施工架,其特征在于:所述支撑板(1)远离护栏(7)一端连接有爬梯(8),所述爬梯(8)倾斜设置。5. A construction frame for architectural decoration according to claim 1, characterized in that: the end of the support plate (1) away from the guardrail (7) is connected with a ladder (8), and the ladder (8) is arranged obliquely. 6.根据权利要求3所述的一种建筑装饰用的施工架,其特征在于:所述滑块(503)的尺寸与滑槽(502)的尺寸匹配设置。6. The construction frame for architectural decoration according to claim 3, characterized in that: the size of the slider (503) is matched with the size of the chute (502).
CN202222052585.4U 2022-08-04 2022-08-04 Construction frame for building decoration Expired - Fee Related CN219411713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222052585.4U CN219411713U (en) 2022-08-04 2022-08-04 Construction frame for building decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222052585.4U CN219411713U (en) 2022-08-04 2022-08-04 Construction frame for building decoration

Publications (1)

Publication Number Publication Date
CN219411713U true CN219411713U (en) 2023-07-25

Family

ID=87237753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222052585.4U Expired - Fee Related CN219411713U (en) 2022-08-04 2022-08-04 Construction frame for building decoration

Country Status (1)

Country Link
CN (1) CN219411713U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118774364A (en) * 2024-09-11 2024-10-15 山西省安装集团股份有限公司 A multifunctional scaffold for civil construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118774364A (en) * 2024-09-11 2024-10-15 山西省安装集团股份有限公司 A multifunctional scaffold for civil construction

Similar Documents

Publication Publication Date Title
CN219411713U (en) Construction frame for building decoration
CN205314504U (en) Building platform for outdoor building and indoor decoration
CN211201100U (en) Civil engineering construction support
CN206191207U (en) But voice recording equipment telescopic supporting device for dissemination
CN111962848B (en) An adjustable building platform for interior decoration buildings
CN218950959U (en) Building support frame for high-rise buildings
CN217732576U (en) Auxiliary lifting device for mounting solar panel
CN217323274U (en) Auxiliary construction device for building decoration
CN218843679U (en) A support frame for building construction
CN115959605A (en) Lifter for construction site
CN213391098U (en) Adjustable scaffold for building
CN221111710U (en) Multifunctional workbench for architectural decoration
CN218562949U (en) Building platform for indoor building decoration
CN212248676U (en) A new type of building construction frame
CN219548321U (en) Building construction platform based on building construction is used and is convenient for remove
CN219471483U (en) Outer wall fitment frame for construction engineering
CN216288921U (en) Electronic communication antenna support
CN214360044U (en) Lifting device for be used for architectural decoration
CN221682414U (en) A construction scaffold for building construction
CN208010270U (en) A kind of electric power overhaul ladder
CN211496853U (en) Electrical engineering location mounting structure
CN221864619U (en) Tobacco lifter special for tobacco curing house
CN118327267B (en) Easily positioned lifting construction frame
CN219492188U (en) A multifunctional safety ladder
CN219011861U (en) Scaffolding for mechanical and electrical equipment engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230725