CN219410470U CN202223572125.0U CN202223572125U CN219410470U CN 219410470 U CN219410470 U CN 219410470U CN 202223572125 U CN202223572125 U CN 202223572125U CN 219410470 U CN219410470 U CN 219410470U
Authority
CN
China
Prior art keywords
road
bottom plate
water
water pump
storage box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223572125.0U
Other languages
Chinese (zh)
Inventor
陈伟彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Qianmo Engineering Technology Co ltd
Original Assignee
Guangdong Qianmo Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Qianmo Engineering Technology Co ltd filed Critical Guangdong Qianmo Engineering Technology Co ltd
Priority to CN202223572125.0U priority Critical patent/CN219410470U/en
Application granted granted Critical
Publication of CN219410470U publication Critical patent/CN219410470U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the technical field of road joint filling, in particular to a road joint filling device for road engineering, which comprises a bottom plate, wherein a water tank and a storage box are fixedly arranged on the upper surface of the bottom plate, a stirring and heating mechanism is arranged in the storage box, a joint filling mechanism is arranged on one side of the storage box, a drying mechanism is arranged on one side of the water tank, a plurality of wheels are fixedly arranged on the lower surface of the bottom plate, and a pushing handle is fixedly arranged on the upper surface of the bottom plate close to one end. The workman promotes the pushing hands, pushes away the gap direction of device along the road, and first water pump is in carrying the spray gun with the pitch material in the storage case through the conveyer pipe, and the spray gun spouts the material to repair the gap of below ground department, and the drying mechanism of rear setting, through wind-guiding box to the ground after carrying out the operation of blowing, the rethread shower nozzle sprays water to the gap after repairing, and the two combines together to accelerate the hardening rate of pitch in the gap, promotes the use as soon as possible of follow-up road.

Description

Road joint filling device for road engineering
Technical Field
The utility model relates to the technical field of road irrigation, in particular to a road joint filling device for road engineering.
Background
In road engineering construction, the road surface of pitch irrigation can appear splitting and gap after long-time use, need use pitch again to carry out the crack filling repair, in the current public patent, bulletin number CN114790678A, patent name are road crack filling device for municipal works, including crack filling device main part, the upper end fixedly connected with feed inlet of crack filling device main part, the left end fixedly connected with promotion handle of crack filling device main part, the positive fixedly connected with control element of crack filling device main part, the lower extreme fixedly connected with of crack filling device main part sprays the swash plate, the left end fixedly connected with L shape pole of spraying the swash plate. According to the utility model, through the arrangement of the main body of the crack pouring device, the feeding hole, the pushing handle, the control element and the roller, the crack pouring device is convenient for a worker to push the main body of the crack pouring device, meanwhile, the control of the internal elements of the crack pouring device is convenient, according to the arrangement of the driving device, the stirring shaft and the baffle, the materials can be stirred when in use, the materials which are stirred in advance are avoided, and the influence on the use of the materials is easy to cause after long-time storage.
Although the device can well realize the crack filling repair of the road, the asphalt hardening time is longer, and only the road surface is only filled and repaired, and the auxiliary hardening is not carried out, so that the rapid use of the following road is very easy to influence.
Disclosure of Invention
The utility model aims to solve the defects in the background art and provides a road joint filling device for road engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a road is road cementation of fissures device for road engineering, includes the bottom plate, the last fixed surface of bottom plate installs water tank and stock case, the inside of stock case is provided with stirring heating mechanism, one side of stock case is provided with cementation of fissures mechanism, one side of water tank is provided with drying mechanism, the lower fixed surface of bottom plate installs a plurality of wheels, the upper surface of bottom plate is close to one end department fixed mounting and has the pushing hands.
Preferably, the stirring and heating mechanism comprises a motor, the motor is fixedly arranged at the top end of the storage box through a fixed seat, an output shaft of the motor penetrates through the top end of the storage box and is connected with one end of a stirring shaft, a plurality of stirring ring blades are sleeved on the outer surface of the stirring shaft, a heating piece is arranged on the inner wall of the storage box, and a storage battery is fixedly arranged on the upper end face of the water tank.
Preferably, the crack pouring mechanism comprises a first water pump, wherein the feeding end of the first water pump is fixedly connected with one side of the storage box through a conveying pipe, and the discharging end of the first water pump is fixedly connected with one end of the spray gun through the conveying pipe.
Preferably, the drying mechanism comprises a second water pump, the water inlet end of the second water pump is fixedly connected with one side of the water tank through a water pipe, the water outlet end of the second water pump is fixedly connected with one end of the guide pipe through a water pipe, the other end of the guide pipe is fixedly provided with a spray head, the outer surface of the guide pipe is fixedly sleeved with an air guide box, a fan is fixedly arranged on the upper surface of the bottom plate and close to one side of the second water pump, and the air outlet end of the fan is fixedly connected with the upper end of the air guide box through an air pipe.
Preferably, the bottom of the spray head and the air guide box are provided with water spray holes and air outlet holes.
Preferably, the upper surface of water tank and be close to one side department and be provided with the piston, the feed inlet has been seted up to the up end of storage case, the upper surface fixed mounting of bottom plate has the rail.
Compared with the prior art, the utility model has the following beneficial effects: the workman promotes the pushing hands, pushes away the gap direction of device along the road, and first water pump is in carrying the spray gun with the pitch material in the storage case through the conveyer pipe, and the spray gun spouts the material to repair the gap of below ground department, and the drying mechanism of rear setting, through wind-guiding box to the ground after carrying out the operation of blowing, the rethread shower nozzle sprays water to the gap after repairing, and the two combines together to accelerate the hardening rate of pitch in the gap, promotes the use as soon as possible of follow-up road.
Drawings
FIG. 1 is a schematic diagram of a road joint filling device for road engineering according to the present utility model;
FIG. 2 is a schematic structural view of the main mechanism of the present utility model;
FIG. 3 is a schematic view of the structure of the inside of the storage tank of the present utility model.
In the figure: 1. a bottom plate; 2. a water tank; 3. a storage box; 4. pushing hands; 5. a motor; 6. a fixing seat; 7. a stirring shaft; 8. stirring the annular blade; 9. a heating member; 10. a storage battery; 11. a first water pump; 12. a delivery tube; 13. a spray gun; 14. a second water pump; 15. a water pipe; 16. a conduit; 17. a spray head; 18. a blower; 19. an air duct; 20. an air guide box; 21. a water spraying hole; 22. an air outlet hole; 23. a piston; 24. a feed inlet; 25. a wheel; 26. and (5) a fence.
Detailed Description
The following description is presented to enable one of ordinary skill in the art to make and use the utility model. The preferred embodiments in the following description are by way of example only and other obvious variations will occur to those skilled in the art.
The utility model provides a road joint filling device for road engineering as shown in fig. 1-3, including bottom plate 1, the upper surface fixed mounting of bottom plate 1 has water tank 2 and bin 3, the inside of bin 3 is provided with stirring heating mechanism, stirring heating mechanism includes motor 5, motor 5 passes through fixing base 6 fixed mounting in the top of bin 3, the output shaft of motor 5 runs through the one end of stirring axle 7 is connected in the top of bin 3, the surface cover of stirring axle 7 is equipped with a plurality of stirring ring leaf 8, the inner wall of bin 3 is provided with heating element 9, the up end fixed mounting of water tank 2 has battery 10, battery 10 improves the electric power support for heating element 9 carries out the heating operation to the pitch in the bin 3, stirring axle 7 and stirring ring leaf 8 rotation that motor 5 work drove one end to be connected carry out the stirring operation to the pitch in the bin 3.
One side of the storage box 3 is provided with a crack filling mechanism, the crack filling mechanism comprises a first water pump 11, a feeding end of the first water pump 11 is fixedly connected with one side of the storage box 3 through a conveying pipe 12, a discharging end of the first water pump 11 is fixedly connected with one end of a spray gun 13 through the conveying pipe 12, the first water pump 11 conveys asphalt materials in the storage box 3 to the spray gun 13 through the conveying pipe 12, and the spray gun 13 sprays and repairs cracks on the ground below.
A drying mechanism is arranged on one side of the water tank 2, the drying mechanism comprises a second water pump 14, the water inlet end of the second water pump 14 is fixedly connected with one side of the water tank 2 through a water pipe 15, the water outlet end of the second water pump 14 is fixedly connected with one end of a guide pipe 16 through the water pipe 15, a spray head 17 is fixedly arranged at the other end of the guide pipe 16, an air guide box 20 is fixedly sleeved on the outer surface of the guide pipe 16, a fan 18 is fixedly arranged on the upper surface of the bottom plate 1 and close to one side of the second water pump 14, the air outlet end of the fan 18 is fixedly connected with the upper end of the air guide box 20 through an air pipe 19, water spray holes 21 and air outlet holes 22 are formed in the bottoms of the spray head 17 and the air guide box 20, the second water pump 14 conveys water into the guide pipe 16 through the water pipe 15, and the guide pipe 16 conveys water into the spray head 17; the fan 18 operates to direct wind into the wind box 20 through the wind pipe 19.
The upper surface of water tank 2 and be close to one side department and be provided with piston 23, feed inlet 24 has been seted up to the up end of bin 3, and the upper surface fixed mounting of bottom plate 1 has rail 26, and the lower surface fixed mounting of bottom plate 1 has a plurality of wheels 25, and the upper surface of bottom plate 1 is close to one end department fixed mounting has pushing hands 4.
During operation, the workman promotes pushing hands 4, pushes the device along the gap direction of road, first water pump 11 carries the pitch material in the storage case 3 to spray gun 13 through conveyer pipe 12, spray gun 13 spouts the material to repair to the gap of below ground department, the drying mechanism of rear setting, after carrying out the operation of blowing to ground through wind-guiding box 20, rethread shower nozzle 17 spouts water to the gap after repairing, the hardening rate of pitch in the gap is accelerated together to the two combination, promote the use as soon as possible of follow-up road.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made therein without departing from the spirit and scope of the utility model, which is defined by the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (5)

1. Road is road cementation of fissures device for road engineering, including bottom plate (1), its characterized in that: the upper surface of the bottom plate (1) is fixedly provided with a water tank (2) and a storage box (3), a stirring and heating mechanism is arranged in the storage box (3), one side of the storage box (3) is provided with a crack filling mechanism, one side of the water tank (2) is provided with a drying mechanism, the drying mechanism comprises a second water pump (14), the water inlet end of the second water pump (14) is fixedly connected with one side of the water tank (2) through a water pipe (15), the water outlet end of the second water pump (14) is fixedly connected with one end of a guide pipe (16) through the water pipe (15), the novel water pump is characterized in that a spray head (17) is fixedly arranged at the other end of the guide pipe (16), an air guide box (20) is fixedly sleeved on the outer surface of the guide pipe (16), a fan (18) is fixedly arranged on the upper surface of the bottom plate (1) and close to one side of the second water pump (14), the air outlet end of the fan (18) is fixedly connected with the upper end of the air guide box (20) through an air pipe (19), a plurality of wheels (25) are fixedly arranged on the lower surface of the bottom plate (1), and a pushing hand (4) is fixedly arranged on the upper surface of the bottom plate (1) close to one end.
2. The road joint filling device for road engineering according to claim 1, wherein: the stirring heating mechanism comprises a motor (5), the motor (5) is fixedly arranged at the top end of a storage box (3) through a fixing seat (6), an output shaft of the motor (5) penetrates through the top end of the storage box (3) and is connected with one end of a stirring shaft (7), a plurality of stirring ring blades (8) are sleeved on the outer surface of the stirring shaft (7), a heating piece (9) is arranged on the inner wall of the storage box (3), and a storage battery (10) is fixedly arranged on the upper end face of the water tank (2).
3. The road joint filling device for road engineering according to claim 1, wherein: the crack pouring mechanism comprises a first water pump (11), wherein the feeding end of the first water pump (11) is fixedly connected with one side of the storage box (3) through a conveying pipe (12), and the discharging end of the first water pump (11) is fixedly connected with one end of the spray gun (13) through the conveying pipe (12).
4. The road joint filling device for road engineering according to claim 1, wherein: the bottoms of the spray head (17) and the air guide box (20) are respectively provided with a water spray hole (21) and an air outlet hole (22).
5. The road joint filling device for road engineering according to claim 1, wherein: the upper surface of water tank (2) and be close to one side department and be provided with piston (23), feed inlet (24) have been seted up to the up end of stock case (3), the upper surface fixed mounting of bottom plate (1) has rail (26).
CN202223572125.0U 2022-12-31 2022-12-31 Road joint filling device for road engineering Active CN219410470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223572125.0U CN219410470U (en) 2022-12-31 2022-12-31 Road joint filling device for road engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223572125.0U CN219410470U (en) 2022-12-31 2022-12-31 Road joint filling device for road engineering

Publications (1)

Publication Number Publication Date
CN219410470U true CN219410470U (en) 2023-07-25

Family

ID=87207524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223572125.0U Active CN219410470U (en) 2022-12-31 2022-12-31 Road joint filling device for road engineering

Country Status (1)

Country Link
CN (1) CN219410470U (en)

Similar Documents

Publication Publication Date Title
CN219410470U (en) Road joint filling device for road engineering
CN215562029U (en) Road and bridge crack reinforcing and repairing structure for civil engineering
CN218815265U (en) Concrete sprayer capable of adding water and preventing solidification
CN213143764U (en) Dry-wet mixed gypsum spraying machine
CN217595044U (en) Crack repairing device for reinforcing bridge structure
CN206889013U (en) A kind of thermal power plant's coal yard spray dust-arrest device
CN215051901U (en) Town road maintenance of equipment
CN213268760U (en) Suspended ceiling spraying device for architectural decoration
CN210032722U (en) Terrace repairing device with quick drying function
CN210767731U (en) Adjustable high-speed plastering machine
CN216040593U (en) Discontinuous road traffic marking and marking device thereof
CN205501778U (en) Repair roads and level all -in -one with stirring
CN212025872U (en) Crack repairing device for road and bridge
CN212041183U (en) Paint spraying apparatus is used in building material processing
CN202380697U (en) Gas-free linear spraying device of cement mortar
CN220867940U (en) Concrete curing means is used in highway engineering construction
CN220868718U (en) Surface spray coating belt for building construction material
CN214831814U (en) Municipal administration road is with drawing traditional thread binding putting
CN214871624U (en) Concrete stirring mixing arrangement for municipal works
CN214975439U (en) Anticorrosive material spraying device with drying function
CN216141868U (en) Repairing device for road engineering
CN216713932U (en) Tile pasting mechanism for repairing ancient buildings
CN211051762U (en) Finish paint spraying support
CN219972903U (en) Scribing device for highway design
CN204663548U (en) A kind of quantitatively interpolation accelerating admixture Wet-dry concrete sprayer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant