CN219408864U - Central separation belt finished component lifting appliance - Google Patents
Central separation belt finished component lifting appliance Download PDFInfo
- Publication number
- CN219408864U CN219408864U CN202320312226.XU CN202320312226U CN219408864U CN 219408864 U CN219408864 U CN 219408864U CN 202320312226 U CN202320312226 U CN 202320312226U CN 219408864 U CN219408864 U CN 219408864U
- Authority
- CN
- China
- Prior art keywords
- lifting
- central separation
- separation belt
- component
- central
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to the technical field of prefabrication of central separation belts, in particular to a lifting appliance for finished central separation belt components, which comprises a finished central separation belt component and a lifting assembly, wherein the lifting assembly comprises a lifting beam, a steel wire rope, a connecting bolt baffle and a connecting component; when the lifting device is used, the connecting component is placed in the lifting groove of the finished component of the central separation belt, the connecting bolt baffle is clamped, the connecting component is lifted and moved to a designated position by the crane, and dislocation caused by interference of the lifting appliance in the lifting process is avoided, so that the problems that the components cannot be installed in a aligned mode due to interference of the lifting appliance in the lifting installation process of the traditional component of the central separation belt, offset occurs easily, and time and labor are wasted in the placement are solved.
Description
Technical Field
The utility model relates to the technical field of prefabrication of central separation belts, in particular to a lifting appliance for finished components of central separation belts.
Background
The central median concrete composite guardrail for highway is a guardrail form of reinforced concrete prefabricated member disposed at the central position of road surface, which is late in the construction of central median guardrail in China, but has the following functions: (1) the structure is simple and beautiful; (2) the light of the opposite lane is blocked when meeting at night, and the anti-dazzle function is good; (3) good sight line induction effect; (4) the impact buffer time is long, the accident damage is effectively reduced, and the like, so that the method is widely applied to the construction of the central partition guardrail in recent years; the traditional precast concrete for the central division belt is precast by a single body, and the single body template is utilized for prefabrication, so that the prefabrication process is complex, the prefabrication time is long, a large amount of labor is required when the single body prefabrication is adopted to ensure the prefabrication efficiency, and a large amount of single body prefabrication templates are required; the traditional prefabricated formwork has the advantages of complex design structure, inconvenient operation, low prefabrication efficiency and low utilization rate of pouring and health maintenance sites; the traditional dividing belt prefabricating process is manually controlled, and the mould closing and removing processes cannot be unified, so that the forming quality of prefabricated parts is good and uneven; the existing prefabricated components of the central separation belt are often embedded in the hanging pipe in the transverse direction of the components, and in order to ensure the consistency and the attractive appearance of the surfaces of the prefabricated components of the central separation belt, the prefabricated components of the separation belt prefabricated and formed by the method are arranged at the longitudinal ends of the components without being embedded in the transverse direction of the components, so that the components of the central separation belt cannot be installed and placed in an aligned mode due to interference of a hanging tool in the hanging and installing process of the components of the central separation belt.
Disclosure of Invention
The utility model aims to provide a lifting appliance for a finished component of a central separation belt, and aims to solve the problems that components cannot be installed and placed in a close manner due to interference of the lifting appliance in the existing lifting installation process of the component of the central separation belt, offset is easy to occur, and time and labor are wasted during placement.
In order to achieve the above purpose, the utility model provides a lifting appliance for a finished product component of a central separation belt, which comprises a finished product component of the central separation belt and a lifting assembly, wherein the lifting assembly comprises a lifting beam, a steel wire rope, a connecting bolt baffle plate and a connecting component, the finished product component of the central separation belt is provided with a lifting groove, and the connecting bolt baffle plate is fixedly connected with the finished product component of the central separation belt and is positioned in the lifting groove; the connecting component is matched with the connecting bolt baffle and is positioned in the lifting groove; the lifting beam is arranged above the finished component of the central separation belt; the steel wire rope is fixedly connected with the connecting component and fixedly connected with the lifting beam.
The lifting beam comprises a lifting rod, a first lifting ring and a second lifting ring, and the lifting rod is arranged above the central separation belt finished product component; the first lifting ring is fixedly connected with the lifting rod and is positioned above the lifting rod; the second lifting ring is fixedly connected with the lifting rod and is positioned below the lifting rod.
The connecting member further comprises a third lifting ring and a lifting hanging plate, wherein the lifting hanging plate is provided with a clamping groove, and the third lifting ring is fixedly connected with the steel wire rope and is positioned on one side of the steel wire rope; the lifting hanging plate is matched with the connecting bolt baffle plate and is positioned in the lifting groove.
The utility model discloses a central separation belt finished product component lifting appliance, which comprises a central separation belt finished product component and a lifting component, wherein the central separation finished product component is a highway central separation belt concrete combined guardrail manufactured into a finished product, is used for being placed in the middle of a highway and has the function of separating the highway; the hoisting assembly comprises a hoisting beam, a steel wire rope, a connecting bolt baffle plate and a connecting member, wherein the central separation belt finished product member is provided with a hoisting groove, and the connecting bolt baffle plate is fixedly connected with the central separation belt finished product member and is positioned in the hoisting groove; the connecting component is matched with the connecting bolt baffle and is positioned in the lifting groove; the lifting beam is arranged above the finished component of the central separation belt; the steel wire rope is fixedly connected with the connecting member and the lifting beam; the lifting beam is used for connecting the lifting machine with the central separation belt finished product component, the steel wire rope is used for connecting the lifting beam with the central separation belt finished product component, certain buffering is arranged in the steel wire rope, and the connecting bolt baffle plate is used for clamping and fixing the connecting component; when the lifting device is used, the connecting member is placed in the lifting groove of the finished central separation belt member, the connecting bolt baffle is clamped, the connecting member is lifted and moved to a designated position by the crane, so that lifting appliance interference and dislocation in the lifting process are avoided, position installation of the finished central separation belt member is completed rapidly, and the problems that the members cannot be installed and placed in a close mode due to lifting appliance interference, offset is easy to occur, and time and labor are wasted in placing are solved in the lifting installation process of the conventional central separation belt member.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below.
Fig. 1 is a cross-sectional view of a central separator belt finished component spreader of the present utility model.
Fig. 2 is a schematic structural view of the connecting member of the central separator belt finished member spreader of the present utility model.
101-central separation belt finished product components, 102-lifting beams, 103-steel wire ropes, 104-connecting bolt baffles, 105-connecting components, 106-lifting grooves, 107-lifting rods, 108-first lifting rings, 109-second lifting rings, 110-third lifting rings, 111-lifting hanging plates and 112-clamping grooves.
Detailed Description
Embodiments of the present utility model are described in detail below, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to like or similar elements or elements having like or similar functions throughout. The embodiments described below by referring to the drawings are illustrative and intended to explain the present utility model and should not be construed as limiting the utility model.
Referring to fig. 1-2, fig. 1 is a cross-sectional view of a central separator belt finished component spreader of the present utility model; fig. 2 is a schematic structural view of the connecting member of the central separator belt finished member spreader of the present utility model.
The utility model provides a lifting appliance for a finished product component 101 of a central separation belt, which comprises the following steps: the lifting assembly comprises a lifting beam 102, a steel wire rope 103, a connecting bolt baffle 104 and a connecting member 105, wherein the lifting beam 102 comprises a lifting rod 107, a first lifting ring 108 and a second lifting ring 109, the connecting member 105 further comprises a third lifting ring 110 and a lifting hanging plate 111, the central separating belt finished member 101 is provided with a lifting groove 106, and the lifting hanging plate 111 is provided with a clamping groove 112. Through the scheme, the problems that in the lifting installation process of the traditional central separation belt component, the component cannot be installed and placed in an aligned mode due to the interference of the lifting appliance, offset occurs easily, and time and labor are wasted during placement are solved.
In this embodiment, the central separation finished product member is a highway central separation belt concrete combined guardrail manufactured into a finished product, and is used for being placed in the middle of a highway and has the function of separating the highway.
Wherein the connecting bolt baffle 104 is fixedly connected with the central separation belt finished product component 101 and is positioned in the lifting groove 106; the connecting member 105 is engaged with the connecting bolt baffle 104 and is located in the lifting groove 106; the lifting beam 102 is arranged above the central separator strip finished member 101; the steel wire rope 103 is fixedly connected with the connecting member 105 and fixedly connected with the lifting beam 102; the lifting beam 102 is used for connecting a lifting machine and the central separation belt finished product component 101, the steel wire rope 103 is used for connecting the lifting beam 102 and the central separation belt finished product component 101, certain buffering is arranged in the steel wire rope, and the connecting bolt baffle 104 is used for clamping and fixing the connecting component 105; when the lifting device is used, the connecting member 105 is placed in the lifting groove 106 of the finished central separation belt member 101, the connecting bolt baffle 104 is clamped, the connecting bolt baffle is lifted and moved to a designated position by the lifting machine, so that the lifting appliance is prevented from interfering and dislocating in the lifting process, the position installation of the finished central separation belt member 101 is completed rapidly, and the problems that the members cannot be installed in an aligned mode due to the interference of the lifting appliance in the lifting installation process of the conventional central separation belt member, the members are easy to bias, and time and labor are wasted in the placing are solved.
Next, the lifting bar 107 is arranged above the central separator strip finished member 101; the first lifting ring 108 is fixedly connected with the lifting rod 107 and is positioned above the lifting rod 107; the second lifting ring 109 is fixedly connected with the lifting rod 107 and is positioned below the lifting rod 107; the lifting rod 107 is used for installing the first lifting ring 108 and the second lifting ring 109, wherein the first lifting ring 108 is used for placing a hook lock of a lifting machine, and the second lifting ring 109 is used for winding and binding the steel wire rope 103 and connecting the steel wire rope 103 with the central separation belt finished product component 101.
Finally, the third lifting ring 110 is fixedly connected with the steel wire rope 103 and is positioned at one side of the steel wire rope 103; the lifting hanging plate 111 is matched with the connecting bolt baffle 104 and is positioned in the lifting groove 106; the third lifting ring 110 is used for winding and binding the steel wire rope 103, and the clamping groove 112 of the lifting hanging plate 111 is used for clamping the connecting bolt baffle 104, so that the connecting bolt baffle is fixed with the central separation belt finished product component 101, and lifting is facilitated.
In the process of lifting and installing the finished central separation belt member 101 by using the device, the finished central separation belt member is a highway central separation belt concrete combined guardrail manufactured into a finished product and is used for being placed in the middle of a highway and has the function of separating the highway; the lifting beam 102 is used for connecting a lifting machine and the central separation belt finished product component 101, the lifting rod 107 is used for installing the first lifting ring 108 and the second lifting ring 109, wherein the first lifting ring 108 is used for placing a hook lock of the lifting machine, and the second lifting ring 109 is used for winding and binding the steel wire rope 103 and connecting the central separation belt finished product component 101 by the steel wire rope 103; the steel wire rope 103 is used for connecting the lifting beam 102 and the central separation belt finished product component 101, so that a certain buffer is arranged in the steel wire rope, the connecting bolt baffle 104 is used for clamping and fixing the connecting component 105, the third lifting ring 110 is used for winding and binding the steel wire rope 103, and the clamping groove 112 of the lifting hanging plate 111 is used for clamping the connecting bolt baffle 104, so that the steel wire rope is fixed with the central separation belt finished product component 101, and is convenient to lift; when the lifting device is used, the connecting member 105 is placed in the lifting groove 106 of the finished central separation belt member 101, the connecting bolt baffle 104 is clamped, the connecting bolt baffle is lifted and moved to a designated position by the lifting machine, so that the lifting appliance is prevented from interfering and dislocating in the lifting process, the position installation of the finished central separation belt member 101 is completed rapidly, and the problems that the members cannot be installed in an aligned mode due to the interference of the lifting appliance in the lifting installation process of the conventional central separation belt member, the members are easy to bias, and time and labor are wasted in the placing are solved.
The above disclosure is only a preferred embodiment of the present utility model, and it should be understood that the scope of the utility model is not limited thereto, and those skilled in the art will appreciate that all or part of the procedures described above can be performed according to the equivalent changes of the claims, and still fall within the scope of the present utility model.
Claims (3)
1. The hanger for the finished product component of the central separation belt comprises the finished product component of the central separation belt and is characterized in that,
the lifting assembly comprises a lifting beam, a steel wire rope, a connecting bolt baffle and a connecting member, wherein the central separation belt finished product member is provided with a lifting groove, and the connecting bolt baffle is fixedly connected with the central separation belt finished product member and is positioned in the lifting groove; the connecting component is matched with the connecting bolt baffle and is positioned in the lifting groove; the lifting beam is arranged above the finished component of the central separation belt; the steel wire rope is fixedly connected with the connecting component and fixedly connected with the lifting beam.
2. The central separator strip end product member spreader of claim 1,
the lifting beam comprises a lifting rod, a first lifting ring and a second lifting ring, and the lifting rod is arranged above the central separation belt finished product component; the first lifting ring is fixedly connected with the lifting rod and is positioned above the lifting rod; the second lifting ring is fixedly connected with the lifting rod and is positioned below the lifting rod.
3. The central separator strip end product member spreader of claim 2,
the connecting member further comprises a third lifting ring and a lifting hanging plate, wherein the lifting hanging plate is provided with a clamping groove, and the third lifting ring is fixedly connected with the steel wire rope and is positioned at one side of the steel wire rope; the lifting hanging plate is matched with the connecting bolt baffle plate and is positioned in the lifting groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320312226.XU CN219408864U (en) | 2023-02-24 | 2023-02-24 | Central separation belt finished component lifting appliance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320312226.XU CN219408864U (en) | 2023-02-24 | 2023-02-24 | Central separation belt finished component lifting appliance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219408864U true CN219408864U (en) | 2023-07-25 |
Family
ID=87210459
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320312226.XU Active CN219408864U (en) | 2023-02-24 | 2023-02-24 | Central separation belt finished component lifting appliance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219408864U (en) |
-
2023
- 2023-02-24 CN CN202320312226.XU patent/CN219408864U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219408864U (en) | Central separation belt finished component lifting appliance | |
CN108560842A (en) | With the precast concrete stair section of multipurpose hole and its preparation and application | |
CN209040349U (en) | A kind of ring muscle fastening shear wall structure being easily installed | |
CN106760570A (en) | Glomeration builds self-tightening type block masonry wall binding apparatus | |
CN112127541A (en) | Assembled floor veneer integrated board convenient to handling | |
CN206562782U (en) | Glomeration builds self-tightening type block masonry wall binding apparatus | |
CN208776200U (en) | A kind of demoulding of V-arrangement concrete folded plate and balance beam for hoisting | |
CN208594572U (en) | Single layer double cabin pipe galleries in underground are hydraulic from walking formwork jumbo | |
CN217051294U (en) | Prefabricated part deposits overhead hoist | |
CN208379439U (en) | A kind of inter-tie and the integrally formed falsework structure of pier stud | |
CN217921021U (en) | Detachable steel pipe arch segment hoisting device | |
CN208197158U (en) | A kind of reinforcing bar tire suspender of precast segment box beam | |
CN216689076U (en) | A prefabricated apron that is used for hollow mound top to pour construction | |
CN213865033U (en) | Prefabricated component hoist of assembly type structure | |
CN212336467U (en) | Assembled full-prefabricated floor structure | |
CN209637109U (en) | A kind of Prefabricated superposed beam | |
CN210828837U (en) | Prefabricated window component that wafts of assembled building | |
CN209665721U (en) | A kind of Precast T-Beam anchored end formwork for placing | |
CN106013819A (en) | Hoisting system and method for hoisting prefabricated exterior wall cladding based on overhead hooking exchange | |
CN215626151U (en) | Concrete drain pipe lifting device | |
CN219929401U (en) | Be used for prefabricated component hoist and mount strengthening equipment | |
CN108773760B (en) | Local integral hoisting device for aluminum alloy template and construction process | |
CN218149757U (en) | Frame body formwork structure is exempted from to precast coincide goes out gusset post-cast section | |
CN215249019U (en) | Prefabricated component hoist device of assembly type structure | |
CN218371211U (en) | Special hook for traction color steel plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |