CN219386634U - A sloped steel structure - Google Patents
A sloped steel structure Download PDFInfo
- Publication number
- CN219386634U CN219386634U CN202223240714.9U CN202223240714U CN219386634U CN 219386634 U CN219386634 U CN 219386634U CN 202223240714 U CN202223240714 U CN 202223240714U CN 219386634 U CN219386634 U CN 219386634U
- Authority
- CN
- China
- Prior art keywords
- groove
- steel
- frame
- steel plate
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 76
- 239000010959 steel Substances 0.000 title claims abstract description 76
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 20
- 241000826860 Trapezium Species 0.000 claims 1
- 238000009434 installation Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及钢结构技术领域,尤其涉及一种斜面钢结构。The utility model relates to the technical field of steel structures, in particular to an inclined steel structure.
背景技术Background technique
钢结构指的是在建筑底部和地基接触的承重构件之一,其是直接与地基接触来传递荷载的结构物的下半部分的扩展部分,其作用是把建筑上部的荷载传递给地基,而其中,为了使高位钢结构与低位钢结构相连接,需要使用到一种斜面钢结构;The steel structure refers to one of the load-bearing components that are in contact with the foundation at the bottom of the building. It is an extension of the lower half of the structure that is directly in contact with the foundation to transfer the load. Its function is to transfer the load from the upper part of the building to the foundation. Among them, in order to connect the high-level steel structure with the low-level steel structure, an inclined steel structure needs to be used;
公告号为CN210887560U公开了一种斜面钢结构,包括多个第一杆和多个第二杆,且多个第一杆与多个第二杆一一对应设置,所述第一杆与相对应的第二杆之间固定安装有同一个斜梁,斜梁的顶部放置有多个加强杆,斜梁的顶部开设有多个第一槽,加强杆上活动套设有U形卡座,且U形卡座与对应的第一槽相适配,U形卡座相互靠近的一侧内壁上均开设有卡槽,卡槽的底部内壁上固定安装有三角座,相对应的两个第一槽相互靠近的一侧内壁上开设有同一个连通孔;The notification number is CN210887560U, which discloses an inclined steel structure, including a plurality of first rods and a plurality of second rods, and the plurality of first rods and the plurality of second rods are arranged in one-to-one correspondence. The same oblique beam is fixedly installed between the first rods and the corresponding second rods, and a plurality of reinforcing rods are placed on the top of the oblique beam. The card slot, the bottom inner wall of the card slot is fixed with a triangular seat, and the corresponding two first slots are provided with the same communication hole on the inner wall of the side close to each other;
其通过转动旋钮带动丝杆进行转动,在螺纹孔的作用下,使得丝杆移动带动滑动板移动,滑动板带动斜杆进行移动,使得斜杆在对应的斜孔内进行滑动,斜杆的移动能够带动卡杆进行移动,使得卡杆卡入卡槽内,在三角座的作用下,卡杆对三角座进行挤压,使得三角座向下移动,三角座的U形卡座向下移动,从对加强杆进行挤压,从而能够对加强杆进行固定,然而该固定方式可能存在一个问题,即斜面钢上往往需要固定多个加强杆,每个加强杆的外侧又都需要多个U型卡座对其进行固定,而在对每个U形卡座进行安装时,都需要手动旋转多圈旋钮,操作繁琐,这可能会导致其在固定每一根加强杆时所用时间较长、安装速度较慢,进而导致安装效率较低,因此我们提出了一种斜面钢结构。It drives the screw rod to rotate by turning the knob, and under the action of the threaded hole, the screw rod moves to drive the sliding plate to move, and the sliding plate drives the oblique rod to move, so that the oblique rod slides in the corresponding oblique hole. That is to say, it is often necessary to fix multiple reinforcing rods on the inclined steel, and the outer side of each reinforcing rod needs multiple U-shaped clamps to fix it. When installing each U-shaped clamp, it is necessary to manually rotate the knob for multiple turns, which is cumbersome. This may lead to a long time spent on fixing each reinforcing rod, slow installation speed, and low installation efficiency. Therefore, we propose an inclined steel structure.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种斜面钢结构。The purpose of the utility model is to solve the shortcomings in the prior art, and propose a kind of inclined steel structure.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种斜面钢结构,包括:A sloped steel structure comprising:
高钢架和低钢架,所述高钢架的左侧固定安装有斜钢板,所述斜钢板固定安装在所述低钢架的右侧,所述斜钢板的顶部左右两侧分别放置有加强杆,所述加强杆的外侧前后两侧分别设置有U型架;A high steel frame and a low steel frame, the left side of the high steel frame is fixedly equipped with a slanted steel plate, the slanted steel plate is fixedly installed on the right side of the low steel frame, reinforcing rods are respectively placed on the left and right sides of the top of the slanted steel frame, and U-shaped frames are respectively arranged on the outer, front and rear sides of the reinforcing rod;
第一固定组件,所述第一固定组件安装在所述斜钢板和所述U型架上;A first fixing component, the first fixing component is installed on the inclined steel plate and the U-shaped frame;
第二固定组件,所述第二固定组件安装在所述斜钢板和所述U型架上。A second fixing component, the second fixing component is installed on the inclined steel plate and the U-shaped frame.
优选的,所述第一固定组件包括插槽、卡槽、安装槽、第一弹簧和卡块,所述插槽开设在所述斜钢板的顶部,所述卡槽开设在所述插槽的一侧,所述安装槽开设在所述U型架的左右两侧,所述第一弹簧的一端固定安装在所述安装槽的一侧,所述卡块滑动安装在所述安装槽的顶部和底部之间,所述卡块固定安装在相邻所述第一弹簧的一端。Preferably, the first fixing component includes a slot, a locking slot, a mounting slot, a first spring and a locking block, the slot is set on the top of the inclined steel plate, the locking slot is set on one side of the slot, the mounting slot is set on the left and right sides of the U-shaped frame, one end of the first spring is fixedly installed on one side of the mounting slot, the locking block is slidably installed between the top and bottom of the mounting slot, and the locking block is fixedly installed on one end of the adjacent first spring.
优选的,所述插槽每两个为一组,且左侧所述插槽较深,右侧所述插槽较浅。Preferably, the slots are in groups of two, and the slots on the left side are deeper, and the slots on the right side are shallower.
优选的,每一个所述加强杆的外侧设置两个所述U型架,每一个所述U型架对应一组所述插槽。Preferably, two U-shaped frames are arranged on the outer side of each reinforcing rod, and each of the U-shaped frames corresponds to a group of the slots.
优选的,所述卡块的截面形状由梯形和长方形构成,所述卡块的外轮廓与所述卡槽的形状相适配。Preferably, the cross-sectional shape of the clamping block is composed of a trapezoid and a rectangle, and the outer contour of the clamping block is adapted to the shape of the clamping groove.
优选的,所述第二固定组件包括凹槽、通槽、横槽、卡杆、横板、推块、第二弹簧和限位块,所述凹槽开设在所述U型架的左右两侧内壁,所述通槽开设在所述斜钢板的底部左右两侧,所述横槽开设在在所述通槽的左右两侧,所述卡杆滑动安装在所述通槽的内侧,所述横板滑动安装在所述横槽的内侧,所述推块固定安装在所述卡杆的顶部中间处,所述第二弹簧固定安装在所述推块的左右两侧,所述限位块滑动安装在所述卡杆的顶部左右两侧,所述限位块固定安装在相邻所述第二弹簧的一端。Preferably, the second fixing component includes a groove, a through groove, a transverse groove, a clamping rod, a transverse plate, a push block, a second spring and a limit block. The groove is set on the left and right inner walls of the U-shaped frame, the through groove is set on the left and right sides of the bottom of the inclined steel plate, and the transverse groove is set on the left and right sides of the through groove. On both sides, the limiting block is slidably installed on the left and right sides of the top of the clamping rod, and the limiting block is fixedly installed on one end adjacent to the second spring.
优选的,所述横板和所述推块的顶部均设置为弧面结构。Preferably, the tops of the horizontal plate and the push block are both arranged in an arc structure.
优选的,所述通槽的顶部宽度大于中间段宽度。Preferably, the width of the top of the through groove is greater than the width of the middle section.
与现有技术相比,本实用新型的有益效果在于:Compared with the prior art, the utility model has the beneficial effects of:
(1)本实用新型的一种斜面钢结构,通过设置的第一固定组件,使得该斜面钢结构可向下插入U型架即可实现对加强杆的固定,使得固定时间较短、安装速度较快,进而使安装效率较高。(1) An inclined-plane steel structure of the present utility model, through the first fixing component provided, the inclined-plane steel structure can be inserted downward into the U-shaped frame to realize the fixing of the reinforcing bar, so that the fixing time is shorter, the installation speed is faster, and the installation efficiency is higher.
(2)本实用新型的一种斜面钢结构,通过设置的第二固定组件,使得该斜面钢结构可通过向上插入卡杆实现对U型架的固定,操作简单,使得固定时间较短、安装速度较快,进而使安装效率较高。(2) An inclined steel structure of the present invention, through the second fixing component provided, the inclined steel structure can be fixed to the U-shaped frame by inserting the clamping rod upwards, the operation is simple, the fixing time is shorter, the installation speed is faster, and the installation efficiency is higher.
附图说明Description of drawings
图1为本实用新型提出的一种斜面钢结构的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of a kind of inclined plane steel structure that the utility model proposes;
图2为本实用新型提出的一种斜面钢结构的剖视结构示意图;Fig. 2 is the sectional structure schematic diagram of a kind of inclined plane steel structure that the utility model proposes;
图3为图2中的A部分放大结构示意图。FIG. 3 is a schematic diagram showing an enlarged structure of part A in FIG. 2 .
图中:1、高钢架;2、低钢架;3、斜钢板;4、加强杆;5、U型架;6、插槽;7、卡槽;8、安装槽;9、第一弹簧;10、卡块;11、凹槽;12、通槽;13、横槽;14、卡杆;15、横板;16、推块;17、第二弹簧;18、限位块。Among the figure: 1, high steel frame; 2, low steel frame; 3, inclined steel plate; 4, reinforcing bar; 5, U-shaped frame; 6, slot;
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.
实施例Example
参照图1-3,一种斜面钢结构,包括高钢架1、低钢架2、第一固定组件和第二固定组件,高钢架1的左侧固定安装有斜钢板3,斜钢板3固定安装在低钢架2的右侧,斜钢板3的顶部左右两侧分别放置有加强杆4,加强杆4的外侧前后两侧分别设置有U型架5,第一固定组件安装在斜钢板3和U型架5上,第二固定组件安装在斜钢板3和U型架5上,插槽6开设在斜钢板3的顶部,卡槽7开设在插槽6的一侧,卡槽7用于和卡块10配合对U型架5进行固定,安装槽8开设在U型架5的左右两侧,安装槽8用于固定卡块10和第一弹簧9,第一弹簧9的一端固定安装在安装槽8的一侧,卡块10滑动安装在安装槽8的顶部和底部之间,卡块10固定安装在相邻第一弹簧9的一端,凹槽11开设在U型架5的左右两侧内壁,通槽12开设在斜钢板3的底部左右两侧,横槽13开设在在通槽12的左右两侧,卡杆14滑动安装在通槽12的内侧,横板15滑动安装在横槽13的内侧,推块16固定安装在卡杆14的顶部中间处,推块16上移时可推动两侧横板15向外侧移动,使其卡进凹槽11中进而对U型架5进一步固定,第二弹簧17固定安装在推块16的左右两侧,第二弹簧17可在限位块18不受阻挡时推动其向外移动被卡住,进而实现对卡杆14的自然固定,限位块18滑动安装在卡杆14的顶部左右两侧,限位块18固定安装在相邻第二弹簧17的一端。Referring to Fig. 1-3, an inclined steel structure includes a high steel frame 1, a low steel frame 2, a first fixing assembly and a second fixing assembly. The left side of the high steel frame 1 is fixedly installed with an inclined steel plate 3, and the inclined steel plate 3 is fixedly installed on the right side of the low steel frame 2. Reinforcing bars 4 are respectively placed on the left and right sides of the top of the inclined steel plate 3, and U-shaped frames 5 are respectively arranged on the outside, front, and rear sides of the reinforcing bar 4. The first fixing assembly is installed on the inclined steel plate 3 and the U-shaped frame 5. On the top of the steel plate 3, the draw-in groove 7 is provided on one side of the slot 6, and the draw-in groove 7 is used to cooperate with the block 10 to fix the U-shaped frame 5. 12 is provided on the left and right sides of the bottom of the inclined steel plate 3, and the transverse groove 13 is opened on the left and right sides of the through groove 12. The clamp bar 14 is slidably installed on the inside of the through groove 12, and the transverse plate 15 is slidably installed on the inside of the transverse groove 13. The push block 16 is fixedly mounted on the top middle of the clamp bar 14. 7. When the limit block 18 is not blocked, it can be pushed to move outwards and be blocked, so as to realize the natural fixation of the clamping rod 14. The limit block 18 is slidably installed on the left and right sides of the top of the clamp rod 14, and the limit block 18 is fixedly installed on one end of the adjacent second spring 17.
本实施例中,插槽6每两个为一组,且左侧插槽6较深,右侧插槽6较浅,需要说明的是,插槽6用于配合U型架5使得U型架5可向下插入把加强杆4卡在其内侧,使得固定时间较短。In this embodiment, two slots 6 form a group, and the left slot 6 is deeper, and the right slot 6 is shallower. It should be noted that the slots 6 are used to cooperate with the U-shaped frame 5 so that the U-shaped frame 5 can be inserted downwards and the reinforcing rod 4 is stuck inside it, so that the fixing time is shorter.
本实施例中,每一个加强杆4的外侧设置两个U型架5,每一个U型架5对应一组插槽6,需要说明的是,每一个加强杆4通过两个U型架5间固定可保证其固定效果较好,固定可靠、稳定。In this embodiment, two U-shaped frames 5 are arranged on the outside of each reinforcing rod 4, and each U-shaped frame 5 corresponds to a group of slots 6. It should be noted that each reinforcing rod 4 is fixed between two U-shaped frames 5 to ensure that its fixing effect is better, and the fixing is reliable and stable.
本实施例中,卡块10的截面形状由梯形和长方形构成,卡块10的外轮廓与卡槽7的形状相适配,需要说明的是,通过限定卡块10的形状可便于下移U型架5时,卡块10的斜面可被插槽6两侧挤压向内收回,使U型架5可顺利插入插槽6的内侧,使得安装速度较快。In this embodiment, the cross-sectional shape of the block 10 is formed by a trapezoid and a rectangle, and the outer contour of the block 10 is adapted to the shape of the slot 7. It should be noted that by limiting the shape of the block 10, the U-shaped frame 5 can be moved down.
本实施例中,横板15和推块16的顶部均设置为弧面结构,需要说明的是,通过设置为弧面结构可便于卡杆14上移时通过推块16推动两侧横板15向外移动,卡进凹槽11中,使得安装效率较高。In this embodiment, the tops of the horizontal plate 15 and the push block 16 are both arranged in an arc-shaped structure. It should be noted that by setting the arc-shaped structure, it is convenient for the push block 16 to push the horizontal plates 15 on both sides to move outwards when the clamping rod 14 moves upwards, and snap into the groove 11, so that the installation efficiency is higher.
本实施例中,通槽12的顶部宽度大于中间段宽度,需要说明的是,通过设置较宽的顶部,可使限位块18在第二弹簧17的弹力作用在使限位块18在不受阻挡时被推进较宽的位置被卡住,进而实现对卡杆14的固定,使得该结构对加强杆4的固定效果较好。In this embodiment, the width of the top of the through groove 12 is greater than the width of the middle section. It should be noted that, by setting a wider top, the elastic force of the second spring 17 can act on the limiting block 18 so that the limiting block 18 is pushed into a wider position when it is not blocked.
通过上述结构,本实用新型提供的一种斜面钢结构能够向下插入U型架5即可实现对加强杆4的固定,再通过向上插入卡杆14实现对U型架5的固定,操作简单,使得固定时间较短、安装速度较快,进而使安装效率较高,具体操作为先把加强杆4放置在斜钢板3上,在加强杆4的外侧向下插入U型架5,使U型架5底部与插槽6接触,慢慢推动U型架5下移,U型架5下移时,外伸的卡块10通过其上斜面与插槽6两侧配合,被挤压收回安装槽8内,使得U型架5顺利下移,直至卡块10外侧正对卡槽7时,其不再被遮挡,此时卡块10在第一弹簧9的作用下伸出,卡在卡槽7中,使U型架5无法取出,此时加强杆4被卡在U型架5的内侧固定,之后,从通槽12底部向上推动卡杆14,卡杆14顶部的推块16随卡杆14上移,直至接触并挤压横板15,受挤压的横板15向外侧移动,直至卡进凹槽11中,同时,卡杆14继续上移,当移动至最顶部时,限位块18在第二弹簧17的作用下向外弹出,卡在通槽12的顶部,使卡杆14无法下拉,实现对U型架5的进一步固定。Through the above-mentioned structure, the inclined steel structure provided by the utility model can be inserted downward into the U-shaped frame 5 to fix the reinforcement bar 4, and then the U-shaped frame 5 can be fixed by inserting the clamp rod 14 upwards. The operation is simple, the fixing time is shorter, the installation speed is faster, and the installation efficiency is higher. , the protruding block 10 cooperates with the two sides of the slot 6 through its upper slope, and is squeezed back in the installation groove 8, so that the U-shaped frame 5 moves down smoothly until the outside of the block 10 faces the draw-in groove 7, and it is no longer blocked. 6. Move up with the clamp rod 14 until it contacts and squeezes the horizontal plate 15, and the squeezed horizontal plate 15 moves outward until it is stuck in the groove 11. At the same time, the clamp rod 14 continues to move upward. When it moves to the top, the limit block 18 is ejected outward under the action of the second spring 17, and is stuck on the top of the through groove 12, so that the clamp rod 14 cannot be pulled down, and the further fixing of the U-shaped frame 5 is realized.
以上对本实用新型所提供的一种斜面钢结构进行了详细介绍。本文中应用了具体实施例对本实用新型的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本实用新型的方法及其核心思想。应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以对本实用新型进行若干改进和修饰,这些改进和修饰也落入本实用新型权利要求的保护范围内。Above, the inclined steel structure provided by the utility model has been introduced in detail. In this paper, specific examples are used to illustrate the principle and implementation of the utility model, and the descriptions of the above examples are only used to help understand the method and core idea of the utility model. It should be pointed out that for those skilled in the art, without departing from the principle of the utility model, some improvements and modifications can also be made to the utility model, and these improvements and modifications also fall within the protection scope of the claims of the utility model.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223240714.9U CN219386634U (en) | 2022-12-05 | 2022-12-05 | A sloped steel structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223240714.9U CN219386634U (en) | 2022-12-05 | 2022-12-05 | A sloped steel structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219386634U true CN219386634U (en) | 2023-07-21 |
Family
ID=87190087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223240714.9U Expired - Fee Related CN219386634U (en) | 2022-12-05 | 2022-12-05 | A sloped steel structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219386634U (en) |
-
2022
- 2022-12-05 CN CN202223240714.9U patent/CN219386634U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213484232U (en) | Electric power cabinet convenient to adjustment baffle interval | |
CN211456074U (en) | Fastening device for computer case jacks | |
CN219386634U (en) | A sloped steel structure | |
CN117432245A (en) | Detachable steel structure supporting device for curtain wall and supporting method thereof | |
CN218459803U (en) | Polar plate structure convenient to dismouting is changed | |
CN116290898A (en) | Floor reinforcing and supporting structure | |
CN213572987U (en) | Aluminum alloy template with stable structure | |
CN213709426U (en) | Ecological supporting construction of hydraulic engineering | |
CN220620496U (en) | Spliced building structure | |
CN220266954U (en) | Mounting structure of aluminum plate curtain wall | |
CN114277933B (en) | A prefabricated steel structure with fixed connection and reinforcement structure | |
CN221972399U (en) | Water conservancy project template | |
CN216382237U (en) | Clamping structure of metal rolled piece aluminum guide rail | |
CN220814266U (en) | Assembled building structure | |
CN221978433U (en) | A convenient installation frame fixture for power distribution cabinet | |
CN217461092U (en) | Butt joint installation device for building curtain wall | |
CN214994976U (en) | Caulking groove stone curtain wall mounting structure | |
CN114541865B (en) | Epidemic prevention tent convenient to disassemble and assemble quickly and application method | |
CN220521949U (en) | Assembled building aluminum template | |
CN213571794U (en) | Interlocking block soft row | |
CN219671787U (en) | Curtain wall structure convenient to disassemble and assemble in energy-saving building | |
CN222773842U (en) | A plate heat exchanger plate | |
CN218028389U (en) | Decorate aluminium veneer curtain | |
CN217461428U (en) | Reinforcing transverse head of disk fastener type scaffold | |
CN215407445U (en) | Assembled building templates |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230721 |