CN219386382U - High pile cap construction support - Google Patents

High pile cap construction support Download PDF

Info

Publication number
CN219386382U
CN219386382U CN202320431656.3U CN202320431656U CN219386382U CN 219386382 U CN219386382 U CN 219386382U CN 202320431656 U CN202320431656 U CN 202320431656U CN 219386382 U CN219386382 U CN 219386382U
Authority
CN
China
Prior art keywords
bolt
collar
construction support
support
pile cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320431656.3U
Other languages
Chinese (zh)
Inventor
吴琳琳
苏国森
王春霞
曹雅洁
王俊丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Ruiyang Road And Bridge Co ltd
Original Assignee
Shanxi Ruiyang Road And Bridge Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Ruiyang Road And Bridge Co ltd filed Critical Shanxi Ruiyang Road And Bridge Co ltd
Priority to CN202320431656.3U priority Critical patent/CN219386382U/en
Application granted granted Critical
Publication of CN219386382U publication Critical patent/CN219386382U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a high pile cap construction support, which belongs to the technical field of geotechnical engineering and comprises a steel pile cap, wherein a first mounting ring is movably sleeved on the outer side of the steel pile cap, a first bolt is mounted on the first mounting ring, the first mounting ring is connected with the steel pile cap through the first bolt, a slot is formed in the outer side of the first mounting ring, a support plate is movably inserted into the first mounting ring through the slot, the first mounting ring is mounted on the steel pile cap through the first bolt, the support plate is mounted on the first mounting ring through the second bolt, and a passing plate is mounted on the support plate through the third bolt, so that the effect of assembling the construction support is achieved, the effect of conveniently disassembling the construction support is achieved through unscrewing the first bolt, the second bolt and the third bolt when the construction support is not used, the construction support is facilitated to be reused, and the loss speed of the construction support is reduced as much as possible.

Description

High pile cap construction support
Technical Field
The utility model belongs to the technical field of geotechnical engineering, and particularly relates to a high-pile cap construction support.
Background
The high pile cap foundation has good capability of bearing vertical load, and is widely applied to traffic engineering such as large-span bridges, highways and the like. The construction platform with high stability and good strength is needed for the construction of the bearing platform, the highway subgrade is filled, so that the construction space of the bearing platform is limited, and the support system is high in erection difficulty and risk.
Existing construction support:
the utility model discloses a high pile cap overhanging construction platform, which is disclosed in a document CN210459260U, wherein the positioning platform (taking a single pile as an example) comprises: seven triangular cantilever support frames are composed of a splicing angle steel and two steel pipe diagonal braces; the triangular cantilever support frame is formed by splicing a strip angle steel at 45 degrees to form a right angle, and one side of the angle steel spliced into the right angle is welded on the steel casing along the vertical direction; and the steel pipe diagonal brace is welded on the angle steel. The utility model solves the problems of limited construction space, difficult bracket erection, high construction difficulty and high risk of the traditional highway high-rise pile cap by directly welding the triangular cantilever support frame on the pile foundation steel pile casing to erect the construction platform.
However, this construction support passes through welded mode with support frame, angle steel etc. welded fastening on the steel pile casing, and in the construction process, these materials are inconvenient to dismantle, if dismantle this construction support through the mode of cutting for a long time, lead to this construction support to be worn gradually.
Disclosure of Invention
The utility model aims to provide a high pile cap construction support, which solves the problems that materials are inconvenient to disassemble in the prior art, if the construction support is disassembled in a cutting mode for a long time, the construction support is gradually worn, and the support is convenient to erect.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a high pile cap construction support, includes the steel protects a section of thick bamboo, the outside movable sleeve of steel protects a section of thick bamboo is equipped with first collar, install first bolt on the first collar, first collar is connected with the steel protects a section of thick bamboo through first bolt, the slot has been seted up in the outside of first collar, first collar has been inserted through the slot activity and has been had the backup pad, install the second bolt on the first collar, first collar is connected with the backup pad through the second bolt, the top overlap joint of backup pad has the traffic board, install the third bolt on the traffic board, the traffic board is connected with the backup pad through the third bolt.
The outside of steel protects a section of thick bamboo is detachable installs the second collar, install the screwed pipe on the second collar, the inside threaded connection of screwed pipe has the bracing piece, the top of bracing piece is connected with the bottom is detachable of backup pad, and second collar, screwed pipe and bracing piece are used for supporting the current board.
Install the fourth bolt on the second collar, the second collar is connected with the steel pile casing through the fourth bolt, and the fourth bolt is convenient for dismantle the installation of second collar.
As a preferable implementation mode, a fifth bolt is arranged on the supporting plate, the supporting plate is connected with the supporting rod through the fifth bolt, and the fifth bolt is convenient to assemble and disassemble the supporting plate and the supporting rod.
As a preferred embodiment, the support plate is provided with a second mounting groove, the fifth bolt is located in the second mounting groove, and the second mounting groove enables the fifth bolt to be completely immersed into the second mounting groove.
As a preferred embodiment, the through plate is provided with a first mounting groove, the third bolt is located in the first mounting groove, and the first mounting groove enables the third bolt to be completely immersed into the first mounting groove.
As a preferred embodiment, the first bolt, the second bolt, the third bolt, the fourth bolt and the fifth bolt are movably clamped with a rubber cover, and the rubber cover is used for protecting the first bolt, the second bolt, the third bolt, the fourth bolt and the fifth bolt.
Compared with the prior art, the utility model has the beneficial effects that,
(1) The first mounting ring is mounted on the steel casing through the first bolt, the supporting plate is mounted on the first mounting ring through the second bolt, the passing plate is mounted on the supporting plate through the third bolt, the effect of assembling the construction support is achieved, when the construction support is not used, the construction support is convenient to detach through unscrewing the first bolt, the second bolt and the third bolt, the repeated use of the construction support is facilitated, and the loss speed of the construction support is reduced;
(2) Through fixing the rubber cap in the outsides of first bolt, second bolt, third bolt, fourth bolt, avoid rainwater and first bolt, second bolt, third bolt, fourth bolt contact, simultaneously, avoid first bolt, second bolt, third bolt, fourth bolt to receive the collision of foreign matter as far as possible, slow down first bolt, second bolt, third bolt, fourth bolt and receive corrosion rate and damage rate.
Drawings
FIG. 1 is a schematic diagram showing the construction of a high pile cap construction support according to the present utility model;
fig. 2 is a schematic diagram of a construction support for a high pile cap, which is a display slot structure;
fig. 3 is a schematic view showing a rubber cover structure of a construction bracket of a high pile cap provided by the utility model.
1. A steel pile casing; 2. a first mounting ring; 3. a first bolt; 4. a slot; 5. a second bolt; 6. a support plate; 7. a through plate; 8. a third bolt; 9. a first mounting groove; 10. a second mounting ring; 11. a fourth bolt; 12. a threaded tube; 13. a support rod; 14. a fifth bolt; 15. a second mounting groove; 16. a rubber cover.
Detailed Description
The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings.
As shown in fig. 1-3, the present utility model provides a technical solution: the utility model provides a high pile cap construction support, including steel pile casing 1, steel pile casing 1's outside movable sleeve is equipped with first collar 2, install five first bolts 3 on the first collar 2, first collar 2 is connected with steel pile casing 1 through five first bolts 3, a plurality of slots 4 have been seted up in the outside of first collar 2, a plurality of backup pads 6 have been inserted through a plurality of slots 4 activity to first collar 2, install the second bolt 5 that corresponds with a plurality of backup pads 6 quantity on the first collar 2, first collar 2 is connected with corresponding backup pad 6 through second bolt 5, the top overlap joint of backup pad 6 has current board 7, current board 7 is convenient for the workman walk, install third bolt 8 on current board 7, current board 7 is connected with backup pad 6 through third bolt 8, through placing first collar 2 in the outside of steel pile casing 1, then utilize first bolt 3 to install first collar 2 in the outside of steel pile casing 1, then insert in slot 4 with backup pad 6, then utilize second bolt 5 to fix backup pad 6 on first collar 2, then overlap joint through plate 7 on backup pad 6, then utilize third bolt 8 to fix through plate 7 on backup pad 6, work can walk the operation on through plate 7 this moment, after the construction is accomplished, unscrew first bolt 3, second bolt 5 and third bolt 8, thereby dismantle the device from steel pile casing 1, through this technical scheme, solve if long-term through placing the dismantlement of this construction support of placing of cutting, then lead to this construction support to be gradually by the loss problem, the effect of being convenient for use this construction support many times has been realized.
As shown in fig. 1 and 2: the outside of steel casing 1 is detachable installs second collar 10, installs screwed pipe 12 on the second collar 10, and screwed pipe 12 inside threaded connection has bracing piece 13, and the top of bracing piece 13 is connected with the bottom of backup pad 6 is detachable, and this technical scheme's advantage is: by installing the second mounting ring 10 below the first mounting ring 2 and then fixing the support bar 13 on the threaded pipe 12, the support bar 13 is connected with the support plate 6, so that the support bar 13 is obliquely installed for stably supporting the support plate 6, and the stability of the construction bracket is increased.
The fourth bolt 11 is installed on the second installation ring 10, and the second installation ring 10 is connected with the steel casing 1 through the fourth bolt 11, and this technical scheme's advantage is: the second mounting ring 10 is connected with the steel casing 1 by the fourth bolt 11, and the second mounting ring 10 can be conveniently detached by unscrewing the fourth bolt 11.
As shown in fig. 2, a fifth bolt 14 is installed on the support plate 6, and the support plate 6 is connected with the support rod 13 through the fifth bolt 14, which has the advantages that: the fifth bolt 14 is used for connecting the support rod 13 and the support plate 6, and the fifth bolt 14 is unscrewed, so that the support plate 6 and the support rod 13 can be separated and detached conveniently.
The second mounting groove 15 is arranged on the supporting plate 6, the fifth bolt 14 is positioned in the second mounting groove 15, and the technical scheme has the advantages that: by providing the second mounting groove 15 such that the fifth bolt 14 is completely submerged in the second mounting groove 15, it is facilitated to mount the through plate 7 on the support plate 6.
As shown in fig. 2, the passing board 7 is provided with a first installation groove 9, and the third bolt 8 is positioned in the first installation groove 9, so that the technical scheme has the advantages that: through setting up first mounting groove 9 for third bolt 8 is submerged in first mounting groove 9 completely, and the work of being convenient for walks on passing board 7, avoids third bolt 8 to stumble the workman as far as possible.
As shown in fig. 1-3: the rubber cover 16 is movably clamped on the first bolt 3, the second bolt 5, the third bolt 8, the fourth bolt 11 and the fifth bolt 14, and the technical scheme has the advantages that: the rubber cover 16 prevents rainwater from contacting the first bolt 3, the second bolt 5, the third bolt 8 and the fourth bolt 11 as much as possible, and slows down the corrosion rate of the first bolt 3, the second bolt 5, the third bolt 8 and the fourth bolt 11 as much as possible.
Working principle:
as shown in fig. 1-3:
in the use process of the construction support, the first mounting ring 2 is placed on the outer side of the steel casing 1, then the first mounting ring 2 is mounted on the outer side of the steel casing 1 through the first bolts 3, then the support plate 6 is inserted into the slot 4, then the support plate 6 is fixed on the first mounting ring 2 through the second bolts 5, then the through plate 7 is lapped on the support plate 6, then the through plate 7 is fixed on the support plate 6 through the third bolts 8, at the moment, the work can be carried out on the through plate 7, after construction is completed, the first bolts 3, the second bolts 5 and the third bolts 8 are unscrewed, so that the construction support is detached from the steel casing 1, the construction support is prevented from being detached through the placement of cutting for a long time as much as possible, the construction support is gradually worn, and the effect of being convenient for multiple use of the construction support is achieved.
After the construction bracket is assembled, the rubber cover 16 is fixed on the outer sides of the first bolt 3, the second bolt 5, the third bolt 8 and the fourth bolt 11, so that rainwater is prevented from contacting the first bolt 3, the second bolt 5, the third bolt 8 and the fourth bolt 11 as much as possible, and meanwhile, the first bolt 3, the second bolt 5, the third bolt 8 and the fourth bolt 11 are prevented from being knocked by foreign objects as much as possible, and the corrosion speed and the damage speed of the first bolt 3, the second bolt 5, the third bolt 8 and the fourth bolt 11 are slowed down as much as possible.
The above description is only a preferred embodiment of the present utility model, and is not intended to limit the present utility model in any way, and those skilled in the art may apply the present utility model to other fields with equivalent embodiments, which are equivalent to the above-described embodiments, using the technical disclosure, and still fall within the scope of the present utility model.

Claims (5)

1. The utility model provides a high pile cap construction support, includes steel pile casing (1), its characterized in that, the outside movable sleeve of steel pile casing (1) is equipped with first collar (2), install first bolt (3) on first collar (2), first collar (2) are connected with steel pile casing (1) through first bolt (3), slot (4) have been seted up in the outside of first collar (2), first collar (2) have inserted backup pad (6) through slot (4) activity, install second bolt (5) on first collar (2), first collar (2) are connected with backup pad (6) through second bolt (5), the top overlap joint of backup pad (6) has access panel (7), install third bolt (8) on access panel (7), access panel (7) are connected with backup pad (6) through third bolt (8); the outer side of the steel casing (1) is detachably provided with a second mounting ring (10), the second mounting ring (10) is provided with a threaded pipe (12), the inside of the threaded pipe (12) is in threaded connection with a supporting rod (13), and the top end of the supporting rod (13) is detachably connected with the bottom of the supporting plate (6); the second mounting ring (10) is provided with a fourth bolt (11), and the second mounting ring (10) is connected with the steel casing (1) through the fourth bolt (11).
2. A high pile cap construction support according to claim 1, wherein: the support plate (6) is provided with a fifth bolt (14), and the support plate (6) is connected with the support rod (13) through the fifth bolt (14).
3. A high pile cap construction support according to claim 2, characterized in that: the support plate (6) is provided with a second mounting groove (15), and the fifth bolt (14) is positioned in the second mounting groove (15).
4. A high pile cap construction support according to claim 1, wherein: the passing plate (7) is provided with a first mounting groove (9), and the third bolt (8) is positioned in the first mounting groove (9).
5. A high pile cap construction support according to claim 2, characterized in that: rubber covers (16) are movably clamped on the first bolt (3), the second bolt (5), the third bolt (8), the fourth bolt (11) and the fifth bolt (14).
CN202320431656.3U 2023-03-09 2023-03-09 High pile cap construction support Active CN219386382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320431656.3U CN219386382U (en) 2023-03-09 2023-03-09 High pile cap construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320431656.3U CN219386382U (en) 2023-03-09 2023-03-09 High pile cap construction support

Publications (1)

Publication Number Publication Date
CN219386382U true CN219386382U (en) 2023-07-21

Family

ID=87167086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320431656.3U Active CN219386382U (en) 2023-03-09 2023-03-09 High pile cap construction support

Country Status (1)

Country Link
CN (1) CN219386382U (en)

Similar Documents

Publication Publication Date Title
CN219386382U (en) High pile cap construction support
CN212153687U (en) Assembled steel construction exempts from to pour concrete building structure
CN215441502U (en) Bridge side-span cast-in-place section short cantilever construction device
CN212688722U (en) Be used for interim consolidation device of mound roof beam convenient to installation is dismantled
CN213389764U (en) Bridge junction reinforcing apparatus
CN211622567U (en) Scaffold for building
CN209816675U (en) A assembled bracket for construction of 0# piece of rectangle mound
CN213563274U (en) Be used for prefabricated pier template of assembled bridge
CN215857357U (en) Large-scale fingerpost metal member
CN213298001U (en) Supporting structure for cable tunnel lining
CN211948455U (en) Subassembly is consolidated to native between stake convenient to dismouting
CN215886130U (en) Guardrail for tower crane convenient to carry out quick assembly disassembly
CN217380651U (en) Adjustable support of tunnel construction geomantic omen pipeline
CN218060136U (en) Reservoir reinforcing and enclosing auxiliary device
CN221031317U (en) Construction device for simply and conveniently installing basket cantilever I-shaped steel beam
CN211113208U (en) Road and bridge engineering is with safety protection frame
CN217460900U (en) Assembled steel construction building system
CN217923034U (en) Bridge steel structure with support reinforcing plate
CN212834998U (en) Bridge cantilever gradient fine adjustment structure
CN214145041U (en) Building construction safety device
CN215889349U (en) Steel bar truss building carrier plate support piece
CN221167446U (en) Assembled protector is used in filler stone construction
CN214061302U (en) Be used for large-scale bent cap to support combined cantilever bent cap bracket
CN220133510U (en) Civil engineering construction pouring template convenient to splice
CN218911136U (en) Bridge panel cantilever cast-in-situ supporting system structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant