CN219316403U - Building outer wall floor connects stubble position concrete placement correcting unit - Google Patents

Building outer wall floor connects stubble position concrete placement correcting unit Download PDF

Info

Publication number
CN219316403U
CN219316403U CN202223174978.9U CN202223174978U CN219316403U CN 219316403 U CN219316403 U CN 219316403U CN 202223174978 U CN202223174978 U CN 202223174978U CN 219316403 U CN219316403 U CN 219316403U
Authority
CN
China
Prior art keywords
template
threaded rod
wall floor
fixedly connected
concrete pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223174978.9U
Other languages
Chinese (zh)
Inventor
孙建志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jiaxing Zhongda Construction Co ltd
Original Assignee
Zhejiang Jiaxing Zhongda Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jiaxing Zhongda Construction Co ltd filed Critical Zhejiang Jiaxing Zhongda Construction Co ltd
Priority to CN202223174978.9U priority Critical patent/CN219316403U/en
Application granted granted Critical
Publication of CN219316403U publication Critical patent/CN219316403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a device for correcting concrete pouring at a joint part of a building outer wall floor. Comprises a first template and a second template; the novel sealing device is characterized in that a sealing strip is arranged at the lower part of the first template, an anchor bolt is rotationally connected to the bottom of the first template, a side support is arranged at the bottom of the second template, a fixed block is fixedly connected to the upper part of the second template, a threaded rod is rotationally connected to the fixed block, a turntable is fixedly connected to one end of the threaded rod, a clamping plate is rotationally connected to the threaded rod, and a pulling plate is fixedly connected to the other end of the threaded rod. The utility model has the advantages that: the handle on the rotary table can be used for driving the threaded rod to rotate, so that the clamping plate and the pulling plate clamp the first template to be fixed, the concrete pouring quality of the outer wall of the building is guaranteed, meanwhile, pouring is completed, the clamping plate and the pulling plate can be detached from the threaded rod and reused, the construction cost is reduced, the pulling screw is not required to be removed, and manpower and material resources are saved.

Description

Building outer wall floor connects stubble position concrete placement correcting unit
Technical Field
The utility model relates to the technical field of concrete pouring, in particular to a correction device for concrete pouring at a joint part of a building outer wall floor.
Background
In construction engineering, casting concrete is an important process. When pouring is performed on the floor of the building outer wall, the phenomena of dislocation, slurry leakage and mold expansion often occur.
The utility model discloses a building outer wall floor connects stubble position concrete placement correcting unit of number CN214462593U installs on the building outer wall through first template and second template to paste between second template and building outer wall and have the sponge adhesive tape, utilize the sponge adhesive tape to the second template with the seal between the building outer wall, reduce the building outer wall and connect the condition that stubble position leaks thick liquid and run out, whole construction is convenient, has avoided running thick liquid and has leaked thick liquid phenomenon, guarantees to connect stubble department concrete impression. But the device adopts to draw the screw rod to tighten first template and second template, after concrete solidification, should draw the screw rod to unable follow the taking out in the wall body, and after the template dismantles, still expose to draw the screw rod on the wall, still need reject again, caused the inconvenience on the use. Therefore, the concrete pouring correction device for the joint part of the building outer wall floor is provided for improvement.
Disclosure of Invention
The object of the present utility model is to solve at least one of the technical drawbacks.
Therefore, an object of the present utility model is to provide a device for correcting concrete pouring at a joint of a building outer wall floor, so as to solve the problems mentioned in the background art and overcome the defects existing in the prior art.
In order to achieve the above purpose, an embodiment of an aspect of the present utility model provides a device for correcting concrete pouring at a joint of a building exterior wall floor, including a first template and a second template; the novel sealing device is characterized in that a sealing strip is arranged at the lower part of the first template, an anchor bolt is rotationally connected to the bottom of the first template, a side support is arranged at the bottom of the second template, a fixed block is fixedly connected to the upper part of the second template, a threaded rod is rotationally connected to the fixed block, a turntable is fixedly connected to one end of the threaded rod, a clamping plate is rotationally connected to the threaded rod, and a pulling plate is fixedly connected to the other end of the threaded rod.
By any of the above schemes, preferably, the sealing strip is arranged at the joint of the outer wall floor, and the anchor bolt is provided with a transverse keel.
In any of the above schemes, preferably, the side support is a triangular thin plate, and the bottom of the side support is fixedly connected with the floor plate through expansion bolts.
By any of the above schemes, preferably, the fixing block is provided with a threaded hole, and the threaded rod is inserted into the threaded hole on the fixing block.
The technical scheme is adopted: the first and second templates provide support for concrete placement. The sealing strip prevents the slurry leakage and the slurry leakage phenomenon. The anchor bolt fixedly connects the first template with the wall body, and the transverse keel strengthens the constraint of the anchor bolt on the first template. The side support fixedly connects the second template with the floor plate to prevent the second template from tilting or toppling. The fixed block restrains the threaded rod to move only in the horizontal direction.
It is preferred from any of the above aspects that the fixed block and threaded rod are arranged in groups every other meter.
By any of the above schemes, preferably, the turntable is fixedly connected with a rotating handle.
By any of the above schemes, preferably, a threaded hole is formed in the middle of the clamping plate and the pulling plate, and the threaded rod passes through the threaded hole in the middle of the clamping plate and the pulling plate.
The technical scheme is adopted: the rotary handle facilitates workers to rotate the threaded rod, and the clamping plates and the pulling plates fix the first templates, so that the first templates can not incline inwards or outwards, and the vertical flatness of the poured wall surface is guaranteed. The first template and the second template are stably connected together through the fixed blocks and the threaded rods which are one meter and one group, so that the concrete pouring is guaranteed.
Compared with the prior art, the utility model has the following advantages and beneficial effects:
this building outer wall floor connects stubble position concrete placement correcting unit sets up the fixed block through the top at the second template to the cooperation sets up threaded rod, carousel, splint and arm-tie, makes the staff drive the threaded rod through the handle on the carousel of rotation and rotates, makes splint and arm-tie clamp with first template clamp fastening, guarantees building outer wall concrete placement quality. Meanwhile, pouring is completed, the clamping plates and the pulling plates can be detached from the threaded rods and reused, so that the construction cost is reduced, the pulling screws are not required to be removed, and manpower and material resources are saved.
Additional aspects and advantages of the utility model will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the utility model.
Drawings
The foregoing and/or additional aspects and advantages of the utility model will become apparent and may be better understood from the following description of embodiments taken in conjunction with the accompanying drawings in which:
FIG. 1 is a schematic view of a first view structure according to the present utility model;
fig. 2 is a schematic view of a second view structure according to the present utility model.
In the figure: the device comprises a first template, a second template, a 3-sealing strip, a 4-anchor bolt, a 5-side support, a 6-fixing block, a 7-threaded rod, an 8-turntable, a 9-clamping plate and a 10-pulling plate.
Detailed Description
Embodiments of the present utility model are described in detail below, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to like or similar elements or elements having like or similar functions throughout. The embodiments described below by referring to the drawings are illustrative and intended to explain the present utility model and should not be construed as limiting the utility model.
In the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
As shown in fig. 1-2, the utility model comprises a first template 1 and a second template 2, wherein a sealing strip 3 is arranged at the lower part of the first template 1, an anchor bolt 4 is rotatably connected at the bottom of the first template 1, a side support 5 is arranged at the bottom of the second template 2, a fixed block 6 is fixedly connected at the upper part of the second template 2, a threaded rod 7 is rotatably connected at the fixed block 6, a turntable 8 is fixedly connected at one end of the threaded rod 7, a clamping plate 9 is rotatably connected on the threaded rod 7, and a pulling plate 10 is fixedly connected at the other end of the threaded rod 7.
Example 1: the sealing strip 3 is arranged at the joint of the floor of the outer wall, and the anchor bolt 4 is provided with a transverse keel. The side support 5 is a triangular thin plate, and the bottom of the side support 5 is fixedly connected with the floor plate through expansion bolts. Threaded holes are formed in the fixed blocks 6, and threaded rods 7 are inserted into the threaded holes in the fixed blocks 6. The first and second forms 1, 2 provide support for concrete placement. The sealing strip 3 prevents the slurry leakage and the slurry leakage. The anchor bolts 4 fixedly connect the first template 1 with the wall body, and the transverse keels strengthen the constraint of the anchor bolts 4 on the first template 1. The side support 5 fixedly connects the second template 2 with the floor slab to prevent the second template 2 from tilting or toppling. The fixed block 6 restrains the threaded rod 7 to move only in the horizontal direction.
Example 2: the fixed block 6 and the threaded rod 7 are arranged in groups every other meter. The turntable 8 is fixedly connected with a rotating handle. Threaded holes are formed in the middle of the clamping plate 9 and the pulling plate 10, and the threaded rod 7 penetrates through the threaded holes in the middle of the clamping plate 9 and the pulling plate 10. The rotary handle facilitates the workers to rotate the threaded rod 7, and the clamping plate 9 and the pulling plate 10 fix the first template 1, so that the first template 1 can not incline inwards or outwards, and the vertical flatness of the poured wall surface is ensured. The first template 1 and the second template 2 are stably connected together by the fixing blocks 6 and the threaded rods 7 which are one meter and one group, so that the concrete pouring is guaranteed.
The working principle of the utility model is as follows:
s1, fixedly connecting a first template 1 with an outer wall of a lower building through an anchor bolt 4;
s2, sleeving the clamping plate 9 and the pulling plate 10 on the first template 1, rotating the clamping plate 9 to clamp the first template 1, and fixedly connecting the side support 5 with the floor plate through expansion bolts;
s3, rotating a handle on the rotary table 8, and driving the threaded rod 7 to rotate and driving the clamping plate 9 and the pulling plate 10 to move by the rotary table 8 to correct the first template 1, so that the first template is kept in a vertical state, and concrete is poured. The sealing strip 3 at the bottom of the first template 1 prevents slurry leakage and slurry leakage.
Compared with the prior art, the utility model has the following beneficial effects compared with the prior art:
this building outer wall floor connects stubble position concrete placement correcting unit sets up fixed block 6 through 2 tops of second template to the cooperation sets up threaded rod 7, carousel 8, splint 9 and arm-tie 10, makes the staff can drive threaded rod 7 through the handle on the rotatory carousel 8 and rotates, makes splint 9 and arm-tie 10 with first template 1 clamp fastening, guarantees building outer wall concrete placement quality. Meanwhile, pouring is completed, the clamping plate 9 and the pulling plate 10 can be detached from the threaded rod 7 and recycled, so that the construction cost is reduced, the pulling screw is not required to be removed, and manpower and material resources are saved.
In the description of the present specification, a description referring to terms "one embodiment," "some embodiments," "examples," "specific examples," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present utility model. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
It will be readily understood by those skilled in the art that the present utility model, including any combination of parts described in the summary and detailed description of the utility model above and shown in the drawings, is limited in scope and does not constitute a complete description of the various aspects of these combinations for the sake of brevity. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.
Although embodiments of the present utility model have been shown and described above, it will be understood that the above embodiments are illustrative and not to be construed as limiting the utility model, and that variations, modifications, alternatives, and variations may be made in the above embodiments by those skilled in the art without departing from the spirit and principles of the utility model. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. A concrete pouring correction device for a building outer wall floor joint part comprises a first template (1) and a second template (2); the novel sealing structure is characterized in that a sealing strip (3) is arranged at the lower part of the first template (1), an anchor bolt (4) is rotationally connected to the bottom of the first template (1), a side support (5) is arranged at the bottom of the second template (2), a fixed block (6) is fixedly connected to the upper part of the second template (2), a threaded rod (7) is rotationally connected to the fixed block (6), a turntable (8) is fixedly connected to one end of the threaded rod (7), a clamping plate (9) is rotationally connected to the threaded rod (7), and a pulling plate (10) is fixedly connected to the other end of the threaded rod (7).
2. The building exterior wall floor joint part concrete pouring correction device as claimed in claim 1, wherein: the sealing strip (3) is arranged at the joint of the outer wall floor, and the anchor bolt (4) is provided with a transverse keel.
3. The building exterior wall floor joint part concrete pouring correction device as claimed in claim 2, wherein: the side support (5) is a triangular thin plate, and the bottom of the side support (5) is fixedly connected with the floor plate through an expansion bolt.
4. A building exterior wall floor joint part concrete placement correcting unit according to claim 3, wherein: threaded holes are formed in the fixing blocks (6), and the threaded rods (7) are inserted into the threaded holes in the fixing blocks (6).
5. The building exterior wall floor joint part concrete pouring correction device according to claim 4, wherein: the fixed block (6) and the threaded rod (7) are arranged in a group every other meter.
6. The building exterior wall floor joint part concrete pouring correction device according to claim 5, wherein: the rotary table (8) is fixedly connected with a rotary handle.
7. The building exterior wall floor joint part concrete pouring correction device according to claim 6, wherein: threaded holes are formed in the middle of the clamping plate (9) and the pulling plate (10), and the threaded rod (7) penetrates through the threaded holes in the middle of the clamping plate (9) and the pulling plate (10).
CN202223174978.9U 2022-11-29 2022-11-29 Building outer wall floor connects stubble position concrete placement correcting unit Active CN219316403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223174978.9U CN219316403U (en) 2022-11-29 2022-11-29 Building outer wall floor connects stubble position concrete placement correcting unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223174978.9U CN219316403U (en) 2022-11-29 2022-11-29 Building outer wall floor connects stubble position concrete placement correcting unit

Publications (1)

Publication Number Publication Date
CN219316403U true CN219316403U (en) 2023-07-07

Family

ID=87030356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223174978.9U Active CN219316403U (en) 2022-11-29 2022-11-29 Building outer wall floor connects stubble position concrete placement correcting unit

Country Status (1)

Country Link
CN (1) CN219316403U (en)

Similar Documents

Publication Publication Date Title
CN110748159B (en) Building beam column construction pouring construction steel template
CN219316403U (en) Building outer wall floor connects stubble position concrete placement correcting unit
CN210827019U (en) Template stabilizing and fastening device used during road and bridge construction
CN210798272U (en) Repeatedly usable's civil engineering pours template
CN209873805U (en) Concrete pouring device for ramp-free basement construction
CN209099761U (en) A kind of high-supported formwork frame
CN207436495U (en) A kind of building template gap sealing part
CN213572984U (en) Building templates that leakproofness is strong
CN210370700U (en) Self-locking type tunnel secondary lining trolley end plugging template
CN211897742U (en) Guardrail steel form
CN213174761U (en) Pulling-on piece formula aluminum alloy shear wall template reinforcing apparatus
CN212562475U (en) Water and electricity pipe hangs mould
CN211873104U (en) Continuous wall encircles to construction joint waterproof construction
CN209990152U (en) Opening-closing type pouring opening structure
CN109930821B (en) Columnar frame structure die
CN220790570U (en) Template for constructional engineering
CN220111874U (en) Turnover residual glue cleaning device
CN212359102U (en) Combined type supporting template for constructional engineering
CN219993122U (en) Novel detachable Hua Futong
CN219753974U (en) Simple and easy quick detach case template of narrow movement joint
CN220539214U (en) Combined spliced beam column template
CN215519964U (en) Structure for controlling slurry leakage at bottom of concrete wall formwork
CN214089295U (en) EPR movement joint repair stagnant water structure
CN219033319U (en) Angle type prefabricated brick moulding bed connecting device
CN219450445U (en) Pier column template convenient to compound die

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant