CN219315826U - Waterproof construction for steel sheet pile construction - Google Patents

Waterproof construction for steel sheet pile construction Download PDF

Info

Publication number
CN219315826U
CN219315826U CN202320347296.9U CN202320347296U CN219315826U CN 219315826 U CN219315826 U CN 219315826U CN 202320347296 U CN202320347296 U CN 202320347296U CN 219315826 U CN219315826 U CN 219315826U
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
waterproof
construction according
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320347296.9U
Other languages
Chinese (zh)
Inventor
宋伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jiacheng Construction Engineering Co ltd
Original Assignee
Hubei Jiacheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jiacheng Construction Engineering Co ltd filed Critical Hubei Jiacheng Construction Engineering Co ltd
Priority to CN202320347296.9U priority Critical patent/CN219315826U/en
Application granted granted Critical
Publication of CN219315826U publication Critical patent/CN219315826U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The application relates to a waterproof construction for steel sheet pile construction belongs to steel sheet pile construction field, and its technical scheme main points include: locate the inboard waterproof board that is used for covering the seam that is located of adjacent steel sheet pile, be equipped with the fixed subassembly that is used for fixed waterproof board on the steel sheet pile, this application is when using, and after the steel sheet pile was built, use fixed subassembly to install the waterproof board in the seam of adjacent steel sheet pile, the simple operation is convenient for standardize the operation, and the waterproof effect is ensured, and the waterproof board is difficult for impaired, can use repeatedly, energy-concerving and environment-protective.

Description

Waterproof construction for steel sheet pile construction
Technical Field
The application relates to the field of steel sheet pile construction, in particular to a waterproof structure for steel sheet pile construction.
Background
Sheet piles are steel structures with linkages at the edges and the linkages can be freely combined to form a continuous tight retaining or retaining wall.
When the steel sheet pile is used as a water retaining wall, materials such as hemp roots, fly ash, sawn wood foam, expansion cement and the like can be plugged into gaps at lock catches of adjacent steel sheet piles to prevent leakage.
With respect to the related art in the above, the inventors consider that there are the following drawbacks: waterproof materials are plugged into gaps at the lock catches to prevent water, standardized operation is not convenient, the waterproof effect is greatly influenced by personal experience of staff, in addition, the waterproof materials are mostly powdery and cannot be basically recycled, and resource waste is caused.
Disclosure of Invention
In order to improve the problem that the powdery waterproof material is used for waterproofing, the waterproof effect is unstable and is inconvenient to use repeatedly, the application provides a waterproof structure for steel sheet pile construction.
The application provides a waterproof construction for steel sheet pile construction adopts following technical scheme:
a waterproof structure for steel sheet pile construction, comprising: the waterproof plates are arranged on the inner sides of the adjacent steel sheet piles and are positioned at the joints and used for covering the joints, and the steel sheet piles are provided with fixing assemblies used for fixing the waterproof plates.
Through adopting above-mentioned technical scheme, after the steel sheet pile is built, use fixed subassembly to install the waterproof board in adjacent steel sheet pile's seam crossing, the simple operation is convenient for standardize the operation, and the waterproof effect is ensured, and the waterproof board is difficult for impaired, can use repeatedly, energy-concerving and environment-protective.
The application further sets up: the waterproof board comprises a board body and a waterproof pad arranged on one side of the board body, and the waterproof pad is abutted against the joint of the adjacent steel sheet piles.
Through adopting above-mentioned technical scheme, waterproof pad has certain elasticity, and under the extrusion of plate body, waterproof pad closely laminates in adjacent steel sheet pile's seam crossing, and the water-proof effects is good.
The application further sets up: the locating slide way is characterized in that locating convex strips are arranged on two sides of the plate body along the length direction of the plate body, and locating slide grooves for accommodating the locating convex strips are arranged on the steel sheet piles along the height direction of the steel sheet piles.
By adopting the technical scheme, on one hand, when the plate body is installed, the positioning convex strips on the plate body are aligned with the positioning sliding grooves and slide in along the positioning sliding grooves, so that the operation is convenient; on the other hand, after the plate body is installed in place, the even locating convex strip of location spout exerts towards the force of steel sheet pile, makes waterproof pad and steel sheet pile's seam crossing laminating inseparabler, and the water-proof effects is better.
The application further sets up: the fixing component comprises a jack arranged on the steel sheet pile, a plug rod is arranged in the jack in a penetrating mode, and a slot corresponding to the jack is arranged on the positioning convex strip.
Through adopting above-mentioned technical scheme, slide into the waterproof board back in place, the jack aligns with the slot, with the inserted bar slide into in jack and the slot, the waterproof board is fixed, the simple operation has promoted the efficiency of construction.
The application further sets up: the outside of the inserted link is sleeved with a spring, one end of the spring is connected to the inserted link, the other end of the spring is connected to the steel sheet pile, and the spring enables the inserted link to slide towards the direction of the positioning convex strip.
Through adopting above-mentioned technical scheme, under the effect of spring restoring force, the inserted bar supports tightly in jack and slot, and the inserted bar is difficult for pine to take off, and waterproof board is fixed more firm.
The application further sets up: the end part of the inserted link is spherical.
Through adopting above-mentioned technical scheme, when the inserted bar slides into the jack, plays the guide effect, makes the inserted bar more easily slide into the jack.
The application further sets up: and the bottom of the steel sheet pile is provided with a diversion trench along the length direction of the steel sheet pile.
By adopting the technical scheme, when the steel sheet pile leaks, water penetrating into the steel sheet pile flows into the diversion trench, so that the possibility that the construction site in the steel sheet pile is corroded by water in the overhaul process is reduced, and the construction quality is improved.
The application further sets up: the steel sheet pile bottom is located the tip department of guiding gutter and is equipped with the water storage bucket, the water storage bucket is less than the guiding gutter, the water storage bucket is linked together with the guiding gutter.
Through adopting above-mentioned technical scheme, infiltration steel sheet pile in water can follow the guiding gutter inflow in the water storage bucket, concentrate the collection to the water of seepage, be convenient for the aftertreatment.
In summary, the present application has the following beneficial effects:
1. when the waterproof board is installed, the waterproof board slides in along the positioning sliding groove, the waterproof board is fixed by the inserting rod, the operation is convenient, the standardized operation is convenient, the waterproof effect is guaranteed, the waterproof board is not easy to damage, the waterproof board can be used repeatedly, and the waterproof board is energy-saving and environment-friendly.
2. The water permeated into the steel sheet pile flows into the water storage barrel along the diversion trench, so that the possibility of water erosion of a construction site is reduced, and the construction quality is improved.
Drawings
FIG. 1 is a schematic overall structure of an embodiment of the present application;
FIG. 2 is an enlarged view of FIG. 1 at A in accordance with an embodiment of the present application;
fig. 3 is a partial cross-sectional view of a steel sheet pile according to an embodiment of the present application.
Reference numerals illustrate:
1. steel sheet piles; 11. a diversion trench; 12. a water storage bucket; 2. a waterproof board; 21. a plate body; 22. a waterproof pad; 23. positioning convex strips; 24. positioning a chute; 25. a jack; 26. a rod; 27. a slot; 28. a spring; 3. and (5) cofferdam.
Detailed Description
The present application is described in further detail below with reference to the accompanying drawings.
This embodiment: the waterproof structure for steel sheet pile construction is specifically described by taking waterproof construction applied to a cofferdam as an example, and referring to fig. 1 and 2, a cofferdam 3 is formed by enclosing a plurality of steel sheet piles 1 which are sequentially connected end to end, and the cofferdam 3 is rectangular. The waterproof structure includes: the waterproof board 2 for covering the joint is arranged on the inner side of the adjacent steel sheet pile 1 and positioned at the joint, the waterproof board 2 comprises a board body 21 and a waterproof pad 22 adhered to one side of the board body 21, the waterproof pad 22 is abutted against the joint of the adjacent steel sheet pile 1, and a fixing component for fixing the board body 21 is arranged on the steel sheet pile 1.
And each side of the cofferdam 3 is welded with a diversion trench 11 near the bottom along the length direction of the cofferdam 3, and two ends of the diversion trench 11 are opened. The corner inside the cofferdam 3 is positioned below the diversion trench 11 and is connected with a water storage barrel 12 through bolts, and the water storage barrel 12 is communicated with the diversion trenches 11 on two sides of the water storage barrel 12.
After the cofferdam 3 is built, the fixing component is used for fixing the plate body 21 at the joint of the adjacent steel sheet piles 1, the operation is convenient, standardized operation is convenient, the waterproof pad 22 is abutted against the joint of the adjacent steel sheet piles 1, the waterproof effect is guaranteed, the waterproof plate 2 is not easy to damage, the waterproof plate can be used repeatedly, and the energy-saving and environment-friendly effects are achieved.
When infiltration appears in cofferdam 3, infiltration cofferdam 3 inside water along guiding gutter 11 inflow in the water storage bucket 12, regularly clear up water storage bucket 12 can, reduced the possibility that construction site in cofferdam 3 is eroded by water, further promoted construction quality.
Referring to fig. 2 and 3, positioning convex strips 23 are arranged on two sides of the plate body 21 along the length direction of the plate body 21, the positioning convex strips 23 and the plate body 21 are integrally formed, the plane of the positioning convex strips 23 and the plane of the plate body 21 is forty-five degrees, and a positioning chute 24 for accommodating the positioning convex strips 23 is formed at the edge of the steel sheet pile 1 along the height direction of the steel sheet pile 1.
The fixed subassembly is including seting up in the jack 25 of steel sheet pile 1 edge, and the jack 25 is interior to wear to be equipped with the inserted bar 26 horizontally, has seted up the slot 27 corresponding with jack 25 on the location sand grip 23, and the inserted bar 26 overcoat is equipped with spring 28, and spring 28 one end fixed connection is on inserted bar 26, and spring 28 other end fixed connection is on steel sheet pile 1, and spring 28 makes inserted bar 26 produce the trend of orientation sand grip 23 direction slip.
When the waterproof board 2 is installed, firstly, the inserting rod 26 is pulled up, at this moment, the spring 28 is in a stretched state, then the positioning convex strips 23 on the board body 21 are aligned with the positioning sliding grooves 24 on the steel sheet piles 1 and slide in along the positioning sliding grooves 24, after the positioning convex strips slide in place, the inserting holes 25 are aligned with the inserting grooves 27, the inserting rod 26 is loosened, the inserting rod 26 is rebounded into the inserting holes 25 and the inserting grooves 27 under the action of the restoring force of the spring 28, in order to enable the inserting rod 26 to slide into the inserting grooves 27 more easily, the end portions of the inserting rod 26 are spherical, after the inserting rod 26 slides into the inserting grooves 27, the board body 21 is fixed, the waterproof pad 22 abuts against the joint of the adjacent steel sheet piles 1, the operation is convenient, and the waterproof effect is good.
The implementation principle of the waterproof structure for steel sheet pile construction in the embodiment of the application is as follows: when the waterproof board 2 is installed, the board body 21 slides in along the positioning sliding groove 24, after the waterproof board is slid in place, the board body 21 is fixed by using the inserting rod 26, the waterproof pad 22 is abutted against the joint of the adjacent steel sheet piles 1, the operation is convenient, standardized operation is convenient, the waterproof effect is guaranteed, and the waterproof board 2 is not easy to damage, can be used repeatedly, and is energy-saving and environment-friendly.
When infiltration appears in cofferdam 3, infiltration water in the cofferdam 3 flows into water storage bucket 12 along guiding gutter 11, regularly handle water storage bucket 12 can, the simple operation has reduced the possibility that construction site in cofferdam 3 is corroded by water, has promoted construction quality.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (8)

1. The utility model provides a waterproof construction for steel sheet pile construction which characterized in that includes: the waterproof plates (2) are arranged on the inner sides of the adjacent steel sheet piles (1) and are positioned at joints and used for covering the joints, and fixing assemblies used for fixing the waterproof plates (2) are arranged on the steel sheet piles (1).
2. A waterproof structure for steel sheet pile construction according to claim 1, characterized in that: the waterproof board (2) comprises a board body (21) and a waterproof pad (22) arranged on one side of the board body (21), and the waterproof pad (22) is abutted against the joint of the adjacent steel sheet piles (1).
3. A waterproof structure for steel sheet pile construction according to claim 2, characterized in that: the steel sheet pile is characterized in that positioning convex strips (23) are arranged on two sides of the plate body (21) along the length direction of the plate body (21), and positioning sliding grooves (24) used for accommodating the positioning convex strips (23) are formed in the steel sheet pile (1) along the height direction of the steel sheet pile (1).
4. A waterproof construction for steel sheet pile construction according to claim 3, characterized in that: the fixing assembly comprises a jack (25) arranged on the steel sheet pile (1), a plug rod (26) is arranged in the jack (25) in a penetrating mode, and a slot (27) corresponding to the jack (25) is arranged on the positioning convex strip (23).
5. The waterproof structure for steel sheet pile construction according to claim 4, wherein: the utility model discloses a steel sheet pile, including inserted bar (26), spring (28) are equipped with in the overcoat of inserted bar (26), spring (28) one end is connected on inserted bar (26), spring (28) other end is connected on steel sheet pile (1), spring (28) make inserted bar (26) produce towards the trend of location sand grip (23) direction slip.
6. The waterproof structure for steel sheet pile construction according to claim 4, wherein: the end of the inserted link (26) is spherical.
7. A waterproof structure for steel sheet pile construction according to claim 1, characterized in that: the bottom of the steel sheet pile (1) is provided with a diversion trench (11) along the length direction of the steel sheet pile (1).
8. The waterproof structure for steel sheet pile construction according to claim 7, wherein: the water storage barrel (12) is arranged at the end part of the bottom of the steel sheet pile (1) located at the diversion trench (11), the water storage barrel (12) is lower than the diversion trench (11), and the water storage barrel (12) is communicated with the diversion trench (11).
CN202320347296.9U 2023-02-27 2023-02-27 Waterproof construction for steel sheet pile construction Active CN219315826U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320347296.9U CN219315826U (en) 2023-02-27 2023-02-27 Waterproof construction for steel sheet pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320347296.9U CN219315826U (en) 2023-02-27 2023-02-27 Waterproof construction for steel sheet pile construction

Publications (1)

Publication Number Publication Date
CN219315826U true CN219315826U (en) 2023-07-07

Family

ID=87029608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320347296.9U Active CN219315826U (en) 2023-02-27 2023-02-27 Waterproof construction for steel sheet pile construction

Country Status (1)

Country Link
CN (1) CN219315826U (en)

Similar Documents

Publication Publication Date Title
CN102900089B (en) With the combination piling bar cofferdam of hydro-expansive rubber waterproof fore shaft
CN101705667A (en) Anti-freezing water stop structure of hydraulic concrete expansion joint
CN205558920U (en) Fissured repair structure of last lining cutting of tunnel wall
CN110424723A (en) Beam slab modular system for clear water concrete placings
CN219315826U (en) Waterproof construction for steel sheet pile construction
CN204418231U (en) A kind of underground concrete exterior wall shrinkage joint water-tight device
CN112081143B (en) Anti-seepage construction method for preventing and draining combination of top plate deformation joints
CN209703489U (en) A kind of bored concrete pile suitable for solution cavity geology
CN209066505U (en) A kind of diaphragm wall circular construction joint waterproof construction
CN112095580B (en) Precast pile in area corroded by chloride ions, preparation method of precast pile and construction method for reducing negative friction resistance of precast pile
CN206034665U (en) Waterproof board and use thereof
CN211850068U (en) Waterproof construction at building structure expansion joint
CN211925073U (en) Slip casting union coupling device for pile foundation construction
CN205976012U (en) Waterproof board and use thereof
CN210562331U (en) Anti-floating structure combined with underground continuous wall and provided with capping beam
CN215165291U (en) Seepage-proofing structure for concrete aqueduct parting
CN217027188U (en) Bearing platform structure for bridge construction
CN218294704U (en) Circular cutting type steel blade foot device
CN217500173U (en) Water stop H-shaped steel joint for underground continuous wall
CN220035378U (en) Geotechnical cell connector and geotechnical cell
CN217896806U (en) External-pasting type water-stopping sealing construction structure for leaking stoppage of structural deformation joint
CN209412858U (en) A kind of Stone brick city side PC contains and its mounting structure
CN215702982U (en) Combined type sleeve milling joint device
CN217678887U (en) Special layering of waterproof blanket installation seam of bentonite
CN214994755U (en) Waterproofing membrane with sealed edge that agrees with

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant