CN219311600U - Use fixture for grouting sleeve - Google Patents

Use fixture for grouting sleeve Download PDF

Info

Publication number
CN219311600U
CN219311600U CN202222812264.XU CN202222812264U CN219311600U CN 219311600 U CN219311600 U CN 219311600U CN 202222812264 U CN202222812264 U CN 202222812264U CN 219311600 U CN219311600 U CN 219311600U
Authority
CN
China
Prior art keywords
section
thick bamboo
grouting sleeve
bolt
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222812264.XU
Other languages
Chinese (zh)
Inventor
夏云
陈春涛
李世春
党永鑫
黄虹晴
金歌
周谢忠
郎伟涛
谢荣
郭�旗
孙子阿伍
何亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Construction Industrialization Co Ltd
Original Assignee
PowerChina Chengdu Construction Industrialization Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Construction Industrialization Co Ltd filed Critical PowerChina Chengdu Construction Industrialization Co Ltd
Priority to CN202222812264.XU priority Critical patent/CN219311600U/en
Application granted granted Critical
Publication of CN219311600U publication Critical patent/CN219311600U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a telescopic use frock of grout, belongs to grout sleeve location technical field, includes the rubber section of thick bamboo, the rubber section of thick bamboo includes interconnect's cylinder section and circular cone column section, the rubber section of thick bamboo middle part is equipped with one and runs through the round hole, be equipped with the bolt in the round hole that runs through, be connected through the nut between rubber section of thick bamboo and the bolt, be equipped with the gasket between the circular cone column section tip of nut and rubber section of thick bamboo. In the utility model, the assembly and disassembly of the tooling are simple and rapid, time and labor are saved, the leakage of cement paste can be effectively prevented, and the quality of the finished product of the prefabricated column is greatly improved; meanwhile, the tool is low in damage rate and reusable, and production cost is greatly reduced.

Description

Use fixture for grouting sleeve
Technical Field
The utility model belongs to the technical field of grouting sleeve positioning, relates to the technical field of connection positioning between a prefabricated column bottom die and a grouting sleeve, and particularly relates to a grouting sleeve using tool.
Background
In recent years, with the strong promotion and propaganda of building offices in various places, an assembled building has become a novel building structure development direction, and is rapidly being integrated into a traditional cast-in-place concrete building structure. The prefabricated column is used as a vertical component, is a very important ring in an assembled building, and can be accurately positioned and installed on the upper layer and the lower layer, and directly relates to the positioning of vertical steel bars in the prefabricated column, so that the position and the length of the vertical steel bars in the prefabricated column can be strictly controlled in the production process of the prefabricated column. Considering the problem of prefabricated post die block and grout sleeve connection location, adopt more one kind of locating connection piece to be expansion bolts in the market now, need screw up the nut with electronic spanner fast rotation, utilize the wedge inclination to promote the expansion to produce friction bond power, reach fixed effect, generally be used to the fastening of rail guard, awning, air conditioner etc. on materials such as cement, brick. However, the expansion bolt is not very reliable, if the load is subjected to larger vibration, the phenomenon of loosening can possibly occur, and the bottom of the grouting sleeve cannot be tightly covered after the expansion of the expansion iron pipe, so that the grouting sleeve can be permeated into the grouting sleeve in the concrete pouring process, and the quality of the finished product of the precast column is seriously affected.
Meanwhile, a split type panel bolt (CN 210623363U) provides a split type panel bolt, including end cover and threaded rod, end cover left end intermediate position fixed threaded rod, threaded rod annular outer end installation limit slat, limit slat is installed at the end cover left end, the end cover left end is equipped with the rubber spacing ring, the inside spacing slat that is equipped with of rubber spacing ring, rubber spacing ring left end fixed rubber cylinder, rubber cylinder and rubber spacing ring all suit are at threaded rod annular outer end, rubber cylinder left end installation nut, the nut is installed at rubber cylinder annular outer end, the ring channel is seted up to rubber cylinder annular outer end left part, the inside rubber ring that is equipped with of ring channel, the rubber ring extends the ring channel inside, rubber ring right-hand member installation nut. The split type plate bolt is additionally provided with more limiting rings and limiting strips, and is complex in structure and installation.
Therefore, in order to solve the problems, the utility model provides a tool for using a grouting sleeve.
Disclosure of Invention
In view of the above-mentioned drawbacks of the prior art, an object of the present utility model is to provide a tool for use in grouting sleeves, which is used for solving the technical problems of complex structure, complex installation and low stability of a connecting piece connected between a prefabricated bottom die and a grouting sleeve in the prior art.
In order to achieve the above and other related objects, the utility model provides a tool for using a grouting sleeve, which comprises a rubber cylinder, wherein a through round hole is formed in the middle of the rubber cylinder, a bolt is arranged in the through round hole, the rubber cylinder is connected with the bolt through a nut, and a gasket is arranged between the nut and the end part of the rubber cylinder.
In any of the above embodiments, the diameter of the through hole is preferably 1 to 3mm larger than the diameter of the bolt.
In any of the above embodiments, preferably, the diameter of the through hole is 2mm larger than the diameter of the bolt.
In any of the above embodiments, preferably, the rubber tube includes a cylindrical section and a conical section connected to each other.
In any of the above schemes, it is preferable that the cylindrical section and the conical section are integrally formed.
In any of the above aspects, preferably, the outer diameter of the cylindrical section is equal to the inner diameter of the grouting sleeve.
In any of the above embodiments, it is preferable that the smallest diameter of the conical cylindrical section is larger than the diameter of the cylindrical section.
In any of the above aspects, preferably, the spacer is disposed between the nut and the end of the conical post section.
As described above, the grouting sleeve using tool has the following beneficial effects:
1. compared with the traditional expansion bolts, the tool can finish the dismounting work by using the common manual wrench, and is simple and quick in dismounting, time-saving and labor-saving.
2. According to the utility model, the tool expands the rubber cylinder under the action of external force extrusion, and has a good fixing effect with a larger friction force formed inside the grouting sleeve, so that the tool can be accurately positioned on the bottom die of the prefabricated column, and can be completely compacted with the bottom of the grouting sleeve, thereby effectively preventing cement paste from leaking and greatly improving the quality of the finished product of the prefabricated column.
3. In the utility model, the rubber cylinder is a high-elasticity polymer material with reversible deformation, so that the damage rate is greatly reduced, the repeated use rate is improved, the purchasing quantity is reduced, and the production cost is saved.
Drawings
Fig. 1 shows a front view of the present utility model.
Fig. 2 shows a left side view of the present utility model.
Fig. 3 shows a right side view of the present utility model.
Fig. 4 shows a left side view of the rubber barrel.
Fig. 5 shows a top view of the prefabricated pillar bottom die.
Description of element reference numerals
1-a bolt; 2-a rubber cylinder; 21-penetrating the round hole; 22-cylindrical section; 23-conical column section; 3-a gasket; 4-nuts; 5-reserving a round hole.
Detailed Description
Further advantages and effects of the present utility model will become apparent to those skilled in the art from the disclosure of the present utility model, which is described by the following specific examples.
Please refer to fig. 1 to 5. It should be understood that the structures, proportions, sizes, etc. shown in the drawings are for illustration purposes only and should not be construed as limiting the utility model to the extent that it can be practiced, since modifications, changes in the proportions, or otherwise, used in the practice of the utility model, are not intended to be critical to the essential characteristics of the utility model, but are intended to fall within the spirit and scope of the utility model. Also, the terms such as "upper," "lower," "left," "right," "middle," and "a" and the like recited in the present specification are merely for descriptive purposes and are not intended to limit the scope of the utility model, but are intended to provide relative positional changes or modifications without materially altering the technical context in which the utility model may be practiced.
Referring to fig. 1-5, the utility model provides a tool for grouting a sleeve, which comprises a rubber cylinder 2, wherein a through round hole 21 is formed in the middle of the rubber cylinder 2, a bolt 1 is arranged in the through round hole 21, the rubber cylinder 2 is connected with the bolt 1 through a nut 4, and a gasket 3 is arranged between the nut 4 and the end part of the rubber cylinder 2.
When the embodiment is used, in the prior art, expansion bolts are adopted for connection and positioning between the prefabricated column bottom die and the grouting sleeve, in the positioning process, the nut is required to be screwed down by using an electric spanner to quickly rotate, and the expansion is promoted to generate friction grip by utilizing wedge-shaped inclination, so that the fixing effect is achieved. However, the expansion bolt is not very reliable, if the load is subjected to larger vibration, the phenomenon of loosening can possibly occur, and the bottom of the grouting sleeve cannot be tightly covered after the expansion of the expansion iron pipe, so that the grouting sleeve can be permeated into the grouting sleeve in the concrete pouring process, and the quality of the finished product of the precast column is seriously affected. Therefore, in order to solve these problems, the present embodiment proposes a tool for using a grouting sleeve. Specifically, the tool consists of four parts, namely a bolt 1, a nut 4, a gasket 3 and a rubber cylinder 2. The center of the rubber cylinder 2 is provided with a through round hole 21, so that the bolt 1 passes through the through round hole 21 at the center of the rubber cylinder 2, the other side of the rubber cylinder passes through the tail of the bolt 1 by using the gasket 3, and the rubber cylinder is tightly sleeved with the nut 4, so that the gasket 3 is tightly pressed at the bottom of the rubber cylinder 2. In the positioning process, a spanner is used for tightening the nut 4, so that the gasket 3 is tightly pressed at the bottom of the rubber cylinder 2, and the rubber cylinder 2 placed in the grouting sleeve expands under the action of external force extrusion until the joint surface of the rubber cylinder and the grouting sleeve is completely compact. So far, the connection and fixation of the grouting sleeve using tool and the prefabricated column bottom die are completed. When the nut 4 is unscrewed and the external force is removed, the rubber cylinder 2 is restored, and the grouting sleeve can be taken out from the bottom for recycling.
In this embodiment, adopt manual spanner can accomplish work, the dismouting is simple rapid, labour saving and time saving.
In the present embodiment, the bolt 1 and the nut 4 are the hexagonal bolt 1 and the hexagonal nut 4 which are matched with each other, and of course, the use of the hexagonal bolt 1 and the hexagonal nut 4 is not limited as long as the interconnection can be achieved.
In this embodiment, in order to ensure that the bolt 1 can pass through the through hole 21 in the center of the rubber cylinder 2, the diameter of the through hole 21 is 2mm larger than the diameter of the hexagonal bolt 1. Of course, the diameter is not limited to 2mm larger than that of the hexagonal bolt 1, as long as the hexagonal bolt 1 can be ensured to pass through the through-hole 21, and the hexagonal bolt 1 may have a relatively stable diameter within the through-hole 21, for example, the diameter of the through-hole 21 is 1 to 3mm larger than that of the bolt 1.
In this embodiment, in order to facilitate the removal of the tooling, a cap-shaped rubber cylinder 2 is designed, i.e. the rubber cylinder 2 comprises a cylindrical section 22 and a conical cylindrical section 23 which are connected with each other. The cylindrical section 22 and the conical section 23 are integrally formed. In use, the cylindrical section 22 is within the grout sleeve, while the visor section, i.e., the conical section 23, is not. After the nut 4 is unscrewed and the external force is removed, the conical column section 23 applies force to the rubber cylinder 2, so that the rubber cylinder 2 is taken out from the bottom of the grouting sleeve, and the grouting sleeve is convenient for next use.
The smallest diameter of the conical column section 23 is larger than that of the cylindrical section 22, so that the rubber cylinder 2 forms a cap shape, and the rubber cylinder is convenient to take out.
In addition, the external diameter of cylinder section 22 equals the internal diameter of grout sleeve, is convenient for insert the rubber section of thick bamboo 2 in the reservation round hole 5 of prefabricated post die block inboard, simultaneously, is convenient for the expansion of rubber section of thick bamboo 2 closely laminate with grout sleeve inner wall, effectively prevents the seepage of grout, improves the finished product quality of prefabricated post.
As a further description of the above embodiments, the washer 3 is disposed between the nut 4 and the end of the conical post section 23.
When the embodiment is used, the arrangement of the gasket 3 can increase the contact area between the nut 4 and the rubber cylinder 2, reduce the pressure, prevent the nut 4 from loosening, and protect the parts and the bolt 1.
In summary, the working process of the tool provided by the utility model is as follows:
by adopting the tool for using the grouting sleeve, the prefabricated column is generally manufactured in a horizontal beating mode, a bottom die of the prefabricated column is cleaned, a proper cap-shaped rubber cylinder 2 is selected according to the size of the grouting sleeve, a hexagonal bolt 1 is used for penetrating through a through round hole 21 reserved in the center of the cap-shaped rubber cylinder 2 with reasonable shape selection, and then the connected hexagonal bolt 1 and the cap-shaped rubber cylinder 2 are inserted into a reserved round hole 5 in the inner side of the bottom die of the prefabricated column. And then the cap-shaped rubber cylinder 2 is inserted from the bottom of the grouting sleeve, and the top of the grouting sleeve is screwed and fixed with the vertical steel bars of the prefabricated column. And then inserting the hexagon bolt 1 extending out of the top of the grouting sleeve into the gasket 3, sleeving the hexagon nut 4, and screwing the hexagon nut by using a manual wrench, so that the gasket 3 is tightly pressed at the bottom of the cap-shaped rubber cylinder 2. Because the extrusion effect of external force is received, the cap-type rubber cylinder 2 is deformed in the grouting sleeve, and expansion is generated, and a large friction force is formed in the grouting sleeve until the cap-type rubber cylinder is completely attached to the bottom of the grouting sleeve, so that the grouting sleeve is connected and fixed with the bottom die of the prefabricated column by using a tool. And then splicing the prefabricated column side dies, pouring concrete after the completion, demoulding after the cured concrete reaches the specified strength, screwing out the hexagonal nut 4 by using a manual wrench, recovering the cap-shaped rubber cylinder 2 once the external force is removed, and taking out the cap-shaped rubber cylinder 2 from the bottom of the grouting sleeve to complete the production of the prefabricated column.
In conclusion, in the utility model, the assembly and disassembly of the tooling are simple and rapid, time and labor are saved, the leakage of cement paste can be effectively prevented, and the quality of the finished product of the prefabricated column is greatly improved; meanwhile, the tool is low in damage rate and reusable, and production cost is greatly reduced. Therefore, the utility model effectively overcomes various defects in the prior art and has high industrial utilization value.
The above embodiments are merely illustrative of the principles of the present utility model and its effectiveness, and are not intended to limit the utility model. Modifications and variations may be made to the above-described embodiments by those skilled in the art without departing from the spirit and scope of the utility model. Accordingly, it is intended that all equivalent modifications and variations of the utility model be covered by the claims, which are within the ordinary skill of the art, be within the spirit and scope of the present disclosure.

Claims (6)

1. The utility model provides a use frock of grout sleeve which characterized in that: including rubber section of thick bamboo (2), rubber section of thick bamboo (2) include interconnect's cylinder section (22) and circular cone column section (23), cylinder section of thick bamboo (22) and circular cone column section (23) integrated into one piece, rubber section of thick bamboo (2) middle part is equipped with one and runs through round hole (21), be equipped with bolt (1) in running through round hole (21), be connected through nut (4) between rubber section of thick bamboo (2) and bolt (1), be equipped with gasket (3) between nut (4) and the rubber section of thick bamboo (2) tip.
2. The grouting sleeve utilization tool of claim 1, wherein: the diameter of the through round hole (21) is 1-3 mm larger than that of the bolt (1).
3. The grouting sleeve utilization tool of claim 2, wherein: the diameter of the through round hole (21) is 2mm larger than that of the bolt (1).
4. The grouting sleeve utilization tool of claim 1, wherein: the outer diameter of the cylindrical section (22) is equal to the inner diameter of the grouting sleeve.
5. The grouting sleeve utilization tool of claim 1, wherein: the smallest diameter of the conical column section (23) is larger than the diameter of the cylindrical section (22).
6. The grouting sleeve utilization tool of claim 1, wherein: the gasket (3) is arranged between the nut (4) and the end part of the conical column section (23).
CN202222812264.XU 2022-10-25 2022-10-25 Use fixture for grouting sleeve Active CN219311600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222812264.XU CN219311600U (en) 2022-10-25 2022-10-25 Use fixture for grouting sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222812264.XU CN219311600U (en) 2022-10-25 2022-10-25 Use fixture for grouting sleeve

Publications (1)

Publication Number Publication Date
CN219311600U true CN219311600U (en) 2023-07-07

Family

ID=87025320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222812264.XU Active CN219311600U (en) 2022-10-25 2022-10-25 Use fixture for grouting sleeve

Country Status (1)

Country Link
CN (1) CN219311600U (en)

Similar Documents

Publication Publication Date Title
CN207485805U (en) A kind of anchor bolt detachably reused
CN108060718B (en) Detachable assembly type column and foundation ductility node connection mode
CN211447792U (en) A supplementary pre-buried subassembly for K board installation location
CN209874483U (en) Detachable fixing die for reserved air conditioner hole of shear wall
CN219311600U (en) Use fixture for grouting sleeve
CN210342642U (en) Scaffold wall connecting piece and scaffold
CN109252457B (en) Quick plugging and repairing device for concrete drainage pipe culvert
CN208899751U (en) Replaceable screw shell ductility reinforcing steel bar connecting device
CN215671022U (en) Pre-embedded type mounting device for aluminum alloy template
CN212055417U (en) Expansion screw for car-repairing gecko
CN212613727U (en) Be applied to mould shell of close rib structure superstructure building
CN209907945U (en) Pre-buried device of template is accepted to aluminum alloy template system
CN213360735U (en) Steel-bonded adhesive reinforced expansion screw
CN207193768U (en) A kind of sustaining wall frame fixation built-in fitting
CN211080218U (en) Soil nail slip casting leak protection thick liquid device
CN214302826U (en) Detachable pre-buried anchor assembly
CN214885466U (en) Recyclable template fixing part at concrete outer wall construction joint
CN216199637U (en) Glue steel and glue inflation tunnel monitoring nail
CN211993525U (en) Grouting sleeve straightening, fixing and prefabricating device
CN217150701U (en) Stagnant water steel sheet reinforcing apparatus for construction
CN219569677U (en) External-adhesion steel reinforced structure of shear wall
CN219637823U (en) Expansion joint department stagnant water copper reinforcement instrument
CN103615109B (en) A kind of Screw arbor with nut at both-ends
CN214942413U (en) Bolt shaping piece pre-embedded in concrete
CN218758664U (en) Wall connecting assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant