CN219274649U - Decorate fossil fragments side pipe cutting processing fixed bolster - Google Patents

Decorate fossil fragments side pipe cutting processing fixed bolster Download PDF

Info

Publication number
CN219274649U
CN219274649U CN202223595172.7U CN202223595172U CN219274649U CN 219274649 U CN219274649 U CN 219274649U CN 202223595172 U CN202223595172 U CN 202223595172U CN 219274649 U CN219274649 U CN 219274649U
Authority
CN
China
Prior art keywords
rod
bolt rod
top plate
welded
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223595172.7U
Other languages
Chinese (zh)
Inventor
王宁
杜昌
兰玉龙
杨威
孟丽利
匡博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202223595172.7U priority Critical patent/CN219274649U/en
Application granted granted Critical
Publication of CN219274649U publication Critical patent/CN219274649U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

A fixing support for cutting and processing a decorative keel square tube belongs to the technical field of building decoration construction. The device comprises a base, an upright post, a right top plate, a fastening rod, a right nut, a right handle, a right bolt rod, a cross beam, a left top plate, a left nut, a left bolt rod, a left handle, a column reinforcing rod and a beam reinforcing rod. When the square keel square tube is used, the square keel square tube is placed between the left top plate and the right top plate of the fixing support, then the left handle and the right handle are operated to simultaneously screw the left bolt rod and the right bolt rod until the left top plate and the right top plate are tightly propped against the two sides of the square keel square tube, and then the square keel square tube is cut. When the machining position of the keel square tube is transversely changed, only the left bolt rod or the right bolt rod is loosened, and then the right bolt rod or the left bolt rod is screwed simultaneously. The square pipe cutting device has the advantages of being simple in assembly and convenient to operate, guaranteeing the square pipe cutting machining precision, reducing personal injury and reducing construction cost.

Description

Decorate fossil fragments side pipe cutting processing fixed bolster
Technical Field
The utility model belongs to the technical field of building decoration construction, and particularly provides a fixing bracket for cutting and processing a decorative keel square tube.
Background
During building decoration construction, a hand-held cutting mode is generally adopted for the square tube cutting processing of the decoration keel, and the defects of the mode are that the square tube is easy to shake by manpower, so that deviation occurs in the square tube cutting processing, and waste materials are formed; secondly, when square pipe cutting is processed, the constructor who holds the square pipe easily causes the injury.
Disclosure of Invention
The utility model aims to provide a fixing bracket for cutting and processing a decorative keel square tube, which solves the problems of deviation, waste formation and the like in square tube cutting and processing.
The utility model puts the keel square tube between the left top plate and the right top plate of the fixed bracket, then operates the left handle and the right handle to simultaneously screw the left bolt rod and the right bolt rod until the left top plate and the right top plate are tightly propped against the two sides of the square tube, and then performs cutting processing on the keel square tube. When the machining position of the keel square tube is transversely changed, only the left bolt rod or the right bolt rod is loosened, and then the right bolt rod or the left bolt rod is screwed simultaneously.
The fixing bracket comprises a base 1, upright posts 2, a right top plate 3, a fastening rod 4, a right nut 5, a right handle 6, a right bolt rod 7, a cross beam 8, a left top plate 9, a left nut 10, a left bolt rod 11, a left handle 12, a column reinforcing rod 13 and a beam reinforcing rod 14, wherein the two upright posts 2 are vertically welded at one end of the base 1 in a combined mode, and the distance between the two upright posts 2 is 1000mm; the column reinforcing rod 13 is welded between the two upright columns 2; one end of each of the two cross beams 8 is respectively and vertically welded with the top ends of the two upright posts 2; the beam reinforcing rod 14 is welded between the two cross beams 8; the two fastening rods 4 are respectively and vertically welded with the lower surfaces of the other ends of the two cross beams 8; the two right nuts 5 are respectively welded on the outer sides of the two fastening rods 4; the right bolt rod 7 is screwed into the right nut 5 and passes through the fastening rod 4; the front end of the right bolt rod 7 is welded with a right top plate 3; the rear end of the right bolt rod 7 is welded with a right handle 6; the two left nuts 10 are respectively welded on the outer sides of the two upright posts 2; the left bolt rod 11 is screwed into the left nut 10 and penetrates through the upright post 2; the front end of the left bolt rod 11 is welded with a left top plate 9; the rear end of the left bolt rod 11 is welded with a left handle 12 (see fig. 1, 2 and 3).
When the square keel pipe 15 is used, the square keel pipe 15 is placed between the left top plate 9 and the right top plate 3 of the fixed support, then the left handle 12 and the right handle 6 are operated to simultaneously screw the left bolt rod 11 and the right bolt rod 7 until the left top plate 9 and the right top plate 3 are tightly abutted against the two sides of the square keel pipe 15, and then the square keel pipe 15 is cut. When the machining position of the keel square tube 15 is transversely changed, only the left bolt rod 11 or the right bolt rod 7 is loosened, and then the right bolt rod 7 or the left bolt rod 11 is screwed simultaneously (fig. 4 and 5).
The square pipe cutting device has the advantages of being simple in assembly and convenient to operate, guaranteeing the square pipe cutting machining precision, reducing personal injury and reducing construction cost.
Drawings
Fig. 1 is a front view of a fixed bracket.
Fig. 2 is a side view of the fixing bracket.
Fig. 3 is a top view of the fixing bracket.
Fig. 4 is a front view of the fixing bracket in use.
Fig. 5 is a side view of the use of the fixing bracket.
In the figure, a base 1, a column 2, a right top plate 3, a fastening rod 4, a right nut 5, a right handle 6, a right bolt 7, a cross beam 8, a left top plate 9, a left nut 10, a left bolt 11, a left handle 12, a column reinforcing rod 13, a beam reinforcing rod 14, and a square tube 15.
Detailed Description
Fig. 1-5 illustrate an embodiment of the present utility model. The utility model is further described below with reference to the accompanying drawings.
The fixing bracket comprises a base 1, upright posts 2, a right top plate 3, a fastening rod 4, a right nut 5, a right handle 6, a right bolt rod 7, a cross beam 8, a left top plate 9, a left nut 10, a left bolt rod 11, a left handle 12, a column reinforcing rod 13 and a beam reinforcing rod 14, wherein the two upright posts 2 are vertically welded at one end of the base 1 in a combined mode, and the distance between the two upright posts 2 is 1000mm; the column reinforcing rod 13 is welded between the two upright columns 2; one end of each of the two cross beams 8 is respectively and vertically welded with the top ends of the two upright posts 2; the beam reinforcing rod 14 is welded between the two cross beams 8; the two fastening rods 4 are respectively and vertically welded with the lower surfaces of the other ends of the two cross beams 8; the two right nuts 5 are respectively welded on the outer sides of the two fastening rods 4; the right bolt rod 7 is screwed into the right nut 5 and passes through the fastening rod 4; the front end of the right bolt rod 7 is welded with a right top plate 3; the rear end of the right bolt rod 7 is welded with a right handle 6; the two left nuts 10 are respectively welded on the outer sides of the two upright posts 2; the left bolt rod 11 is screwed into the left nut 10 and penetrates through the upright post 2; the front end of the left bolt rod 11 is welded with a left top plate 9; the rear end of the left bolt rod 11 is welded with a left handle 12.
The base 1 is formed by processing a 30mm thick steel plate, and the size is 1500 mm (length: width); the upright post 2 is formed by processing square tubes with the cross section dimension (length is equal to width) of 120mm and the length is 1200mm; the right top plate 3 is formed by processing a 20mm thick steel plate, and the size is 100mm (length is equal to width); the fastening rod 4 is formed by processing square tubes with the cross section dimension (length: width) of 80mm and the length of 500mm; the diameter of the right nut 5 is 20mm; the right handle 6 is formed by processing round steel with the diameter of 12mm and the length of 150mm; the diameter of the right bolt rod 7 is 20mm, and the length is 600mm; the cross beam 8 is formed by processing square tubes with the cross section dimension (length: width) of 100mm and the length of 1000mm; the left top plate 9 is formed by processing a 20mm thick steel plate, and the size is 100mm (length is equal to width); the diameter of the left nut 10 is 20mm; the left bolt rod 11 has the diameter of 20mm and the length of 600mm; the left handle 12 is formed by processing round steel with the diameter of 12mm and the length of 150mm; the column reinforcing rod 13 is formed by processing a circular tube with the diameter of 80mm and the length of 1000mm; the beam stiffener 14 is machined from a 80mm diameter round tube, 1000mm long.
When the square keel pipe 15 is used, the square keel pipe 15 is placed between the left top plate 9 and the right top plate 3 of the fixed support, then the left handle 12 and the right handle 6 are operated to simultaneously screw the left bolt rod 11 and the right bolt rod 7 until the left top plate 9 and the right top plate 3 are tightly abutted against the two sides of the square keel pipe 15, and then the square keel pipe 15 is cut. When the machining position of the keel square tube 15 is transversely changed, only the left bolt rod 11 or the right bolt rod 7 is loosened, and then the right bolt rod 7 or the left bolt rod 11 is screwed simultaneously.
When cutting processing is managed to apartment building decoration fossil fragments side, has adopted a decoration fossil fragments side pipe cutting processing fixed bolster, has both guaranteed square pipe cutting processing precision, has avoided personal injury simultaneously again, convenient and fast, and the effect is better. The fixing support is used in a combined way, two upright posts are vertically welded at one end of the base, and the distance between the two upright posts is 1000mm; the column reinforcing rod is welded between the two upright columns; one end of each of the two cross beams is respectively and vertically welded with the top ends of the two upright posts; the beam reinforcing rod is welded between the two cross beams; the two fastening rods are respectively and vertically welded with the lower surfaces of the other ends of the two cross beams; the two right nuts are welded on the outer sides of the two fastening rods respectively; the right bolt rod is screwed into the right nut and penetrates through the fastening rod; the front end of the right bolt rod is welded with a right top plate; the rear end of the right bolt rod is welded with a right handle; the two left nuts are welded on the outer sides of the two upright posts respectively; the left bolt rod is screwed into the left nut and penetrates through the upright post; the front end of the left bolt rod is welded with a left top plate; the rear end of the left bolt rod is welded with a left handle. When the square keel square tube is used, the square keel square tube is placed between the left top plate and the right top plate of the fixing support, then the left handle and the right handle are operated to simultaneously screw the left bolt rod and the right bolt rod until the left top plate and the right top plate are tightly propped against the two sides of the square keel square tube, and then the square keel square tube is cut. When the machining position of the keel square tube is transversely changed, only the left bolt rod or the right bolt rod is loosened, and then the right bolt rod or the left bolt rod is screwed simultaneously. The fixing support is simple in assembly and convenient to operate, ensures the cutting machining precision of the square tube, reduces personal injury and reduces construction cost.

Claims (3)

1. The fixed bracket for cutting and processing the decorative keel square tube is characterized by comprising a base (1), an upright post (2), a right top plate (3), a fastening rod (4), a right nut (5), a right handle (6), a right bolt rod (7), a cross beam (8), a left top plate (9), a left nut (10), a left bolt rod (11), a left handle (12), a column reinforcing rod (13) and a beam reinforcing rod (14); the two upright posts (2) are vertically welded at one end of the base (1), and the post reinforcing rod (13) is welded between the two upright posts (2); one end of each of the two cross beams (8) is respectively and vertically welded with the top ends of the two upright posts (2); the beam reinforcing rod (14) is welded between the two cross beams (8); the two fastening rods (4) are respectively and vertically welded with the lower surfaces of the other ends of the two cross beams (8); the two right nuts (5) are respectively welded on the outer sides of the two fastening rods (4); the right bolt rod (7) is screwed into the right nut (5) and penetrates through the fastening rod (4); the front end of the right bolt rod (7) is welded with a right top plate (3); the rear end of the right bolt rod (7) is welded with a right handle (6); the two left nuts (10) are respectively welded on the outer sides of the two upright posts (2); the left bolt rod (11) is screwed into the left nut (10) and penetrates through the upright post (2); the front end of the left bolt rod (11) is welded with a left top plate (9); the rear end of the left bolt rod (11) is welded with a left handle (12).
2. The decorative keel square tube cutting machining fixing bracket according to claim 1, wherein the distance between the two upright posts (2) is 1000mm.
3. The decorative keel square tube cutting machining fixing bracket according to claim 1, wherein the base (1) is formed by machining a 30mm thick steel plate, and the size is 1500 x 1200mm long; the upright post (2) is formed by processing square tubes with the cross section dimension of 120mm in length and 120mm in width, and the length of the upright post is 1200mm; the right top plate (3) is formed by processing a 20mm thick steel plate, and the size is 100mm long by 100mm wide; the fastening rod (4) is formed by processing square tubes with the cross section dimension of 80mm in length and 80mm in width, and the length of the fastening rod is 500mm; the diameter of the right nut (5) is 20mm; the right handle (6) is formed by processing round steel with the diameter of 12mm and the length of 150mm; the diameter of the right bolt rod (7) is 20mm, and the length is 600mm; the cross beam (8) is formed by processing square tubes with the cross section dimension of 100mm in length and 100mm in width, and the length of the cross beam is 1000mm; the left top plate (9) is formed by processing a 20mm thick steel plate, and the size is 100mm long by 100mm wide; the diameter of the left nut (10) is 20mm; the diameter of the left bolt rod (11) is 20mm, and the length is 600mm; the left handle (12) is formed by a diameter of 12mm
Round steel is processed into the steel with the length of 150mm; the column reinforcing rod (13) is formed by processing a circular tube with the diameter of 80mm,
a length of 1000mm; the beam reinforcing rod (14) is formed by processing a circular tube with the diameter of 80mm and the length of 1000mm.
CN202223595172.7U 2022-12-29 2022-12-29 Decorate fossil fragments side pipe cutting processing fixed bolster Active CN219274649U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223595172.7U CN219274649U (en) 2022-12-29 2022-12-29 Decorate fossil fragments side pipe cutting processing fixed bolster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223595172.7U CN219274649U (en) 2022-12-29 2022-12-29 Decorate fossil fragments side pipe cutting processing fixed bolster

Publications (1)

Publication Number Publication Date
CN219274649U true CN219274649U (en) 2023-06-30

Family

ID=86934063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223595172.7U Active CN219274649U (en) 2022-12-29 2022-12-29 Decorate fossil fragments side pipe cutting processing fixed bolster

Country Status (1)

Country Link
CN (1) CN219274649U (en)

Similar Documents

Publication Publication Date Title
CN219274649U (en) Decorate fossil fragments side pipe cutting processing fixed bolster
CN218622337U (en) Be used for "nearly" type reinforcing apparatus of outer wall post-cast strip adjustable length
CN206768854U (en) A kind of foundation bolt accurate positioning die
CN220427592U (en) Square steel cutting processing fixing device
CN219766929U (en) Double-operated guardrail tube machining and fixing device
CN209369334U (en) A kind of large-span concrete stay in place form support device
CN212385075U (en) Flying saw floating clamp mechanism
CN219274632U (en) Electric tube cutting positioning support
CN219113460U (en) Angle steel cutting processing mounting fixture
CN219114276U (en) Fixing clamp for building square timber processing
CN219684371U (en) Auxiliary fixing device for angle steel assembly welding
CN214885513U (en) Beam clamp device
CN220408499U (en) Simple fixture for square tube
CN219114042U (en) Pipeline transverse cutting, positioning and scribing device
CN220428350U (en) Wall body fluting location marking device
CN214134346U (en) Pipeline mantle fiber bed-jig
CN113152889A (en) Beam clamp device
CN219118637U (en) Temporary fixing support for wall decoration gypsum board installation
CN218947274U (en) Beam side template perforating device
CN213509602U (en) Tool type beam bottom supporting device
CN219443668U (en) Toothless saw cuts shaped steel fixed bolster
CN219445625U (en) Bilge well block cutting device
CN217492498U (en) Straight thread connection reinforcing bar lightning protection jumper wire processingequipment
CN219411839U (en) Casting frame capable of being recycled
CN221064757U (en) Equilong pipeline cutting support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant