CN219260731U - Auxiliary positioning device for steel box girder construction - Google Patents

Auxiliary positioning device for steel box girder construction Download PDF

Info

Publication number
CN219260731U
CN219260731U CN202222716367.6U CN202222716367U CN219260731U CN 219260731 U CN219260731 U CN 219260731U CN 202222716367 U CN202222716367 U CN 202222716367U CN 219260731 U CN219260731 U CN 219260731U
Authority
CN
China
Prior art keywords
steel box
box girder
fixedly connected
positioning device
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222716367.6U
Other languages
Chinese (zh)
Inventor
李永春
廖清芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Aofeng Construction Engineering Co ltd
Original Assignee
Chengdu Rishengyueheng Enterprise Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Rishengyueheng Enterprise Management Co ltd filed Critical Chengdu Rishengyueheng Enterprise Management Co ltd
Priority to CN202222716367.6U priority Critical patent/CN219260731U/en
Application granted granted Critical
Publication of CN219260731U publication Critical patent/CN219260731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Abstract

The utility model relates to the technical field of steel box girders, in particular to an auxiliary positioning device for construction of the steel box girders, which comprises a first steel box girder and a second steel box girder, wherein the top end and the bottom end of the first steel box girder are connected with two first transverse plates through a plurality of first bolts, a fixed block is fixedly connected between the two first transverse plates, the right end of the fixed block is provided with a sliding groove, a sliding rod is slidably connected in the sliding groove, the left end of the sliding rod is fixedly connected with a pull rod, when the auxiliary positioning device is used, the first steel box girder and the second steel box girder are conveniently and rapidly positioned, the sliding rod is conveniently and fixedly limited through the cooperation of limiting blocks, top plates, fixing rods and the like, so that the first steel box girder and the second steel box girder are conveniently and rapidly installed and detached through the cooperation of the first bolts, the second bolts, the first transverse plates, the limiting blocks and the like, and the working efficiency is improved.

Description

Auxiliary positioning device for steel box girder construction
Technical Field
The utility model relates to the technical field of steel box girders, in particular to an auxiliary positioning device for construction of steel box girders.
Background
When the steel box girder is hoisted, after a large bridge deck crane is adopted for hoisting, the connection part of the steel box girder is subjected to experience positioning according to the edge of the previous steel box girder section, so that the requirement on the construction experience of personnel is high, when the steel box girder is hoisted, the steel box girder to be installed and the installed steel box girder are required to be accurately aligned in advance, the steel box girder to be installed and the installed steel box girder can be connected into a whole after being accurately aligned through welding, and in order to ensure the welding quality, the steel box girder to be installed and the installed steel box girder cannot be subjected to relative displacement during welding, namely the butt joint end surfaces of the steel box girder to be aligned, the height direction is required to be flush, and dislocation cannot occur.
At present, when some existing auxiliary positioning devices for steel box girder construction are used, the steel box girders are positioned rapidly and accurately due to inconvenience, and the devices are not convenient to install and disassemble, so that the working efficiency is reduced, and the use requirements of the current stage cannot be met.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides an auxiliary positioning device for steel box girder construction, which solves the problems that the prior art proposed in the background art is inconvenient to rapidly and accurately position the steel box girder, and inconvenient to mount and dismount the device, thereby reducing the working efficiency and being incapable of meeting the use requirement in the prior art.
(II) technical scheme
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a steel case roof beam auxiliary positioning device for construction, includes first steel case roof beam and second steel case roof beam, the top and the bottom of first steel case roof beam all are connected with two first diaphragms through a plurality of first bolts, two fixedly connected with fixed block between the first diaphragm, the spout has been seted up to the right-hand member of fixed block, sliding connection has the slide bar in the spout, the left end fixedly connected with pull rod of slide bar, the left end of pull rod runs through out the spout, the cover is equipped with the spring on the pull rod, run through threaded connection has hand screw rod on the fixed block, two spacing holes have been seted up on the slide bar, the top and the bottom of second steel case roof beam all are connected with two second diaphragms through a plurality of second bolts fixedly connected with, two fixedly connected with stopper between the second diaphragm, set up the fixed orifices with looks adaptation on the stopper, fixedly connected with is to a plurality of multisection telescopic link, a plurality of telescopic link's other end fixedly connected with roof, fixedly connected with pull spring on the roof, two extension spring two inside extension bars have two ends to stretch into the fixed beam, two extension bar both ends are equipped with two and two extension bar inside the fixed device, two extension bar, respectively.
Preferably, the auxiliary fixing device comprises two first side plates and two second side plates, the two first side plates are connected to the first steel box girder through a plurality of first screws, the two second side plates are connected to the second steel box girder through a plurality of second screws, a supporting block is fixedly connected between the two first side plates, a clamping block is fixedly connected to the right end of the supporting block, a clamping groove is fixedly connected between the two second side plates, the clamping block is located inside the clamping groove, and the clamping groove is connected with the clamping block through a plurality of positioning bolts.
Further, a first pull ring is fixedly connected to the top plate.
Still further, fixedly connected with second pull ring on the pull rod.
Furthermore, anti-skid patterns are arranged on the first pull ring and the second pull ring.
(III) beneficial effects
Compared with the prior art, the utility model provides an auxiliary positioning device for steel box girder construction, which has the following beneficial effects:
this auxiliary positioning device is used in steel case roof beam construction, through the auxiliary fixing device who sets up, be convenient for carry out quick accurate positioning to first steel case roof beam and second steel case roof beam, through the cooperation of stopper, roof, dead lever etc. be convenient for fix spacing to the slide bar, thereby be convenient for fix first steel case roof beam and second steel case roof beam, through the cooperation of first bolt, second bolt, first diaphragm etc. be convenient for carry out quick installation and dismantlement to fixed block, first diaphragm, stopper etc. thereby made things convenient for people to use, improved work efficiency.
Drawings
FIG. 1 is a schematic view of a partially sectioned front plan view effect of the present utility model;
FIG. 2 is a schematic view of the top plan effect of the present utility model, partially in section;
FIG. 3 is a schematic view of a partial enlarged structure of the present utility model at A in FIG. 1;
fig. 4 is a schematic view of a partially enlarged structure at B in fig. 1 according to the present utility model.
In the figure: 1. a first steel box girder; 2. a second steel box girder; 3. a first bolt; 4. a first cross plate; 5. a fixed block; 6. a slide bar; 7. a pull rod; 8. a spring; 9. screwing the screw rod by hand; 10. a second bolt; 11. a second cross plate; 12. a limiting block; 13. a multi-section telescopic rod; 14. a top plate; 15. a fixed rod; 16. a tension spring; 17. a first side plate; 18. a second side plate; 19. a first screw; 20. a support block; 21. a clamping block; 22. a clamping groove; 23. positioning bolts; 24. a first pull ring; 25. a second pull ring; 26. anti-skid lines.
Detailed Description
Examples
Referring to fig. 1-4, an auxiliary positioning device for steel box girder construction comprises a first steel box girder 1 and a second steel box girder 2, wherein the top end and the bottom end of the first steel box girder 1 are connected with two first transverse plates 4 through a plurality of first bolts 3, a fixed block 5 is fixedly connected between the two first transverse plates 4, the right end of the fixed block 5 is provided with a sliding groove, a sliding rod 6 is connected in the sliding groove in a sliding way, the left end of the sliding rod 6 is fixedly connected with a pull rod, the pull rod is fixedly connected with a second pull ring 25, the pull ring is convenient to pull, people can conveniently use, the left end of the pull rod penetrates through the sliding groove, a spring 8 is sleeved on the pull rod, a hand-screwed screw 9 is connected on the fixed block 5 in a penetrating and threaded manner, two limiting holes are formed in the sliding rod 6, the top end and the bottom end of the second steel box girder 2 are fixedly connected with two second transverse plates 11 through a plurality of second bolts 10, the limiting block 12 is fixedly connected between the two second transverse plates 11, the limiting block 12 is provided with a fixing hole matched with the sliding rod 6, the limiting block 12 is fixedly connected with a plurality of multi-section telescopic rods 13, the other ends of the multi-section telescopic rods 13 are fixedly connected with the top plate 14, the top plate 14 is fixedly connected with the first pull ring 24, the pull plate is conveniently pulled, people can conveniently use the pull plate, anti-slip patterns 26 are arranged on the first pull ring 24 and the second pull ring 25, friction force is increased, practicability is improved, two fixing rods 15 are fixedly connected on the top plate 14, the two fixing rods 15 penetrate through the fixing holes and respectively extend into the two limiting holes, tension springs 16 are sleeved on the fixing rods 15, and two ends of each tension spring 16 are respectively fixedly connected with the top plate 14 and the limiting block 12.
It should be further noted that, both ends all are provided with auxiliary fixing device around first steel case roof beam 1 and second steel case roof beam 2, auxiliary fixing device includes two first curb plates 17 and two second curb plates 18, two first curb plates 17 are all connected on first steel case roof beam 1 through a plurality of first screws 19, two second curb plates 18 are all connected on second steel case roof beam 2 through a plurality of second screws, fixedly connected with supporting shoe 20 between two first curb plates 17, the right-hand member fixedly connected with fixture block 21 of supporting shoe 20, fixedly connected with draw-in groove 22 between two second curb plates 18, fixture block 21 is located the inside of draw-in groove 22, draw-in groove 22 and fixture block 21 are connected through a plurality of positioning bolt 23 for carry out quick location.
In summary, the working principle and working process of the auxiliary positioning device for steel box girder construction are that, when in use, the auxiliary positioning device for steel box girder construction is firstly placed at a place where the auxiliary positioning device for steel box girder construction is required to be used, then, when in use, the first side plate 17 and the supporting block 20 are firstly fixed on the first steel box girder 1 by using the first screw 19, the second side plate 18 and the clamping groove 22 are fixed on the second steel box girder 2 by using the second screw, then, when the first steel box girder 1 and the second steel box girder 2 are butted, the clamping block 21 is firstly put into the clamping groove 22, then, the clamping block 21 and the clamping groove 22 are fixed by using the fixing bolt, thus, the quick butting of the first steel box girder 1 and the second steel box girder 2 can be realized, then, the first transverse plate 4 is fixed on the first steel box girder 1 by using the first bolt 3, the second transverse plate 11 is fixed on the second steel box girder 2 by using the second bolt 10, then the first pull ring 24 is pulled to drive the top plate 14, the fixed rod 15 and the like to move upwards, the slide rod 6 enters the fixed hole, then the first pull ring 24 is loosened, the pulled tension spring 16 is contracted and then pulls the top plate 14 to move because of the tension spring 16, thereby facilitating the fixed rod 15 to enter the limiting hole, fixing and limiting the slide rod 6, thus completing the butt joint fixation of the first steel box girder 1 and the second steel box girder 2, then when the slide rod is detached, the first pull ring 24 is pulled firstly, the first pull ring 24 drives the top plate 14 to move, the top plate 14 drives the fixed rod 15 to move, the fixed rod 15 moves out of the limiting hole, the second pull ring 25 is pulled, the pull ring drives the slide rod 6 to move, the slide rod 6 enters the sliding groove, compresses the spring 8, and then the screw rod 9 is screwed by rotating, the device is simple to operate, convenient and fast, convenient to install and detach, and improves the working efficiency and practicality of people.

Claims (5)

1. The utility model provides a steel case roof beam construction is with auxiliary positioning device, includes first steel case roof beam (1) and second steel case roof beam (2), its characterized in that: the top and the bottom of the first steel box girder (1) are connected with two first transverse plates (4) through a plurality of first bolts (3), two fixed blocks (5) are fixedly connected between the first transverse plates (4), a chute is formed in the right end of each fixed block (5), a slide bar (6) is connected in the chute in a sliding manner, a pull rod is fixedly connected to the left end of each slide bar (6), the left end of each pull rod penetrates out of the chute, a spring (8) is sleeved on each pull rod, two limiting holes are formed in each fixed block (5) in a penetrating threaded manner, two limiting rods (9) are formed in each slide bar (6), two second transverse plates (11) are fixedly connected to the top and the bottom of each second steel box girder (2) through a plurality of second bolts (10), a limiting block (12) is fixedly connected between the two second transverse plates (11), a fixing hole matched with each sliding block (6) is formed in each limiting block (12), a plurality of limiting blocks (12) are connected with a plurality of tension springs (13) in each limiting rod, a plurality of extension rods (15) are connected to the plurality of extension rods (15) in each fixing holes, a plurality of extension rods (15) are connected to the extension rods (15) in each extension rod respectively, a plurality of extension rods (15) are connected to the extension rods (15), two ends of the tension spring (16) are fixedly connected with the top plate (14) and the limiting block (12) respectively, and auxiliary fixing devices are arranged at the front end and the rear end of the first steel box girder (1) and the second steel box girder (2).
2. The auxiliary positioning device for steel box girder construction according to claim 1, wherein: the auxiliary fixing device comprises two first side plates (17) and two second side plates (18), wherein the two first side plates (17) are connected to a first steel box girder (1) through a plurality of first screws (19), the two second side plates (18) are connected to a second steel box girder (2) through a plurality of second screws, a supporting block (20) is fixedly connected between the first side plates (17), a clamping block (21) is fixedly connected to the right end of the supporting block (20), a clamping groove (22) is fixedly connected between the two second side plates (18), the clamping block (21) is located inside the clamping groove (22), and the clamping groove (22) and the clamping block (21) are connected through a plurality of positioning bolts (23).
3. The auxiliary positioning device for steel box girder construction according to claim 2, wherein: a first pull ring (24) is fixedly connected to the top plate (14).
4. The auxiliary positioning device for steel box girder construction according to claim 3, wherein: and a second pull ring (25) is fixedly connected to the pull rod.
5. The auxiliary positioning device for steel box girder construction according to claim 4, wherein: anti-skid patterns (26) are arranged on the first pull ring (24) and the second pull ring (25).
CN202222716367.6U 2022-10-14 2022-10-14 Auxiliary positioning device for steel box girder construction Active CN219260731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222716367.6U CN219260731U (en) 2022-10-14 2022-10-14 Auxiliary positioning device for steel box girder construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222716367.6U CN219260731U (en) 2022-10-14 2022-10-14 Auxiliary positioning device for steel box girder construction

Publications (1)

Publication Number Publication Date
CN219260731U true CN219260731U (en) 2023-06-27

Family

ID=86858913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222716367.6U Active CN219260731U (en) 2022-10-14 2022-10-14 Auxiliary positioning device for steel box girder construction

Country Status (1)

Country Link
CN (1) CN219260731U (en)

Similar Documents

Publication Publication Date Title
CN208729677U (en) Pin shaft dismounting device for derrick crane
CN204934670U (en) A kind of electric drill auxiliary stand
CN202000658U (en) Hydraulic climbing system for wall-attached support frame
CN219260731U (en) Auxiliary positioning device for steel box girder construction
CN211148312U (en) Novel crack propagation testing machine
CN114856290B (en) Pulling-out type waste electric pole removing device
CN211038036U (en) Quick replacement mechanism for equal-elevation sliding anti-seismic support
CN219118789U (en) Automatic quick die sinking device of aluminum alloy template
CN216030492U (en) Special device for disassembling and assembling oil window cover plate of derivation bearing
CN216074782U (en) Prefabricated large-span steel box girder hoisting device for river-crossing viaduct
CN201250517Y (en) Miter gate bottom hinge mushroom head dismounting device
CN211568249U (en) Auxiliary tool for cabin operation
CN217479857U (en) Rail cementing insulation clamp plate dismounting device
CN218539089U (en) Auxiliary device for connecting super-lifting mast lacing wire of crawler crane
CN217498442U (en) Positioning fixture for steel beam supporting rod
CN216398675U (en) Bolt dismounting device for limited space
CN216040745U (en) Road bridge engineering consolidates effectual reinforcement strutting arrangement
CN219753030U (en) Auxiliary safety device for hanging basket steel suspender
CN213038595U (en) Connecting mechanism between steel structure stand column and cross beam
CN212374710U (en) Soft generating line assembly and disassembly tools
CN211340476U (en) Safe hanging basket convenient for high-altitude operation
CN202627618U (en) High-speed railway rush-repair support
CN215518430U (en) Bridge reinforcing device for municipal bridge engineering
CN217934800U (en) Fixing clamp convenient to install and used for electric power design
CN109926987B (en) Auxiliary device for driving maintenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230805

Address after: Room 506, Building 2, No. 1501, Section 1, Riyue Avenue, Qingyang District, Chengdu City, Sichuan Province, 610031

Patentee after: Sichuan Aofeng Construction Engineering Co.,Ltd.

Address before: No. 607, Unit 1, Building 6, No. 399, West Section of Fucheng Avenue, High tech Zone, China (Sichuan) Pilot Free Trade Zone, Wuhou District, Chengdu, 610041, Sichuan

Patentee before: Chengdu Rishengyueheng Enterprise Management Co.,Ltd.

TR01 Transfer of patent right