CN219240299U - Bridge pier column steel bar binding platform connecting device - Google Patents

Bridge pier column steel bar binding platform connecting device Download PDF

Info

Publication number
CN219240299U
CN219240299U CN202320113667.7U CN202320113667U CN219240299U CN 219240299 U CN219240299 U CN 219240299U CN 202320113667 U CN202320113667 U CN 202320113667U CN 219240299 U CN219240299 U CN 219240299U
Authority
CN
China
Prior art keywords
connecting rod
outer base
steel bar
binding platform
bar binding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320113667.7U
Other languages
Chinese (zh)
Inventor
刘建锋
李元坤
吴晓强
任小强
赵志民
余进富
裴鹏
李爱家
常钰
刘晓贺
许锐
柴迪
杜恒
甘川勇
王猛
范洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN202320113667.7U priority Critical patent/CN219240299U/en
Application granted granted Critical
Publication of CN219240299U publication Critical patent/CN219240299U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of auxiliary equipment of bridge pier column steel bar binding platforms, and particularly discloses a connecting device of a bridge pier column steel bar binding platform, wherein an outer base is formed by encircling a first connecting rod, a second connecting rod, a third connecting rod and a fourth connecting rod; the inner base comprises a fifth connecting rod, a sixth connecting rod, a seventh connecting rod and an eighth connecting rod; the fifth connecting rod is arranged in parallel with the sixth connecting rod, one end of the fifth connecting rod is connected to the second connecting rod, and the other end of the fifth connecting rod is connected to the fourth connecting rod; the seventh connecting rod and the eighth connecting rod are arranged in parallel, one end of the seventh connecting rod is connected to the first connecting rod, and the other end of the seventh connecting rod is connected to the third connecting rod; the four mounting vertical grooves are respectively arranged at four corners of the outer base; the main edge of the pier body template supports the outer base, or the main edge of the pier body template supports the inner base. The utility model is provided with the outer base and the inner base which are suitable for pier body templates with different sizes, so that the binding platform is convenient to be connected to the pier body templates with different sizes, and the construction efficiency is improved.

Description

Bridge pier column steel bar binding platform connecting device
Technical Field
The utility model relates to the technical field of bridge pier column steel bar binding platform auxiliary equipment, in particular to a bridge pier column steel bar binding platform connecting device.
Background
Under the general condition, when the construction height of the pier column of the urban rail fast line bridge is less than 15m, a pier column operation platform is erected by adopting a disc buckle type or fastener type scaffold, and an operation platform is provided for construction operations such as pier column reinforcement bar binding and pier column template assembling.
Because the pier column is different in size, the size of the pier body template also changes along with the pier column, binding platforms with different sizes are required to be erected for adaptation, time and labor are wasted, and construction progress is seriously affected.
Disclosure of Invention
The utility model aims to solve the technical problem that a plurality of binding platforms need to be erected when different pier columns are constructed, and the construction progress is affected.
In order to solve the technical problems, the utility model adopts the following technical scheme: a bridge pier column reinforcement bar binding platform connecting device comprises an outer base and an inner base;
the outer base is formed by encircling a first connecting rod, a second connecting rod, a third connecting rod and a fourth connecting rod;
the inner base comprises a fifth connecting rod, a sixth connecting rod, a seventh connecting rod and an eighth connecting rod; the fifth connecting rod is arranged in parallel with the sixth connecting rod, one end of the fifth connecting rod is connected to the second connecting rod, and the other end of the fifth connecting rod is connected to the fourth connecting rod; the seventh connecting rod and the eighth connecting rod are arranged in parallel, one end of the seventh connecting rod is connected to the first connecting rod, and the other end of the seventh connecting rod is connected to the third connecting rod;
the four mounting vertical grooves are respectively arranged at four corners of the outer base; the four mounting vertical grooves are used for fixing four supporting vertical rods of the binding platform;
the main edge of the pier body template supports the outer base, or the main edge of the pier body template supports the inner base.
As a further technical scheme of the scheme, a diagonal bracing is arranged between the installation vertical groove and the outer base.
As a further technical scheme of the scheme, the wood wedge fixing device further comprises a fixing wood wedge which is arranged at the joint of the mounting vertical groove and the supporting vertical rod.
As a further technical scheme of the scheme, the outer base or the inner base is connected to the pier body template main ridge through a U-shaped bolt.
Compared with the prior art, the utility model has the following advantages and beneficial effects: the utility model is provided with the outer base and the inner base which are suitable for pier body templates with different sizes, so that the binding platform is convenient to be connected to the pier body templates with different sizes, and the construction efficiency is improved.
Drawings
Fig. 1 is a schematic top view of the present utility model.
FIG. 2 is a schematic side view of the present utility model in connection with a ligating platform.
FIG. 3 is a schematic top view of a ligating platform.
The definitions of the various numbers in the figures are: a first connecting rod-11; a second connecting rod-12; a third connecting rod-13; a fourth connecting rod-14; a fifth connecting rod-15; a sixth connecting rod-16; a seventh connecting rod-17; an eighth connecting rod-18; installing a vertical groove-2; diagonal bracing-3; fixing the wooden wedge-4; the pier body template is provided with a main ridge-5; supporting the upright pole-6.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the drawings in the embodiments of the present utility model, so as to further understand the concept of the present utility model, the technical problems to be solved, the technical features constituting the technical solutions, and the technical effects brought thereby.
As shown in fig. 1 to 3, a bridge pier column reinforcement bar binding platform connecting device comprises an outer base and an inner base;
the outer base is formed by encircling a first connecting rod 11, a second connecting rod 12, a third connecting rod 13 and a fourth connecting rod 14;
an inner base including a fifth connecting rod 15, a sixth connecting rod 16, a seventh connecting rod 17, and an eighth connecting rod 18; the fifth connecting rod 15 is arranged in parallel with the sixth connecting rod 16, one end of which is connected to the second connecting rod 12, and the other end of which is connected to the fourth connecting rod 14; the seventh connecting rod 17 and the eighth connecting rod 18 are arranged in parallel, one end of which is connected to the first connecting rod 11, and the other end of which is connected to the third connecting rod 13;
the four mounting vertical grooves 2 are arranged at four corners of the outer base respectively; the four mounting vertical grooves 2 are used for fixing four supporting vertical rods 6 of the binding platform;
the pier body template main edge 5 supports the outer base, or the pier body template main edge 5 supports the inner base.
The principle of the utility model is as follows: when pier column steel bars are bound, the first connecting rod 11, the second connecting rod 12, the third connecting rod 13 and the fourth connecting rod 14 are enclosed to form an outer base, a fifth connecting rod 15, a sixth connecting rod 16, a seventh connecting rod 17 and an eighth connecting rod 18 are arranged to form an inner base, and meanwhile, four corners of the outer base are respectively provided with a mounting vertical groove 2 for connecting a binding platform; placing an outer base above the pier body template main edge 5, and fixedly connecting the outer base with the pier body template main edge 5; when binding different pier studs, when facing a small pier body template main edge 5, an inner base is placed above the pier body template main edge 5, and the inner base is fixedly connected with the pier body template main edge 5, so that the requirements of binding pier studs of different sizes are met, and the construction efficiency is improved.
The utility model further discloses a preferred embodiment of the mounting vertical groove, wherein a diagonal brace 3 is arranged between the mounting vertical groove 2 and the outer base. In this embodiment, the diagonal braces 3 are disposed between the installation vertical slots 2 and the first connecting rod 11, the second connecting rod 12, the third connecting rod 13 and the fourth connecting rod 14, so as to increase the stability of the device.
The utility model further discloses a preferred embodiment, which also comprises a fixed wooden wedge 4 arranged at the joint of the mounting vertical groove 2 and the supporting vertical rod 6. In the embodiment, the fixed wooden wedge 4 is arranged, after the supporting upright rod 6 is inserted into the mounting vertical groove 2, the fixed wooden wedge 4 is adopted to wedge all around, so that the stability of connection is improved.
The utility model further discloses a preferred embodiment of the pier body template main ridge, wherein the outer base or the inner base is connected to the pier body template main ridge 5 through a U-shaped bolt. In this embodiment, when the outer base or the inner base is connected with the pier body template main rib 5, the U-shaped bolts are used for fixing, and meanwhile, short steel bars can be used for welding, so that the stability of the outer base or the inner base and the pier body template main rib 5 is improved.
The terms "connected" and "fixed" used in the description of the present utility model may be fixed, formed, welded, or mechanically connected, and the specific meaning of the terms in the present utility model is understood in specific cases.
In the description of the present utility model, the terms "center," "upper," "lower," "horizontal," "inner," "outer," and the like are used merely for convenience in describing the present utility model and to simplify the description, and do not denote or imply a particular orientation that the device or element in question must have, and thus should not be construed as limiting the utility model.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present utility model, and are not limiting; although the utility model has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art will appreciate that; the technical scheme described in the foregoing embodiments can be modified or some or all of the technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit of the utility model.

Claims (4)

1. Bridge pier stud steel bar binding platform connecting device, its characterized in that: comprises an outer base and an inner base;
the outer base is formed by encircling a first connecting rod (11), a second connecting rod (12), a third connecting rod (13) and a fourth connecting rod (14);
the inner base comprises a fifth connecting rod (15), a sixth connecting rod (16), a seventh connecting rod (17) and an eighth connecting rod (18); the fifth connecting rod (15) is arranged in parallel with the sixth connecting rod (16), one end of the fifth connecting rod is connected to the second connecting rod (12), and the other end of the fifth connecting rod is connected to the fourth connecting rod (14); the seventh connecting rod (17) and the eighth connecting rod (18) are arranged in parallel, one end of the seventh connecting rod is connected to the first connecting rod (11), and the other end of the seventh connecting rod is connected to the third connecting rod (13);
the four mounting vertical grooves (2) are arranged at four corners of the outer base respectively; the four mounting vertical grooves (2) are used for fixing four supporting vertical rods (6) of the binding platform;
the pier body template main edge (5) supports the outer base, or the pier body template main edge (5) supports the inner base.
2. The bridge pier steel bar binding platform connecting device according to claim 1, wherein: and a diagonal brace (3) is arranged between the mounting vertical groove (2) and the outer base.
3. The bridge pier steel bar binding platform connecting device according to claim 1, wherein: the wood wedge fixing device also comprises a fixed wood wedge (4) which is arranged at the joint of the mounting vertical groove (2) and the supporting vertical rod (6).
4. The bridge pier steel bar binding platform connecting device according to claim 1, wherein: the outer base or the inner base is connected to the pier body template main ridge (5) through a U-shaped bolt.
CN202320113667.7U 2023-01-17 2023-01-17 Bridge pier column steel bar binding platform connecting device Active CN219240299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320113667.7U CN219240299U (en) 2023-01-17 2023-01-17 Bridge pier column steel bar binding platform connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320113667.7U CN219240299U (en) 2023-01-17 2023-01-17 Bridge pier column steel bar binding platform connecting device

Publications (1)

Publication Number Publication Date
CN219240299U true CN219240299U (en) 2023-06-23

Family

ID=86841552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320113667.7U Active CN219240299U (en) 2023-01-17 2023-01-17 Bridge pier column steel bar binding platform connecting device

Country Status (1)

Country Link
CN (1) CN219240299U (en)

Similar Documents

Publication Publication Date Title
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN203247856U (en) Short column inserted bar position fixing device for large-size bearing platform construction
CN219240299U (en) Bridge pier column steel bar binding platform connecting device
CN209924434U (en) High-altitude overhanging formwork support frame body
CN210659407U (en) Tool type protective shed for machining of reinforcing steel bars
CN102080383B (en) Suspension type embedded part and hole reserved template fixing method
CN216892017U (en) Tie beam integral casting template in template connecting piece and lower stand
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN214834751U (en) High-rise concrete batter post structure die carrier supports and connection structure
CN213925893U (en) Jig frame and pier stud construction device
CN214116300U (en) Template supporting structure of overhead concrete cantilever beam
CN211421793U (en) Design steel operation platform
CN107476559A (en) A kind of spigot-and-socket builder's jack and installation method
CN107419740B (en) Steel bearing platform of beam-holding tower crane foundation and construction method thereof
CN207092508U (en) A kind of spigot-and-socket builder's jack
CN220867998U (en) Self-supporting assembled bridge steel-concrete composite Liang Tiaobei formwork protection frame
AU2021101985A4 (en) Cantilever construction method for railway high-pier simply-supported-beam sound barrier foundation
CN214403606U (en) Template supporting construction of T shape basis
CN215800930U (en) Be applied to domes's rag bolt device
CN217231491U (en) Two-way support system of pre-buried formula in operation pier position on water
CN218667143U (en) Bridge pier column reinforcing bar installation auxiliary stand
CN220789467U (en) Construction platform for reinforcing bridge T-shaped beam
CN218582435U (en) Cable-stayed support and support truss
CN214737445U (en) Firm type platform is used in construction of continuous rigid frame bridge
CN216866109U (en) Building carrier plate support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant