CN219237940U CN202320044730.6U CN202320044730U CN219237940U CN 219237940 U CN219237940 U CN 219237940U CN 202320044730 U CN202320044730 U CN 202320044730U CN 219237940 U CN219237940 U CN 219237940U
Authority
CN
China
Prior art keywords
blanking frame
torsion spring
steel pipe
limiting plate
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320044730.6U
Other languages
Chinese (zh)
Inventor
陈树忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinghua Zhongke Aluminized Steel Pipe Co ltd
Original Assignee
Xinghua Zhongke Aluminized Steel Pipe Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinghua Zhongke Aluminized Steel Pipe Co ltd filed Critical Xinghua Zhongke Aluminized Steel Pipe Co ltd
Priority to CN202320044730.6U priority Critical patent/CN219237940U/en
Application granted granted Critical
Publication of CN219237940U publication Critical patent/CN219237940U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of blanking frames and discloses an aluminized steel tube blanking frame which comprises a blanking frame main body, wherein a limiting plate is rotationally connected to the side wall of the blanking frame main body, a torsion spring is arranged at the lower end of the limiting plate, one end of the torsion spring is fixedly connected with the limiting plate, and the other end of the torsion spring is fixedly connected with the side wall of the blanking frame main body. This kind of aluminized steel pipe work or material rest, through the lateral wall at the work or material rest main part rotates the installation limiting plate, the torsion spring is installed in the bottom of limiting plate, the staff when using, torsion spring and limiting plate can play spacing effect to the steel pipe, can prevent before the steel pipe contacts unloader main part end, slide from the baffle, this design staff is when using, no matter the thickness size of steel pipe, can prevent that the steel pipe from dropping at the slip in-process, the untidy condition is put to the steel pipe can not appear, staff's work load has been reduced.

Description

Aluminized steel tube blanking frame
Technical Field
The utility model relates to the technical field of blanking frames, in particular to an aluminized steel tube blanking frame.
Background
The steel pipe blanking frame is an indispensable device in the steel pipe production process, the steel pipe is a steel lining which is provided with a hollow section and the length of the steel lining is far greater than the diameter or the circumference, and the steel pipe blanking frame mainly stores and places produced steel pipes uniformly.
Through searching, the patent with the Chinese patent number of CN217707777U discloses a novel steel pipe blanking frame, which comprises a supporting frame, a storage bracket and a blanking guide plate, wherein the storage bracket comprises a guide rod and a baffle rod, a plurality of rollers are rotationally connected to the blanking guide plate, a baffle plate is fixed on one side of the top end of the blanking guide plate, an inclined plate inclined towards the other side of the top end of the blanking guide plate is arranged at one end of the baffle plate, one end of the inclined plate, which is away from the baffle plate, extends to the other side of the top end of the blanking guide plate, and the inclined angle of the inclined plate is 135-165 degrees. The steel pipe can automatically slide downwards immediately after moving in place, and an operator does not need to push the steel pipe manually, so that time and labor are saved, and the production efficiency of the assembly line is improved.
The novel steel pipe blanking frame in the above patent has the following problems:
this novel steel pipe work or material rest, staff are in the use, and the steel pipe removes along the baffle, and when the one end of steel pipe and hang plate contact, the steel pipe can follow the baffle and fall down, falls into in the storage support, but because the steel pipe is thick when production, when the steel pipe slides on the stock guide, can appear not sliding down the condition that the hang plate will drop, can lead to the steel pipe to put neatly, still needs the staff to adjust, has increased staff's work load widely.
Disclosure of Invention
In order to overcome the defects in the prior art, the utility model provides an aluminized steel tube blanking frame, which is designed so that the steel tube cannot fall onto a storage bracket from a guide plate before sliding to an inclined plate no matter what the thickness of the steel tube is.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an aluminized steel pipe work or material rest, includes the work or material rest main part, the lateral wall of work or material rest main part rotates and is connected with the limiting plate, the lower extreme of limiting plate is equipped with torsion spring, torsion spring's one end and limiting plate fixed connection, torsion spring's the other end and the lateral wall fixed connection of work or material rest main part.
Preferably, two sliding grooves are symmetrically formed in the bottom of one side wall of the blanking frame main body, long rods are connected in the sliding grooves in a sliding mode, and the tail ends of the two long rods are fixedly connected with a retaining plate.
Preferably, a baffle is fixedly arranged on the other side wall of the blanking frame main body.
Preferably, the outer wall of the retaining plate is fixedly provided with a handle.
Preferably, a fixed rod is fixedly arranged at a position, corresponding to the torsion spring, of the side wall of the baffle plate, and the fixed rod is sleeved in the torsion spring.
Preferably, the torsion springs are installed not less than two groups and are uniformly distributed.
Preferably, a protective shell is fixedly arranged at the lower end of the side wall of the blanking frame main body, which is positioned on the torsion spring.
Compared with the prior art, the utility model has the following beneficial effects:
this kind of aluminized steel pipe work or material rest, through the lateral wall at the work or material rest main part rotates the installation limiting plate, the torsion spring is installed in the bottom of limiting plate, the staff when using, torsion spring and limiting plate can play spacing effect to the steel pipe, can prevent before the steel pipe contacts unloader main part end, slide from the baffle, this design staff is when using, no matter the thickness size of steel pipe, can prevent that the steel pipe from dropping at the slip in-process, the untidy condition is put to the steel pipe can not appear, staff's work load has been reduced.
Drawings
FIG. 1 is a schematic diagram of a blanking frame of an aluminized steel tube;
FIG. 2 is a schematic diagram of a torsion spring structure of an aluminized steel tube blanking frame according to the present utility model;
FIG. 3 is an enlarged schematic view of the structure of the aluminized steel tube blanking frame at A in FIG. 1;
fig. 4 is an enlarged schematic view of the structure of the aluminized steel tube blanking frame at B in fig. 2.
In the figure: 1. a blanking frame main body; 2. a limiting plate; 3. a fixed rod; 4. a torsion spring; 5. a baffle; 6. a long rod; 7. a retaining plate; 8. a handle; 9. and a protective shell.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, an aluminized steel tube blanking frame comprises a blanking frame main body 1, wherein a limiting plate 2 is rotatably connected to the side wall of the blanking frame main body 1, a torsion spring 4 is arranged at the lower end of the limiting plate 2, one end of the torsion spring 4 is fixedly connected with the limiting plate 2, and the other end of the torsion spring 4 is fixedly connected with the side wall of the blanking frame main body 1.
According to the aluminized steel tube blanking frame, in the use process, firstly, a steel tube slides to one side of an inclined plate along a guide plate under the action of rollers, and when one end of the steel tube contacts with the inclined plate, the steel tube falls into a storage bracket.
Further, as shown in fig. 1, two sliding grooves are symmetrically formed in the bottom of one side wall of the blanking frame main body 1, long rods 6 are slidably connected in the sliding grooves, the tail ends of the two long rods 6 are fixedly connected with a retaining plate 7, the long rods 6 and the retaining plate 7 are arranged at the tail ends of the blanking frame main body 1, before the blanking frame is used, the long rods 6 are pulled to a proper position, after blanking is completed, the inner walls of the retaining plate 7 are abutted against the steel pipes, and the steel pipes are placed in order.
Further, as shown in fig. 1, a baffle 5 is fixedly installed on the other side wall of the blanking frame body 1, and the baffle 5 is installed on the other end of the blanking frame body 1, so that the steel pipe can be limited.
Further, as shown in fig. 1, the handle 8 is fixedly installed on the outer wall of the retaining plate 7, and by installing the handle 8 on the outer wall of the retaining plate 7, a worker can conveniently pull the long rod 6 out of the chute when using the device.
Further, as shown in fig. 1, a fixing rod 3 is fixedly installed at a position corresponding to the torsion spring 4 on the side wall of the baffle 5, the fixing rod 3 is sleeved in the torsion spring 4, and the fixing rod 3 is installed on the inner wall of the baffle 5 to limit the torsion spring 4, so that the torsion spring 4 is prevented from being displaced during use.
Further, as shown in fig. 1, the torsion springs 4 are not lower than two groups and are uniformly distributed, and the steel pipes are limited to be more stable in use by arranging the torsion springs 4 not lower than two groups and are uniformly distributed.
Further, as shown in fig. 1, a protective shell 9 is fixedly arranged at the lower end of the side wall of the blanking frame main body 1, and the protective shell 9 is arranged to protect the torsion spring 4, so that the torsion spring 4 is prevented from being damaged during use.
Finally, it should be noted that: in the description of the present utility model, it should be noted that the azimuth or positional relationship indicated by the terms "vertical", "upper", "lower", "horizontal", etc. are based on the azimuth or positional relationship shown in the drawings, and are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or element referred to must have a specific azimuth, be constructed and operated in a specific azimuth, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, it should also be noted that, unless explicitly specified and limited otherwise, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
The foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (7)

1. The utility model provides an aluminized steel pipe work or material rest, includes work or material rest main part (1), its characterized in that, the lateral wall of work or material rest main part (1) rotates and is connected with limiting plate (2), the lower extreme of limiting plate (2) is equipped with torsion spring (4), the one end and limiting plate (2) fixed connection of torsion spring (4), the other end and the lateral wall fixed connection of work or material rest main part (1) of torsion spring (4).
2. The aluminized steel tube blanking frame according to claim 1, characterized in that two sliding grooves are symmetrically formed in the bottom of one side wall of the blanking frame main body (1), long rods (6) are connected in a sliding mode in the sliding grooves, and the tail ends of the two long rods (6) are fixedly connected with a retaining plate (7).
3. An aluminized steel tube blanking frame according to claim 1, characterized in that a baffle (5) is fixedly arranged on the other side wall of the blanking frame main body (1).
4. An aluminized steel tube blanking frame according to claim 2, characterized in that the outer wall of the retaining plate (7) is fixedly provided with a handle (8).
5. An aluminized steel tube blanking frame according to claim 3, characterized in that a fixed rod (3) is fixedly arranged on the side wall of the baffle plate (5) at a position corresponding to the torsion spring (4), and the fixed rod (3) is sleeved in the torsion spring (4).
6. An aluminized steel tube blanking frame according to claim 1, characterized in that the torsion springs (4) are installed not lower than two groups and are evenly distributed.
7. An aluminized steel tube blanking frame according to claim 1, characterized in that a protective shell (9) is fixedly arranged at the lower end of the torsion spring (4) on the side wall of the blanking frame main body (1).
CN202320044730.6U 2023-01-05 2023-01-05 Aluminized steel tube blanking frame Active CN219237940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320044730.6U CN219237940U (en) 2023-01-05 2023-01-05 Aluminized steel tube blanking frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320044730.6U CN219237940U (en) 2023-01-05 2023-01-05 Aluminized steel tube blanking frame

Publications (1)

Publication Number Publication Date
CN219237940U true CN219237940U (en) 2023-06-23

Family

ID=86841263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320044730.6U Active CN219237940U (en) 2023-01-05 2023-01-05 Aluminized steel tube blanking frame

Country Status (1)

Country Link
CN (1) CN219237940U (en)

Similar Documents

Publication Publication Date Title
CN219237940U (en) Aluminized steel tube blanking frame
CN207643011U (en) A kind of speed changer cylinder cap fixture
CN110980401B (en) Winding device for floor heating pipeline
CN209973810U (en) Production device of steel belt composite pipe for drainage
CN215478626U (en) Meshbelt coiling mechanism
CN110318576A (en) A kind of security isolation net for electric power overhaul
CN212245637U (en) Unwinding device for elastic wire processing
CN210023612U (en) Install stretching mechanism's snakelike spring machine
CN211812763U (en) Support frame for yarn barrel
CN112208948A (en) Glass curtain wall placing device
CN209680826U (en) Reinforcing bar automatic discharging machine
CN112447386B (en) Coil blocking and positioning mechanism of miniature transformer convenient for feeding
CN116060465B (en) Preparation process of high-strength copper wire
CN218903439U (en) Can have enough to meet need reinforcing bar alignment protector
CN219274631U (en) Steel pipe cutting equipment for room construction engineering
CN221110312U (en) Fixed-length cutting device for stainless steel pipe
CN221071598U (en) Double-layer material rack for preventing steel wire from bending during annealing treatment
CN221115875U (en) Paper core pipe material loading pusher
CN220659822U (en) Chemical petroleum pipeline installation adjusting device
CN211102409U (en) Auxiliary tool for welding plate
CN205739168U (en) A kind of aluminum pipe is set with grading conveyer device
CN211453399U (en) Multifunctional yarn conveying and detecting device
CN213770716U (en) Dismounting device is used in production of reel
CN218059533U (en) Suspension device for textile fabric