CN219220304U - Workover mast with foldable wellhead operating platform - Google Patents
Workover mast with foldable wellhead operating platform Download PDFInfo
- Publication number
- CN219220304U CN219220304U CN202320192799.3U CN202320192799U CN219220304U CN 219220304 U CN219220304 U CN 219220304U CN 202320192799 U CN202320192799 U CN 202320192799U CN 219220304 U CN219220304 U CN 219220304U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- wellhead
- platform
- workover rig
- workover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
技术领域technical field
本实用新型属于油田采油施工作业领域,尤其涉及一种配带折叠式井口操作平台的修井架。The utility model belongs to the field of oil production construction operations in oil fields, in particular to a well workover frame equipped with a foldable well head operating platform.
背景技术Background technique
通井机是油田修井作业使用的一种主要装备,主要由修井架和动力机构组成。动力机构一般置于液压起重卡车上。修井架是高约20多米的桁架结构,修井架底部与地面的底盘支架铰链连接,用以调整修井架与井口的位置。修井架顶部设有工作围栏,顶端设有滑轮组,滑轮组贯穿钢丝绳,钢丝绳一端连接大钩,钢丝绳另一端缠绕在连接动力机的绞车上,通过控制绞车正反向旋转,钢丝绳拉动大钩上下往复运动,完成油井内油管、抽油杆的提起和下井。工作时修井架安装在井口一侧,用顶部绷绳四周固定,一般与地面成大约85°角向井口方向倾斜,使修井架的大钩正对准井口中心,目的是减少吊起下油管或油杆过程中的横向力。修井作业期间,需要围绕井口四周搭建一个操作平台,为工人提供一个施工空间。操作平台是由钢结构组合而成,其体重很大,吊装搬抬非常困难。在搬家离场的修井作业时,通井机通过液压起重卡车运到下一个井场,将修井架置于井口,同时通过起重吊车将操作平台吊装于井口附近,然后由现场操作工用修井架绞车大钩吊起后安装在井口正上方。由于修井架大钩是在井口正上方,井口处还有采油树,操作平台放在井口侧面,起吊时是斜向起吊,需要几个工人用晃绳用力牵引操作平台,避免其冲撞修井架或井口的采油树,操作费时费力,还存在安全隐患。采油修井作业中亟待开发一种折叠式的操作平台,附带在修井架上。不但可以减少运输成本,还简化了操作平台的安装和收起工序,使现场操作省时省力更安全。Drilling rig is a major equipment used in oilfield workover operations, mainly composed of workover frame and power mechanism. The power mechanism is generally placed on a hydraulic lift truck. The workover frame is a truss structure with a height of more than 20 meters. The bottom of the workover frame is hinged to the chassis support on the ground to adjust the position of the workover frame and the wellhead. There is a working fence on the top of the workover frame, and a pulley block on the top. The pulley block runs through the wire rope. One end of the wire rope is connected to the hook, and the other end of the wire rope is wound on the winch connected to the power machine. By controlling the forward and reverse rotation of the winch, the wire rope pulls the hook to reciprocate up and down. Complete the lifting and lowering of the tubing and sucker rods in the oil well. The workover frame is installed on the side of the wellhead during work, and is fixed around it with the top guy rope. Generally, it is inclined to the wellhead at an angle of about 85° with the ground, so that the big hook of the workover frame is aligned with the center of the wellhead. The purpose is to reduce the lifting of the oil pipe or Lateral force during oil rod. During workover operations, an operating platform needs to be built around the wellhead to provide workers with a construction space. The operating platform is composed of steel structures, which are very heavy and difficult to hoist and lift. During the workover operation when moving away from the site, the well drilling machine is transported to the next wellsite by hydraulic lifting truck, the workover frame is placed on the wellhead, and the operating platform is hoisted near the wellhead by a lifting crane, and then the on-site operator It is installed directly above the wellhead after being hoisted by the hook of the workover frame winch. Since the hook of the workover derrick is directly above the wellhead, there is a Christmas tree at the wellhead, and the operation platform is placed on the side of the wellhead, and it is lifted obliquely when lifting. Several workers are required to pull the operation platform with swaying ropes to prevent it from colliding with the workover derrick or The Christmas tree at the wellhead is time-consuming and labor-intensive to operate, and there are also potential safety hazards. In oil production and workover operations, it is urgent to develop a foldable operating platform attached to the workover stand. Not only can it reduce transportation costs, but it also simplifies the installation and storage procedures of the operating platform, making on-site operations time-saving, labor-saving and safer.
实用新型内容Utility model content
本实用新型是为了克服现有技术中的不足,提供一种配带折叠式井口操作平台的修井架,安装在修井架上,成为修井架的整体附件,简化了操作平台的安装和收起工序,使现场操作省时省力更安全。The utility model aims to overcome the deficiencies in the prior art, and provides a workover frame equipped with a foldable wellhead operation platform, which is installed on the workover frame and becomes an integral accessory of the workover frame, which simplifies the installation and storage procedures of the operation platform , so that the on-site operation saves time and effort and is safer.
本实用新型为实现上述目的,通过以下技术方案实现,一种配带折叠式井口操作平台的修井架,包括四只支腿、滑轮组、钢丝绳、大钩构成的修井架桁架结构,修井架桁架结构靠近井口侧的支腿上固接有井口操作平台,所述井口操作平台包括近端支腿、远端支腿和操作平台,所述近端支腿通过连接块与修井架桁架结构的井口侧支腿固接,所述操作平台两侧设有四对耳板,近端支腿和远端支腿与耳板铰接,构成修井架附带的折叠式操作平台结构,所述操作平台中间对应井口位置设有避让井口采油树的开口式工艺空间。In order to achieve the above object, the utility model is realized through the following technical solutions, a workover frame equipped with a foldable wellhead operation platform, including a workover frame truss structure composed of four legs, a pulley block, a steel wire rope, and a hook, and a workover frame truss structure The wellhead operation platform is fixedly connected to the legs near the wellhead side. The wellhead operation platform includes a proximal leg, a distal leg and an operation platform. The proximal leg is connected to the wellhead side of the workover truss structure through the connecting block The outriggers are fixed, and there are four pairs of ear plates on both sides of the operation platform. The proximal and distal outriggers are hinged to the ear plates to form a foldable operation platform structure attached to the workover frame. The middle of the operation platform corresponds to the wellhead The location is equipped with an open process space avoiding the wellhead Christmas tree.
进一步地,所述近端支腿沿其纵向均布有若干个销孔,用于调整操作平台高度,所述连接块与修井架支腿固接侧设有角度,保证固接的近端支腿轴线与地面垂直。Further, several pin holes are evenly distributed along the longitudinal direction of the proximal support leg, which are used to adjust the height of the operation platform, and the connection block is provided with an angle with the fixed connection side of the workover frame support leg, so as to ensure that the fixed proximal support The leg axis is perpendicular to the ground.
进一步地,所述远端支腿沿其纵向均布有若干个销孔,用于调整操作平台高度,所述远端支腿底部固接有支撑底板。Furthermore, several pin holes are evenly distributed along the longitudinal direction of the distal support leg for adjusting the height of the operating platform, and the bottom of the distal support leg is fixedly connected with a support base plate.
进一步地,所述操作平台形状呈钢结构框架结构,操作平台上铺装钢板网,操作平台两侧边框分别通过铰链与副操作平台铰接,副操作平台上铺装钢板网。Further, the shape of the operation platform is a steel frame structure, the operation platform is paved with steel mesh, the side frames of the operation platform are respectively hinged with the auxiliary operation platform through hinges, and the auxiliary operation platform is covered with steel mesh.
进一步地,所述副操作平台侧边框周边设有围栏插座,副操作平台通过围栏插座插接操作平台围栏。Further, a fence socket is provided around the side frame of the auxiliary operation platform, and the auxiliary operation platform is plugged into the fence of the operation platform through the fence socket.
进一步地,所述操作平台上的开口式工艺空间铺装带有两个半圆形的钢格网,构成的整圆结构与井口位置对准,位于操作平台的开口处上铺装钢格网的折叠小门。Further, the open process space on the operation platform is paved with two semicircular steel grids, the formed circular structure is aligned with the wellhead, and the steel grid is paved on the opening of the operation platform folding door.
进一步地,所述操作平台上搭接钢结构爬梯。Further, a steel structure ladder is overlapped on the operating platform.
有益效果:与现有技术相比,修井架附带折叠式操作平台运输简单方便,无需单独起吊、运输、操作平台,利用原来的井架车运输,节省运力和吊车设备;折叠的操作平台安装收起过程安全,省时省力;修井架安装在井口后,利用修井架绞车将操作平台放平,安装围栏和爬梯并调整高度后即可工作,省去了单独操作平台起吊、安装的过程,节省人力,操作安全。围栏采用插接方式,爬梯采用搭接方式,安装拆卸简单。收起时拆掉围栏和爬梯,用井架绞车即可将操作平台折叠到与井架贴合,操作简单;高度调整范围大、操作简便;销轴安装在近端支腿和远端支腿的不同孔内可以调整操作平台高度,范围可达2米,能适应油田绝大多数油井;结构简单、成本低。采用一个主操作平台和两个副操作平台折叠结构,既可以复合运输宽度要求,也可以增加操作平台面积,便于井口作业。高度调节用修井架自身大钩即可完成,不用其他的液压或丝杠机构,结构简单,成本低廉。Beneficial effects: Compared with the prior art, the foldable operation platform attached to the workover derrick is easy and convenient to transport, without the need for separate lifting, transportation, and operation of the platform, and the original derrick truck is used for transportation, saving transportation capacity and crane equipment; the folded operation platform is installed and put away The process is safe, time-saving and labor-saving; after the workover derrick is installed at the wellhead, use the workover derrick winch to level the operation platform, install the fence and ladder and adjust the height to start working, eliminating the need for a separate operation platform lifting and installation process, saving manpower , safe operation. The fence adopts the plug-in method, and the ladder adopts the lap-joint method, which is easy to install and disassemble. Remove the fence and ladder when stowing, and use the derrick winch to fold the operation platform to fit the derrick, easy to operate; the height adjustment range is large, easy to operate; the pin shaft is installed on the difference between the proximal leg and the distal leg The height of the operating platform can be adjusted in the hole, and the range can reach 2 meters, which can adapt to most oil wells in the oil field; the structure is simple and the cost is low. The foldable structure of one main operation platform and two auxiliary operation platforms can not only meet the transportation width requirements, but also increase the area of the operation platform, which is convenient for wellhead operations. The height adjustment can be completed with the big hook of the workover mast itself, without other hydraulic pressure or lead screw mechanism, the structure is simple and the cost is low.
附图说明Description of drawings
图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2是图1的俯视图;Fig. 2 is the top view of Fig. 1;
图3是操作平台中间开口式工艺空间的结构示意图;Figure 3 is a schematic structural view of the open process space in the middle of the operating platform;
图4是折叠状态的侧视图;Fig. 4 is a side view of the folded state;
图5是现有通井机工作状态示意图。Fig. 5 is a schematic diagram of the working state of the existing well drilling machine.
图中:1、修井架桁架结构,1-1、支腿,1-2、滑轮组,1-3、钢丝绳,1-4、大钩,2、井口操作平台,2-1、近端支腿,2-2、远端支腿,2-3、操作平台,2-4、副操作平台,3、连接块,4、耳板,5、采油树,6、开口式工艺空间,7、销孔,8、支撑底板,9、钢板网,10、铰链,11、围栏插座,12、围栏,13、半圆形的钢格网,14、折叠小门,15、爬梯。In the figure: 1. Workover truss structure, 1-1, outrigger, 1-2, pulley block, 1-3, wire rope, 1-4, hook, 2, wellhead operation platform, 2-1, proximal outrigger , 2-2, remote outrigger, 2-3, operating platform, 2-4, auxiliary operating platform, 3, connection block, 4, lug plate, 5, Christmas tree, 6, open process space, 7, pin Hole, 8, support base plate, 9, steel mesh, 10, hinge, 11, fence socket, 12, fence, 13, semicircular steel grid, 14, folding small door, 15, climbing ladder.
具体实施方式Detailed ways
以下结合较佳实施例,对依据本实用新型提供的具体实施方式详述如下:详见附图,本实施例提供了一种配带折叠式井口操作平台的修井架,包括四只支腿1-1、滑轮组1-2、钢丝绳1-3、大钩1-4构成的修井架桁架结构1,修井架桁架结构靠近井口侧的支腿上固接有井口操作平台2,所述井口操作平台包括近端支腿2-1、远端支腿2-2和操作平台2-3,所述近端支腿通过连接块3与修井架桁架结构的井口侧支腿固接,所述操作平台两侧设有四对耳板4,近端支腿和远端支腿与耳板铰接,构成修井架附带的折叠式操作平台结构,所述操作平台中间对应井口位置设有避让井口采油树5的开口式工艺空间6。Below in conjunction with the preferred embodiments, the specific implementation methods provided according to the utility model are described in detail as follows: see the accompanying drawings for details, this embodiment provides a workover stand equipped with a foldable wellhead operating platform, including four legs 1 -1. Workover
本实施例的优选方案是,所述近端支腿沿其纵向均布有若干个销孔7,用于调整操作平台与修井台相对高度,所述连接块与修井架支腿固接侧设有角度,保证固接的近端支腿轴线与地面垂直。本实施例修井架支腿固接侧与水平线的角度为85°。The preferred solution of this embodiment is that the near-end support leg has
本实施例的优选方案是,所述远端支腿沿其纵向均布有若干个销孔,用于调整操作平台高度,以满足修井台施工环境地面不平的环境条件。所述远端支腿底部固接有支撑底板8。The preferred solution of this embodiment is that the distal leg has several pin holes evenly distributed along its longitudinal direction, which are used to adjust the height of the operation platform, so as to meet the environmental conditions of the uneven ground in the construction environment of the workover platform. A
本实施例的优选方案是,所述操作平台形状呈钢结构框架结构,操作平台上铺装钢板网9,操作平台两侧边框分别通过铰链10与副操作平台2-4铰接,副操作平台上铺装钢板网。The preferred solution of this embodiment is that the shape of the operating platform is a steel frame structure, and the expanded
本实施例的优选方案是,所述副操作平台侧边框周边设有围栏插座11,副操作平台通过围栏插座插接操作平台围栏12。The preferred solution of this embodiment is that a
本实施例的优选方案是,所述操作平台上的开口式工艺空间铺装带有两个半圆形的钢格网13,构成的整圆结构与井口位置对准,位于操作平台的开口处上采用铺装或铰链连接钢格网的折叠小门14。本实施例折叠小门采用铺装。The preferred solution of this embodiment is that the open process space on the operation platform is paved with two
本实施例的优选方案是,所述操作平台上搭接钢结构的爬梯15。The preferred solution of this embodiment is that the
工作原理working principle
一、安装过程1. Installation process
1、按操作规范将修井架安装在井口一侧,根据井口实际情况确定操作平台高度;1. Install the workover frame on the side of the wellhead according to the operating specifications, and determine the height of the operating platform according to the actual situation at the wellhead;
2、用绞车大钩吊装操作平台,调整操作平台高度合适后,插入近端支腿的销轴;2. Hoist the operation platform with the hook of the winch, adjust the height of the operation platform to a suitable height, and insert the pin shaft of the proximal outrigger;
3、用大钩吊操作平台的远端,缓缓放下,远端支腿自然下垂与地面垂直,调整远端支腿和操作平台相对高度,将铰接销插入销孔,使操作平台保持与地面平行,由于两个近端支腿固接在井架上并与操作平台铰接,工作状态时,操作平台与地面保持平行,操作平台另一侧与两个远端支腿铰接,通过两个远端支腿支撑在地面。3. Use a large hook to hang the far end of the operating platform and lower it slowly. The legs at the far end will naturally sag and be perpendicular to the ground. Adjust the relative height between the legs at the far end and the operating platform, and insert the hinge pin into the pin hole to keep the operating platform on the ground. Parallel, since the two near-end outriggers are fixed on the derrick and hinged with the operation platform, in the working state, the operation platform is kept parallel to the ground, and the other side of the operation platform is hinged with the two far-end outriggers, through the two far-end outriggers The outriggers rest on the ground.
4、操作平台四周插上围栏,防止操作人员坠落;爬梯为工作人员上下操作平台的通道;4. Fences are inserted around the operating platform to prevent operators from falling; the ladder is the channel for the staff to operate the platform up and down;
5、合上操作平台开口处的钢格网折叠小门,安装半圆孔钢格网围住采油树,操作平台安装完毕。5. Close the steel grid folding door at the opening of the operation platform, install the semi-circular steel grid to surround the Christmas tree, and the installation of the operation platform is completed.
说明:附图1对于修井架桁架结构采用截图方式制图,原因是:绞车大钩沿其中心线必须与井口中心线重合,修井架相对地面成85°角。Explanation: Attached Figure 1 uses screenshots to draw the truss structure of the workover rig, because the hook of the drawworks along its centerline must coincide with the centerline of the wellhead, and the workover derrick is at an angle of 85° relative to the ground.
二、工作过程2. Working process
操作平台高度合适,附件安装完毕,即可以进行修井作业。The height of the operation platform is appropriate, and the workover operation can be carried out after the accessories are installed.
三、收起过程3. Putting away the process
1、取掉围栏、半圆钢格网和爬梯;1. Remove the fence, semicircular steel grid and ladder;
2、用修井架绞车起吊操作平台远端,操作平台绕近端支腿销轴旋转至与修井架贴合;2. Use the workover derrick winch to lift the far end of the operation platform, and the operation platform rotates around the pin shaft of the near-end outrigger until it fits the workover derrick;
3、将两个副操作平台折叠与修井架侧面贴合,远端支腿自然下垂,完成收起过程,整个操作平台和修井架折叠在一起,然后可以用井架车进行运输,3. Fold the two auxiliary operating platforms and fit them on the side of the workover mast, and the outriggers at the far end will hang down naturally. After completing the retracting process, the entire operation platform and the workover mast are folded together, and then can be transported by the derrick truck.
4、开口式工艺空间的设置,目的是防止操作平台折叠过程中操作平台与井口相关设备发生干涉。可以将操作平台铰接钢格网的折叠小门折叠到与操作平台贴合,此时操作平台呈现为一个U型开口结构,保证操作平台顺利折叠。4. The setting of the open process space is to prevent the operation platform from interfering with the wellhead related equipment during the folding process of the operation platform. The folding door of the hinged steel grid of the operating platform can be folded until it fits the operating platform. At this time, the operating platform presents a U-shaped opening structure to ensure the smooth folding of the operating platform.
上述参照实施例对一种配带折叠式井口操作平台的修井架的详细描述,是说明性的而不是限定性的,可按照所限定范围列举出若干个实施例,因此在不脱离本实用新型总体构思下的变化和修改,应属本实用新型的保护范围之内。The above-mentioned detailed description of a workover frame with a folding wellhead operating platform with reference to the embodiments is illustrative rather than limiting, and several embodiments can be listed according to the limited scope, so without departing from the utility model Changes and modifications under the overall concept should fall within the protection scope of the present utility model.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320192799.3U CN219220304U (en) | 2023-02-09 | 2023-02-09 | Workover mast with foldable wellhead operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320192799.3U CN219220304U (en) | 2023-02-09 | 2023-02-09 | Workover mast with foldable wellhead operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219220304U true CN219220304U (en) | 2023-06-20 |
Family
ID=86735129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320192799.3U Expired - Fee Related CN219220304U (en) | 2023-02-09 | 2023-02-09 | Workover mast with foldable wellhead operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219220304U (en) |
-
2023
- 2023-02-09 CN CN202320192799.3U patent/CN219220304U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2703803C (en) | Land rig | |
CN202090674U (en) | Multifunctional stringing and poling machine | |
CN102296876B (en) | Multifunctional stringing pole-erecting machine | |
CN202379620U (en) | Lifting and operating platform comprehensive equipment | |
CN102910532B (en) | Method for butting and hoisting large box type derricks in air | |
CN204827251U (en) | Novel suit derrick upright | |
CN204571885U (en) | A kind of telescopic derrick formula coiled tubing work vehicle | |
CN219220304U (en) | Workover mast with foldable wellhead operating platform | |
CN210597308U (en) | Steel-pipe pile extractor | |
CN204281116U (en) | Wind power generation stepped leap self-crawling type translation loop wheel machine | |
CN108425348B (en) | Hydraulic overhaul platform for flood discharge flow channel of hydropower station and operation method | |
CN207092949U (en) | The convenient rig of elevator formula free of demolition | |
CN113585860B (en) | Method for assembling and disassembling double-arm holding pole | |
CN209444284U (en) | It is a kind of can Operating Pressure planer-type derrick | |
CN204384733U (en) | Bus plug-in strip Lift-on/Lift-off System | |
CN204529155U (en) | A kind of multifunction power Operation Van | |
CN208618415U (en) | A kind of pervious concrete well casing mounting device for base pit dewatering | |
CN113526418A (en) | A movable multifunctional lifting device and a manhole cover hoisting method for opening a work well and underground operation | |
CN203130100U (en) | Tunnel eave wall construction trolley | |
CN206053355U (en) | A kind of tower concrete spreader | |
CN220537368U (en) | High hanging type safety rope device for crawler crane arm support | |
CN205687456U (en) | A kind of portable high-pressure line guy dish delivery device | |
CN111425133A (en) | Dewatering well construction device and construction method thereof | |
CN216471971U (en) | Movable wellhead lifting device | |
CN110844768A (en) | Culvert pipe overhead hoist for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230620 |
|
CF01 | Termination of patent right due to non-payment of annual fee |