CN219219977U - Guardrail net for greening construction - Google Patents
Guardrail net for greening construction Download PDFInfo
- Publication number
- CN219219977U CN219219977U CN202320160785.3U CN202320160785U CN219219977U CN 219219977 U CN219219977 U CN 219219977U CN 202320160785 U CN202320160785 U CN 202320160785U CN 219219977 U CN219219977 U CN 219219977U
- Authority
- CN
- China
- Prior art keywords
- connecting block
- greening construction
- stand
- guardrail net
- net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P60/00—Technologies relating to agriculture, livestock or agroalimentary industries
- Y02P60/40—Afforestation or reforestation
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to the technical field of guardrail nets, in particular to a guardrail net for greening construction. The technical proposal comprises: upright post, first connecting block, second connecting block, phosphor strip, protection network, rotation control board, pivot, mounting panel, fixing base and screw hole, its characterized in that: the first connecting blocks are arranged above and below the outer walls of the two sides of the stand column, the first connecting blocks are movably connected with the second connecting blocks through movable pin shafts, the second connecting blocks are arranged above and below the outer walls of the two sides of the protective net, the bottom ends of the stand column are arranged in bearings, and the bearings are arranged at the center position of the upper surface of the mounting plate. The utility model is convenient for constructors to fixedly install on the greening construction ground with the level difference, avoids the condition that the greening construction ground with the level difference can be installed only after the constructors horizontally adjust the ground, improves the installation efficiency, reduces the labor intensity of constructors and has strong practicability.
Description
Technical Field
The utility model relates to the technical field of guardrail nets, in particular to a guardrail net for greening construction.
Background
The green construction is to save resources and reduce construction activities negatively affecting the environment to the greatest extent through scientific management and technical progress under the premise of ensuring basic requirements of quality, safety and the like in engineering construction, and realizes energy conservation, land conservation, water conservation, material conservation and environmental protection, and at the moment, a green construction protective fence net is needed to protect a construction site.
Through retrieving, patent bulletin number CN213898420U discloses a green construction rail guard net, including rail guard net, fixed cover and spout, one side of rail guard net is connected with the fixture block, the mounting groove has been seted up to one side that the fixture block was kept away from to the rail guard net, the draw-in groove has been seted up to one side that the rail guard net is close to the mounting groove, wherein, the bottom left side of rail guard net is connected with left cassette, the bottom right side of rail guard net is connected with right cassette. This green construction rail guard net through setting up fixture block and fixed cover, when the rail guard net drives the fixture block and removes the inside of the draw-in groove of another rail guard net, the left cassette of rail guard net one side and the right cassette parallel and level of another rail guard net, afterwards, pulls fixed cover, and fixed cover drives the slider and slides in the inside of spout, and when fixed cover drives the slider and removes one side of fixed slot, continues to pull fixed cover, and fixed cover drives the fixed hole and removes the inside of fixed slot, is convenient for splice fixedly to the rail guard net.
When the existing guardrail net for greening construction is actually installed, constructors firstly carry out horizontal adjustment on construction ground with level difference when the constructors are installed on the construction ground with the level difference, the construction ground with the level difference is dug and shoveled in places with higher heights, the ground with lower heights needs to be filled with earth to be heightened, installation construction can be carried out after the ground is relatively horizontal, labor intensity is high, installation efficiency is low, and therefore the guardrail net for greening construction is provided for solving the existing problems.
Disclosure of Invention
The utility model aims to provide a guardrail net for greening construction, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a guardrail net for greening construction, includes stand, first connecting block, second connecting block, phosphor strip, protection network, rotatory regulating plate, pivot, mounting panel, fixing base and screw hole, first connecting block is all installed to both sides outer wall top and the below of stand, first connecting block passes through movable pin axle and second connecting block swing joint, second connecting block is installed in both sides outer wall top and the below of protection network, the bottom of stand is installed in the bearing, the bearing sets up the upper surface central point of mounting panel, the screw hole has all been seted up at four corners on the surface of mounting panel, the pivot is installed to the screw hole, the fixing base is installed to the bottom of pivot.
Through the cooperation setting of a series of structures such as first connecting block, the second connecting block, the pivot, the external screw thread, the fixing base, rotatory regulating plate, protection network, when constructor installs the utility model, when the utility model installs on the construction ground that has the level difference, constructor can drive the pivot and carry out corotation or reversal when carrying out corotation or reversal to rotatory regulating plate, because of being provided with the external screw thread on the outer wall of pivot, and be threaded engagement connection between the external screw thread on the pivot outer wall and the screw hole on the mounting panel, can indirect drive the fixing base and do upward or decurrent rectilinear motion when the pivot carries out corotation or reversal, and because of the difference in height between the first connecting block on the stand and the second connecting block on the protection network through movable pin swing joint, thereby constructor only need adjust the difference in height between the fixing base and can make the utility model install fixedly on the construction ground that has the level difference, thereby the constructor is convenient for carrying out fixed installation on the greening construction ground that has the level difference, the condition that the constructor can carry out installation only can take place after carrying out the level adjustment to the ground, thereby the improvement construction efficiency, the reduction constructor has carried out the installation position, the intensity of support is reduced, can be convenient from the first connecting block through a series of bearing setting up on the second connecting block on the stand through the support, thereby the position is convenient for the support is installed on the stand can be installed on the stand through the support.
Preferably, a rotation adjusting plate is installed at the top end of the rotating shaft.
Preferably, the fixing holes are formed in the surface of the fixing base, the number of the fixing holes is four, and the four fixing holes are distributed in an annular array.
Preferably, an external thread is arranged on the outer wall of the rotating shaft, and the external thread on the outer wall of the rotating shaft is in threaded engagement connection with a threaded hole on the mounting plate.
Preferably, fluorescent strips are arranged on the front end face and the rear end face of the upright post.
Preferably, the first connecting block is fixed with the upright post through welding.
Preferably, the second connecting block is fixed with the protective net through welding.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the matching arrangement of a series of structures such as the first connecting block, the second connecting block, the rotating shaft, the external threads, the fixed seat, the rotary adjusting plate, the protective net and the like, when a constructor installs the utility model on construction ground with level difference, when the constructor installs the utility model on the construction ground with level difference, the constructor can drive the rotating shaft to rotate forward or reversely, the external threads are arranged on the outer wall of the rotating shaft, and the external threads on the outer wall of the rotating shaft are in threaded engagement connection with the threaded holes on the mounting plate, so that the fixed seat can be indirectly driven to do upward or downward rectilinear motion when the rotating shaft rotates forward or reversely, and the constructor can be enabled to install and fix on the construction ground with level difference only by adjusting the height difference between the fixed seat, thereby being convenient for the constructor to install fixedly on greening construction ground with level difference, avoiding the condition that the constructor can install after the greening construction ground with level difference is horizontally adjusted, the construction efficiency is improved, and the labor intensity of the constructor is reduced.
2. According to the utility model, through the matching arrangement of a series of structures such as the bearing, the upright post and the like, as the bottom end of the upright post is arranged in the bearing on the mounting plate, the upright post is convenient for constructors to rotate, and the upright post rotates so as to adjust the position of the first connecting block, thereby facilitating the constructors to mount between the first connecting block on the upright post and the second connecting block on the protective net, and having strong practicability.
Drawings
FIG. 1 is a front view of the present utility model;
FIG. 2 is a cross-sectional view of the present utility model;
fig. 3 is a side view of the post of the present utility model.
In the figure: 1. a column; 2. a first connection block; 3. a second connection block; 4. a fluorescent strip; 5. a protective net; 6. rotating the adjusting plate; 7. a rotating shaft; 8. an external thread; 9. a mounting plate; 10. a fixing seat; 11. a fixing hole; 12. a bearing; 13. and (3) a threaded hole.
Detailed Description
The technical scheme of the utility model is further described below with reference to the attached drawings and specific embodiments.
Example 1
As shown in fig. 1-3, the guardrail net for greening construction provided by the utility model comprises an upright post 1, a first connecting block 2, a second connecting block 3, fluorescent strips 4, a protective net 5, a rotation adjusting plate 6, a rotating shaft 7, a mounting plate 9, a fixing seat 10 and threaded holes 13, wherein the first connecting block 2 is arranged above and below the outer walls of two sides of the upright post 1, the first connecting block 2 is movably connected with the second connecting block 3 through a movable pin shaft, the second connecting block 3 is arranged above and below the outer walls of two sides of the protective net 5, the bottom end of the upright post 1 is arranged in a bearing 12, the bearing 12 is arranged at the center position of the upper surface of the mounting plate 9, the threaded holes 13 are formed in four corners of the surface of the mounting plate 9, the rotating shaft 7 is arranged in the threaded holes 13, and the bottom end of the rotating shaft 7 is provided with a fixing seat 10.
The working principle of the guardrail net for greening construction based on the first embodiment is as follows: when the utility model is installed on construction ground with level difference, the constructor can drive the rotating shaft 7 to rotate forward or reversely when the rotary adjusting plate 6 rotates forward or reversely, the external thread 8 is arranged on the outer wall of the rotating shaft 7, and the external thread 8 on the outer wall of the rotating shaft 7 is in threaded engagement with the threaded hole 13 on the mounting plate 9, so that the rotating shaft 7 can indirectly drive the fixing seat 10 to do upward or downward linear motion when rotating forward or reversely, and the first connecting block 2 on the upright post 1 is movably connected with the second connecting block 3 on the protective net 5 through the movable pin shaft, so that the constructor can install and fix the utility model on the construction ground with level difference only by adjusting the height difference between the fixing seats 10, thereby facilitating the installation of the constructor on the greening construction ground with level difference, avoiding the condition that the greening construction ground with level difference needs to be horizontally adjusted on the ground by the constructor, improving the installation efficiency, reducing the labor intensity of the constructor, facilitating the rotation of the bearing 12 on the mounting plate 9 at the bottom end of the upright post 1, and facilitating the rotation of the first connecting block 1 on the upright post 1, and the position of the first connecting block 2 can be conveniently adjusted by the constructor on the first connecting block 5.
Example two
As shown in fig. 1-3, compared with the first embodiment, the guardrail net for greening construction provided by the present utility model further includes: the rotation adjusting plate 6 is installed on the top of pivot 7, fixed orifices 11 have been seted up on fixing base 10's surface, fixed orifices 11 are four, and four fixed orifices 11 are annular array distribution, be provided with external screw thread 8 on the outer wall of pivot 7, be threaded engagement connection between external screw thread 8 on the outer wall of pivot 7 and the screw hole 13 on mounting panel 9, phosphor strip 4 is all installed to the preceding terminal surface and the rear end face of stand 1, pass through welded fastening between first connecting block 2 and the stand 1, pass through welded fastening between second connecting block 3 and the protection network 5.
In this embodiment, the rotation adjusting plate 6 is convenient for constructors to make the rotating shaft 7 rotate forward or reversely, the fixing seat 10 and the fixing hole 11 are convenient for constructors to install and fix the whole device, and the fluorescent strips 4 are arranged on the front end face and the rear end face of the upright post 1, so that the fluorescent strips 4 can play a role of fluorescent warning at night, people nearby the periphery of the device can observe the device conveniently, collision is avoided, and safety is improved.
The above-described embodiments are merely a few preferred embodiments of the present utility model, and many alternative modifications and combinations of the above-described embodiments will be apparent to those skilled in the art based on the technical solutions of the present utility model and the related teachings of the above-described embodiments.
Claims (7)
1. The utility model provides a guardrail net for greening construction, includes stand (1), first connecting block (2), second connecting block (3), phosphor strip (4), protection network (5), rotation control board (6), pivot (7), mounting panel (9), fixing base (10) and screw hole (13), its characterized in that: the utility model discloses a stand, including stand (1) and fixed seat, stand (1) are installed in the stand, first connecting block (2) are all installed to both sides outer wall top and below of stand (1), first connecting block (2) are through movable pin axle and second connecting block (3) swing joint, second connecting block (3) are installed in both sides outer wall top and below of protection network (5), install in bearing (12) in the bottom of stand (1), bearing (12) set up the upper surface central point of mounting panel (9), screw hole (13) have all been seted up in four corners in the surface of mounting panel (9), install pivot (7) in screw hole (13), fixing base (10) are installed to the bottom of pivot (7).
2. The guardrail net for greening construction according to claim 1, wherein: the top end of the rotating shaft (7) is provided with a rotation adjusting plate (6).
3. The guardrail net for greening construction according to claim 1, wherein: fixing holes (11) are formed in the surface of the fixing seat (10), the number of the fixing holes (11) is four, and the four fixing holes (11) are distributed in an annular array.
4. The guardrail net for greening construction according to claim 1, wherein: external threads (8) are arranged on the outer wall of the rotating shaft (7), and the external threads (8) on the outer wall of the rotating shaft (7) are in threaded engagement connection with threaded holes (13) on the mounting plate (9).
5. The guardrail net for greening construction according to claim 1, wherein: fluorescent strips (4) are arranged on the front end face and the rear end face of the upright post (1).
6. The guardrail net for greening construction according to claim 1, wherein: the first connecting block (2) is fixed with the upright post (1) through welding.
7. The guardrail net for greening construction according to claim 1, wherein: the second connecting block (3) is fixed with the protective net (5) through welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320160785.3U CN219219977U (en) | 2023-02-09 | 2023-02-09 | Guardrail net for greening construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320160785.3U CN219219977U (en) | 2023-02-09 | 2023-02-09 | Guardrail net for greening construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219219977U true CN219219977U (en) | 2023-06-20 |
Family
ID=86748736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320160785.3U Active CN219219977U (en) | 2023-02-09 | 2023-02-09 | Guardrail net for greening construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219219977U (en) |
-
2023
- 2023-02-09 CN CN202320160785.3U patent/CN219219977U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20150119600A (en) | Protection wall with convertible wind protection panel using solar power | |
CN219219977U (en) | Guardrail net for greening construction | |
CN205119537U (en) | Ramp type solar device's installing support | |
CN113346370B (en) | Assembled switch board of controllable heat dissipation | |
CN214195707U (en) | Anti-seismic energy-saving environment-friendly movable board house | |
CN209625730U (en) | Typhoon-proof billboard | |
IE20080118A1 (en) | A barrier | |
CN220847250U (en) | Temporary traffic blocking device | |
CN219490995U (en) | Water conservancy construction template support frame | |
CN220754314U (en) | Lightning protection device convenient to adjust for lightning protection engineering | |
CN219394760U (en) | Solar photovoltaic bracket convenient for slope installation | |
CN213875358U (en) | Raise dust monitoring facilities for building site | |
CN220732187U (en) | Box-type substation with excellent waterproof performance | |
CN219459684U (en) | High-efficiency barren rake | |
CN211993631U (en) | Building construction cutting device | |
CN214740224U (en) | High-rise building segmentation construction protection canopy | |
CN218265364U (en) | Garden guardrail | |
CN219107357U (en) | Rotatable photovoltaic flexible support | |
CN219994944U (en) | Lifting type monitoring rod | |
CN213123766U (en) | Noise-proof device for green building construction | |
CN220155092U (en) | Signboard convenient to installation | |
CN220789489U (en) | Intelligent Internet of things highway maintenance construction early warning information broadcasting device | |
CN220725974U (en) | Baffle for pile foundation construction convenient to installation combination | |
CN221034903U (en) | Disaster prevention and control monitoring equipment for geological disaster management | |
CN220469364U (en) | Bearing hanger for civil engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |