CN219213537U - Concrete maintenance device - Google Patents

Concrete maintenance device Download PDF

Info

Publication number
CN219213537U
CN219213537U CN202222741914.6U CN202222741914U CN219213537U CN 219213537 U CN219213537 U CN 219213537U CN 202222741914 U CN202222741914 U CN 202222741914U CN 219213537 U CN219213537 U CN 219213537U
Authority
CN
China
Prior art keywords
maintenance
storehouse
concrete
fixedly connected
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222741914.6U
Other languages
Chinese (zh)
Inventor
陈仟
王亚标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222741914.6U priority Critical patent/CN219213537U/en
Application granted granted Critical
Publication of CN219213537U publication Critical patent/CN219213537U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a concrete maintenance device, which relates to the technical field of concrete and comprises a movable maintenance box, wherein a concrete maintenance bin is fixedly connected to the inside of the movable maintenance box, and a temperature control bin is fixedly connected to the inside of the movable maintenance box and positioned at one side of the concrete maintenance bin: be provided with water filtration storehouse and universal wheel, the maintenance water of carrying is carried out abundant filtration operation to concrete maintenance storehouse inside, through the water pump operation, through first inlet channel to the inside required storage water of replenishment of water filtration storehouse, use through drainage pipe cooperation second inlet channel and carry out normal discharge, the quality of the maintenance water when having realized curing the concrete is controlled, final maintenance quality has been improved, be provided with the accuse temperature storehouse, when the inside temperature of concrete maintenance storehouse needs to regulate and control, all operate through fan and heating wire, carry out the temperature conduction through the temperature conduction stick, it is required that the concrete maintenance temperature has been satisfied, the resource guarantee of power equipment operation has been provided.

Description

Concrete maintenance device
Technical Field
The utility model relates to the technical field of concrete, in particular to a concrete maintenance device.
Background
The concrete needs special maintenance equipment to be matched for use when standing for a long time, and is commonly used in building construction operation, so that the maintenance equipment plays an extremely critical role.
Chinese patent publication No. CN 215150247U discloses a concrete maintenance device, which comprises a bod, be equipped with the control box on the organism, be equipped with the air exhauster on the organism, be equipped with the water tank on the organism, be equipped with atomizer on the organism, atomizer below is equipped with the storage rack, the bottom of the body is equipped with the catch basin, be equipped with the bin gate on the organism, wet processing is carried out in to the organism through atomizer and isosceles trapezoid reposition of redundant personnel piece when outside air is dry, conveniently take out the concrete of depositing in the inside through electric putter push pedal, save access time, when the humidity in the organism, carry out real-time ventilation through air intake and air outlet to the organism, the heating wire work, keep the drying in the organism, prevent that the inside temperature of organism from being too low, according to the real-time variation of outside temperature, each subassembly in the control organism makes corresponding reaction keeps invariable temperature, keep the concrete quality.
However, the above scheme still has the following problems: the water for maintaining the concrete is not subjected to multistage filtration treatment, so that the internal residues cause irrecoverable damage to the whole quality of the concrete, and meanwhile, the internal pressure cannot be adjusted according to the requirement, and the quality of the concrete can be influenced, so that a concrete maintenance device is required to be designed to solve the problems.
Disclosure of Invention
The utility model aims to provide a concrete maintenance device, which solves the problems that in the prior art, water for maintaining concrete is not subjected to multistage filtration treatment, so that internal residues cause irrecoverable damage to the whole quality of the concrete, and internal pressure cannot be regulated according to the requirement, and the quality of the concrete is affected.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a concrete maintenance device, includes removes the maintenance case, remove the inside fixedly connected with concrete maintenance storehouse of maintenance case, remove the inside of maintenance case and be located one side fixedly connected with accuse temperature storehouse of concrete maintenance storehouse, one side fixedly connected with water filtration storehouse of concrete maintenance storehouse is kept away from to accuse temperature storehouse, the inside fixedly connected with water pump of water filtration storehouse, the output fixedly connected with of water pump extends to the first inlet channel in removal maintenance case outside, the inside of water filtration storehouse just is located the below of water pump and installs first filter screen, the inside of water filtration storehouse just is located the below of first filter screen and installs the second filter screen, the inside of water filtration storehouse just is located the below of second filter screen and installs the third filter screen, the inside of removal maintenance case just is located the top fixedly connected with air pump of concrete maintenance storehouse, the output fixedly connected with pressure release pipeline of air pump, the inside of accuse temperature storehouse has offered the cavity, the inside fixedly connected with equidistant fan that distributes, one side fixedly connected with of fan just is close to the inside of first filter screen, the inside of water filtration storehouse just is located the below of second filter screen, the inside of second filter screen is located the below of second filter screen.
Preferably, the light is installed to one side of removal maintenance case, deposit the box is installed to the inside of water filtration storehouse and the below that is located the third filter screen, the spacing groove has been seted up to one side that the temperature control storehouse is close to the concrete maintenance storehouse, the inside of temperature control storehouse and be located one side fixedly connected with electric power storage storehouse that the fan kept away from the heating wire.
Preferably, a drainage pipeline matched with the water filtering bin is arranged on one side of the movable maintenance box and below the illuminating lamp, and a drainage pipeline matched with the concrete maintenance bin is arranged on the other side of the movable maintenance box.
Preferably, the stopper that cooperates fixed use is installed at the top of removal maintenance case and the outside that is located first inlet channel, the one end of pressure release pipeline extends to the inside in concrete maintenance storehouse, the other end of pressure release pipeline extends to the removal maintenance case outside.
Preferably, the first valve is fixedly connected to the outer side of the drainage pipeline, the second valve is fixedly connected to the outer side of the first water inlet pipeline, and the third valve is fixedly connected to the outer side of the drainage pipeline.
Preferably, universal wheels are arranged around the movable maintenance box, a second water inlet pipeline matched with the concrete maintenance bin is arranged on the outer side of the movable maintenance box, and one end of the second water inlet pipeline is connected with the first water inlet pipeline.
Preferably, a control panel is installed on one side of the movable maintenance box and below the lighting lamp, and the lighting lamp, the water pump, the fan, the heating wire, the first valve, the second valve and the air pump are electrically connected with the control panel.
Compared with the prior art, the utility model has the beneficial effects that:
be provided with water filtration storehouse and universal wheel, when using, control panel is opened, it is convenient to have realized removing through installing the universal wheel, place change needs when having satisfied the use, it carries out abundant filtration operation to the maintenance water of concrete maintenance storehouse inside transport, through the water pump operation, it is required to supply required storage water to water filtration storehouse inside through first inlet channel, carry out multistage water purification treatment through first filter screen, second filter screen and third filter screen, the particulate matter of remaining is retrieved through the sedimentation box, use through drainage pipe cooperation second inlet channel and carry out normal discharge, the quality of the maintenance water when having realized carrying out the maintenance to the concrete is controlled, final maintenance quality has been improved, be provided with the accuse temperature storehouse, when the inside temperature of concrete maintenance storehouse needs to regulate and control, all operate through fan and heating wire, carry out the heat transfer through the temperature conduction stick, it is required to have satisfied concrete maintenance temperature, when the inside atmospheric pressure of concrete maintenance storehouse is higher, when the temperature is higher, operate through the air pump, carry out gaseous discharge through the pressure release pipeline, unnecessary safety is reduced, through installing the power equipment's hidden danger, and resource is provided.
Drawings
FIG. 1 is a cross-sectional view of the overall structure of the present utility model;
FIG. 2 is an internal view of the water filter cartridge structure of the present utility model;
FIG. 3 is an internal view of the temperature control cabin structure of the present utility model.
In the figure: 1. moving the maintenance box; 2. a concrete maintenance bin; 3. a temperature control bin; 4. a water filtering bin; 5. a universal wheel; 6. a lighting lamp; 7. a control panel; 8. a drainage pipe; 9. a first water inlet pipe; 10. a discharge conduit; 11. an electric storage bin; 12. a cavity; 13. a precipitation box; 14. a water pump; 15. a first filter screen; 16. a second filter screen; 17. a third filter screen; 18. a fan; 19. heating wires; 20. a temperature conduction rod; 21. a first valve; 22. a second valve; 23. a limit groove; 24. a limiting block; 25. a second water inlet pipe; 26. an air pump; 27. and a pressure release pipeline.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, 2 and 3, the present utility model provides a technical solution: a concrete maintenance device comprises a movable maintenance box 1, a concrete maintenance bin 2 is fixedly connected to the inside of the movable maintenance box 1, a spray component is arranged in the concrete maintenance bin 2, water inflow treatment is matched, a temperature control bin 3 is fixedly connected to the inside of the movable maintenance box 1 and positioned on one side of the concrete maintenance bin 2, temperature control is matched, a water filtering bin 4 is fixedly connected to one side of the temperature control bin 3 away from the concrete maintenance bin 2, multistage filtering is carried out on maintenance water, a water pump 14 is fixedly connected to the inside of the water filtering bin 4, a first water inlet pipeline 9 extending to the outer side of the movable maintenance box 1 is fixedly connected to the output end of the water pump 14, a first filter screen 15 is arranged in the inside of the water filtering bin 4 and positioned below the water pump 14, a second filter screen 16 is arranged in the inside of the water filtering bin 4 and positioned below the first filter screen 15, the third filter screen 17 is arranged in the water filter bin 4 and below the second filter screen 16, the air pump 26 is fixedly connected in the movable maintenance box 1 and above the concrete maintenance bin 2, the pressure release pipeline 27 is fixedly connected to the output end of the air pump 26 for timely internal pressure release, the cavity 12 is arranged in the temperature control bin 3, the equally distributed fans 18 are fixedly connected in the cavity 12, the equally distributed heating wires 19 are fixedly connected to one side of the fans 18, the equally distributed temperature conduction rods 20 are fixedly connected to one side of the temperature control bin 3 close to the concrete maintenance bin 2, when the water filter is used, the control panel 7 is opened, the movement convenience is realized through the universal wheels 5, the requirement of site change in use is met, the maintenance water conveyed into the concrete maintenance bin 2 is fully filtered, and the water pump 14 runs, the water filter bin 4 is internally supplemented with required storage water through the first water inlet pipeline 9, multistage water purification treatment is carried out through the first filter screen 15, the second filter screen 16 and the third filter screen 17, residual particles are recovered through the precipitation box 13, normal discharge is carried out through the water outlet pipeline 8 and the second water inlet pipeline 25, quality control of curing water during curing of concrete is achieved, final curing quality is improved, when the internal temperature of the concrete curing bin 2 needs to be regulated and controlled, the fan 18 and the heating wire 19 are operated, heating is carried out, temperature conduction is carried out through the temperature conduction rod 20, the requirement of concrete curing temperature is met, when the internal air pressure of the concrete curing bin 2 is higher, the air pump 26 is operated, gas discharge is carried out through the pressure relief pipeline 27, unnecessary potential safety hazards are reduced, and the power equipment operation resource is provided through the installation of the power storage bin 11.
Further, the light 6 is installed to one side of removal maintenance case 1, makes things convenient for night operation, and sediment box 13 is installed to the inside of water filtration storehouse 4 and the below that is located third filter screen 17, and limit groove 23 has been seted up to one side that temperature control storehouse 3 is close to concrete maintenance storehouse 2, and the inside of temperature control storehouse 3 just is located one side fixedly connected with electric power storage storehouse 11 that the heating wire 19 was kept away from to fan 18, through installing electric power storage storehouse 11, has provided the resource guarantee of power equipment operation.
Further, a drain pipe 8 matched with the water filtering bin 4 is arranged on one side of the movable maintenance box 1 and below the illuminating lamp 6, a drain pipe 10 matched with the concrete maintenance bin 2 is arranged on the other side of the movable maintenance box 1, and normal tests are carried out in a matched mode.
Further, the stopper 24 that cooperates fixed use is installed at the top of removal maintenance case 1 and the outside that is located first inlet channel 9, and the one end of pressure release pipeline 27 extends to the inside of concrete maintenance storehouse 2, and the other end of pressure release pipeline 27 extends to removal maintenance case 1 outside, has improved sealed effect.
Further, the outer side of the discharge pipeline 10 is fixedly connected with a first valve 21, the outer side of the first water inlet pipeline 9 is fixedly connected with a second valve 22, the outer side of the discharge pipeline 8 is fixedly connected with a third valve, and the first valve and the third valve are matched to be normally opened and closed.
Further, all install universal wheel 5 around removing maintenance case 1, the outside of removing maintenance case 1 is installed the second inlet channel 25 that cooperation concrete maintenance storehouse 2 used, and the one end of second inlet channel 25 is connected with first inlet channel 9, has realized removing conveniently through installing universal wheel 5, has satisfied the place change when using required.
Further, the control panel 7 is installed on one side of the movable maintenance box 1 and below the illumination lamp 6, and the illumination lamp 6, the water pump 14, the fan 18, the heating wire 19, the first valve 21, the second valve 22 and the air pump 26 are electrically connected with the control panel 7, so that integral normal operation is realized.
Specifically, when the utility model is used: when the concrete curing warehouse is used, the control panel 7 is opened, the movement convenience is realized through installing the universal wheel 5, the requirement of site change during use is met, the full filtering operation is carried out on the curing water conveyed to the inside of the concrete curing warehouse 2, the water pump 14 is operated, the required storage water is supplemented to the inside of the water filtering warehouse 4 through the first water inlet pipeline 9, the multistage water purification treatment is carried out through the first filter screen 15, the second filter screen 16 and the third filter screen 17, the residual particles are recovered through the sedimentation box 13, the normal discharge is carried out through the water discharge pipeline 8 and the second water inlet pipeline 25, the quality control of the curing water during curing of the concrete is realized, the final curing quality is improved, when the internal temperature of the concrete curing warehouse 2 needs to be regulated and controlled, the fan 18 and the electric heating wire 19 are operated, the heating is carried out, the temperature conduction is carried out through the temperature conduction rod 20, the requirement of the concrete curing temperature is met, when the internal air pressure of the concrete curing warehouse 2 is higher, the temperature is higher, the air is operated through the air pump 26, the unnecessary potential safety hazards are reduced through the pressure relief pipeline 27, the power equipment is provided through the installation of the electric power equipment, and the power equipment is ensured.
In the description of the present utility model, it should be understood that the terms "coaxial," "bottom," "one end," "top," "middle," "another end," "upper," "one side," "top," "inner," "front," "center," "two ends," etc. indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
Furthermore, the terms "first," "second," "third," "fourth," and the like are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, whereby features defining "first," "second," "third," "fourth" may explicitly or implicitly include at least one such feature.
In the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "configured," "connected," "secured," "screwed," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intermediaries, or in communication with each other or in interaction with each other, unless explicitly defined otherwise, the meaning of the terms described above in this application will be understood by those of ordinary skill in the art in view of the specific circumstances.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. A concrete maintenance device comprising a mobile maintenance box (1), characterized in that: the inside fixedly connected with concrete maintenance storehouse (2) of removal maintenance case (1), the inside of removal maintenance case (1) just is located one side fixedly connected with accuse temperature storehouse (3) of concrete maintenance storehouse (2), one side fixedly connected with water filtration storehouse (4) of accuse temperature storehouse (3) keep away from concrete maintenance storehouse (2), the inside fixedly connected with water pump (14) of water filtration storehouse (4), the output fixedly connected with of water pump (14) extends to first inlet channel (9) in removal maintenance case (1) outside, the inside of water filtration storehouse (4) just is located the below of water pump (14) and installs first filter screen (15), the inside of water filtration storehouse (4) just is located the below of first filter screen (15) and installs second filter screen (16), the inside of water filtration storehouse (4) just is located the below of second filter screen (16) and installs third filter screen (17), the inside of removal case (1) just is located the top fixedly connected with air pump (26) of concrete maintenance storehouse (2), air pump (26) are connected with air pump (26) and are located the inside of removal case (4) and are connected with air pump (12), cavity (18) are connected with each other in a certain way, cavity (12) is opened to the inside of the pressure control fan (12), one side of fan (18) fixedly connected with equidistance distributed heating wire (19), one side that accuse temperature storehouse (3) are close to concrete maintenance storehouse (2) fixedly connected with equidistant distributed temperature conduction stick (20).
2. The concrete maintenance device according to claim 1, wherein: the utility model discloses a concrete electric power storage device, including removal maintenance case (1), deposit box (13) are installed to the inside of water filtration storehouse (4) and be located the below of third filter screen (17), spacing groove (23) have been seted up to one side that temperature control storehouse (3) are close to concrete maintenance storehouse (2), the inside of temperature control storehouse (3) just is located one side fixedly connected with electric power storage storehouse (11) that heating wire (19) were kept away from to fan (18).
3. A concrete maintenance device according to claim 2, wherein: the movable maintenance box is characterized in that a drainage pipeline (8) matched with the water filtering bin (4) is arranged on one side of the movable maintenance box (1) and below the illuminating lamp (6), and a drainage pipeline (10) matched with the concrete maintenance bin (2) is arranged on the other side of the movable maintenance box (1).
4. The concrete maintenance device according to claim 1, wherein: the top of removal maintenance case (1) just is located the outside of first inlet channel (9) and installs stopper (24) of cooperation fixed use, the inside of concrete maintenance storehouse (2) is extended to one end of pressure release pipeline (27), the other end of pressure release pipeline (27) extends to removal maintenance case (1) outside.
5. A concrete curing device according to claim 3, characterized in that: the outside fixedly connected with first valve (21) of exhaust pipe (10), the outside fixedly connected with second valve (22) of first inlet channel (9), the outside fixedly connected with third valve of exhaust pipe (8).
6. The concrete maintenance device according to claim 1, wherein: universal wheels (5) are arranged around the movable maintenance box (1), a second water inlet pipeline (25) matched with the concrete maintenance bin (2) is arranged on the outer side of the movable maintenance box (1), and one end of the second water inlet pipeline (25) is connected with the first water inlet pipeline (9).
7. The concrete maintenance device according to claim 5, wherein: one side of the movable maintenance box (1) and the lower part of the illuminating lamp (6) are provided with a control panel (7), and the illuminating lamp (6), the water pump (14), the fan (18), the heating wire (19), the first valve (21), the second valve (22) and the air pump (26) are electrically connected with the control panel (7).
CN202222741914.6U 2022-10-18 2022-10-18 Concrete maintenance device Active CN219213537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222741914.6U CN219213537U (en) 2022-10-18 2022-10-18 Concrete maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222741914.6U CN219213537U (en) 2022-10-18 2022-10-18 Concrete maintenance device

Publications (1)

Publication Number Publication Date
CN219213537U true CN219213537U (en) 2023-06-20

Family

ID=86734120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222741914.6U Active CN219213537U (en) 2022-10-18 2022-10-18 Concrete maintenance device

Country Status (1)

Country Link
CN (1) CN219213537U (en)

Similar Documents

Publication Publication Date Title
CN109045895B (en) Road administration facility for monitoring urban environment
CN205532142U (en) Haze window is removed to solar energy intelligence
CN208777575U (en) A kind of solar energy green building with water saving fixtures
CN115854474B (en) Auxiliary material conveying mechanism for high-integration purifying system
CN208490098U (en) A kind of high efficiency and heat radiation PLC control cabinet
CN219213537U (en) Concrete maintenance device
CN109025082A (en) A kind of solar energy green building with water saving fixtures
CN208317960U (en) A kind of intelligent control regulating device for Shui nationality raising
CN207445794U (en) A kind of energy conservation and environmental protection Water curtain style dust collector
CN114130159A (en) Composite purification and adsorption device for VOCs organic waste gas
CN209200389U (en) A kind of power distribution cabinet with defrosting function
CN208465602U (en) A kind of new multistage formula flue gas desulfurization spray tower
CN209034042U (en) A kind of high-temperature oil smoke deodorization combined treatment device
CN203464798U (en) Light closed cooling tower
CN208194041U (en) A kind of device of active carbon adsorption removing VOC
CN207849561U (en) A kind of air humidification purification intelligent air condition
CN212081491U (en) Indoor haze-preventing purification system
CN216204098U (en) Wisdom hospital ward is with outer hanging air purification lighting mechanism
CN219547067U (en) Gas outlet purifying and then discharging ion nitriding furnace
CN219848820U (en) Chemical fiber oven waste gas high-efficiency purifying device convenient to clear up
CN215842231U (en) Intelligent integrated lifting pump station
CN218820472U (en) Smoke exhaust system capable of intelligently adjusting temperature
CN219390007U (en) Air sterilizer with multiple sterilization effects
CN216075767U (en) Intelligent thing networking building curtain
CN219730544U (en) Novel chlorine purification device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant